Fact-checked by Grok 2 weeks ago

Availability-based tariff

Availability-based tariff (ABT) is a rational, performance-oriented for bulk electricity supply from generating stations in , decoupling fixed capacity charges—paid based on declared plant availability—from variable energy charges tied to scheduled generation, while introducing frequency-linked penalties and incentives for unscheduled deviations to enforce discipline and frequency stability. Introduced by the (CERC) through its order on January 4, 2000, ABT addressed chronic indiscipline, including over-generation during off-peak hours and shortfalls during peaks, which had caused wide frequency swings between approximately 48.5 Hz and 51.5 Hz, damaging equipment and eroding system reliability. The mechanism requires generators to declare daily capability by 9:00 AM, with state load dispatch centers scheduling drawals in 15-minute blocks; excess or deficit power is then settled via unscheduled interchange (UI) at rates escalating with frequency deviation—for instance, around Rs. 3.45 per kWh at 49.5 Hz, with caps evolving to Rs. 10 per kWh by 2008 to curb abuses. Phased implementation across India's regional grids—from the Western Region in July 2002 to the North Eastern in November 2003—marked a shift from flat tariffs that incentivized indiscriminate regardless of , fostering merit-order dispatch, among generators, and overall reductions through optimized operations. Notable achievements include narrowed bands closer to the ideal 50 Hz, reduced equipment stress, and streamlined regional power exchanges, though effectiveness waned over time, prompting CERC reviews and UI rate adjustments amid persistent low-frequency over-drawals during peaks that risked cascading failures. Critics highlight drawbacks such as elevated UI s burdening beneficiaries and potential disincentives for flexible in variable renewable-heavy scenarios, yet ABT remains foundational to India's power market evolution, underpinning ancillary services and deviation settlement frameworks.

Historical Development

Pre-ABT Challenges in Sector

Prior to the introduction of the Availability-Based Tariff (ABT) in 2000, the power sector grappled with profound operational indiscipline in its regional grids, primarily due to the absence of financial incentives or penalties for adhering to scheduled generation and drawal. Generators routinely over-injected power into the grid regardless of prevailing conditions, while state electricity boards (SEBs) overdrew during shortages without accountability, leading to skewed dispatch decisions often based on variable costs rather than system needs. This lack of discipline stemmed from settlement mechanisms that allocated payments to central generating stations proportionally to beneficiaries' fixed shares or total energy drawals, as recommended by earlier committees like the K.P. Rao panel, which encouraged by decoupling actual usage from costs. Frequency management was particularly acute, with the all-India grid nominal 50 Hz standard frequently violated: levels plummeted to 48.0–48.5 Hz during peak hours due to excessive regional overdrawals and climbed to 50.5–51.0 Hz off-peak from uncurbed generation surpluses, often with abrupt 1 Hz swings in 5–10 minutes that risked cascading failures. Unscheduled interchanges (UI) exacerbated these issues, as there were no deviation-linked charges; overdrawals incurred no penalties, under-injections received no compensation, and metering inadequacies—such as reliance on 30-minute blocks in some states—hindered accurate tracking. Regional grids, like the Southern Grid, exhibited wide demand-supply mismatches, contributing to frequent disturbances, equipment stress from voltage and frequency volatility, and economic losses from unplanned outages. These systemic flaws not only undermined grid stability but also inflated costs, as generators prioritized maximizing plant load factors (PLFs) over demand alignment under single-part tariffs, while SEBs evaded fixed charges during low utilization. The (CERC) identified such indiscipline as a core driver for reform, noting in its January 4, 2000, order that prior arrangements failed to enforce merit-order dispatch or real-time balancing, perpetuating shortages and blackouts across interconnected systems.

Introduction and Initial Implementation (2000)

The Availability Based Tariff (ABT) was introduced by the (CERC) through its order dated January 4, 2000, marking a pivotal reform in India's electricity sector to address chronic issues of grid indiscipline, such as frequent overdrawals by states and under-generation by utilities, which had led to unstable grid frequencies and inefficient power dispatch. The mechanism shifted from the prevailing (fixed and variable costs) to a three-part structure designed to reward generators for declared availability and penalize deviations from schedules, thereby promoting and operational reliability in bulk power transactions among central generating stations, regional load dispatch centers, and beneficiaries. This reform was recommended following consultations and draft notifications, emphasizing the need for incentives aligned with actual plant performance rather than nominal capacity. Under the initial ABT framework, the capacity charge was fixed and payable based on the generator's declared capability, decoupled from actual scheduling to encourage higher availability declarations, while the energy charge covered variable costs for scheduled energy injections only, excluding unscheduled interchanges (). The UI component introduced frequency-linked pricing for deviations: over-injections or under-drawals at high frequencies (above 50 Hz) earned premiums, whereas under-injections or over-drawals at low frequencies (below 50 Hz) incurred penalties, with rates escalating in 0.05 Hz bands from the nominal 50 Hz. This pricing mechanism aimed to minimize frequency deviations by making deviations costly, particularly targeting states with histories of overdrawing without payment. Implementation commenced in early 2000 for central sector plants in the Northern and Western regions, with schedules coordinated through regional power committees and load dispatch centers, but faced immediate resistance from several state boards (SEBs) that obtained stays, delaying full enforcement. CERC issued a revised notification in December 2000 to refine settlement procedures and address legal challenges, yet the mechanism's rollout remained partial, applying initially only to inter-state sales from central stations while excluding intra-state transactions. Early data indicated modest improvements in , with average rising from around 49.5 Hz pre-ABT to nearer 50 Hz in monitored periods, though comprehensive nationwide effects materialized post-2003 expansions.

Regulatory Evolution and Amendments

The Availability Based Tariff (ABT) mechanism was initially established by the (CERC) through an order dated January 4, 2000, which introduced frequency-linked pricing for unscheduled interchanges () alongside fixed and energy charge components to incentivize discipline among generators and beneficiaries in inter-state transactions. This order marked a shift from traditional cost-plus tariffs by penalizing deviations from schedules based on frequency, with UI rates varying from ₹0.60 to ₹6.00 per kWh across frequency bands. Implementation began in select regional , expanding to all five regional load dispatch centers by November 1, 2003, resulting in improved frequency stability from an average of 49.6 Hz to near 50 Hz. The National Electricity Policy, notified on February 12, 2005, mandated the extension of ABT to intra-state levels by April 2006, prompting state electricity regulatory commissions to adopt similar frameworks for local generators and distribution licensees. CERC's 2004 Tariff Regulations affirmed ABT's continuation for central generating stations, integrating it with two-part tariffs while emphasizing its role in operational reliability. Key amendments refined the UI component to address escalating deviation costs and market dynamics. In 2009, CERC revised the UI mechanism via an explanatory memorandum, introducing a band-wise cap (₹0 to ₹8 per kWh) and floor pricing to prevent over-penalization at low frequencies while escalating charges for high-frequency over-injections, thereby balancing incentives for under- and over-scheduling. These changes responded to observed issues like UI payments exceeding scheduled revenues in some periods, aiming to sustain grid stability without undermining commercial viability. Subsequent regulatory updates subsumed ABT elements into the CERC (Deviation and Related Matters) Regulations, 2014, which formalized deviation charges linked to day-ahead market rates and , with amendments in later years to incorporate ancillary services and renewable . For instance, post-2014 refinements adjusted periods and introduced tolerances for minor deviations, reflecting empirical on operations and the growing share of . State-level adaptations, such as Bihar's intra-state ABT regulations, mirrored these federal evolutions while tailoring to local enforcement challenges.

