Utah Data Center

The Utah Data Center is a secure computing facility owned and operated by the (NSA) in , designed to store and process vast quantities of data for the U.S. Intelligence Community. Located at facility, it supports NSA's core missions of foreign intelligence collection, cybersecurity, and by providing scalable infrastructure for handling digital intercepts, , and encrypted traffic. Construction began with a in January 2011 at an initial estimated cost of $1.2 billion, with the facility achieving operational status by May 2014 after phased development including a 30 MW initial technical load expandable to 65 MW overall. The design incorporates Tier 3 reliability standards for uptime, infrastructure across raised floors, and on-site support systems to manage high-density farms capable of petabyte-scale storage, though exact current capacity remains classified. Notable for its resource demands, the center consumes electricity equivalent to tens of thousands of households and requires substantial cooling, prompting local infrastructure upgrades and ongoing expansions as of 2025 to accommodate growing data volumes from global surveillance and cyber defense operations. While enabling advancements in threat detection and code-breaking, the facility has drawn scrutiny for its role in bulk data retention practices, which underpin NSA's analytical capabilities but have fueled debates over scope and oversight in intelligence gathering.

History

Planning and Announcement (2006–2010)

The Utah Data Center's planning originated in the mid-2000s amid the U.S. intelligence community's expansion to handle surging volumes of global communications data for purposes. As part of this effort, the project was integrated into the Comprehensive National Cybersecurity Initiative (CNCI), a classified program initiated by President in 2008 to bolster cyber defenses against threats including and state-sponsored . The center was designated as the first Intelligence Community CNCI data center, emphasizing decentralized storage to support analysis amid exponential data growth. Funding for the facility, estimated at approximately $1.5 billion from classified "" budgets, was authorized to enable petabyte-to-yottabyte-scale capabilities, as articulated by NSA Director Lt. Gen. to address cyber vulnerabilities and intercept vast digital intercepts. Public disclosure of the plans emerged in through leaked details and reports, revealing intentions for a one-million-square-foot complex to consolidate NSA resources previously concentrated at . Site selection favored , at base, due to abundant open land on a secure installation, access to a skilled technical workforce, proximity to reliable power infrastructure near , and relatively low exposure to natural disasters compared to seismically active regions like . NSA officials evaluated over 30 potential locations, prioritizing for its cost-effective electricity rates and water availability essential for cooling systems, alongside minimal seismic history in the selected area. By late 2010, contract preparations advanced, setting the stage for construction awards.

Construction and Initial Operations (2011–2014)

Construction of the Utah Data Center commenced with a groundbreaking ceremony on January 6, 2011, led by the National Security Agency (NSA) and the U.S. Army Corps of Engineers at Camp Williams near Bluffdale, Utah. The project, valued at $1.2 billion initially, involved building a one-million-square-foot facility—the largest Department of Defense construction effort underway at the time—under the Army Corps of Engineers' oversight. The structure reached substantial completion by mid-2013, encompassing data halls, administrative buildings, and support infrastructure on a 200-acre site. Full activation faced significant setbacks from electrical system failures at the dedicated on-site substation, which supplies the facility's 65-megawatt demand. From late 2012 through 2013, at least ten arc-fault "meltdowns" occurred, involving power surges that fried equipment, melted metal, and triggered explosions akin to "a flash of inside a 2-foot box." These incidents damaged components worth hundreds of thousands of dollars and perplexed engineers, delaying operations by approximately one year beyond the 2013 target. The NSA mitigated these electrical issues by October 2013, enabling the data center to transition to operational status in 2014. Initial phases emphasized stabilizing power delivery and cooling systems to support high-density computing, marking an engineering milestone in scaling secure, utility-scale data infrastructure despite the early technical hurdles.

Location and Facilities

Site Selection and Physical Layout

The Utah Data Center occupies approximately 247 acres of secured federal land at near , selected for its isolation from urban centers, which minimizes exposure to population-related risks and facilitates secure operations. This location on a installation provides inherent protection through existing defense infrastructure and proximity to rapid response forces, while the region's low incidence of enhances long-term operational viability. Access to pre-existing fiber optic lines supports efficient data connectivity without extensive new deployments. Utah's selection also benefited from the state's business-friendly policies and minimal local opposition, attributed to a supportive populace and available undeveloped land on the military base. The physical layout features a 1 million square foot complex housing four 25,000 square foot data halls for core processing, alongside administrative and support buildings. Perimeter security includes reinforced fencing engineered to halt a 15,000-pound vehicle, integrated into a $10 million anti-terrorism barrier system to deter physical threats. The design emphasizes fortified containment and controlled access points, leveraging the site's military adjacency for layered defense.

