Fact-checked by Grok 2 weeks ago

Tainter gate

A Tainter gate, also known as a radial gate, is a type of or crest gate used in and locks to regulate water flow, consisting of a curved cylindrical skinplate reinforced by structural ribs, girders, and radial arm struts that pivot about horizontal trunnions to open or close under hydraulic pressure. These gates typically range from a few feet to 110 feet in width and up to 50 feet in , constructed primarily from with components like pins and bushings made of stainless or , , or self-lubricating materials to withstand hydrostatic loads, self-weight, and . Operated via hydraulic cylinders, wire ropes, or chain hoists, they enable efficient , normal water passage, and testing while requiring minimal manpower due to their design leveraging water pressure for movement. Invented in 1886 by Wisconsin engineer Jeremiah Burnham Tainter (1836–1920), the gate was originally developed as an improvement on earlier designs at the Knapp, Stout & Co. lumber mill in , to facilitate the transport of log rafts down the Red Cedar River by precisely controlling water release from the mill's dam forming Lake Menomin. Tainter, who had joined the mill as a in 1862, drew on his expertise in and to create a more reliable and labor-efficient mechanism, patenting the design that same year. The innovation addressed challenges in the lumber industry by allowing rapid adjustments to water levels without excessive manual effort, marking a significant advancement in for the era. Since its introduction, the Tainter gate has become a standard component in water management infrastructure worldwide, with over 321 installed in the Basin alone and 195 in the Basin, including major sites like Bonneville and Dams. Its adoption extends to international projects in countries such as the , , and , where it supports flood mitigation, , navigation locks, and hydropower generation due to its durability, ease of operation, and ability to handle large-scale water volumes. Despite its reliability, historical incidents like the 1995 partial failure at —caused by corrosion-induced friction and inadequate arm strength—have prompted enhanced inspection protocols by agencies such as the U.S. Bureau of Reclamation and the to ensure ongoing safety.

History and Development

Invention

The Tainter gate was invented by Jeremiah Burnham Tainter, a structural engineer born in 1836 in Prairie du Chien, Wisconsin who moved to Menomonie, Wisconsin, in 1862 at the age of 26 to join his brother Andrew as an employee of the Knapp, Stout & Co. lumber company. Tainter's work at the company involved addressing practical challenges in water management for the lumber industry, which relied on dams to impound water for seasonal log drives. By the mid-1880s, the firm operated a large dam on the Red Cedar River at Menomonie, forming Lake Menomin, a reservoir essential for storing floodwaters to transport millions of board feet of lumber downstream to the Chippewa River and markets in the Mississippi Valley. The invention emerged in 1886 from Tainter's efforts to redesign an existing but inefficient sluice system used in eastern dams, which required excessive manual labor to operate under high water pressure. Motivated by the need for a more reliable mechanism to rapidly release impounded water during log drives—allowing crews to flush thousands of logs over the without structural or prolonged effort—Tainter developed the gate specifically for installation in the Knapp, Stout & Co. that year. This context of industrial lumber operations, where timely water control directly impacted productivity and profitability, drove the innovation to prioritize ease of manipulation and durability in high-flow environments. The key innovation of the Tainter gate lies in its radial arm configuration, where the gate leaf forms a cylindrical sector supported by curved arms pivoting on pins located above the sill, enabling water pressure to act nearly perpendicular to the gate's surface and thereby balance its weight for smoother operation with reduced mechanical input. This design minimized the torque required for raising and lowering, contrasting with flat gates that bore unbalanced hydrostatic forces. Tainter secured U.S. No. 344,878 for his "Sluiceway-Gate" on July 6, 1886, following an application filed on November 16, 1885, which detailed the truss-supported structure, hoisting chains, and self-sealing features tailored to withstand the rigors of lumber dam applications.

