Union Station Bus Terminal

The Union Station Bus Terminal is an intercity bus station in downtown Toronto, Ontario, Canada, situated on the second floor of the south tower of CIBC Square at 81 Bay Street, on the northeast corner of Bay Street and Lake Shore Boulevard East. Opened on December 5, 2020, it primarily serves GO Transit regional bus routes while accommodating intercity operators including Greyhound Lines, FlixBus, Megabus, and Ontario Northland, facilitating seamless transfers to adjacent Union Station's rail services such as GO Trains, VIA Rail, Amtrak, and the Union Pearson Express, as well as TTC subway and streetcar lines. This state-of-the-art facility, developed by as part of broader revitalization efforts, features climate-controlled waiting areas, Wi-Fi access, restrooms, and enhanced safety measures, operating daily from 5:00 a.m. to 2:50 a.m. to support high-volume commuter and long-distance travel. It replaced a smaller established in 2003 near , addressing growing demand for integrated bus services amid Toronto's expanding regional transit network. The terminal's strategic location enhances accessibility to amenities and events, contributing to efficient urban mobility without notable operational controversies since inception.

History

Pre-Existing Bus Facilities

Prior to the construction of a dedicated bus terminal at Union Station, intercity and commuter bus operations in relied on the , established in 1931 at 610 , approximately 1.2 kilometers north of the station. This facility served as the primary hub for multiple operators, including early that commenced in October 1971 with initial routes using smaller vehicles for commuter connections to rail lines. GO buses predominantly originated and terminated there, accommodating growing demand but requiring passengers to transfer via local transit or walking to reach Union Station's rail platforms. Limited integration with occurred through select peak-hour extensions of GO bus routes, where vehicles would loop from the Coach Terminal to curbside stops along Front Street West or adjacent to the station, facilitating transfers to GO trains and other rail services. These stops lacked enclosed waiting areas, dedicated bays, or modern amenities, exposing passengers to weather and street traffic; operations depended on temporary signage and coordination with station staff for boarding. Other intercity carriers, such as , similarly avoided , concentrating at the Coach Terminal to consolidate services away from the rail-focused infrastructure. The absence of integrated bus facilities at stemmed from its original design as a rail hub, completed in 1927, with buses emerging later as a complementary mode amid post-World War II suburban expansion. By the late , rising ridership—exceeding 10 million annual GO bus passengers—highlighted inefficiencies, including transfer delays and capacity constraints at the Coach Terminal, prompting plans for site-specific improvements at to enhance connectivity. These pre-2003 arrangements underscored a transitional phase, prioritizing ad-hoc street-level access over permanent infrastructure.

Temporary GO Bus Terminal (2003–2021)

The temporary GO Bus Terminal opened in 2003 to accommodate the expanding demand for GO Transit's bus services, providing a dedicated boarding area adjacent to Union Station in downtown Toronto. Previously, GO buses had relied on pick-up and drop-off points at the Toronto Coach Terminal on Bay and Dundas streets, which proved inadequate for growing ridership. Designed by DTAH Architects as an interim facility on a site immediately east of the station, it featured basic infrastructure including bus bays and pedestrian access to Union Station's rail services, facilitating integrated multimodal travel. Located at 141 , the terminal primarily served GO Transit's regional bus routes connecting to suburbs and nearby cities across the , handling peak commuter flows with multiple daily departures. Over its 17-year operation, it supported the system's evolution from supplementary service to a core component of GO Transit's network, which began bus operations in the early 1970s but saw significant expansion in the 2000s. The facility included essential amenities such as ticketing, waiting areas, and connectivity to local transit, though it lacked the advanced features of later developments. Operations at the temporary terminal concluded on December 4, 2020, with GO bus services relocating to the new permanent Union Station Bus Terminal under to address capacity constraints and improve integration with rail infrastructure. This transition marked the end of an era for the site, which had become a familiar hub for commuters despite its provisional design, paving the way for enhanced efficiency in the regional transit network.

Relocation from Toronto Coach Terminal

The Toronto Coach Terminal, located at 610 Bay Street, functioned as Toronto's principal intercity bus station from its opening on December 19, 1931, until its permanent closure in July 2021. Prior to the establishment of dedicated GO Transit facilities, regional buses including early GO services operated from the terminal, but GO began shifting operations toward Union Station in the 1990s to improve connectivity with rail services. By 2003, GO Transit had fully relocated its bus routes to a temporary terminal at 141 Bay Street adjacent to Union Station, leaving the Coach Terminal primarily for private intercity carriers such as Megabus, Ontario Northland, and, until its discontinuation, Greyhound Canada. The terminal's lease, held by Toronto Coach Terminal Inc., expired on July 7, 2021, prompting the handover of the property to the City of Toronto for potential redevelopment and necessitating the transfer of remaining bus operations. Intercity services still utilizing the Coach Terminal transitioned to the newly opened Union Station Bus Terminal, which had commenced operations for GO buses on December 5, 2020, enabling consolidated access to Toronto's multimodal transit network including GO trains, , subway, and UP Express. This relocation addressed capacity constraints at the aging Coach Terminal and aligned with broader goals to centralize infrastructure downtown, though it required operators to adapt to the new facility's layout and integration with the development.