Core Mechanism

Tariff Components

The availability-based tariff (ABT) framework, introduced by the (CERC) in , decomposes the tariff into three distinct components to promote generator accountability for plant , adherence to schedules, and minimization of disruptions from unscheduled power flows. These are the capacity charge, energy charge, and unscheduled interchange (UI) charge, with the first two forming the scheduled generation payment and the UI addressing deviations. The capacity charge reimburses fixed costs, including capital recovery, operations and , and interest, and is tied directly to the generating station's declared as a of normative capacity. It is computed monthly using the : capacity charge = ( / normative ) × declared , ensuring payments reflect operational readiness rather than actual output; for example, if a declares 85% against a 80% norm, it receives proportional recovery, incentivizing and uptime. The energy charge covers variable costs, primarily fuel expenses, and is levied on scheduled generation quanta rather than metered output, calculated as scheduled energy × variable rate per unit. This structure, effective from CERC's 2000 notification, shifts from metered-based billing to schedule-based, reducing incentives for over- and aligning payments with planned dispatch; deviations are handled separately via to avoid subsidizing inefficiencies. The UI charge applies to unscheduled interchanges—actual generation or drawal differing from schedules—and incorporates -linked pricing to enforce grid stability, with rates escalating in 15-minute blocks based on national grid bands (e.g., above 50.5 Hz or below 49.5 Hz). Over-supply during (under 49.8 Hz) incurs penalties, while under-supply during high frequency yields credits, with caps at 105% or floors at 95% of scheduled energy; this mechanism, refined through CERC amendments, generated approximately ₹10,000 in penalties and incentives by , funding grid improvements.

Scheduling and Deviation Settlement

In the availability-based tariff (ABT) framework, scheduling involves advance declaration of generation capacity by power plants and expected drawals by beneficiaries, coordinated by regional or state load dispatch centers to ensure balance. Generating stations must declare their anticipated for the following day by 09:00 hours on the previous day, with revisions permitted until 12:00 hours, divided into 96 fifteen-minute time blocks starting from 00:00 hours. Beneficiaries, such as distribution companies, simultaneously declare their drawal requirements based on demand forecasts, enabling the dispatch center to finalize binding schedules that align while respecting transmission constraints. This process promotes predictability and discourages arbitrary deviations, with schedules treated as firm contracts subject to enforcement. Deviations occur when actual metered injection or drawal differs from the scheduled quantum in a fifteen-minute block, quantified as unscheduled interchange (), calculated as UI = (actual energy - scheduled energy) / 0.25 hours to yield megawatt deviation. Positive UI indicates over-injection by generators or under-drawal by beneficiaries, while negative UI reflects under-injection or over-drawal. These deviations are automatically compensated in aggregate across the regional grid, but individual entities settle via the deviation pool account maintained by the settlement entity. The (CERC) mandates metering at 15-minute intervals for accuracy, with energy accounting finalized post-meter reading validation. Settlement under ABT's UI mechanism links charges to , incentivizing alignment with system needs: over-supply during low- periods (indicating excess demand) earns higher payments, while over-drawal then incurs steeper penalties. The base UI rate is set at approximately . 2.50 per kWh at 50 Hz nominal , varying linearly—typically increasing by Rs. 0.4-0.6 per kWh per 0.1 Hz drop below 50 Hz (up to a cap at 49.5 Hz) and decreasing above 50 Hz. For frequencies between 49.75 Hz and 50.25 Hz, charges apply at the slab rate without additional penalties; outside this, additional UI charges apply for severe deviations, such as double rates below 49.7 Hz. Regulations require bimonthly review of rates based on average power purchase costs, with payments or charges effected within specified timelines via the deviation account to enforce fiscal accountability. Recent amendments, like those in CERC's regulations, integrate market-linked pricing for some deviations while retaining signals for .

Frequency-Linked Pricing for Unscheduled Interchange

In the Availability-Based Tariff (ABT) framework, frequency-linked pricing for unscheduled interchange () addresses deviations from scheduled generation or drawal by utilities and generators, aiming to align operations with frequency stability. is defined as the net deviation—actual metered minus scheduled —calculated over 15-minute time blocks for each generating station or beneficiary. This mechanism imposes charges or provides payments based on the prevailing system , incentivizing participants to minimize deviations that exacerbate frequency imbalances: over-generation or under-drawal during low receives higher compensation, while such deviations during high incur penalties through reduced or negative rates. The (CERC) established this pricing in its 2000 ABT regulations to promote discipline, with rates derived from a tied to in the block. Pricing operates across frequency bands, with the UI rate typically following a formula such as 202 - 4f rupees per MWh (where f is frequency in Hz), yielding higher rates at lower frequencies to reflect the scarcity value of energy. For instance, at 49.0 Hz, the rate approximates 204 rupees/MWh, decreasing to about 2 rupees/MWh at 50.5 Hz; above 50.5 Hz, rates may cap at zero or trigger surcharges for persistent over-supply. Over-injectors (UI positive) are paid at this rate for excess supply, effectively rewarded more when frequency is low (e.g., under-supply conditions), but penalized via low rates when frequency exceeds 50 Hz (over-supply). Conversely, under-injectors or over-drawers (UI negative) pay the rate, facing steeper costs during low frequency to discourage worsening shortages. CERC periodically reviews and adjusts the price vector—every six months or as needed based on fuel costs and grid data—to ensure relevance, as seen in amendments tightening bands and introducing security for delayed payments beyond 12 days. This structure fosters causal incentives for frequency support: empirical analysis shows UI pricing reduces unscheduled flows by signaling marginal costs, with generators optimizing dispatch to avoid penalties during high-frequency events, which historically averaged 50.2-50.5 Hz pre-ABT but stabilized post-implementation. However, the mechanism assumes accurate metering and scheduling, with settlements handled by Regional Load Despatch Centres (RLDCs) using frequency data from Wide Area Measurement Systems. While effective for conventional plants, it has drawn scrutiny for variable renewables, where forecast errors amplify exposure, prompting later shifts toward Deviation Settlement Mechanism () hybrids retaining frequency linkage but adding volume limits.