Early Adoption

The first installation of the Tainter gate occurred in 1886 at the Knapp, Stout and Co. dam on the Red Cedar River in , where it was employed to control flow for lumber mill operations. This implementation demonstrated superior flow control compared to earlier vertical lift gates, as the radial design allowed for rapid release of to float logs downstream while requiring less manual effort to operate. The gate's efficiency stemmed from its ability to harness the 's rush to assist in opening and closing, marking a significant improvement over clumsier predecessor designs. By the early , Tainter gates saw widespread adoption in major U.S. river systems, including the Upper Mississippi and Rivers, owing to their suitability for high-head environments where precise flow regulation was essential. On the Upper Mississippi, the U.S. Army Corps of Engineers integrated them into the 9-Foot Channel Project starting in the 1930s to replace older roller gates, enhancing navigation and flood control. Similarly, in the Basin, early projects like (constructed 1933–1937) incorporated Tainter gates in their spillways to manage substantial water volumes. A pivotal example of this integration was Lock and Dam No. 7 on the near , constructed and placed in operation by the U.S. Army Corps of Engineers in 1935, featuring 11 Tainter gates alongside roller gates for improved operational reliability. The adoption was driven by the gate's hydrostatic balance, where the radial shape efficiently transfers water pressure to the pivot, minimizing net torque and thus reducing the hoist capacity and operator effort needed compared to non-radial designs. This recognition of the design's mechanical advantages, formalized in Jeremiah Burnham Tainter's 1886 patent (U.S. Patent No. 344,878), facilitated commercial licensing and further refinements, accelerating its proliferation in hydraulic engineering.

Design and Components

Structural Elements

The Tainter gate features a radial consisting of a sector of a , resembling a slice, which allows it to efficiently for water control in spillways and structures. This curved enables the gate to rotate about horizontal pins located at the center of the cylindrical sector's , offset upstream from the skinplate, balancing hydrostatic forces so that the resultant pressure line passes through the axis, thereby minimizing operational torques. Key structural components include the skinplate, a curved metal sheet forming the upstream face against the , stiffened by vertical such as T-sections to act compositely under load; trunnion arms, which are radial s extending from the end frames and converging at the trunnion hubs to on the pins; girders spanning the gate's width to the skinplate ; and end frames comprising radial struts and bracing for overall stability. The skinplate often includes top extensions of a smaller radius serving as attachment points for the hoist , typically wire ropes or chains. Trunnion pins are positioned at the convergence point of the radial arms, offset upstream from the skinplate, with arms limited to a maximum of four per side to optimize load transfer. The geometry emphasizes a cylindrical sector with a radius generally equal to or greater than the gate height—up to four times the height in navigation applications—and a sector of 60 to 90 degrees to ensure balanced rotation and hydraulic efficiency. Horizontal girders are spaced 4 to 6 feet apart, while end frames may be inclined to reduce flexural stresses on the structure. Size variations accommodate diverse hydraulic requirements, with gate heights ranging from 10 to 100 feet and widths from 10 to 100 feet or more, often matching the bays of spillways or lock chambers for seamless integration. For instance, spillway gates may reach heights of 75 feet and widths up to 110 feet, while navigation gates tend toward wider but shorter profiles.

Materials and Fabrication

Tainter gates constructed prior to the primarily utilized mild , such as ASTM A36 equivalents, for the skinplate and structural arms to provide sufficient strength under hydrostatic loads. Cast components, including hubs conforming to ASTM A27, were employed for to enhance against and . The fabrication of early Tainter gates relied on riveted connections for assembling the skinplate, arms, and reinforcing elements, which offered reliable joints but required labor-intensive processes. Skinplates were rolled to the required radius and riveted to vertical ribs and horizontal girders, while were cast and machined for precise alignment. Assembly often omitted extensive , relying instead on the inherent toughness of the materials. A significant evolution occurred with the transition from riveted to welded fabrication starting in the mid-20th century, which improved structural integrity by eliminating potential failure points at holes and allowing for more efficient load . This shift, widely adopted by the 1950s, enabled the use of full-penetration welds compliant with AWS D1.1 standards, particularly beneficial for thicker sections exceeding 38 mm. Since the 1970s, systems have been incorporated in corrosive environments, such as coastal installations, to mitigate electrochemical degradation through impressed current anodes. In contemporary designs, high-strength low-alloy steels like ASTM A572 Grade 50 are favored for skinplates, arms, and girders due to their enhanced strength and resistance to atmospheric . Stainless steel bushings (e.g., ASTM A240 Type 304) and pins (ASTM A564 Type 630) are standard for trunnions to reduce friction and prevent . -based coatings, such as or Amerlock 400, are applied post-fabrication to provide a barrier against and salts, often in multiple layers for submerged components. Modern fabrication begins with rolling the skinplate to its cylindrical radius, followed by it to T-section and arms using submerged arc or shielded metal arc processes for smooth transitions. Trunnions are precision-machined from forged or cast , with bushings inserted for bearing surfaces, and the entire assembly undergoes stress-relieving at 600–650°C to minimize residual stresses from . Gates are typically shop-fabricated in segments to facilitate transport, with field welds limited to low-stress areas and inspected via . The skinplate's curvature aids in uniform pressure distribution during operation.