Planning and Construction

Development Rationale and Planning Phase

The Union Station Bus Terminal was developed primarily to resolve chronic capacity constraints and operational inefficiencies in downtown Toronto's bus services, driven by surging demand for buses that exceeded the limitations of existing on-street facilities along Front Street. By the mid-2010s, GO Transit's regional bus network had expanded significantly, rendering the temporary outdoor terminal established in 2003—located north of the rail corridor—overcrowded and vulnerable to weather disruptions, with only seven bus bays insufficient for peak-hour volumes. Planning for the new terminal began as part of 's broader Union Station revitalization efforts, emphasizing integration to streamline passenger flows across bus, rail, subway, and pedestrian networks in the . identified the need for a purpose-built during assessments of Union Station's role as a central transit node, where bus operations had previously relied on ad-hoc street-level queuing that compromised safety and efficiency. The project was integrated into the development at 81 , a public-private partnership between , , and Hines, which allocated space within two office towers for the terminal while advancing goals around the station precinct. Key planning objectives included doubling bus capacity to 14 indoor bays across two levels, incorporating climate-controlled waiting areas exceeding 23,000 square feet, and implementing airport-style signaling for bus movements to minimize and enhance security. These features addressed empirical ridership data showing annual GO bus passengers surpassing millions, with projections for further growth under Ontario's regional expansions, thereby prioritizing causal improvements in throughput over temporary patches. The phase culminated in construction commencing around 2017, following environmental reviews and stakeholder consultations focused on minimizing disruptions to Station's status and surrounding traffic.

Design Specifications and Infrastructure

The Union Station Bus Terminal, integrated into the development at 81 , spans approximately 23,000 square feet across two levels dedicated to bus operations and passenger areas. Buses access the facility via , with each level accommodating seven dynamic bus bays designed for efficient departure zoning and service flexibility. This configuration doubles the bay capacity of the prior temporary terminal, enabling simultaneous handling of regional and intercity services. Infrastructure emphasizes seamless connectivity, featuring climate-controlled indoor spaces for waiting and boarding, along with a two-stage departure process where passengers first proceed to designated zones before receiving specific gate assignments via digital displays. Pedestrian linkages include an enclosed walkway over connecting directly to Union Station's rail concourse, facilitating transfers without street-level exposure. Additional amenities comprise 270 secure spaces, washrooms, and device charging stations to support commuter needs. The terminal's design incorporates advanced audiovisual systems for real-time information dissemination and safety monitoring, integrated with Metrolinx's broader network standards for shared transit facilities. Constructed as part of a public-private partnership, the structure aligns with guidelines prioritizing high-capacity, weather-resilient operations in Toronto's dense core.

Timeline, Budget Overruns, and Delays

Planning for the Bus Terminal began in 2014 as part of efforts to consolidate GO Transit's bus operations into a permanent facility integrated with and the developing office towers. Construction was initially projected to start in 2015 and conclude by 2018. Actual groundbreaking occurred in June 2017 on the northeast corner of and , within the site developed by Hines and , with the bus terminal occupying the lower levels. The project timeline extended beyond initial estimates, with the terminal opening to buses on December 5, 2020, approximately two years later than planned. This delay aligned with broader challenges in infrastructure projects, including coordination with adjacent rail enhancements and urban development, though specific causes for the bus terminal's postponement were not publicly detailed by . Full operational transition for intercity services from the occurred in May 2021, marking the end of reliance on temporary facilities. Initial cost projections for the bus , integrated into the development, were set at $106 million in 2014 announcements, covering construction of the alongside tower foundations. No verified reports of overruns specific to the bus have been disclosed by or project partners, distinguishing it from concurrent revitalization efforts that exceeded estimates by nearly 30 percent due to scope expansions and scheduling issues. The 's completion within the private- framework may have mitigated exposure to overruns observed in government-led works.

Facilities and Layout

Physical Location and Integration with Union Station

The Union Station Bus Terminal is located at 81 in , occupying the northeast corner of and East, integrated within the . The facility spans two levels of the south tower of , featuring 14 indoor bus bays designed for efficient passenger flow and weather protection. This positioning places the terminal approximately 200 meters southeast of the main rail concourse, enhancing multi-modal connectivity in the city's primary transportation hub. Integration with occurs through a network of covered pathways and the underground system, enabling indoor transfers between bus services and rail platforms. Passengers can access the terminal from the GO Transit's York Concourse by following to the Galleria, ascending escalators, and crossing a dedicated bridge over to reach the terminal's second level. This bridge provides direct, climate-controlled linkage, bypassing street-level exposure and reducing transfer times to under five minutes for most routes. Alternative entry points include south-facing doors on east of or the east sidewalk of , with clear directional guiding users from 's Bay Concourse via blue doors near the . The terminal's design prioritizes seamless adjacency to Union Station's rail, subway, and UP Express services, with connections extending to the TTC's Line 1 Yonge-University and VIA Rail platforms through the shared concourse infrastructure. This integration supports the broader precinct as a unified node, accommodating over 300,000 daily passengers across modes while minimizing external street congestion. The facility opened on December 5, 2020, replacing prior temporary bus operations and fulfilling long-term plans for consolidated downtown transit infrastructure.

Platforms, Amenities, and Accessibility Features

The Union Station Bus Terminal features 14 bus bays distributed across two indoor levels, doubling the capacity of its predecessor and organized into zones and gates analogous to airport terminals for efficient passenger flow. Departure information is displayed via real-time digital screens and boards indicating specific gates. Safety measures include glass-enclosed gates that separate the climate-controlled waiting areas from active platforms, restricting access until boarding is authorized, and enhanced security protocols to prevent unauthorized entry. Amenities within the terminal include free access, charging ports for devices, washrooms on both levels, a café operating from 6 a.m. to 10 p.m. on the first floor, and a CIBC ATM. Bicycle parking accommodates up to 270 spaces on the P1 level and street level along , supporting access. The facility connects directly to adjacent pedestrian pathways, facilitating seamless integration with Union Station's rail and networks without exposure to outdoor elements. Accessibility features encompass and escalators providing barrier-free access to the second-level platforms (L2), automatic power doors equipped with vertical support bars, tactile signage with integrated into handrails, and eye-level information displays for low-vision users. Enhanced washroom designs comply with standards, including wider stalls and support features, while GO broader network supports elevated mini-platforms and ramps for boarding on accessibility-equipped coaches. These elements align with provincial mandates for inclusive public infrastructure, though operational challenges such as reliability have been noted in user reports.