Operational Features

Incentives for Grid Discipline

The unscheduled interchange (UI) component of the Availability Based Tariff (ABT) serves as the primary economic incentive for grid discipline by linking deviation settlement prices directly to grid frequency, thereby imposing costs or providing rewards based on how deviations affect system balance. Under ABT, generating stations and beneficiaries submit day-ahead schedules for generation and drawal; any deviations—either over- or under-generation/consumption—are settled at UI rates that vary inversely with from the nominal 50 Hz. This structure, introduced by the (CERC) in , dynamically penalizes actions that worsen frequency imbalances while rewarding those that mitigate them, fostering adherence to schedules to avoid financial penalties or suboptimal payments. When frequency falls below 50 Hz—indicating excess demand relative to supply—the rate escalates (e.g., higher charges per MW of deviation), making over-drawal by beneficiaries expensive and incentivizing under-drawal to alleviate shortages, while over-generation by stations earns higher payments, encouraging additional supply to restore balance. Conversely, at frequencies above 50 Hz—signaling surplus supply—the rate decreases, reducing payments to over-generators (discouraging excess injection that exacerbates over-frequency) and lowering penalties for over-drawal (though still promoting schedule compliance to maximize economic outcomes). These frequency bands, typically structured with progressive rates (e.g., higher penalties beyond 50.05 Hz or below 49.90 Hz as per codes), create signals that align individual incentives with overall , as deviations in the "wrong" direction during imbalances lead to net financial losses. This mechanism extends incentives beyond mere scheduling to operational responsiveness, as regional load dispatch centers monitor real-time deviations and settle them ex-post, compelling stakeholders to invest in forecasting accuracy, reserve margins, and control systems to minimize exposures. For instance, generators, which form the bulk of baseload , face fixed capacity charges based on declared (typically 80-85% for plants), but UI deviations can erode variable revenues, thus motivating disciplined ramping and outage planning. Beneficiaries, including state utilities, similarly face pass-through costs from UI payments, incentivizing demand-side management and bilateral contracting to reduce reliance on unscheduled . Overall, ABT's design transforms grid discipline from a regulatory into an economically rational choice, with UI settlements collected and disbursed daily to enforce across interconnected regional .

Implementation Across Stakeholders

The implementation of Availability Based Tariff (ABT) in involves coordinated actions by generators, beneficiaries such as distribution companies (discoms), load dispatch centers, and regional power committees to enforce day-ahead scheduling and penalize deviations through unscheduled interchange () pricing. Introduced via (CERC) order on January 4, 2000, ABT initially applied to central generating stations serving multiple states, requiring these entities to transition from flat tariffs to a three-part structure comprising fixed charges for availability, energy charges for scheduled generation, and frequency-linked charges for deviations. Phased rollout occurred across regions, with full implementation in the Western Region by July 1, 2002, and subsequent adoption in others, extending to intra-state levels by state regulators as mandated under the National Electricity Policy by April 2006. Generators, including central and state-owned stations, must declare their daily capability and by the previous day's specified deadline, typically enabling the regional load dispatch center (RLDC) or state load dispatch center (SLDC) to finalize schedules that supply with beneficiary demands. They are obligated to install ABT-compliant special meters capable of 15-minute interval recording and time for accurate deviation accounting, with real-time data transmission to dispatch centers via communication infrastructure. In operation, generators receive fixed charges based on declared (normatively 80-85% depending on plant type), charges only for scheduled output, and UI credits or debits: over-generation at high frequency yields lower payments, while under-generation incurs penalties, incentivizing adherence to schedules and grid frequency around 50 Hz. State generators integrated into intra-state ABT follow similar protocols under state electricity regulatory commissions (SERCs), with demonstrated capability verification possible upon SLDC request to prevent over-declaration. Beneficiaries, primarily discoms and state utilities, declare their anticipated drawal requirements day-ahead, committing to scheduled consumption to avoid UI penalties for over-drawal (charged at rates escalating above 50.5 Hz) or under-drawal (yielding credits diminishing below 49.5 Hz). Implementation demands that they equip interface points with ABT meters for precise metering of actual versus scheduled energy, often integrating with SCADA systems for SLDC oversight, and manage load forecasting to minimize deviations amid variable demand. Payments flow monthly: fixed charges prorated by allocated shares in central stations, energy charges for scheduled quantum, and net UI settlements reflecting frequency-linked pricing, which has historically imposed costs on chronic over-drawers like certain northern and eastern states pre-full enforcement. Bilateral traders and open-access consumers, when using the grid, must similarly submit schedules and face UI charges on net injection or drawal, ensuring market participants contribute to discipline. Load dispatch centers (SLDCs for intra-state, RLDCs for inter-state) serve as operational hubs, aggregating declarations by 00:00 hours to issue binding schedules, monitor real-time generation and drawal via , and compute 15-minute block deviations for pricing using CERC-approved slabs (e.g., full rate at 50 Hz, zero at 49 Hz or 51 Hz). Regional power committees (RPCs) oversee inter-regional settlements, reconciling accounts monthly and distributing pools—credits from over-generators to under-generators or vice versa—while enforcing metering standards and penalizing non-compliance through fines or schedule revisions. Regulators like CERC and SERCs mandate infrastructure upgrades, such as the State-Area Metering, Accounting, and Settlement System (SAMAST) for intra-state ABT, to enable automated data flow and reduce disputes, though uneven state-level rollout has persisted due to metering gaps and forecasting inaccuracies.

Monitoring and Enforcement

The monitoring of Availability-Based Tariff (ABT) compliance in India relies on real-time data collection from specialized ABT-compliant meters installed at generating stations, beneficiaries, and interconnection points, which record energy injections and drawals in 15-minute time blocks with time-stamped accuracy to enable precise deviation calculations. These meters interface with Supervisory Control and Data Acquisition (SCADA) systems and Energy Management Systems (EMS) operated by Regional Load Despatch Centres (RLDCs) for inter-state transactions and State Load Despatch Centres (SLDCs) for intra-state operations, allowing continuous oversight of grid frequency, scheduled versus actual generation, and unscheduled interchanges (UI). SLDCs, as mandated under Section 32 of the Electricity Act, 2003, maintain detailed accounts of intra-state energy exchanges, supervise transmission usage, and issue directives for balancing deviations to uphold grid discipline. Enforcement occurs primarily through the Deviation Settlement Mechanism (DSM), where deviations from schedules trigger financial settlements via UI charges or payments tiered by grid frequency bands—such as penalties for over-drawal during low-frequency periods (below 49.5 Hz) at rates escalating from ₹1.05 to ₹6.60 per kWh as of the 2009 revisions—to incentivize adherence without direct coercive measures. The (CERC) oversees inter-state ABT enforcement by approving UI rates, pooling funds from defaulters, and distributing them to compliant entities, while state electricity regulatory commissions (SERCs) handle intra-state equivalents, often mirroring CERC frameworks post-2008 implementations. In cases of persistent non-compliance or metering failures, regulators may impose additional penalties, mandate corrective actions, or suspend operations, as evidenced in CERC directives during grid events, ensuring accountability through audited settlements rather than discretionary interventions.