Infrastructure and Security Features

The Utah Data Center features fully redundant designed to maintain operational continuity amid potential disruptions, including grids, multiple cable runs, and uninterruptible power supplies. Diverse electrical substations deliver over 11 MW of high-density power, with scalability for additional capacity to support phased expansions. On-site facilities and plants enable self-sufficient cooling operations, reducing to external supply interruptions. The facility's architecture supports modular growth via add-on building modules, allowing incremental scaling without necessitating full-site reconstruction. measures include a $10 million antiterrorism with reinforced perimeter engineered to halt high-impact vehicular assaults. Access controls incorporate biometric alongside continuous and on-site personnel patrols to counter both external intrusions and internal threats.

Technical Specifications

Data Storage and Computing Capacity

The Utah Data Center's storage infrastructure consists of custom racks housing high-capacity hard disk drives and solid-state arrays, distributed across four 25,000-square-foot data halls totaling 100,000 square feet of server space. These approximately racks enable raw storage capacities estimated at 3 to 12 exabytes, supporting multi-year retention of data including unstructured formats like voice recordings and video feeds. Initial planning documents from around projected potential scalability to yottabyte levels (10^24 bytes) to accommodate in intercepted volumes, though subsequent blueprint analyses in revised feasible capacities downward to exabyte scales due to physical and architectural constraints. Each typically holds around 1.2 petabytes, with designs emphasizing modular expansion for handling diverse types such as encrypted . Computing resources include supercomputing clusters utilizing XC30 systems, configured for of petabyte-scale datasets to perform pattern recognition, metadata extraction, and low-latency queries on stored . These systems support high-performance workloads scalable to petaflop ranges, evolving from 2013 modular blueprints to prioritize efficient analysis of raw, high-volume inputs without relying on external processing dependencies.

Power, Cooling, and Resource Demands

The Utah Data Center maintains a baseline consumption of 65 megawatts to sustain its dense arrays and associated , equivalent to the needs of roughly 33,000 households. This draw stems from the conversion of into computational work, which generates substantial per thermodynamic principles, necessitating additional for circulation and dissipation systems. Redundancy includes up to 60 diesel-fueled emergency generators with three-day fuel capacity to ensure uninterrupted operation during grid failures. Heat management relies on an open-evaporative cooling system, which consumes an estimated 1.7 million gallons of daily by leveraging evaporation's absorption to reject thermal loads from servers. is drawn from local municipal sources in the Basin, with monthly usage varying—such as 23.5 million gallons in June 2022—to align with ambient conditions and modes that reduce mechanical cooling demands in cooler periods. Initial commissioning encountered electrical arc faults and equipment failures in 2013, resulting in at least 10 incidents that compromised transformers and delayed full operations. These issues were addressed through targeted testing, repairs, and mitigations by mid-2014, allowing the facility to achieve stable power delivery without inherent design defects.

Purpose and Operations

Role in Signals Intelligence

The Utah Data Center functions as a primary storage facility for (SIGINT) gathered by the (NSA), authorized under , which establishes the foundational framework for collecting, retaining, and analyzing foreign SIGINT to protect . This order directs the NSA to target foreign powers and entities outside the , with collections limited to non- persons consistent with applicable laws, including the (FISA) for domestic-facing activities involving foreign intelligence targets. The center's role aligns with the NSA's statutory mandate to centralize such data, enabling systematic retention of intercepted communications and electronic signals from global sources deemed relevant to foreign threats. Integral to the Comprehensive National Cybersecurity Initiative launched in 2008, the facility supports the archiving of global network traffic to facilitate the identification of state-sponsored cyber operations and proliferation-related activities through SIGINT-derived insights. As the designated Intelligence Community data center for this initiative, it processes and stores petabytes of raw SIGINT to underpin cybersecurity defenses, prioritizing data from foreign adversaries over incidental domestic metadata. The center distinguishes itself from ephemeral NSA processing nodes by providing persistent, high-capacity for unfiltered SIGINT streams, which permits longitudinal forensic examination and across datasets spanning years—capabilities constrained in fragmented or time-limited systems. This design ensures that historical signals data remains accessible for re-analysis in response to evolving requirements, reinforcing the strategic depth of U.S. SIGINT operations.