Services and Operators

GO Transit Regional Services

The Union Station Bus Terminal functions as the downtown Toronto hub for 's regional bus network, handling departures and arrivals for routes connecting the (GTHA). GO commenced dedicated bus operations at a temporary terminal adjacent to Union Station in 2003 to address rising demand, with services relocating to the permanent facility at 81 Bay Street on December 5, 2020. This terminal supports GO's strategy of multimodal integration, allowing bus passengers to transfer indoors via a pedestrian bridge to Union Station's rail platforms, TTC subway, and other services. GO bus routes from the terminal primarily operate express services along key corridors, including Route 16 (Hamilton/Toronto Express), which runs from the terminal to , covering approximately 60 kilometers with stops at major interchanges. Additional routes extend to destinations such as Square One in (Route 21) and connections northward to Highway 407 Bus Terminal for onward travel to and other northern GTHA points. Services run daily from 5:00 a.m. to 2:50 a.m., with frequencies up to every 15-30 minutes during peak hours on high-demand lines, supplemented by real-time departure boards and digital announcements for boarding at designated gates. These operations carried over 10 million bus passengers annually pre-pandemic across the GO network, underscoring the terminal's role in regional mobility.

Intercity and Long-Distance Providers

The Union Station Bus Terminal primarily hosts private operators for intercity travel within and long-distance routes extending to other provinces and the , complementing 's regional network. These services utilize dedicated platforms on the terminal's upper levels, with departures coordinated through and ticketing kiosks shared across providers. Operators must adhere to protocols for scheduling and security, ensuring integration with the adjacent rail hub. FlixBus, a German-owned budget carrier, consolidated all Toronto-area operations at the terminal upon its 2021 opening, offering routes to destinations such as , , and , with fares starting around CA$25 for shorter trips. Its fleet features , power outlets, and extra legroom options, targeting cost-conscious travelers for connections averaging 2-5 hours. Greyhound Lines provides long-distance services from the terminal's second-floor bays, including cross-border routes to (approximately 8-10 hours, fares from US$75) and other U.S. hubs like and . As a legacy operator with over 100 years of service, emphasizes reliability for extended journeys, though it has faced competition from low-cost alternatives leading to route consolidations post-2020. Megabus, under the Coach USA umbrella, relocated its Toronto stop to the terminal in 2021, focusing on affordable long-distance express services such as New York-Toronto (fares from US$50, travel time 9 hours) with reserved seating and onboard amenities. Its model prioritizes high-occupancy coaches to major urban centers, serving as a key option for international travel without airport hassles. Ontario Northland operates intercity buses to communities like and from the terminal (listed as an stop at 81 ), with schedules supporting daily departures and connections to remote areas underserved by rail. These routes, often 5-8 hours in duration, cater to regional economic travel and freight integration, reflecting the provider's mandate as a Crown for underserved provinces.
OperatorPrimary FocusExample Routes/DestinationsTypical Duration/Fare Range
Intercity (Canada)Toronto to Ottawa, Montreal4-6 hours / CA$25-50
GreyhoundLong-distance (U.S.)Toronto to New York, Buffalo8-10 hours / US$75+
MegabusLong-distance (U.S.)Toronto to New York9 hours / US$50+
Ontario NorthlandIntercity (Northern ON)Toronto to Sudbury, Timmins5-8 hours / CA$40-80
Smaller operators like Rider Express occasionally serve the terminal for niche prairie routes, but major volume stems from the above providers, which handled thousands of daily passengers pre-2025 expansions. Service reliability depends on traffic along , with occasional delays reported during peak seasons.

Connections and Accessibility

The Union Station Bus Terminal connects passengers to regional and networks via a dedicated pedestrian linkage to , approximately 200 meters away, enabling a roughly 5-minute indoor walk through the system and escalators. This pathway supports seamless transfers to GO Transit's commuter rail services across the , Canada's intercity routes to destinations like and , and the Union Pearson (UP) Express airport link to . Subway access is provided through Union Station's integration with the Toronto Transit Commission's (TTC) Line 1 Yonge-University subway, located directly beneath the rail concourse; bus terminal users reach this via the same pedestrian route, with elevators and ramps ensuring accessibility from Union Station's lower levels. TTC streetcar lines, including the 509 Harbour route that tunnels directly into Union Station for underground transfers, further extend connectivity to waterfront and downtown areas, with platforms accessible post-rail/subway linkage. These connections prioritize weather-protected indoor transit, reducing exposure during transfers compared to prior open-air bus arrangements.

Proximity to Other Transport and Urban Hubs

The Union Station Bus Terminal occupies the second floor of at the northeast corner of and in Toronto's South Core neighborhood, positioning it at the epicenter of the city's downtown core and immediately adjacent to the . This location enables direct underground linkages via the pedestrian network, which spans over 30 kilometers and connects to prominent commercial hubs including the (approximately 500 meters north) and Southcore Financial Centre, allowing year-round covered access to office towers, retail spaces, and employment centers housing more than 75,000 workers. Key entertainment and tourism districts lie within easy walking distance, underscoring the terminal's role in urban connectivity. The and complex are situated about 800 meters southwest along Front Street, a distance traversable in 10 to 15 minutes on foot for passengers transferring to or from events at and nearby venues. Harbourfront Centre and the broader waterfront precinct, encompassing cultural sites and recreational areas, extend just 600 meters south, with pathways and the adjacent Queens Quay corridor supporting pedestrian and cycling access. Additional transport options nearby include shuttle services bridging to , roughly 2 kilometers southwest across the inner harbor; free buses from —directly accessible from the terminal—complete the link in under 10 minutes, followed by a brief or crossing to the airport facilities serving regional flights. This setup complements longer-haul connections via the integrated UP Express rail to , 25 kilometers northwest, though the terminal itself emphasizes central urban and short-range intermodal proximity over distant airports.