Empirical Benefits and Achievements

Improvements in Grid Frequency and Stability

The implementation of the Availability-Based Tariff (ABT) mechanism in , commencing with central generating stations in 2000 and extending regionally by 2002-2003, resulted in a marked enhancement of profiles. Prior to ABT, the national frequently fluctuated between 48 Hz and 52 Hz due to unscheduled deviations in and load, leading to operational instability and inefficient resource utilization. Following ABT's rollout, stabilized predominantly within a narrower 49.0-50.5 Hz band for the majority of operational hours, reflecting improved discipline among generators and beneficiaries. Central to these gains is the unscheduled interchange (UI) pricing under ABT, which levies frequency-linked charges on deviations from scheduled generation or drawal. When frequency falls below 50 Hz—indicating excess demand—overdrawals by beneficiaries incur higher penalties, while excess generation by utilities receives lower credits; conversely, above-50 Hz conditions reverse these incentives, prompting underdrawals to be curtailed and surplus generation to be reduced. This real-time economic signal fosters automatic secondary frequency control without relying solely on manual interventions, as participants adjust output or consumption to avoid adverse pricing. Empirical analyses confirm that UI-based settlements under ABT enhance secondary frequency response in interconnected systems dominated by conventional thermal and hydro units, reducing nadir deviations and overshoots during disturbances. Further stability benefits arise from ABT's promotion of accurate scheduling and deviation minimization, which collectively lower the rate of excursions and support primary control mechanisms. Post-ABT from regional load dispatch centers indicate sustained reductions in variation indices, with average daily frequencies inching closer to the nominal Hz and fewer instances of sub-49 Hz operation. For instance, the mechanism's incentives have correlated with decreased unscheduled exchanges, from levels exceeding 10-15% of total pre-ABT to under 5% in subsequent years, thereby mitigating cascading risks in large interconnected . These outcomes underscore ABT's role in causal discipline, where financial accountability directly translates to operational responsiveness, though ongoing refinements like finer intervals continue to address residual variability from renewable integration.

Economic and Efficiency Gains

The implementation of availability-based tariffs (ABT) in , commencing in 2000 under the , has driven by enforcing merit-order dispatch and penalizing unscheduled interchanges (UI), thereby aligning generation with demand to minimize variable costs across the system. Prior to ABT, UI often resulted in inefficient over-generation by surplus utilities and under-utilization by deficit ones without adequate pricing signals, leading to elevated fuel expenses; post-implementation, frequency-linked UI pricing has curtailed such deviations, fostering cost-reflective operations and substantial savings through optimized scheduling. This mechanism separates fixed capacity charges—tied to declared availability—and variable energy charges, incentivizing generators to maximize plant uptime to recover investments, which has correlated with enhanced plant load factors (PLF) in participating utilities. Efficiency gains manifest in reduced operational losses and improved , as ABT's deviation settlements discourage frivolous deviations and promote grid discipline, yielding systemic benefits like lower congestion and minimized spillage of cheaper or surplus power. Empirical observations from regional grids indicate that ABT has facilitated greater in and dispatch, enabling utilities to operate closer to technical optima, with incentives for heat-rate improvements translating to long-term fuel cost reductions for consumers. For instance, by rewarding availability above normative levels and penalizing shortfalls, ABT has encouraged maintenance practices that boost overall , indirectly lowering consumption at higher load factors—from around 12% at partial loads to under 9% at full capacity in optimized plants. These reforms have yielded broader economic advantages, including enhanced wholesale and reduced reliance on ad-hoc bilateral trades, contributing to more predictable revenue streams for generators and cost stability for distributors. While direct quantification varies by region, the framework's emphasis on causal incentives for disciplined operation has demonstrably lowered aggregate system costs compared to pre-reform regimes dominated by flat tariffs, supporting affordable supply without compromising reliability.

Case Studies of Impact Post-Implementation

Following the rollout of the inter-state Availability Based Tariff (ABT) mechanism in July 2002 across India's regional grids, the Northern Regional Grid experienced notable enhancements in operational discipline. Prior to ABT, frequency variations were frequent, often dipping below 49 Hz or exceeding 50.5 Hz due to unscheduled overdrawals and under-injections by states and generators, contributing to grid instability and occasional blackouts. Post-implementation, average frequency stabilized within 49.8-50.2 Hz for extended periods, with deviations outside the 49-50.5 Hz band reduced significantly as utilities faced financial penalties via the unscheduled interchange (UI) pricing linked to real-time frequency. This shift incentivized better scheduling adherence, resulting in fewer operational incidents and improved voltage profiles, though challenges persisted, such as the 2012 blackout triggered by excessive regional overdrawals despite ABT's framework. In the Southern Regional Grid, ABT's introduction in 2000 demonstrated rapid stabilization, as evidenced by comparative data from a typical week before and after implementation. Pre-ABT, swung widely between 48.5 Hz and 51 Hz, reflecting poor between and load. After ABT, remained closer to the nominal 50 Hz, with over 95% of time spent within 49-50.5 Hz limits, reducing transmission losses and enhancing overall grid reliability through charges that penalized deviations—e.g., higher payments for under-frequency injections and penalties for overdrawals. This led to more predictable power flows and economic incentives for generators to ramp up during peaks, though empirical data indicates sustained benefits were contingent on consistent enforcement. Intra-state ABT adaptations, such as in implemented around 2005-2006, mirrored inter-state gains by extending deviation settlement to local entities, fostering better intra-utility scheduling. Post-rollout, grid incidents dropped from over 100 annually in regional precedents to isolated events, with maintained in the 49-50.5 Hz band over 95% of the time, alongside reduced unscheduled exchanges that previously exacerbated imbalances. Utilities reported optimized use, including lower deviation penalties averaging Rs. 2-5 per kWh based on bands, encouraging investments in and systems; however, smaller distributors faced initial burdens, highlighting uneven impacts. These cases underscore ABT's role in causal improvements to control via market signals, though long-term efficacy required complementary measures like metering upgrades.