Data Ingestion, Processing, and Analysis

The Utah Data Center ingests vast streams of data through high-bandwidth fiber optic links connected to global collection points, including geostationary satellites, overseas listening posts, and domestic telecommunications infrastructure such as switches operated by providers like and . These inputs derive from taps on at least a dozen major international communications cables and cooperative arrangements with telecom firms, enabling the capture of petabytes daily from sources like phone calls, emails, and . Initial filtering occurs via onboard software at collection stages, which targets by geographic regions, specific countries, cities, numbers, email addresses, and watch-listed entities, discarding irrelevant volumes before transmission to the facility. tools, such as those from Narus, scan for keywords, suspicious patterns, and flagged names, prioritizing —like headers and routing information—for archival while routing potentially relevant content for further scrutiny. This tiered approach aligns with scalable computing principles, emphasizing efficient indexing over indiscriminate retention to manage exabyte-scale inflows. Downstream processing layers utilize distributed storage systems and clusters for decryption, employing cryptanalytic algorithms on supercomputers to target encryption schemes like in selected datasets. techniques, including and , analyze patterns across and decrypted content to identify threats, such as unusual behaviors or correlations in financial and , thereby focusing resources on high-value . Outputs from these automated pipelines feed into analyst workstations and integrated review environments, where human experts apply oversight to refine machine-generated leads, reducing false positives through iterative validation against raw signals.

National Security Role

Contributions to Cybersecurity and Threat Prevention

The Utah Data Center supports the Comprehensive National Cybersecurity Initiative (CNCI) through its role as the Intelligence Community's dedicated data storage facility for related to threats, enabling the identification of vulnerabilities and the provision of warnings to defend against foreign intrusions. Constructed to handle exabyte-scale data volumes, it facilitates and historical analysis of global communications patterns, which underpins NSA efforts to detect state-sponsored operations targeting U.S. networks. This capacity addresses the need for comprehensive amid escalating threats, where adversaries employ obfuscated techniques requiring correlation across petabytes of intercepted traffic to uncover indicators of compromise. In bolstering defensive postures, the facility provides foreign intelligence on cybersecurity threats directed at Department of Defense systems, supporting attribution and strategies against advanced . Operational since mid-2014 following resolution of initial electrical issues, it has enabled enhanced vulnerability assessments for the U.S. intelligence community, contributing to proactive measures like network hardening recommendations derived from SIGINT-derived insights. The center's , including redundant power and cooling systems scaled for continuous high-throughput processing, ensures availability for time-sensitive threat hunting, countering arguments of overcapacity by demonstrating necessity for handling the volume of global data flows essential to preempting widespread breaches. While specific declassified outcomes tying the facility to individual thwarted intrusions remain limited due to , its integration into NSA's broader cyber defense framework has sustained contributions to initiatives like shared threat intelligence with partners, where stored aids in tracing persistent campaigns without relying solely on forensics. This underscores the facility's value in causal chains of prevention, where long-term reveals temporal patterns in adversary behavior that ephemeral cannot capture.

Integration with Broader Intelligence Community Efforts

The Utah Data Center supports synergies across the U.S. Intelligence Community by storing and enabling access to datasets that are shared with agencies including the (CIA), (FBI), and U.S. Cyber Command via secure networks and fusion centers. This data dissemination aids in fusing with from the CIA and domestic investigations by the FBI, facilitating joint attribution of adversarial activities. For instance, NSA-derived intelligence, bolstered by the center's processing infrastructure, contributed to operations by providing communications intercepts used in targeting decisions against groups like , shared with military and interagency partners to disrupt command structures. In national cybersecurity strategy, the facility's role under the Comprehensive National Cybersecurity Initiative involves archiving cyber threat indicators that inform vulnerability assessments and defensive measures across agencies. Stored data on network intrusions and patterns has been leveraged to enhance public-private partnerships, such as those countering campaigns by identifying attacker tactics attributable to state actors or criminals. This integration allows Cyber Command and the FBI to operationalize NSA insights for proactive defenses, including disrupting foreign cyber infrastructure. The center's long-term archival capacity provides enduring value for post-event forensic analysis, enabling reviews of complex threats like foreign interference attempts. NSA assessments of cyber operations in 2016, for example, relied on historical communications data to reconstruct and intrusion campaigns targeting systems, with findings disseminated to IC partners for policy and mitigation responses. Such capabilities underscore causal efficiencies in multi-domain , where stored yields insights years after collection through advanced decryption and pattern analysis.