Operating Principle

Mechanics of Operation

The Tainter gate operates through a rotational centered on a axis, allowing the to swing upward from its sealed position against the sill to permit controlled . The gate structure features a curved skin plate forming a segment of a , reinforced by girders or arches and supported by radial arms that connect to pins anchored in the walls. When closed, the skin plate seals tightly against the sill and side seals, preventing leakage; during opening, applied to the trunnions raises the lower edge of the skin plate, creating an opening beneath the for flow. This radial geometry ensures smooth rotation with minimal binding, as the is typically positioned at approximately one-third of the gate height above the sill to optimize load distribution. Hydrostatic pressure from the upstream plays a critical role in facilitating movement by generating a net that assists opening, while downstream pressure provides . The curved profile of the skin plate directs upstream forces nearly tangent to the surface, resulting in a moment arm that aligns closely with the axis, thereby reducing the external needed and achieving a near-neutral balance under balanced head conditions. This design leverages the vertical component of hydrostatic force for partial support, minimizing operational loads, though submergence on both sides alters the net based on differential heads. Actuation is achieved by applying to the assembly using methods such as or chain hoists, where cables attach to the gate's end frames or skin plate and wind around drums driven by electric or hydraulic motors. Alternative systems employ hydraulic cylinders mounted on the piers at an angle (often 45 degrees when closed) or gear-driven mechanisms like bull gears or rack-and-pinion drives to rotate the gate. These systems account for at trunnions and , with a typical load factor of 1.4 applied in design; full travel from closed to open positions generally requires 1 to 5 minutes, depending on gate size and hoist capacity. For flow regulation, partial gate openings create a submerged or free orifice beneath the skin plate. For free flow (tailwater depth h_2 < gate opening h_g), discharge is governed by Q = C B h_g \sqrt{2g h_1}, where Q is discharge, C is the discharge coefficient (typically 0.6–0.8), B is gate width, h_g is gate opening height, g is gravity, and h_1 is upstream head above sill. For submerged flow (h_2 > h_g), Q = C B h_g \sqrt{2g (h_1 - h_2)}, where C decreases with increasing submergence ratio h_2 / h_g (e.g., from ~0.8 at low submergence to ~0.6 at high submergence), enabling precise of rates without full opening.

Force and Stress Analysis

The force and of a Tainter gate focuses on the hydrostatic loads from differentials, which are the primary design drivers, along with secondary effects from and dynamic conditions. The gate's radial positions the at the center of , ensuring that the resultant hydrostatic acts along a line passing through the pivot point. The radial positions the at the center of , ensuring the resultant hydrostatic from upstream passes through the pivot point, resulting in zero net from hydrostatic loads independent of head difference. Downstream pressures on the sill and seals contribute negligibly. Thus, \tau = 0 for hydrostatic forces due to the aligning with the . Structural stresses arise from these loads transmitted through the gate's components, including the skin plate, radial , and . stresses in the skin plate and girders are calculated using \sigma = \frac{M y}{I}, where M is the , y is the from the , and I is the ; moments peak near the trunnion under full head conditions, often reaching hundreds of kip-inches in large gates. Shear stresses in the and struts handle transverse loads, with maximum allowable values limited to 0.75 times the yield strength F_y during dynamic events per AISC specifications. Bearing stresses on the trunnions, influenced by pin and reaction forces, are kept below 1,500 (up to 2,500 with ), with coefficients ranging from 0.1 for well-maintained bushings to 0.3 for degraded ones, contributing additional moments of up to F_t = \mu R r_p where \mu is the , R is the reaction force, and r_p is the pin radius. Dynamic loads, such as , impacts, and seismic forces, superimpose on static hydrostatic conditions and can increase total loads by 20-50% depending on site specifics. and are typically modeled as uniform loads of 5 kips/ft over a 2-ft depth or concentrated at low elevations, while seismic hydrodynamic pressures follow Westergaard's equation p = \frac{7}{8} \gamma_w a_c H y / \sqrt{H}, where \gamma_w is unit weight, a_c is crest , H is head, and y is depth. These are incorporated into load combinations using Load and Resistance Factor Design (LRFD), with factors like 1.4 for hydrostatic and 1.0 for seismic, ensuring an interaction ratio below 1.0 for stability. Design factors of safety typically range from 1.5 to 2.0, achieved through resistance factors \phi \approx 0.9 and allowable stresses at 0.5F_y for critical components. In the 1995 Folsom Dam incident, led to stress concentrations in the assemblies, amplifying bending moments and causing under operational friction loads with coefficients of 0.22-0.3, highlighting the need for corrosion-resistant materials and regular inspections to maintain design margins.