Operational Challenges

Traffic Congestion and Access Delays

The Union Station Bus Terminal, located adjacent to downtown Toronto's core, experiences significant access delays primarily due to heavy vehicular traffic on surrounding streets such as Lake Shore Boulevard West and Front Street. Buses approaching from the Gardiner Expressway or regional highways often encounter bottlenecks, exacerbated by mixed traffic flows including commuter vehicles, delivery trucks, and construction-related disruptions near Union Station. Reports indicate that inbound GO Transit buses have faced delays of up to 45 minutes to reach the terminal during peak periods, as vehicles queue to enter the drop-off zones. These delays stem from the terminal's urban integration, where bus lanes compete with general amid high volumes and ongoing projects, including expansions by . Outbound departures similarly suffer, with buses idling in congested loops or waiting for clearance at intersections like Bay and Lake Shore, leading to cascading schedule disruptions across regional services. Commuters have reported frustration with these predictable backups, which have intensified since the terminal's relocation to its current site at , despite design features intended to streamline platform assignments. Efforts to mitigate include calls for additional traffic agents to manage at pinch points and proposals for dedicated bus lanes on approach roads, though implementation has lagged. Broader trends, influenced by return-to-office policies, have compounded the issue, with projections of worsening conditions without expanded prioritization. These access challenges highlight causal links between , inadequate road hierarchy favoring automobiles, and the terminal's reliance on surface streets rather than segregated rights-of-way.

Labor Disputes and Service Disruptions

In April 2022, a involving electrical rail workers represented by IBEW Local 353 at led to temporary diversions of from the Union Station Bus Terminal. The workers walked off the job on , citing unresolved issues over wages and working conditions, which disrupted station operations and prompted to reroute buses to alternative locations like Yorkdale Terminal and Islington Station for four days. resumed at the bus terminal on April 26 after partial , though full came on May 3 when workers returned following a binding arbitration ruling. A more direct impact on bus terminal operations occurred in November 2022, when approximately 2,200 workers—including bus operators, station attendants, maintenance staff, and transit safety officers represented by (ATU) Local 1587—initiated a strike at 12:01 a.m. on November 7 after contract negotiations stalled over wages, benefits, and job security. This action halted all GO bus services across the , including departures and arrivals at the Union Station Bus Terminal, forcing commuters to rely on rail alternatives or personal vehicles amid peak travel demands. Picketing focused on high-visibility sites like Union Station, amplifying disruptions during the workweek. The four-day strike concluded on November 10 with a tentative three-year agreement ratified by members, restoring bus operations by November 12; the deal included wage increases but drew criticism from some union members for not fully addressing inflation-adjusted cost-of-living pressures. These incidents highlight recurring tensions in transit labor relations at the terminal, often tied to broader bargaining with unions amid rising operational costs and post-pandemic recovery. No major bus-specific strikes have been reported since 2022, though ancillary rail labor actions, such as the 2024 CN and CPKC lockouts affecting interconnected commuter networks, have indirectly strained bus terminal usage by overloading modes. disruptions from such disputes typically last days to weeks, with implementing contingency plans like increased train capacity or partnerships with private operators to mitigate commuter impacts.

Weather Vulnerabilities and Infrastructure Issues

The Union Station Bus Terminal's curbside drop-off and loading zones along West expose bus operations to Toronto's variable climate, including heavy winter , ice accumulation, and summer convective storms producing intense rainfall. These conditions frequently delay bus arrivals and departures by impairing road access, with requiring mechanical clearing and salting that can the terminal's 14 bays designed for high-volume turnover. During the February 16, 2025, winter storm, accumulations exceeding 20 cm across the led to hazardous roadway conditions, stranding vehicles and disrupting and intercity services reliant on the terminal. Flash flooding poses a recurrent threat due to the terminal's proximity to and the Don River watershed, where stormwater overwhelms systems and low-lying infrastructure. On July 16, 2024, over 100 mm of rain in hours flooded adjacent and prompted emergency rescues near , halting bus movements and requiring diversions that extended travel times by up to an hour. Similar inundation recurred in July 2025, closing portions of the station complex—including access routes to the bus terminal—for nearly 12 hours despite prior flood mitigation investments. Early planning documents from 2016 identified the Union Station Bus Depot as particularly at risk from flooding, citing inadequate drainage capacity in the rail corridor and surrounding urban hardening that accelerates runoff. Infrastructure limitations amplify weather impacts, as the terminal's design—opened in to consolidate GO and private operators—prioritizes vertical integration with but depends on constrained surface arterials without dedicated bus ramps or weather-resilient queuing zones. routinely adds 30-45 minutes to inbound trips during peak hours, a delay that , , or standing intensifies by reducing lane capacity and increasing collision risks on the elevated approaches. Ongoing revitalization works, including truck tunnel modifications and expansions, have introduced temporary barriers that hinder and bus maneuvering, particularly under slippery or wet conditions. Post-2013 flood retrofits, such as sump pumps and barriers at , have mitigated some basement risks but proved insufficient against extreme events, underscoring causal gaps in probabilistic modeling for 100-year storms now occurring more frequently.