Controversies and Criticisms

Privacy and Civil Liberties Debates

The disclosures by in June 2013 revealed NSA programs involving the bulk acquisition of internet communications, with the Utah Data Center serving as a primary storage facility for data exceeding yottabytes in scale, prompting widespread debate over the scope of domestic . Critics, including the (ACLU), contended that such collection under programs like and UPSTREAM violated Fourth Amendment protections by enabling warrantless interception of Americans' international emails and other data incidentally captured alongside foreign targets, fostering risks of into purely domestic activities. Defenders of the programs emphasize legal constraints under Section 702 of the (FISA), which authorizes targeting of non-U.S. persons abroad without warrants, provided that U.S. persons' data acquired incidentally undergoes minimization procedures—such as masking identifiers, limiting retention to five years unless pertinent to foreign intelligence, and prohibiting dissemination without relevance determinations. These procedures, approved annually by the Foreign Intelligence Surveillance Court (FISC), are supplemented by and internal compliance mechanisms, including over 200 dedicated officers at the NSA who investigate and report incidents to prevent recurrence. Audits by the Office of the (ODNI) and Department of Justice, as detailed in their July 2025 joint assessment, confirm that the NSA and other agencies adhere to these guidelines without evidence of systemic non-compliance or widespread abuse, attributing isolated violations—such as improper querying—to rather than structural flaws, with subsequent of unauthorized U.S. . Security analysts counter concerns by noting that global flows make purely extraterritorial collection infeasible without incidental U.S. captures, which are statutorily barred from domestic use absent individualized warrants under Title I of FISA, thereby prioritizing foreign intelligence over unsubstantiated fears of totalitarian overreach. This framework, while imperfect, reflects causal necessities of asymmetric threats in digital networks, where targeted foreign yields defensive value without routine domestic exploitation.

Operational Challenges and Environmental Impacts

The Utah Data Center encountered notable electrical instability during its commissioning phase in . The facility experienced at least 10 "meltdowns" over a 13-month period ending in October , triggered by massive power surges that damaged electrical transformers and substation components, incurring repair costs in the hundreds of thousands of dollars. These incidents, occurring amid testing of the unprecedented-scale infrastructure, halted computer operations and delayed full activation but were addressed through targeted electrical system reinforcements, enabling subsequent operational rollout without documented persistent disruptions to mission capabilities. Cooling demands present ongoing environmental pressures, as the center employs open-loop evaporative systems necessitating significant freshwater intake in Utah's semiarid conditions. Usage reached a documented peak of 23.5 million gallons in June 2022, sourced primarily from the Basin amid regional drought strains. Per-megawatt water intensity aligns with industry norms for similar hyperscale facilities—typically 0.2 to 1.8 gallons per processed—yet the site's location amplifies local resource competition, though actual consumption has fallen short of pre-construction projections of up to 1.7 million gallons daily through phased efficiencies and variable load management. Power infrastructure integration has sparked localized apprehensions regarding loading, given the center's estimated 65-megawatt baseline draw and potential for surges during high-compute periods. Regional analyses highlight data centers collectively as contributors to grid vulnerabilities, with facing accelerated demand growth outpacing supply additions. No verified instances attribute systemic blackouts or shortages directly and solely to the Utah Data Center, however; its isolated substation ties mitigate broader impacts, while facility-related economic activity, including and sustainment for hundreds, provides offsetting fiscal benefits to Bluffdale's utility district.

Recent Developments and Expansions

Post-2014 Upgrades and Expansions

Following activation in , the Utah Data Center underwent targeted expansions to support heightened operational demands from escalating global data volumes, including those stemming from Internet of Things proliferation and sophisticated cyber threats. These adaptations emphasized logistical enhancements rather than core data hall modifications, with the existing processing facilities remaining unchanged as of 2024. A key development was the completion of an onsite in 2024, increasing for employee and visitor vehicles to accommodate workforce growth tied to intensified processing. Concurrently, realignment of the NSA access road progressed, with completion slated for December 2024, to integrate with the regional Mountain View Corridor and improve for expanded campus activities. Broader NSA efforts to manage data surges post-2018 involved shifting mission data to classified environments, enabling architectures that offload processing from on-premise sites like to mitigate throughput constraints. This transition supported handling petabyte-to-exabyte scale ingestion without full facility overhauls, aligning with documented in collected signals. In addressing 2020s incidents such as the supply chain compromise, the NSA bolstered telemetry storage and analysis capacities across its infrastructure, utilizing Utah's repository for endpoint to aid attribution and mitigation. Technical details on hardware iterations, including potential analytics integration or updates, remain classified, though the site's initial design incorporated modular scalability for such evolutions.

Planned Campus Growth (2020s)