Criticisms and Limitations

Challenges for Variable Generation Sources

Variable generation sources (VGS), primarily and installations, face inherent difficulties under availability-based tariff (ABT) mechanisms due to their output variability driven by meteorological factors, which hinders precise adherence to day-ahead generation schedules. ABT's deviation settlement component, including unscheduled interchange charges tied to , imposes financial penalties for mismatches between scheduled and actual generation, with under-injection during high-frequency periods or over-injection during low-frequency periods attracting costs that can exceed standard energy tariffs by factors linked to frequency bands (e.g., up to 150% of normal rates in extreme cases). For VGS, forecasting inaccuracies—often exceeding 10-20% for and 5-15% for due to unpredictability—exacerbate these deviations, leading to recurrent penalties that erode project revenues. Recent amendments to India's Deviation Settlement Mechanism (DSM), integrated within the ABT framework, have intensified these pressures by tightening tolerance bands and escalating penalty structures; for instance, deviations beyond 15% for or 10% for /hybrid projects incur stepwise charges without compensatory credits for over-generation in certain scenarios, potentially elevating deviation-related costs to 5-6% of total annual revenue for existing plants, up from prior levels of 1-2%. This has raised viability concerns, with analyses indicating that unmitigated penalties could render marginal projects economically unsustainable, particularly in regions with high curtailment risks or grid inflexibility, where VGS operators bear the full brunt without proportional incentives for dispatchable backups. While limited exemptions exist—such as no penalties for deviations under 10% in scheduled generation for —broader enforcement still disadvantages VGS relative to conventional plants, which exhibit more predictable availability. These challenges compound investment risks for VGS developers, as ABT's frequency-linked penalties do not adequately account for non-controllable , prompting calls for hybrid exemptions or forecasting error tolerances; empirical from grids show renewables contributing disproportionately to deviation volumes during ramp events, with farms occasionally facing penalties equivalent to 10-20% of monthly energy charges in volatile periods. Without reforms like mandatory storage integration or relaxed bands calibrated to VGS error rates, ABT risks stifling renewable additions, as evidenced by stalled tenders post-2022 regulatory updates. Stakeholder feedback highlights that while ABT enhances overall grid discipline, its uniform application overlooks causal differences in variability, potentially biasing against low-carbon sources unless paired with ancillary services markets.

Stakeholder Burdens and Inequities

Generators face significant financial penalties under the unscheduled interchange () component of ABT for deviations from scheduled generation or drawal, with charges escalating based on grid frequency (e.g., up to 870 paise/kWh for frequencies below 49.5 Hz). These flat-rate penalties often fail to account for operational constraints such as shortages, equipment failures, or renewable variability, imposing disproportionate burdens on smaller or less flexible operators who lack the resources to precisely match schedules. For instance, during outages like the July 30, 2012 event, penalties reached Rs. 7,30,684 per hour, exacerbating economic pressures without considering contextual factors like voltage profiles or transmission limits. Renewable energy generators, in particular, encounter inequities due to ABT's emphasis on predictability, as and output fluctuates inherently, leading to frequent deviations and penalties that hinder without exemptions or forecasting adjustments. Larger generators, with greater dispatch flexibility, can mitigate risks through over-generation trading (e.g., selling surplus beyond 105% of declared at rates while retaining payments), creating an uneven playing that favors established players over emerging distributed or variable sources. Pre-ABT practices compounded this by allowing over-recovery of fixed costs above 62.8% plant load factor, which burdened consumers through inflated tariffs without corresponding penalties for indiscipline. Consumers and distribution companies bear indirect burdens as penalties are often passed through via higher charges, contributing to hikes amid poor load forecasting (e.g., 0.8% overdraw vs. 5.2% underdraw penalties lacking nuance). Metering requirements for 15-minute tracking impose additional costs on beneficiaries, including special equipment and communication , with installation responsibilities falling to state transmission utilities but ultimate ownership burdens on stakeholders. These rigid mechanisms have drawn criticism for insufficient granularity, prompting proposals like multi-staged penalties or regression-based estimators to better reflect dynamic grid conditions and reduce perceived unfairness.

Empirical Shortcomings and Unintended Consequences

The unscheduled interchange () component of the availability-based tariff (ABT), intended to penalize deviations and enforce scheduling discipline, resulted in persistently high volumes of unscheduled energy flows, undermining full grid stability. Post-implementation in 2002, UI energy often accounted for 4-6% of total inter-state transactions in the initial decade, reflecting ongoing inaccuracies in day-ahead scheduling by generators and beneficiaries rather than the anticipated reduction in deviations. This empirical persistence prompted multiple regulatory revisions by the (), including adjustments to UI rate slabs in 2009, as the mechanism failed to align economic incentives sufficiently with physical frequency control needs. An unintended consequence was the creation of arbitrage incentives, where some generators under-scheduled output to capitalize on higher rates during low-frequency periods (below 49.5 Hz), effectively treating as a rather than a penalty. Beneficiaries, conversely, faced escalating costs from over-drawal penalties, with payments totaling over ₹10,000 annually by the late 2000s in some regions, exacerbating financial stress on distribution companies already grappling with losses. These dynamics contributed to inefficient , as participants prioritized short-term financial optimization over investments in , reserves, or ancillary services, leading to continued frequency excursions outside the ideal 49.75-50.25 Hz band for substantial portions of the day. Empirical assessments highlight that ABT's fixed frequency-band penalties did not dynamically reflect marginal generation costs, resulting in suboptimal dispatch decisions and occasional windfall gains for low-marginal-cost plants that deviated upward during high-frequency events. This misalignment was a key factor in the eventual supplantation of the UI mechanism by the Deviation Settlement Mechanism (DSM) in 2015, which introduced band-based settlements to curb such gaming and better integrate real-time market signals. Despite these shortcomings, ABT's framework laid groundwork for subsequent reforms, though its initial design overlooked the growing complexities from demand variability and hydro-dominated schedules in certain regions.

Comparisons with Alternatives

Versus Cost-Plus and Traditional Tariffs

Availability-based tariffs (ABT) diverge from cost-plus and traditional fixed tariffs by structuring payments into three components: capacity charges based on declared plant , energy charges covering variable fuel costs for scheduled generation, and unscheduled interchange (UI) charges that penalize or reward deviations from schedules according to real-time grid frequency. In contrast, cost-plus tariffs guarantee recovery of approved fixed costs plus a regulated , irrespective of operational performance, while traditional tariffs often rely on simplistic single- or two-part structures without linkage to or grid discipline. This performance-oriented design in ABT addresses inefficiencies inherent in cost-plus regimes, where generators face limited incentives to optimize or minimize deviations, often resulting in over-capitalization and lax scheduling. ABT fosters economic dispatch and merit-order operation by tying capacity payments to a target —typically 80% for coal plants—beyond which additional incentives apply, unlike cost-plus systems that normalize plant load factors (e.g., 62.8% under older norms) without accountability. Traditional tariffs, prevalent in state electricity boards prior to reforms, exacerbated grid indiscipline through unchecked overdrawals and under-injections, as costs were passed through without frequency-linked penalties. Empirical data from India's implementation since demonstrates ABT's superiority in enhancing generator responsiveness: UI charges, escalating from 0 paise/kWh at frequencies ≥50.5 Hz to 420 paise/kWh below 49.02 Hz in 15-minute blocks, have sustained national grid frequency within 49.0-50.5 Hz, averting major blackouts recorded in prior decades. Cost-plus tariffs, by approving benchmarks for fixed and variable costs without deviation penalties, have historically yielded higher effective tariffs—e.g., around Rs. 3.13-5.73/kWh in select projects—compared to performance-driven alternatives that encourage efficiency gains. ABT's mechanism, in particular, imposes financial discipline on beneficiaries and generators for unscheduled operations, reducing system imbalances that traditional tariffs ignore, thereby lowering ancillary service costs and improving overall sector reliability. While cost-plus provides stability for capital-intensive investments, it discourages proactive maintenance and , as evidenced by pre-ABT frequency volatility exceeding 1 Hz deviations; ABT's causal link to frequency stabilization has empirically cut such excursions, supporting larger inter-regional power flows without collapse risks.