Impact and Future Outlook

Role in Greater Toronto's Transit Ecosystem

The Union Station Bus Terminal (USBT) functions as a primary interchange for regional bus services within the (GTHA), primarily accommodating 's extensive network of commuter routes that connect suburban origins to . Operating under , buses from the terminal serve key corridors including Lakeshore West, Lakeshore East, and , transporting passengers from areas such as , , and to the urban core, thereby alleviating pressure on rail lines during peak hours and supporting daily commutes for over 70 million annual GO riders system-wide, with a substantial portion involving bus-to-rail transfers at Union Station. This integration enables seamless journeys, as the terminal's proximity—linked via covered pedestrian pathways and underground concourses—facilitates direct access to GO rail platforms, reducing transfer times and enhancing efficiency in a network where 91% of train trips converge at . Beyond regional commuting, USBT contributes to the broader transit ecosystem by hosting intercity operators, allowing riders to combine bus travel with local options like the Toronto Transit Commission's () Line 1 subway and streetcar lines at , which together handle over 200,000 daily travelers across modes. The terminal's design, including climate-controlled waiting areas and , supports high-volume operations with routes departing as frequently as every 15-30 minutes during peaks, fostering reduced automobile dependency in a densely populated region where public transit accounts for a critical share of inbound trips to 's economic hubs. This role underscores USBT's position as a for sustainable mobility, evidenced by its relocation to in December 2020, which improved connectivity amid 's revitalization to accommodate growing GTHA demand. In the context of the GTHA's transit framework, USBT mitigates fragmentation by centralizing bus departures, enabling efficient last-mile connections to employment districts like the and supporting spillover from capacity-constrained rail services, particularly for off-peak or express routes not viable by train. Its operational hours from 5:00 a.m. to 2:50 a.m. align with 24/7 access via , promoting round-the-clock viability and resilience against disruptions in single-mode reliance. Overall, the terminal bolsters the ecosystem's capacity to manage radial flows into , with empirical ridership patterns indicating buses handle diverse demographics underserved by rail, thus enhancing equity and throughput in a strained by exceeding 100,000 annually in the region.

Economic Costs, Benefits, and Criticisms

The construction of the Union Station Bus Terminal, integrated into the development and managed by , exceeded $106 million in costs borne by the agency, with approximately $30 million offset through the sale of the prior bus facility site and the balance drawn from 's capital budget. Funding involved contributions from private developers such as and Hines, alongside public entities including the City of Toronto and the . This capital outlay formed part of a broader $2.1 billion project, reflecting the premium for downtown real estate and infrastructure integration amid escalating urban development expenses. Economically, the terminal delivers benefits through a 50% expansion in bus capacity compared to legacy facilities, enabling higher throughput for services and intercity operators, which supports commuter flows into Toronto's core and reduces reliance on fragmented terminals. Seamless connections to Union Station's rail, subway, and networks facilitate multimodal transfers, potentially lowering overall transport costs for users by minimizing walking distances and wait times, while bolstering downtown economic activity via improved access for workers and visitors. These enhancements align with regional transit goals, where investments in integrated hubs contribute to broader efficiencies, such as reduced automobile dependency and associated congestion externalities, though specific ridership-driven returns for the bus terminal remain tied to GO Transit's post-pandemic recovery, which reached about 62% of 2019 levels across agencies by 2022. Criticisms center on the terminal's development delays and integration hurdles, including three years of negotiations to reconcile office-grade aesthetics demanded by tenants like CIBC's headquarters with functional bus operations, raising questions about opportunity costs in a high-stakes public-private partnership. The project echoed wider Union Station revitalization issues, where original budgets ballooned due to unforeseen building conditions and contractor underperformance, extending timelines by years and inflating expenditures beyond initial projections. Skeptics argue that such capital-intensive builds, amid stagnant operational funding for transit, strain provincial resources without guaranteed proportional ridership gains, particularly if economic pressures suppress intercity travel or favor remote work patterns.