In February 2025, the U.S. Army Corps of Engineers issued a Draft Environmental Assessment for a proposed two-phase expansion of the Utah Data Center Campus in Bluffdale, aimed at consolidating operations and accommodating increased administrative and support needs without altering existing facilities. Phase 1, with construction slated to begin in 2027 and span 42 months, includes a 110,000–130,000 gross square foot (GSF) administrative building for 500–750 personnel, a 37,000 GSF commons building featuring fitness and cafeteria spaces, and a 135,000 GSF , alongside a new vehicle control point. Phase 2, contingent on future funding, would add a 120,000–130,000 GSF administrative building for approximately 500 personnel, a 40,000 GSF security forces facility with an indoor firing range, a 130,000 GSF , and a 20,000 GSF , bringing total post-expansion personnel to 1,250. The initiative focuses on enhancing support for mission-critical data handling and processing through resilient, adaptable infrastructure designed for long-term operational flexibility amid evolving requirements. Total added gross square footage across phases is estimated at 267,000–472,000 GSF, utilizing previously disturbed land to minimize new environmental footprints. Phase 1 is fully funded, reflecting prioritized investments in intelligence infrastructure. Sustainability measures emphasize efficiency to counter operational challenges, including 2 megawatts of photovoltaic panels, 500 geothermal boreholes (each 300 feet deep) for ground-source heating and cooling to reduce energy demands and water consumption relative to traditional systems, and a potential 3-megawatt . These elements target net-zero and LEED Silver certification, despite projected increases of 4.2 megavolt-amperes in power demand and 30,000 gallons per day in potable water use (15,000 gallons per phase). Annual emissions are forecasted at 196–1,944 metric tons of CO2 equivalent from 2027–2034, deemed below significant impact thresholds.