Versus Full Market-Based Mechanisms

Availability-based tariffs (ABT) incorporate market-like incentives through frequency-linked for unscheduled deviations from fixed schedules, aiming to enforce discipline without requiring comprehensive competitive . Full market-based mechanisms, by contrast, rely on anonymous auctions in day-ahead and segments, where locational marginal prices (LMP) emerge from bid-based clearing to directly reflect supply-demand imbalances, congestion, and losses at individual nodes. This distinction positions ABT as a regulatory overlay on scheduled bilateral trades, prevalent in India's inter-state since 2000, whereas full markets like PJM's enable granular economic dispatch across thousands of nodes. In ABT, generators receive capacity payments tied to declared (typically 80-90% thresholds for full fixed-cost recovery) and energy charges for scheduled output, with unscheduled interchanges settled at rates escalating from over-frequency surpluses (e.g., credits at 105.5-50.5 paise/kWh bands as of 2010 updates) to under-frequency penalties. Full markets eschew such schedules, instead using merit-order curves from bids to optimize dispatch hourly or sub-hourly, yielding average LMPs that varied from $20-50/MWh in PJM's 2023 segments amid demand fluctuations. ABT's frequency-based mechanism improved India's grid stability post-implementation, reducing average frequency deviations from 0.2-0.3 Hz pre-2002 to tighter bands by linking financial penalties to balancing needs. However, it assumes uniform deviation impacts grid-wide, ignoring nodal specifics, which can distort incentives compared to LMP's components that added up to 10-20% premiums in constrained PJM zones during 2022 peaks. ABT's structured penalties curb via over-declaration but limit flexibility for variable resources, as schedules must be locked 24-48 hours ahead, potentially stranding low-marginal-cost output during ramps; full mitigate this via intraday adjustments, with India's own day-ahead (DAM) at IEX handling ~65 TWh in FY2022 (4.3% of ) showing price volatility from ₹2-10/kWh reflecting bids. Empirical assessments of nodal systems indicate 1-4% operational cost savings over zonal approximations like ABT's, through precise signals for siting and line upgrades, though India's avoidance of full nodal stems from metering gaps (e.g., only ~70% ABT-compliant interfaces by 2016) and computational demands for 1,000+ nodes. While ABT facilitated transitional competition in a state-dominated sector—boosting availability from ~70% in the to 85%+ by —it underperforms full markets in scarcity pricing, as UI caps (e.g., no explicit capacity auctions) fail to spur peaking investments amid India's shortages exceeding 10 daily. Proponents of market-based alternatives argue causal inefficiencies in ABT arise from fixed/variable payments, enabling uneconomic to persist, whereas LMP enforces exit for high-cost units, as seen in PJM's uplift reductions post-reforms. Yet, in contexts like India's with politicized tariffs and asynchronous state grids, ABT's simplicity averts volatility that could exacerbate inequities, though ongoing reforms toward market-based economic dispatch (MBED) signal a evolution.

Adaptations in Other Sectors (e.g., )

In and , structures analogous to availability-based principles emphasize reservation charges for firm to incentivize reliability and penalize deviations from contracted , mirroring the fixed and unscheduled components of ABT. Shippers contract for guaranteed , paying fixed fees regardless of utilization to cover and ensure standby readiness, which promotes investment in expansion and maintenance. For example, in the United States, interstate pipelines regulated by the (FERC) apply two-part s: a reservation charge based on the maximum daily (MDQ) reserved, recovering 100% of fixed costs for firm , and a variable charge for actual volumes transported. Firm contracts prioritize delivery during constraints, with release markets allowing temporary transfers while maintaining primary liability for . In , the Petroleum and Natural Gas Regulatory Board (PNGRB) determines pipeline tariffs through a composite formula incorporating allowable (12%), , and operating expenses, with capacity allocation via authorized shares to entities for network development. Reforms approved in July 2025 simplified the structure by reducing unified tariff zones from three to two, extending lower Zone 1 rates nationwide to lower transport costs (e.g., from $0.25–$0.60 per MMBtu regionally) and boost adoption in underserved areas, thereby enhancing effective . Deviation penalties, such as imbalance cash-outs or curtailment charges exceeding tolerance bands (typically 5–10%), enforce scheduling discipline, similar to ABT's frequency-linked unscheduled interchange rates, reducing systemic risks like supply shortages during . These mechanisms address sector-specific challenges, such as bottlenecks during winter peaks or LNG dependencies, by from throughput to reward consistent . Empirical from FERC-jurisdictional pipelines show charges comprising 70–90% of total , stabilizing operator finances against volatility and enabling expansions like the U.S. additions averaging 2–3 Bcf/d annually. In contrast to electricity's focus, gas adaptations prioritize contractual firmness over instantaneous balancing, though with markets (e.g., gas-fired ) has prompted proposals for joint deviation settlements in regions like . Limitations include potential over- leading to underutilization (e.g., U.S. rates of 60–70% in non-peak periods) and regulatory disputes over rate bases, underscoring the need for auction-based allocations to enhance .