Applications

Dams and Spillways

Tainter gates play a critical role in spillways by regulating the release of excess water to prevent structural overtopping during flood events, thereby safeguarding the and downstream areas while enabling effective reservoir management for and generation. These radial gates allow operators to adjust flow dynamically, maintaining optimal reservoir levels and minimizing in spillway channels through controlled discharge. In spillway applications, Tainter gates can handle substantial peak flows, with individual gates capable of discharging up to approximately 100,000 cubic feet per second (cfs) under design conditions, as exemplified by the spillway at on the , where 18 such gates collectively manage over 2 million cfs during extreme events. This capacity supports flood routing by modulating outflows in response to inflow variations, reducing downstream flood risks without requiring oversized fixed structures. By providing precise control over levels, Tainter gates enhance capacity compared to fixed- spillways, which spill uncontrollably once the crest is exceeded; gated systems allow reservoirs to be drawn down only as needed, significantly increasing usable volume and operational flexibility for seasonal demands. This adjustability is particularly valuable in multi-purpose dams, where it optimizes for , flood attenuation, and power production without compromising . Tainter gates are extensively deployed across major U.S. river basins, with over 150 installations documented in U.S. Army of Engineers projects alone, including numerous examples in the (such as Locks and Dams 5 and 26) and the basin (such as Lower Granite Dam). They are common in large-scale dams like , where their radial design facilitates integration into frameworks for reliable performance. The gates' radial arm configuration, pivoting on trunnions, makes them ideal for high-head applications—up to several hundred feet—where vertical lift gates would experience excessive unbalanced forces and potential failure; this setup efficiently transfers hydrostatic loads to the supporting piers, enabling use in deep reservoirs that demand robust . Tainter gates play a crucial role in river systems, particularly in maintaining consistent water levels for safe passage through canal locks and . In these structures, the gates are typically installed across the adjacent to the lock chamber, where they regulate the upstream elevation to support the 9-foot navigation channel required for traffic. By raising or lowering the gates, operators adjust water flow to create or sustain the necessary head differential, allowing locks to raise or lower vessels between pool levels without excessive or delays. This ensures efficient for shipping, as the gates seal tightly against walls to prevent leakage and maintain hydraulic control during operations. In lock operations, Tainter gates facilitate the or lowering of levels in the lock chamber to match upstream and downstream conditions, enabling vessels to navigate changes. The , often arranged in series across the , on trunnions to open partially or fully, controlling while sealing against walls to isolate the lock chamber during filling or emptying cycles. This setup is essential for handling large volumes of quickly, minimizing wait times for tows in busy waterways. Multiple synchronized per allow precise management, with operators coordinating their positions via hydraulic or electric hoists to achieve the desired level. Sizing of Tainter gates for navigation structures is tailored to accommodate barge traffic, with typical widths ranging from to feet to match lock chamber dimensions and allow passage of multi-barge tows. For instance, gates are spaced between piers at 110-foot intervals to align with 110-by-600-foot locks, ensuring unobstructed movement once pool levels are stabilized. In systems with heavy commercial use, such as riverine dams, multiple gates—often 10 to 15 per structure—are synchronized to handle varying flows while supporting locks designed for 1,200-ton barge capacities. Prominent examples of Tainter gate applications in include the locks along the , where over such support a network of 29 lock-and-dam sites from to . At sites like Lock and Dam No. 21 near , 10 submersible elliptical Tainter gates, each 64 feet wide and 20 feet high, maintain pool levels with a maximum lift of 10.5 feet, enabling year-round commercial navigation of , , and cargoes. Similarly, Lock and Dam No. 24 near Clarksville, Missouri, features 15 fully submersible Tainter gates spanning 1,340 feet, providing a 15-foot lift while regulating flows for the 9-foot channel that handles approximately 30 million tons of cargo annually. These installations demonstrate how Tainter gates underpin reliable vessel passage in one of North America's busiest inland waterways. Adaptations such as Tainter gate designs enhance efficiency in systems by allowing auxiliary during lock cycles, thereby reducing overall transit times. These can be lowered into recesses below the sill level, permitting controlled water passage under the without fully interrupting lock operations or requiring vessels to wait for pool adjustments. In the Upper and systems, submersible variants—often elliptical in shape for better hydraulic performance—facilitate ice and debris passage or supplemental filling/draining. This feature is particularly valuable in variable-head environments, where brief references to stress considerations from fluctuating water levels underscore the need for robust supports.