References

  1. [1]
    Groundbreaking Ceremony Held for $1.2 Billion Utah Data Center
    Jan 6, 2011 · The National Security Agency and the US Army Corps of Engineers broke ground today on a $1.2 billion data center at Camp WG Williams National Guard Post here.Missing: facts | Show results with:facts
  2. [2]
    NSA/CSS - Cryptologic Centers - National Security Agency
    It has a 24/7 watch floor, Alaska Security Operations Center (ASOC). NSA Utah (NSAU) Located in Bluffdale, 20 miles outside of Salt Lake City, NSA Utah excels ...Missing: facts | Show results with:facts
  3. [3]
    [PDF] National Security Agency FY 2013 Military Construction, Defense ...
    (2) Facilities a) Data center technical load of 65 MW distributed across raised floor is a design parameter for the facility. b) The infrastructure support area ...Missing: facts | Show results with:facts
  4. [4]
    [PDF] National Security Agency Military Construction, Defense-Wide FY ...
    Installed infrastructure will support 65MW technical load data center capacity for future expandability. The design is to be capable of Tier 3 reliability.Missing: facts | Show results with:facts
  5. [5]
    NSA Awards a Multi-Year IDIQ Umbrella Contract and the 1st ...
    May 28, 2010 · Camp Williams, Utah is the location of the intelligence community data center for which NSA/CSS is the executive agent for the design, ...Missing: facts | Show results with:facts
  6. [6]
    [PDF] Environmental Assessment for the Utah Data Center Campus ...
    Feb 9, 2025 · COVER SHEET. Environmental Assessment for the Utah Data Center Campus Expansion. Bluffdale, Utah. Responsible Agency: National Security ...
  7. [7]
    The NSA Is Building the Country's Biggest Spy Center ... - WIRED
    Mar 15, 2012 · Inside, the facility will consist of four 25,000-square-foot halls filled with servers, complete with raised floor space for cables and storage.
  8. [8]
    NSA Utah Data Center - Serving Our Nation's Intelligence Community
    Utah Data Center Technical Specifications · Data Storage Capacity · Code-Breaking Supercomputer Platform · Our Ultimate Target: 256-bit AES.Missing: cost | Show results with:cost
  9. [9]
    NSA Bumblehive - WorldsTopDataCenters.com
    Aug 9, 2025 · The Utah Data Center, also known as Bumblehive, is the first Intelligence Community Comprehensive National Cyber-security Initiative data center
  10. [10]
    NSA Plans $1.6 Billion Utah Data Center
    Jul 1, 2009 · NSA Plans $1.6 Billion Utah Data Center. The National Security Agency is planning to build a massive data center at Fort Williams in Utah, which ...Missing: announcement | Show results with:announcement
  11. [11]
    NSA to store yottabytes of surveillance data in Utah megarepository ...
    Nov 1, 2009 · The NSA is constructing a datacenter in the Utah desert that they project will be storing yottabytes of surveillance data.Missing: Alexander | Show results with:Alexander
  12. [12]
    NSA Plans Massive, 65MW, $2B Data Center in Utah - HPCwire
    Jul 6, 2009 · The ultra-secretive National Security Agency plans to build a 1-million-square-foot data center in Utah as it seeks to decentralize its computing resources.Missing: 2006-2010 | Show results with:2006-2010
  13. [13]
    Why the NSA put a data center in Utah - The Salt Lake Tribune
    Jun 29, 2013 · "That's how we picked Utah." Open land on a military installation, a qualified workforce and no history of natural disasters also helped ...Missing: rationale seismic
  14. [14]
    Booting Up: New NSA Data Farm Takes Root In Utah - NPR
    maybe one of the nicest data centers ...
  15. [15]
    Big Data Meets Big Brother: Inside the Utah Data Center - Datanami
    Aug 6, 2013 · “NSA would like to confirm, on the record, that the Utah Data Center ... The NSA won't disclose the capacity, but commercially available ...
  16. [16]
    Army awards $1.2 billion contract for NSA data center in Utah
    Sep 27, 2010 · The Army Corps of Engineers awarded a $1.2 billion contract on Sept. 24 to a consortium of construction companies to build a massive data center ...
  17. [17]
    Groundbreaking ceremony held for $1.2 billion Utah Data Center
    Jan 6, 2011 · The $1.2 billion, one million sq ft data center, is the largest DOD project, designed for cyber security, and will be led by the NSA.Missing: Bluffdale | Show results with:Bluffdale
  18. [18]
    Utah Data Center | archnexus
    This $1.4 billion, 1 million-square-foot facility occupies 200 acres within the Utah National Guard camp near Camp Williams, Utah. Built under the direction ...Missing: NSA | Show results with:NSA
  19. [19]
    NSA Says It Has 'Mitigated' Meltdowns At Utah Data Farm - KPBS
    Oct 8, 2013 · The Utah Data Center requires 65 megawatts of electricity and its own power substation. That much power used by so much computer gear generates ...
  20. [20]
    NSA data centre opening delayed after series of electrical surges in ...
    Oct 8, 2013 · Electrical surges at a huge new National Security Agency data centre have reportedly fried equipment, melted metal and caused fiery explosions, ...
  21. [21]
    NSA Data Center Plagued by Electrical Problems
    Oct 8, 2013 · The NSA's massive data center in Utah has been plagued by electrical problems that have delayed the opening of the facility.
  22. [22]
    Massive NSA Data Center Crippled By Consecutive Electrical Surges
    Electrical surges described as “a flash of lightning inside a 2-foot box” have destroyed hundreds of thousands of dollars worth of machinery and delayed the ...
  23. [23]
    Power surges 'cripple NSA data centre' - BBC News
    Oct 8, 2013 · Electrical supply problems at a National Security Agency data centre have delayed its opening by a year, reports the Wall Street Journal.
  24. [24]
    NSA's Data Center Electrical Problems Aren't That Shocking
    Last week, the Wall Street Journal reported that arc-fault failures—electrical problems that exceed the protective capabilities of circuit breakers and ...Missing: repairs | Show results with:repairs