References

  1. [1]
    Union Station Bus Terminal at CIBC Square - GO Transit
    The GO bus terminal at Union Station is located at 81 Bay Street in Toronto at the north-east corner of Bay and Lake Shore Blvd. To access the new terminal from ...
  2. [2]
    New Union Station Bus Terminal to Officially Open | Ontario Newsroom
    Dec 4, 2020 · New Union Station Bus Terminal to Officially Open. Larger Terminal Offers Greater Safety, Comfort and Better Transit Connections. December 04, ...<|separator|>
  3. [3]
    The Union Station Bus Terminal is ready – what you need to know
    The new Union Station bus terminal is set to open its doors to GO customers on December 5th, 2020. (Roy Mak photo). Customer access to the new terminal includes ...
  4. [4]
    Toronto (Union Station Bus Terminal) - Greyhound
    The address of the Greyhound station is 81 Bay St, Toronto. You can easily check the exact location of the bus station by using the map on this page. For ...
  5. [5]
    Union Station Bus Terminal - GO Transit
    Open 5:00 am to 2:50 am daily. No one is permitted on site outside of these hours as the building is locked. No overnight bicycle parking allowed.
  6. [6]
    Riders remember current Bus Terminal as they move into new digs
    The terminal first opened in 2003. Prior to that, buses used to pick up and drop off customers at the Toronto Coach Terminal, at Bay and Dundas Streets, in the ...
  7. [7]
    How to get to Union Station Bus Terminal from Union Station
    Oct 4, 2024 · How to get to the bus terminal from Union Station · You can get to the bus terminal from outside by exiting the building here and turning right ...
  8. [8]
    FlixBus makes Union Station Bus Terminal its home in Toronto
    All FlixBus trips to Toronto will now run through the historic Union Station (65 Front Street) with easy access to Toronto sporting events, music and cultural ...
  9. [9]
    Toronto Coach Terminal - Wikipedia
    The building was the central intercity bus station in Toronto until mid-2021, when it was replaced by the Union Station Bus Terminal. It is located at 610 Bay ...
  10. [10]
    50 Years of GO Transit Bus Operations
    Oct 11, 2020 · GO Transit began commuter bus services 50 years ago, initially with minibuses for local service, then expanding to four routes connecting to ...<|separator|>
  11. [11]
    The history of the Union Station bus terminal in Toronto - blogTO
    Dec 5, 2020 · GO Transit History ... Construction for the new station began in 2017 on the heels of the GO transit's 50th anniversary. GO services currently ...
  12. [12]
    Union Station Bus Terminal (2003 to 2020)
    The terminal serves GO's bus routes originating and terminating at Toronto Union Station. ... Construction of CIBC Square began in 2017, with the new terminal ...
  13. [13]
    Looking Back: The Union Station GO Bus Terminal - DTAH
    Dec 9, 2020 · The first terminal was designed by DTAH as an interim facility for GO Transit, on a site immediately east of Union Station in downtown Toronto.
  14. [14]
    1914–2024: A century of expansion at Union Station - Metrolinx
    Nov 1, 2024 · 2000–2021. The Union Station GO Bus Terminal opened in 2003 to meet an increase in demand for bus services. This provided a safe, dedicated ...
  15. [15]
    Union Station: History, Facts & Map | GO Transit
    The current building opened its doors in 1927, although its history dates back to 1858 with the debut of the first of three stations. The Union Station we know ...
  16. [16]
    How to find your way through the new Union Station Bus Terminal
    Nov 29, 2020 · The old bus terminal will close its doors at the end of the service day on December 4th, after more than 17 years of GO bus service. Now that ...
  17. [17]
    Toronto's historic coach terminal is shutting down after 90 years
    Jun 10, 2021 · The remaining coach traffic from Greyhound and Coach Canada will move to the new Union Station Bus Terminal near Bay and Front Streets, ...
  18. [18]
    Toronto's Bay Street bus terminal reaches the end of the line
    Jun 9, 2021 · After almost a century of use, the Toronto Coach Terminal will cease operations next month and be handed over to the municipal government ...
  19. [19]
    Final Days of the Toronto Coach Terminal - YouTube
    Jul 7, 2021 · ... bus routes run by Greyhound, Megabus, and Ontario Northland ... Toronto Bus Terminal Walk - Touring The Brand New Union Station Go Bus Terminal On ...
  20. [20]
    Toronto Coach Terminal shutting down after 90 years | Urbanized
    Jun 10, 2021 · After serving the city for 90 years, the Toronto Coach Terminal is permanently closing its doors next month for possible redevelopment.
  21. [21]
    Former Toronto Coach Terminal to see apartments, plaza as part of ...
    Nov 21, 2024 · The Toronto Coach Terminal operated for decades near Bay Street and Dundas Street West. It shut down to riders in 2021.<|separator|>
  22. [22]
    [PDF] It's Happening Capital Projects Update - Metrolinx
    UNION STATION BUS TERMINAL. Partnership with Ivanhoe Cambridge/Hines in development of two towers, 81 Bay Street housing the new Union Station Bus Terminal.
  23. [23]
    2020: A State-of-the-Art Bus Terminal is Introduced in Downtown ...
    Dec 5, 2023 · December 5, 2020. In the Canadian province of Ontario, an intercity bus terminal in the downtown section of Toronto was officially opened.
  24. [24]
    New Union Station bus terminal opens in Toronto
    Dec 5, 2020 · The new 23,000 square foot Union Station Bus Terminal is located on the north-east corner of Bay ... The new terminal also features a two-stage ...
  25. [25]
    [PDF] DGL-14 SHARED STATIONS - DESIGN GUIDELINE - Metrolinx
    Shared Stations play a key role in supporting the integrated transit network and typically have multi-use development opportunities around the station site.Missing: rationale | Show results with:rationale
  26. [26]
    Inside the Toronto site of the new Union Station Bus Terminal
    Mar 26, 2020 · The new bus terminal will eventually include a new signalling system – think of it as traffic lights – that will help guide buses in and out of ...
  27. [27]
    Union Station's new bus terminal opens doors for first time - Metrolinx