Advantages and Limitations

Operational Benefits

Tainter gates offer notable primarily due to their radial design, which achieves hydrostatic balance by aligning the gate's curved surface with the resultant hydrostatic force vector. This configuration transfers water pressure directly through the trunnions to the supporting structure, resulting in low operating torque that requires only a fraction of the hoist capacity needed for vertical lift gates—often allowing via manual mechanisms or small electric motors without excessive power demands. The durability of Tainter gates stems from their structural geometry, which minimizes leakage through effective sealing with rubber J-bulb side seals and sharp-edged bottom lips, while the radial arms and skin plate evenly distribute loads to reduce wear on . Many installations demonstrate long service lives, with a typical design expectancy of at least 50 years and examples from , such as those at Lock and Dam 5, remaining functional after over 80 years of operation when protected against via coatings and cathodic systems. In terms of versatility, Tainter gates excel in managing high water heads up to 75 feet (23 meters) and wide spans reaching 110 feet (34 meters), proving cost-effective for openings greater than 20 feet (6 meters) where alternatives like gates may falter under similar conditions. Their smooth radial motion and absence of vertical slots enable better handling of debris and ice compared to or gates, facilitating reliable flow control in spillways and navigation locks without frequent jamming. Relative to other gate types, Tainter gates provide superior simplicity over Stoney roller gates by obviating the need for counterweights, roller chains, and complex lifting assemblies, which lowers both initial costs and operational complexity while maintaining efficient discharge characteristics.

Challenges and Maintenance

Tainter gates exhibit several limitations that impact their long-term reliability and deployment. A primary concern is their vulnerability to , particularly in the assemblies, where pins and bushings can degrade due to exposure to and , leading to increased coefficients that rise from approximately 0.15 in new conditions to 0.22–0.3 in corroded states. This can exacerbate moments on arms, potentially causing structural distress under operational loads. Additionally, constructing large Tainter gates incurs high initial costs owing to the complexity of their radial design, heavy fabrication, and robust anchoring systems required for spans exceeding 20 meters. In ice-prone regions, these gates face operational difficulties from buildup on the skinplate and seals, as well as dynamic loads from breaking jams, which can hinder smooth rotation and increase stress during winter pool management. Maintenance of Tainter gates is essential to mitigate these limitations and ensure operational integrity, typically involving routine protocols outlined by agencies like the U.S. Bureau of Reclamation and U.S. Army Corps of Engineers. Annual or biennial visual inspections are recommended to detect in critical areas such as and welds, using tools like ultrasonic thickness gauges to measure material loss and assess structural capacity. of bushings and pins must be performed regularly—often quarterly for high-use gates—to minimize and prevent binding, with grease fittings designed for underwater application where necessary. Gate cycling, or periodic full-range operation, is advised at least monthly during non-flood seasons to avoid from or buildup. Seals on the gate's radial face require for and every 10–20 years, depending on exposure to abrasive debris, to maintain watertightness and prevent leakage-induced . Common operational issues further underscore the need for vigilant upkeep. accumulation, such as branches or , can lodge in the area or along the gate lip, causing uneven lifting and increased hoist loads that strain the operating machinery. Many older installations, built before the 1970s, lack adequate seismic resistance under modern standards, necessitating retrofits like reinforced girders or additional bracing to withstand earthquake-induced accelerations up to 0.5g. To address these challenges, contemporary mitigations have evolved since the , incorporating and . Epoxy-based or zinc-rich coatings applied to components provide superior resistance compared to older paints, extending service life by reducing pitting in submerged zones. Additionally, remote monitoring systems with strain gauges, position sensors, and Supervisory Control and Data Acquisition () integration enable real-time detection of anomalies or misalignment, allowing without the structure.