  25. [25]
    Meltdowns Prevent Use of NSA's Utah Data Center
    Oct 16, 2013 · Because of the arc fault failure explosions, thousands of dollars worth of equipment has been destroyed, according to the Wall Street Journal.Missing: transformer | Show results with:transformer
  26. [26]
    A Visit to the NSA's Data Center in Utah - The Atlantic
    Nov 19, 2015 · At the time that the city of Bluffdale approved the construction of the NSA Data Center, it seemed like a pretty appealing development. The ...
  27. [27]
    Town looks to capitalize on NSA data center - The Denver Post
    Nov 3, 2013 · But the Utah Data Center construction brought benefits that weren't in the plans. ... Electricity, sewer and fiber optics were already in the area ...
  28. [28]
  29. [29]
    'Utah has long stood as one of our nation's most patriotic states ...
    Jul 16, 2018 · The documents affirm the practical assumptions for why the Data Center was built in Bluffdale: The NSA was seeking cheap electricity. The newly ...
  30. [30]
    NSA Utah Data Center - Baxtel
    Situated on 55 acres, including a dedicated on-site substation, the former Fairchild Semiconductor chip fabrication facility is being renovated to become a ...
  31. [31]
    Utah Data Center | Public Intelligence
    Jul 23, 2010 · The Utah Data Center is a 1 million sq ft, 65 MW, Tier III, highly secure NSA facility with 100,000 sq ft mission-critical space, and 900,000 ...
  32. [32]
    Taking a Closer Look at the NSA's Data Center - Vocalcom
    The Utah installation (codenamed Bumblehive) will be, to date, the largest center of its type in the nation. It will be 1 million square feet – 100,000 square ...
  33. [33]
    Welcome to Utah, the NSA's desert home for eavesdropping on ...
    Jun 14, 2013 · The $1.7bn facility, two years in the making, will soon host supercomputers to store gargantuan quantities of data from emails, phone calls, ...
  34. [34]
    A Closer Look At Federal Government Data Centers In The USA
    Apr 17, 2024 · The facility is surrounded by perimeter fencing, surveillance cameras, and armed guards to deter unauthorized access, while access to critical ...
  35. [35]
    Blueprints Of NSA's Ridiculously Expensive Data Center In Utah ...
    Jul 24, 2013 · The NSA will soon cut the ribbon on a facility in Utah built to help house and process data collected from telephone and Internet companies, ...Missing: construction completion
  36. [36]
    Leaks shed light on how NSA may use supercomputers, gigantic ...
    Jul 1, 2013 · The NSA will use the Cray XC30 series of high-capacity computers to crunch at least some of its data, according to documents from several of the ...
  37. [37]
    NSA Utah Data Center: frequently asked questions
    Sep 30, 2013 · Private contractors have said the NSA has purchased Cray XC30 supercomputers. Industry officials say those machines can run up to 1 million ...
  38. [38]
    NSA Utah Data Center Facing Unexpected Energy Taxes
    The NSA has said it will spend up to $1.5 billion on the Utah data center, which is approaching completion of its first phase after nearly four years of ...Missing: cost | Show results with:cost
  39. [39]
    NSA's Huge Utah Datacenter: How Much Of Your Data Will It Store ...
    Jul 26, 2013 · The NSA's mammoth new facility in Bluffdale, Utah, is nearing completion. We think we know it'll be used to store, decrypt, ...Missing: land | Show results with:land
  40. [40]
    Pictures of the NSA's Utah Data Center - Business Insider
    Jun 7, 2013 · ... center, and sixty diesel-fueled emergency standby generators and fuel facility for a 3-day 100% power backup capability. The chiller plant ...
  41. [41]
    Why Does the NSA Want to Keep Its Water Usage a Secret? - WIRED
    Mar 19, 2014 · According to the NSA, its water usage is a matter of national security. An aerial view of the NSA039s Utah Data Center in Bluffdale Utah.Missing: treatment | Show results with:treatment
  42. [42]
    NSA Data Center's Water Use Pattern Indicates Economization
    May 2, 2014 · The National Security Agency's Utah data center using much less water than the U.S. spy agency pays for most likely indicates that the ...Missing: treatment | Show results with:treatment
  43. [43]
    Voices: Utah data centers must be transparent about water usage
    Dec 31, 2024 · In June 2022, the National Security Agency's Utah Data Center in the West Desert reported using more than 23.5 million gallons of freshwater.
  44. [44]
    The NSA's Hugely Expensive Utah Data Center Has Major Electrical ...
    Oct 7, 2013 · The NSA's Hugely Expensive Utah Data Center Has Major Electrical Problems And Basically Isn't Working.
  45. [45]
    Electrical failures confirmed at NSA data center | KSL.com
    Oct 8, 2013 · "During the testing and commissioning of the Utah Data Center, problems were discovered with certain parts of the electrical system. Issues ...
  46. [46]
    EO 12333 - Signals Intelligence - National Security Agency
    Executive Order (EO) 12333 is the foundational authority by which NSA collects, retains, analyzes, and disseminates foreign signals intelligence information.
  47. [47]
    Signals Intelligence - FISA - National Security Agency
    Under all FISA and FAA programs, the government compels one or more providers to assist NSA with the collection of information responsive to the foreign ...
  48. [48]
    National Security Agency/Central Security Service > Signals ...
    As set forth in Executive Order 12333 and National Security Council Intelligence Directive 6, NSA collects, processes, analyzes, produces, and disseminates ...Missing: Utah Data
  49. [49]
    Research Overview - National Security Agency
    NSA Research expands our in-house development of data science, machine learning, and scalable analytic techniques to draw actionable intelligence from raw data.Missing: pipeline | Show results with:pipeline
  50. [50]
    NSA Breaks Ground on Cybersecurity Center - GovInfoSecurity