Recent Developments and Future Directions

Integration with Renewables and Power Markets

The availability-based tariff (ABT) mechanism supports integration by imposing frequency-linked penalties on deviations from scheduled generation, incentivizing improved and balancing for intermittent sources like and , which helps maintain stability amid variability. In India's power system, where ABT has been operational since 2000, this structure addresses imbalances at the interstate level during high renewable penetration scenarios, as demonstrated in simulations of renewable-integrated showing reduced deviations through ABT-controlled ancillary services. For instance, studies on doubly-fed generators in farms indicate that ABT-based -linked pricing strategies enhance automatic load control, mitigating the impacts of variability on system . However, the inherent unpredictability of renewables poses challenges under ABT, as under- or over-generation relative to schedules triggers unscheduled interchange (UI) charges, potentially increasing costs for developers if forecasts err by more than 10-15%. To counter this, the (CERC) granted solar and projects "must-run" status in 2010, prioritizing their evacuation over economic dispatch and limiting curtailments to grid security reasons only, thereby shielding them from full ABT penalties for intermittency-driven deviations. This policy, reinforced in the Electricity (Promotion of Generation Linked Demand Fulfilment in Respect of Must-Run Power Plants) Rules, 2021, has enabled over 120 GW of non-fossil capacity addition by 2025, though empirical data reveals persistent scheduling inaccuracies leading to average deviation rates of 12-20% for in states like and . In power markets, ABT integrates with platforms like the (IEX) by linking real-time settlements to frequency bands (e.g., penalties escalate above 50.5 Hz for over-injection), providing price signals that encourage renewable sellers to align output with demand peaks and avoid excess during low-frequency events. The introduction of deviation settlement mechanisms () evolving from ABT, alongside day-ahead and real-time markets since 2020, has facilitated better accommodation of renewables, with payments totaling ₹15,000 in FY 2023-24 reflecting balancing contributions from variable sources. Yet, without complementary measures like battery storage—projected to reach 10 by 2030—high renewable shares (targeting 500 by 2030) risk amplified deviations, as NREL analyses confirm that flexibility upgrades are essential for economic viability beyond 175 integration. Ongoing reforms, including relaxed bands for renewables (e.g., no penalties for deviations up to 15% in low-injection scenarios), aim to reduce these burdens while preserving ABT's role in incentivizing grid discipline.

Policy Reforms and Deviation Settlement Mechanism

The Deviation Settlement Mechanism (DSM), integral to the Availability-Based Tariff (ABT) framework, operates as a commercial tool to penalize or incentivize deviations from scheduled generation or drawl, thereby promoting grid frequency stability in India's electricity system. Under , unscheduled interchanges are settled based on grid frequency: over-drawal or under-injection during low-frequency periods (below 49.85 Hz) incurs penalties calculated at escalating rates tied to the deviation quantum and frequency band, while injections during high-frequency periods (above 50.15 Hz) may yield incentives. This mechanism pools deviations across regional entities, with settlements cleared daily through the Regional Load Despatch Centre (RLDC), ensuring financial accountability for grid indiscipline. Policy reforms to ABT and have evolved to address operational gaps and increasing renewable integration. Initially introduced by the (CERC) in 2002 as part of ABT to replace flat tariffs with frequency-linked pricing, the mechanism was refined in subsequent years to include explicit provisions, emphasizing adherence to schedules for all users. A key reform came via CERC's Deviation Settlement Mechanism and Related Matters Regulations, 2022, which standardized penalty and incentive structures across inter-state transactions, capping tolerances at ±1% for generators and introducing vector-based settlements for complex deviations, aiming to reduce and enhance predictability. Recent state-level adaptations reflect broader reforms to extend DSM efficacy intra-state, responding to rising (VRE) penetration. For instance, the Karnataka Electricity Regulatory Commission (KERC) issued Intra-State Deviation Settlement Mechanism Regulations in 2024, mandating ABT's three-part (capacity, , and deviation charges) for state entities, with penalties scaled by slabs (e.g., 105-110% of nodal charge for under-frequency over-drawals) and incentives limited to surplus pool availability. Similarly, Bihar's Electricity Regulatory Commission drafted DSM Regulations, 2025, to enforce schedule compliance via market-linked pricing, prohibiting incentives for predictable VRE over-injections and tightening bands to ±0.5% for non-VRE sources. These reforms prioritize grid reliability over revenue neutrality, with CERC proposing further changes in 2025 for VRE projects, including a phased transition to schedule-based deviations from April 2026, narrowing tolerance bands to 15% initially and linking settlements to power exchange prices to mitigate forecasting errors. Empirical data from post-reform implementations indicate improved frequency control, with average deviations dropping by 20-30% in regulated regions, though challenges persist in equitable incentive distribution amid VRE growth. Reforms continue to balance penalizing indiscipline with fostering participation, as evidenced by Andhra Pradesh's 2023 comprehensive for , which integrates real-time metering to curb under-scheduling. Overall, these evolutions underscore a shift toward dynamic, frequency-responsive settlements to sustain grid integrity amid capacity expansions.

Global Influences and Potential Expansions

India's Availability Based Tariff (ABT), implemented in 2002 for of unscheduled power interchange, reflects influences from designs emphasizing real-time balancing to maintain grid frequency. The mechanism's frequency-linked incentives and penalties for deviations parallel global ancillary services markets, such as the U.S. Federal Energy Regulatory Commission's (FERC) regulation of imbalance charges in independent system operators (ISOs) like PJM, where operators procure reserves to correct deviations and impose costs on non-compliant parties. Similarly, Europe's TSO-level balancing markets, governed by the Electricity Balancing Guideline since , use marginal pricing for imbalances that incentivizes forecast accuracy amid variable generation, akin to ABT's role in curbing over- or under-injection. These frameworks, developed to handle growing from renewables, informed ABT's adoption as a tool for grid discipline in a centralized system prone to frequency excursions. The global surge in deployment, projected by the to supply over 95% of electricity demand growth through 2026 primarily from and , has amplified the need for deviation management mechanisms like ABT to mitigate variability-induced imbalances. In , this has driven ABT's integration with Deviation Settlement Mechanism (DSM) regulations, updated by the in 2022 to link penalties to power exchange prices during high renewable penetration periods, echoing adaptations in Australia's where imbalance pricing adjusts for and forecast errors. analyses of South Asian energy trade highlight ABT's effectiveness in reducing unscheduled flows, positioning it as a reference for cross-border pools where frequency stability is critical for reliable interchange. Potential expansions of ABT principles extend to other emerging economies with underdeveloped markets and high load variability, particularly in and , where regional grids face similar challenges in enforcing schedules without advanced metering. For instance, SAARC initiatives for asynchronous inter-regional links propose ABT-compatible settlement to enable and optimize trade, as outlined in policy papers advocating mandatory ABT metering for cross-border transactions to prevent frequency distortions. In , World Bank-supported reforms in countries like reference ABT-like tariffs for penalizing deviations in hybrid renewable-thermal systems, aiming to replicate India's 20-30 Hz frequency improvement post-ABT implementation. However, adoption barriers include metering infrastructure deficits and regulatory harmonization, limiting direct exports of the model beyond pilot regional applications.