Notable Examples

Major Installations

One of the prominent U.S. installations of Tainter gates is at Ice Harbor Dam on the in , constructed between 1956 and 1962 as part of the U.S. Army Corps of Engineers' navigation and projects. The dam features a with ten Tainter gates, each measuring 50 feet wide and approximately 53 feet high, allowing for controlled flood releases and supporting a powerhouse with six generating units. These gates facilitate the management of high flows in the Snake-Columbia River system, contributing to regional , power generation, and fish passage infrastructure. Another significant U.S. example is John H. Kerr Dam (also known as Buggs Island Dam) on the River in , completed in 1953 by the U.S. Army Corps of Engineers. It incorporates 22 Tainter gates on its , each 42 feet wide by 32 feet high, enabling overflow control for one of the largest reservoirs east of the and supporting flood risk management across the region. The gates are integral to the dam's operation, which includes a 225-megawatt powerhouse and maintains downstream flows through integrated gates. Internationally, Tainter gates (often referred to as radial gates) play a key role in China's on the River, the world's largest project, with construction spanning 1994 to 2009. The spillway features 23 radial gates, each 22 meters wide by 18 meters high, supporting for a basin affecting over 400 million people and generating 22,500 megawatts of power. These installations demonstrate the gates' scalability in mega-projects, where they handle extreme discharges exceeding 100,000 cubic meters per second. In , Tainter gates are utilized in navigation structures in the , where they support water level regulation for inland networks. Tainter gates have also enabled key water diversion projects in early 20th-century , underscoring their role in integrating with power systems on a large scale.

Incidents and Failures

One of the most significant incidents involving a Tainter gate occurred on , 1995, at in , where Spillway Gate No. 3 failed during routine operation with a nearly full . The failure was triggered by excessive trunnion , exacerbated by on the carbon steel pins, leading to uneven loading and of the gate's arm struts at a bolted connection; the gate's lacked sufficient stiffness and strength to accommodate the elevated of 0.22–0.28. This resulted in an uncontrolled release of approximately 40,000 cubic feet per second from the , though no injuries or fatalities occurred. The (USBR) led a multi-agency forensic , conducting over 30 tests and analyses that confirmed and inadequate accounting for trunnion in the original as primary factors. Failures of Tainter gates under normal operational conditions are exceedingly rare, with the USBR reporting only one such event across its inventory of 314 spillway radial gates, representing about 20,000 gate-years of service and a base of approximately 5 × 10^{-5} per gate-year—well below 0.1%. Despite this low incidence, the high-consequence potential in populated downstream areas underscores the need for vigilant oversight, as even isolated failures can lead to significant risks. Other operational challenges, such as accumulation causing gate jams at navigation dams or overload during extreme , have been documented in US Army Corps of Engineers (USACE) structures, though these rarely escalate to structural collapse. In January 2024, a Tainter gate at the Black River Canal in , sustained damage from accumulation during floodwaters, leading to operational issues and requiring and repairs by city officials. The incident highlighted vulnerabilities to environmental in urban waterway management, with the gate reopening after maintenance in May 2024. The Folsom incident prompted key lessons for Tainter gate and , including the of regular non-destructive testing (NDT) to monitor and in pins and bushings. Post-failure upgrades at and similar sites incorporated self-lubricating bushings to keep below 0.1, pins, sealed bearings to mitigate , and additional bracing on gate arms for enhanced ; broader USBR initiatives evaluated 78 radial gates nationwide, leading to recommendations for oversizing fracture-critical components by 15% and improved hoisting systems with to prevent uneven operation. These measures have since informed programs, emphasizing proactive that accounts for second-order effects like -induced stresses.