    The NSA, Department of Homeland Security and other agencies are expected to use the facility to help identify cyber threats and protect national IT security ...Missing: contributions | Show results with:contributions
  51. [51]
    NSA building $1.5 billion cyber security data center - Consulting
    Nov 4, 2009 · The NSA is building the facility to provide intelligence and warnings related to cyber security threats, cyber security support to defense and ...Missing: prevention | Show results with:prevention
  52. [52]
    Army Awards $1.2 Billion NSA Data Center Contract - Dark Reading
    The Army has awarded a $1.2 billion contract to a construction consortium to build a spacious new data center in Utah for the National Security Agency's ...Missing: yottabytes | Show results with:yottabytes<|separator|>
  53. [53]
    NSA Cybersecurity Collaboration Center - National Security Agency
    NSA establishes collaborative relationships to prevent, detect, and defeat cyber adversaries targeting our nation's most sensitive networks. Learn More ...DIB Cybersecurity Services · Customer Contact Form · DIB Customer Contact Form
  54. [54]
    How The U.S. Hacked ISIS - NPR
    Sep 26, 2019 · The NSA and US Cyber Command created a secret task force, a special mission, and an operation that would become one of the largest and longest offensive cyber ...
  55. [55]
    NSA Utah Data Center Scrutiny Is Misguided, Experts Say
    Jul 25, 2013 · Critics upset about the soon-to-open data center are overlooking the larger issues of the NSA's surveillance activities, according to some privacy and security ...
  56. [56]
    NSA Report on Russian Hacking of U.S. Election - The Intercept
    Jun 5, 2017 · Russian military intelligence executed a cyberattack on at least one U.S. voting software supplier and sent spear-phishing emails to more ...Missing: Utah | Show results with:Utah
  57. [57]
    Edward Snowden: the whistleblower behind the NSA surveillance ...
    Jun 9, 2013 · The 29-year-old source behind the biggest intelligence leak in the NSA's history explains his motives, his uncertain future and why he never intended on hiding ...Missing: Utah | Show results with:Utah
  58. [58]
    Amid Data Controversy, NSA Builds Its Biggest Data Farm - NPR
    Jun 10, 2013 · The Utah Data Center is a data farm that will begin harvesting emails, phone records, text messages and other electronic data in September.Missing: funding yottabytes
  59. [59]
    NSA Surveillance | American Civil Liberties Union
    Oct 5, 2023 · History has shown that powerful, secret surveillance tools will almost certainly be abused for political ends. The ACLU has been at the ...Missing: Utah | Show results with:Utah
  60. [60]
    [PDF] SECTION 702 OF THE FOREIGN INTELLIGENCE SURVEILLANCE ...
    When instances of non-compliance occur, NSA investigates, reports it to overseers, and works to prevent it from reoccurring . 200+ Compliance Officers. 100% of ...Missing: widespread abuse
  61. [61]
    ODNI Releases 29th Joint Assessment of Section 702 Compliance
    Jul 11, 2025 · DOJ and ODNI assessed that NSA, FBI, CIA, and NCTC continued to implement the Section 702 procedures and followed the relevant guidelines.
  62. [62]
    Reforming Section 702 of the Foreign Intelligence Surveillance Act ...
    Dec 8, 2023 · Under Section 702, the National Security Agency (NSA) can intercept emails, phone calls, and text messages from specific non-Americans overseas— ...
  63. [63]
    NSA Stops Certain Section 702 "Upstream" Activities
    Apr 28, 2017 · NSA has decided that its Section 702 foreign intelligence surveillance activities will no longer include any upstream internet communications that are solely ...
  64. [64]
    Utah Data Center experienced electrical failures, NSA confirms
    Oct 7, 2013 · Electrical failures occurred during testing at the National Security Agency's massive data storage center in Bluffdale, an NSA spokeswoman ...Missing: transformer repairs
  65. [65]
    [PDF] Reducing Data Centers' Water Consumption in the Great Salt Lake ...
    For example, in June 2022, the NSA's Utah Data Center used 23,532,000 gallons of water from the Great Salt Lake Basin.
  66. [66]
    Data flows and water woes: The Utah Data Center - Mél Hogan, 2015
    Specifically, I explore the NSA's infrastructure and the million of gallons of water it requires daily to cool its servers, while located in one of the driest ...
  67. [67]
    NSA data center 'crippled' by huge power surges - DCD
    Oct 8, 2013 · The US National Security Agency data center being built the US state of Utah has suffered a series of massive power surges which have crippled the facility.
  68. [68]
    Energy demand from data centers growing faster than West can ...
    Aug 27, 2024 · Data centers being rapidly built in the West are becoming an “emerging risk” to electrical grid reliability in the region, experts say.Missing: concerns | Show results with:concerns
  69. [69]
    In the arid West, AI data centers could stress water resources, grid ...
    Jul 31, 2025 · The energy used by AI data centers could put enormous strain on the grid. A new study shows that utility companies in Colorado, Utah, Nevada ...
  70. [70]
    NSA 'Systematically Moving' All Its Data to The Cloud - Nextgov/FCW
    Jun 21, 2018 · The National Security Agency has moved most of the mission data it collects, analyzes and stores into a classified cloud computing environment ...Missing: Utah | Show results with:Utah
  71. [71]
    NSA Turns to the Cloud to Help Manage Data Deluge - Nextgov
    Nov 14, 2014 · In 2010, NSA decided to pursue cloud as a “common space” where analysts could look across the agency's entire river of collected information ...Missing: integration networks
  72. [72]
    Federal Response to SolarWinds and Microsoft Exchange Incidents
    Jan 13, 2022 · This report describes the federal response to 2 high-profile cybersecurity incidents that affected the US government.