    Dec 4, 2020 · With 14 bus bays – double the capacity of the previous terminal – 270 bike parking spaces, and convenient amenities like washrooms, charging ...
  28. [28]
    A look inside the new Union Station bus terminal before it opens ...
    Nov 16, 2020 · Transit agency Metrolinx says the new transit hub “will act a bit like an airport” with a modern method of keeping track of bus traffic and ...
  29. [29]
    Nationwide AV opens new Union Station Bus Terminal
    Nationwide AV has provided mission-critical audiovisual systems for the high-tech new Metrolinx Union Station Bus Terminal (USBT).
  30. [30]
    [PDF] City of Toronto Transit Design Guide: Bus Terminals
    At the Master Planning and Preliminary Design Stage, work should focus on refining and confirming the typological and network role of Bus Terminal sites and ...Missing: rationale | Show results with:rationale
  31. [31]
    New GO bus terminal planned for Toronto's Union Station
    Sep 30, 2014 · Construction for the new terminal and tower is projected to cost $106 million with work to start next year and be complete by 2018. WATCH ...
  32. [32]
    Six years late, Union Station revitalization a case study in what can ...
    Jul 28, 2021 · More than a decade into the five-year project, with costs settled just short of 30 per cent over budget, the saga is now officially over.
  33. [33]
    [PDF] Union Station – Concourse and street level map - Metrolinx
    To/from bus terminal via Scotiabank Arena. 200m, 5 minutes. Union Station – Concourse and street level map. Gare Union – Plan du hall et du niveau de la rue ...
  34. [34]
    Station Access | Construction Projects - GO Transit
    The entrance to the Union Station Bus Terminal from the south side of Bay Street is closed until later this summer due to construction in the area. Elevators ...
  35. [35]
    Accessible Vehicles & Stations - GO Transit
    Barrier-free parking and washrooms · Automatic doors · Elevators and ramps · Elevated mini-platforms for boarding the accessibility coach.Missing: amenities | Show results with:amenities
  36. [36]
    Dysfunction Junction: another Union Station malfunction
    Dec 17, 2024 · Despite new escalators and elevators, accessibility in Union Station remains poor. Though technically, the station is fully accessible to ...Missing: features | Show results with:features
  37. [37]
    Metrolinx opens new Union Station Bus Terminal - Toronto.com
    Dec 5, 2020 · It has 14 bus bays, which is double the capacity of the old one. It also features 270 bike parking spaces and convenience amenities ...
  38. [38]
    GO Transit 16 bus - Toronto
    The GO Transit 16 - Hamilton / Toronto Express bus serves 10 bus stops in the Toronto area departing from Union Station Bus Terminal and ending at Hamilton GO ...<|control11|><|separator|>
  39. [39]
    Go Bus route 21 is back in Union : r/gotransit - Reddit
    May 2, 2024 · It is currently faster to go direct to/from Union on the 21 vs transfer to the Lakeshore West, which automatically added 10-15+ minutes of transfer time.
  40. [40]
    GO Transit | Regional Public Transit Service for the GTHA
    Confederation GO will Open on October 27! We're excited to announce the opening of Confederation GO on Lakeshore West on October 27. Learn more about the new GO ...Plan Your Trip · Bus & Train Schedules · System Map · Find a Station or StopMissing: delays | Show results with:delays
  41. [41]
    Bus routes from London, ON to Toronto, ON - FlixBus
    Starting from CA$24.98The bus route from London to Toronto covers 179 km. FlixBus can bring you from London to Toronto in 2 hours 35 minutes. How long does it take from London to ...<|separator|>
  42. [42]
    Bus from New York, NY to Toronto, ON - Greyhound
    Starting from $74.98Book your next Greyhound bus from New York, NY to Toronto, ON. Get free Wi-Fi & plug outlets on board, extra legroom and 2 pieces of free luggage.
  43. [43]
    Bus from New York to Toronto with megabus
    The Megabus stop location in central Toronto has now moved to the new Union Station Bus Terminal located on the northeast corner of Bay St & Lakeshore Blvd.
  44. [44]
    Bus from Union City to Toronto with megabus
    The Megabus stop location in central Toronto has now moved to the new Union Station Bus Terminal located on the northeast corner of Bay St & Lakeshore Blvd.<|control11|><|separator|>
  45. [45]
    TORONTO-UNION STATION BUS TERMINAL - Ontario Northland
    TORONTO-UNION STATION BUS TERMINAL. Coach Canada 81 Bay St. Toronto ON M5J 0E7 Canada. Station Type. Agency. Services. Bus. Ticketing. Hours of Operation.
  46. [46]
    Find a Station - Ontario Northland
    Bus. TORONTO-UNION STATION BUS TERMINAL. Station Type. Agency. Coach Canada 81 ... Bus. VAUGHAN - HWY 407 TERMINAL. Station Type. Bus Stop. HWY 407 Terminal
  47. [47]
    Union Station Bus Terminal, Ontario Cheap Bus Tickets - Busbud
    The address of Union Station Bus Terminal is 81 Bay St. Toronto ON M5J 1J5 Canada. View this Toronto bus stop location on a map. Where is the ...<|separator|>
  48. [48]
    Union Station - TTC
    Access Concourse Level via elevator or ramp to the Union Train Station arrival and GO Transit Levels, and stair or ramp connection to Union Subway Station ...
  49. [49]
    Union Station Transit & Travel - City of Toronto
    Union Station is Canada's largest and busiest multi-modal transit hub which connects more than 300,000 passengers daily to their destination.Missing: operators | Show results with:operators
  50. [50]
    [PDF] Toronto PATH Network Map
    Southcore Financial Centre (SFC). Brookfeld Place ... Toronto Coach Terminal. E1. Toronto-Dominion Centre. E7. U 55 University. C7. Union Station GO Bus Terminal ...
  51. [51]
    Union Station | Destination Ontario
    Jan 23, 2025 · Union Station has three concourse halls to help passengers navigate between trains, buses and the subway, to explore the city of Toronto and ...
  52. [52]
    Shuttle - Billy Bishop Toronto City Airport
    Six complimentary shuttle buses connect passengers between Billy Bishop Toronto City Airport and Toronto's Union Station, with connections to public and ...<|separator|>
  53. [53]
    Public Transit - Billy Bishop Toronto City Airport
    Take the 509 Harbourfront streetcar east to Toronto's Union Station in under 15 minutes. This route also provides transit connections to GO Transit, Up Express, ...