References

  1. [1]
    [PDF] Chapter G-1 - Bureau of Reclamation
    Jul 1, 2019 · G-1.1.1 Introduction. Radial gates (sometimes referred to as Tainter gates) consist of a cylindrical skinplate reinforced by vertical or ...
  2. [2]
    Tainter Gate - Dunn County Historical Society
    Used in dams and locks throughout the world, the Tainter Gate was developed at the Knapp-Stout lumber mill in Menomonie.Missing: definition | Show results with:definition
  3. [3]
    Tainter, Jeremiah Burnham 1836 - 1920 | Wisconsin Historical Society
    Invented the Tainter Gate. This device is used in water control dams and locks throughout the world; there are 321 Tainter Gates on the Mississippi River Basin.
  4. [4]
    [PDF] DETAILED RADIAL GATE INSPECTION REPORTS
    May 1, 2017 · The FERC Tainter Gate Initiative (TGI) was implemented in 1998 following the forensic investigation into the failure of a radial spillway gate ...<|control11|><|separator|>
  5. [5]
    The U.S. Army Corps of Engineers' 9-Foot Channel Project on the ...
    Feb 1, 2008 · In May 1935, Corps engineers initiated a new kind of submersible Tainter gate at Dam No. 18, located in the Rock Island District. On this new ...
  6. [6]
    US344878A - Sluiceway-gate - Google Patents
    TAINTER. SLUIG'EW'AY GATE. No. 344,878. Patented Jul 6,1886. Units rarns Parent union. JEREMIAH BURNHAM TAINTER, OF MENOMONEE, WISCONSIN,. SLUHCEWAY GATE.
  7. [7]
    Lock & Dam 7 - US Army Corps of Engineers, St. Paul
    Constructed and placed in operation in 1935. The site underwent major rehabilitation from 1989 through 2002. Dam consists of concrete structure 940 feet long, ...Missing: 1936 | Show results with:1936
  8. [8]
    [PDF] ETL 1110-2-2105, "Design of Hydraulic Steel Structures"
    Jun 30, 2014 · Advantages of tainter gates include that: ... Loads that are applicable to tainter gate design include gravity loads, hydrostatic loads, operating ...
  9. [9]
    [PDF] Design of Spillway Tainter Gates - DTIC
    Jan 1, 2000 · This manual provides guidance for the design, fabrication, and inspection of spillway tainter gates, trunnion girder, and trunnion girder ...
  10. [10]
    [PDF] TABLE OF CONTENTS - Bureau of Reclamation
    Jul 1, 2019 · G-3.1.1 Introduction. Radial gates (sometimes referred to as Tainter gates) consist of a cylindrical skin plate reinforced by vertical or ...
  11. [11]
    [PDF] SPECIFICATION: TAINTER GATES
    This specification relates to the design, materials of construction, fabrication, and furnishing of the tainter gate with appurtenant seals, side seal ...
  12. [12]
    [PDF] CECW-CE - Manual No. 1110-2-2704 - USACE Publications
    Jul 12, 2004 · This manual provides guidance for the selection, design, installation, operation, and maintenance of cathodic protection systems (CPSs) for ...
  13. [13]
    None
    Summary of each segment:
  14. [14]
    None
    Below is a merged summary of Tainter Gate Mechanics from EM 1110-2-2107, consolidating all information from the provided segments into a comprehensive response. To retain maximum detail, I’ve organized key aspects into a dense table format where applicable (e.g., quantitative data and equations), followed by narrative summaries for qualitative aspects. All unique details, including URLs, equations, and examples, are preserved.
  15. [15]
    [PDF] EM 1110-2-2602 - USACE Publications
    Sep 30, 1995 · Tainter gate sills are of two dis- tinct types from the ... much longer operation time--approximately 3 to 5 min. This type of ...
  16. [16]
    [PDF] DISCHARGE RATINGS FOR TAINTER GATES AND ROLLER ...
    NGVD of 1912 is still used throughout the Mississippi River navigation system. ... tainter gates operate between pier walls with 35-ft openings and are 15 ft ...
  17. [17]
    [PDF] General Purpose Computer-Aided Analysis and Design of Tainter ...
    Both hand and computer analysis procedures are based upon highly approximate simplifications of the tainter gate structure's behavior. For example, several ...
  18. [18]
    [PDF] Spillway Deflectors at Bonneville, John Day and McNary Dams on ...
    was maintained by the spillway gates. The tailvater elevations fur- t. nished by NPW were controlled by a vaned 'tailgate and were set 'at a gage on the ...
  19. [19]
    [PDF] Hydraulic Design of Spillways - USACE Publications
    Aug 31, 1992 · is the maximum head on the crest where the gate controls the. The maximum gate opening for which tainter gates will control the discharge ...
  20. [20]
    [PDF] A Risk Based Framework for Evaluating Gated Spillway Operations
    Jun 30, 2016 · Gated spillways offer specific advantages over fixed crest spillways, including significant discharge capacity within a given spillway width and ...
  21. [21]
    Lifting force acting on a gate with high head - ScienceDirect
    The hydrodynamic lifting force acting on a gate with high head is one of the key factors concerning the safety and reliability of gates.
  22. [22]
    [PDF] Em 1110-2-2610 Mechanical and Electrical Design for lock and ...
    Jun 30, 2013 · gate structure. Cathodic protection should be installed on those portions of the gates submerged at normal pool levels. The faces of the ...
  23. [23]
    [PDF] Chapter G-2 - Bureau of Reclamation
    Jul 1, 2019 · There are multiple gate types used in flood control and navigation dams that could fail and affect the operation of the dam or lead to a dam ...
  24. [24]
    [PDF] Lock and Dam 25 - Army.mil
    Lock Chamber: 110 feet wide by 600 feet long. • Average Lift of Lock: 15 ft. • Dam Length: 1,296 feet. • Dam Tainter Gates: Fourteen-60 feet.
  25. [25]
    [PDF] Lock and Dam 24 - Army.mil
    Lock and Dam 24, located in Clarksville, Missouri, is part of the Upper Mississippi River project. It has a 15 ft lift, 1340 ft dam, and 110 ft wide by 600 ft ...
  26. [26]
    [PDF] Lock & Dam 21
    The movable dam has 10 submersible, elliptical Tainter gates (20 feet high by 64 feet long) and three submersible ... Paul on the Upper Mississippi River to its ...<|control11|><|separator|>
  27. [27]
    [PDF] EM 1110-2-2607 - USACE Publications
    Jul 31, 1995 · tainter gate. (2) A continuous sill beam serves as level seating and metal-to-metal sealing surface for spillway gates--tainter, vertical ...
  28. [28]
    [PDF] Inspection, Evaluation, and Repair of Hydraulic Steel Structures
    Dec 1, 2001 · This manual covers inspection, evaluation, and repair of hydraulic steel structures, including pre-inspection, testing, material analysis, and  ...
  29. [29]
    [PDF] Trunnion Friction of Radial Gate Failure
    Very few failures of radial (tainter) gates have been documented that were the result of structural failures under expected design static loads. • Structural ...Missing: pre- | Show results with:pre-
  30. [30]
  31. [31]
    [PDF] Ice Harbor Lock and Dam Lake Sacajawea, Washington ... - DTIC
    Sep 30, 2024 · Preliminary Design Report, Powerhouse. General Plan and Detailed Cost Estimate. Supplement 1 to D.M. 1. First-Step Cofferdam and Access ...
  32. [32]
    Description of John H. Kerr Project
    It is crested with 22 tainter gates, each 42 feet wide by 32 high. The powerhouse has six vertical shaft Francis turbines rated at 32,000 kw each, one unit ...Missing: largest east Rockies
  33. [33]
    [PDF] Reconnaissance Report JOHN H. KERR DAM AND ... - NC DEQ
    For additional discharges, the tainter gates (no power generation) are sequentially opened to increase the discharge rate. After flooding conditions recede.Missing: largest Rockies
  34. [34]
    Current situation and trends in gate design for water conservancy ...
    Nov 16, 2018 · The first steel gate was constructed in the mid-1930s. The earliest known Tainter gates were four 8.75 m × 1.0 m (width × height) gates located ...Missing: pre- | Show results with:pre-
  35. [35]
    Layout of Three Gorges Dam - Yangtze River Cruise
    Each of its 22 surface sluice gates measures 8 meters wide. The maximum discharge capacity of the TGP is 116,000 cubic meters, the biggest in the world.
  36. [36]
    [PDF] Scoping mission at Iron Gates I and II dams (Romania and Serbia)
    May 9, 2011 · On its left bank there is a 196 m wide spillway with 7 gates (21 m wide, regulated by radial sluice gates); the central portion of the structure ...Missing: Tainter | Show results with:Tainter
  37. [37]
    [PDF] Fish migration at the Iron Gate dams - Bundesanstalt für Wasserbau
    Iron Gates I​​ A spillway forms the centre of the dam and is made up of 14 sections, each 25 m wide; the upper 14.5 m reservoir lamella can be regulated by ...
  38. [38]
    Construction of the Los Angeles Aqueduct
    (October 16, 1913)* - The gates are opened to allow water to cascade down above the San Fernando dam during a dual test and photo opportunity for the new Los ...
  39. [39]
    lessons learned from the spillway gate failure at folsom dam
    Jul 1, 2020 · In 1995, failure of spillway Gate No.3 at Folsom Dam during normal operation resulted in an uncontrolled release of the reservoir.Missing: USBR | Show results with:USBR
  40. [40]
    [PDF] Debris Control at Hydraulic Structures in Selected Areas of the USA ...
    Debris accumulates adjacent to the dam and tainter gates. • Debris often accumulates in the tainter gate during the flushing operations. In addition, debris ...