  54. [54]
    Toronto traffic congestion impacting Union Station Bus Terminal trips
    Aug 19, 2024 · There have been reports of buses taking up to 45 minutes to get into the Union Station Bus Terminal due to downtown Toronto traffic.
  55. [55]
    More traffic agents needed to deal with congestion outside Union ...
    Sep 16, 2024 · As Toronto officials began a crackdown of intersection blocking, CityNews revisited the congested area outside the Union Station Bus ...Missing: overruns | Show results with:overruns
  56. [56]
    Toronto traffic, transit congestion likely to worsen with in-office ... - CBC
    Sep 2, 2025 · Greater Toronto commuters are likely bracing for traffic and transit congestion to worsen over the coming months as a number of major employers ...<|separator|>
  57. [57]
    Union station strike impacting GO bus services for the 3rd day - CBC
    Apr 25, 2022 · GO buses have resumed service from Toronto's Union Station after being diverted to alternative transit hubs on Monday due to ongoing strike action.
  58. [58]
    GO bus service disrupted for 4th day by strike at Toronto's Union ...
    Apr 26, 2022 · GO buses are being diverted from Toronto's Union Station to other transit hubs for the fourth consecutive day due to ongoing labour action.
  59. [59]
    Striking rail workers back on the job at Union Station as labour ...
    May 3, 2022 · Electrical rail workers at Toronto's Union Station will resume their duties at the busy transit hub tonight after walking off the job last ...
  60. [60]
    Striking Toronto Union Station workers to return to work as labour ...
    May 3, 2022 · Electrical rail workers at Toronto's Union Station will resume their duties at the busy transit hub tonight after walking off the job last ...
  61. [61]
    No GO bus service Monday as 2,200 transit workers launch first day ...
    Nov 7, 2022 · Inside Union Station in downtown Toronto, some commuters scanned train schedules on Monday morning after learning bus service was suspended due ...
  62. [62]
    ATU Local 1587-Toronto, ON, GO Transit Workers Reach Tentative ...
    Nov 10, 2022 · GO Transit bus service will resume on Saturday. The more than 2,200 station attendants, bus operators, maintenance workers, transit safety ...
  63. [63]
    Over 2,000 GO Transit workers walk off job amidst strike
    Nov 6, 2022 · Just over 2200 GO Transit workers will be on strike starting at 12:01 a.m. on Monday morning after negotiations did not progress.
  64. [64]
    ATU ends Toronto-area GO Bus workers strike, seeks to ... - WSWS
    Nov 13, 2022 · After announcing the three-year wage-cutting deal, the ATU immediately ended a four-day strike by 2,200 GO Transit bus operators, mechanics, ...
  65. [65]
    Canada's biggest railways lock out workers after failed negotiations ...
    Aug 22, 2024 · CPKC and CN and the union, which represents almost 10000 railway workers, have been in separate talks for several months.
  66. [66]
    Toronto, Montreal, Vancouver Commuters Face Disruption From ...
    Aug 19, 2024 · Workers in Canada's largest cities may have a more difficult commute starting Thursday, as the country's two biggest railways are set to ...
  67. [67]
    Adapting to extreme weather conditions - Metrolinx
    Daily routines have been disrupted by increased temperatures, excessive rain and wind. We've seen major property damage, power outages, floods and everything ...Missing: Terminal | Show results with:Terminal
  68. [68]
    Winter storm continues to batter Toronto, causing hazardous travel ...
    Feb 16, 2025 · Heavy snowfall that began Saturday afternoon hammered Toronto and its surrounding areas through the day Sunday, impacting roads, transit and ...
  69. [69]
    Torrential rain causes major flooding in Toronto, parts of GTA
    Jul 16, 2024 · Torrential rain that pummelled Toronto flooded a major highway, several thoroughfares and a key transit hub on Tuesday – requiring emergency crews to rescue ...
  70. [70]
    'What's being done to prevent this?,' Portions of Union Station was ...
    Jul 21, 2025 · Portions of Union Station were shut down for nearly 12 hours on Sunday due to heavy rainfall overnight despite the station's robust flood ...Missing: snow | Show results with:snow
  71. [71]
    [PDF] Resilient City - Preparing for a Changing Climate - City of Toronto
    Nov 2, 2016 · Considered during the session were flood risks to Union. Station, including the Union Station Rail Corridor, the Union Station Bus Depot, and ...
  72. [72]
    How engineers solved a space problem at Union Station - Facebook
    Aug 5, 2025 · To build Union Station's new concourse, crews had to rethink the station's truck tunnel. The roof of the tunnel was too high, ...
  73. [73]
    How Ontario Transit Adapts to Climate Change | Live Assets Blog
    Oct 6, 2024 · After the 2013 floods, Toronto's Union Station—a major hub for VIA Rail, the TTC, and GO Transit—underwent extensive flood-proofing improvements ...Missing: Terminal vulnerabilities
  74. [74]
    What is GO? | About Us - GO Transit
    Today, our trains and buses carry 70 million riders annually. At least 91 per cent of our train ridership is to and from Union Station in downtown Toronto ...
  75. [75]
    Union Station Update - A better way to get between GO and TTC
    Starting July 7, a new glass-covered, underground path running below Front Street will open and change the way thousands of customers access the TTC.<|control11|><|separator|>
  76. [76]
    Case – CIBC Square & GO Bus Commuter Terminal
    CIBC Square / GO Bus Commuter Terminal (Union Station) is a new transit hub which includes a bus station within a two-building office development project.Missing: planning | Show results with:planning
  77. [77]
    Ontario's Public Transit Agencies: Ridership, Finances and ...
    Sep 12, 2024 · In 2022, total ridership partially rebounded to 590.9 million trips, or 62.0 per cent of the 2019 pre-pandemic level, with further recovery ...Missing: Union Terminal
  78. [78]
    After years of delays and cost overruns, Union Station renovations ...
    Jul 27, 2021 · After a decade of construction work that has seen delays and increasing costs, renovations to Union Station are finally complete, Toronto Mayor John Tory says.