References

  1. [1]
    [PDF] ABC of ABT - tsecl
    The term Availability Tariff, particularly in the Indian context, stands for a rational tariff structure for power supply from generating stations, on a.
  2. [2]
    [PDF] Explanatory Memorandum on revision of UI Mechanism
    Feb 26, 2009 · Based Tariff (ABT) regime in India based on the Order issued by the CERC on. January 4, 2000. The ABT mechanism was implemented in a phased ...
  3. [3]
    [PDF] How price reform revolutionized the operational discipline of India's ...
    Volt- age fluctuations have been minimized, greater supply made available, and costs reduced. All this was achieved through the ABT. (availability-based tariff) ...
  4. [4]
    (PDF) Availability Based Tariff-Discussion and Issues - ResearchGate
    Sep 18, 2017 · Availability Based Tariff-Discussion and Issues ; Low frequency during peak-load hours, with frequency ; High frequency during off-peak hours, ...
  5. [5]
    [PDF] ISSUES IN UNSCHEDULED INTERCHANGE IN INDIA
    Dec 1, 2010 · Issues include compatible software, avoiding gaming, open access, trading surplus, grid disturbance, special meters, and communication system ...
  6. [6]
    [PDF] 522 - Availability Based Tariff
    The Availability Based Tariff mechanism (founded in 1980), was presented by power grid as 'a solution for technical and commercial problems in regional grid ...
  7. [7]
    Availibility Based Tariff - 2000 Supreme(Online)(CERC) 27
    (iv) Draft Notification for ABT. 1.3 The Commission after taking into account the objectives behind ABT considered it appropriate to initiate proceedings in ...
  8. [8]
    Reforms in the Indian Power Sector | Electrical India Magazine
    Jan 13, 2021 · The ABT was implemented in all the five regions of India by 1 November 2003 and also its enactment had displayed a notable improvement in grid ...
  9. [9]
    [PDF] EXPLANATORY MEMORNDOM
    Sep 1, 2020 · 1. Introduction: 1.1 Effort to bring discipline in the grid operations started with the introduction of Availability Based. Tariff (ABT) by the ...Missing: pre- problems
  10. [10]
    BERC (Intra-state Availability Based Tariff and De...
    2.1. These Regulations may be called the "Bihar Electric. ity Regulatory Commission (Intra-state. Availability Based Tariff and Deviation Settlement ... including ...
  11. [11]
    [PDF] D2-02_05 USAGE OF CIM IN SYSTEM OPERATIONS IN INDIA
    Nov 13, 2013 · Availability Based Tariff comprises of three components: (a) capacity charge, towards reimbursement of the fixed cost of the plant, linked ...
  12. [12]
    [PDF] recommendations regarding implementation of
    The present ABT for Central generating stations comprises of three (3) components : capacity charge, energy charge and UI. This structure is rational and ...
  13. [13]
    [PDF] 1 Action Plan for implementation of Intra state ABT
    Dec 26, 2005 · The generation tariff under the ABT regime has three components namely the fixed charge, the variable charge and the Un-scheduled Inter-change ...
  14. [14]
    [PDF] A Mathematical Framework for Frequency Linked Availability Based ...
    AVAILABILITY BASED TARIFF (ABT). Availability Based Tariff is a rational tariff structure for power supply from generating units. The most significant aspect ...
  15. [15]
    [PDF] Procedures for Scheduling, Despatch, Energy Accounting, UI ...
    implementation of Availability Based Tariff in the State, such generating plant shall be subject to day ahead scheduling with the exception that on ...
  16. [16]
    [PDF] Deviation Settlement Mechanism Regulations 2022
    Mar 14, 2022 · (1) These regulations may be called the Central Electricity Regulatory Commission. (Deviation Settlement Mechanism and Related Matters) ...
  17. [17]
    Deviation Settlement Mechanism and Its Implementation in Indian ...
    How to design a settlement mechanism adapted to the electricity market according to local conditions is a key theoretical and practical problem to be solved ...<|control11|><|separator|>
  18. [18]
    Implementation of new electricity regulatory norms for deviation ...
    To overcome this situation, India has adopted commercial mechanism known as Availability-based Tariff (ABT), which has a component linked with frequency. A ...
  19. [19]
    Ensuring Grid Discipline: Developments under the deviation ...
    Jun 6, 2023 · A three-part tariff (capacity charge, energy charge and unscheduled power interchange) scheme, ABT aimed at maintaining grid discipline through ...
  20. [20]
    [PDF] UI-Regulations.pdf - Central Electricity Regulatory Commission
    (2) If any payments for the Unscheduled Interchange charges are delayed by more than two days, that is to say, payments are made beyond a period of 12 days of ...
  21. [21]
    Frequency based pricing, aka unscheduled interchange (UI ...
    The compensation/penalty for unscheduled production or withdrawal is based on the real-time system frequency. The price at 49.95 Hz is intended to promote all ...Missing: bands | Show results with:bands
  22. [22]
    UI/RLDC - Central Electricity Regulatory Commission
    1. Review of the frequency linked Unscheduled Interchange (UI) price vector and implementation of a payment security mechanism for UI charges. 2. Ensuring ...
  23. [23]
    CERC restructures unscheduled interchange regime - Projects Today
    c) CERC would review the UI charges and the additional UI surcharge rate every six months or earlier, if required, keeping in view the prevailing fuel prices ...
  24. [24]
    Performance Analysis of Price Based AGC for Indian Power System ...
    Availability Based Tariff (ABT) mechanism was instituted in Indian power system with an aim to maintain grid discipline and bring about more accountability ...
  25. [25]
    Availability Based Tariff: An Economic Instrument for Grid Discipline
    Aug 6, 2025 · Availability-based tariff (ABT), as an economic instrument, has successfully addressed both the issues: rationalise the tariff structure and ...<|separator|>
  26. [26]
    Deviation Settlement Mechanism Linked with Market Price in Indian ...
    Abstract: In India, before introduction of Availability Based Tariff (ABT) grid was undisciplined. There was large variation in the grid frequency.
  27. [27]
    Moving Towards Better Indian Electricity Grid Discipline – Part 1
    Aug 24, 2020 · Availability Based Tariff: A Timeline Review​​ In year 2000, after accounting all the encountered problems in the grid the commission issued a ...
  28. [28]
    [PDF] Staff Consultative Paper on Implementation of Intra-State ABT - tnerc
    (b) The Additional Unscheduled Interchange Charge for under-injection of electricity during the time-block when grid frequency is below 49.7 Hz and up to 49.5 ...Missing: bands | Show results with:bands
  29. [29]
    [PDF] First Report FOR Technical Committee Implementation of ...
    Nov 10, 2017 · ... implementation of Availability Based Tariff (ABT) framework at the State level as mandated in the National Electricity Policy and Tariff Policy;.
  30. [30]
    [PDF] DISCUSSION PAPER ON TERMS & CONDITIONS OF TARIFF
    Jun 10, 2003 · 3.1.4 For improving the grid operation, the Commission has introduced. Availability Based Tariff (ABT), which is at present being implemented in ...
  31. [31]
    ABT accounting and decision support at a utility in India
    ABT compliant metering and high frequency monitoring defined the boundaries within which the utility would operate. This became the backbone around which they ...Missing: enforcement | Show results with:enforcement
  32. [32]
    Functions of State Load Despatch Centres
    State Load Despatch Centres are responsible for scheduling, monitoring grid operations, keeping accounts, supervising intra-state transmission, and real-time ...Missing: SLDC enforcement
  33. [33]
    [PDF] State Load Despatch Centre (SLDC) - BSPTCL
    Mar 25, 2022 · Functions of State Load Despatch Centre. The functions of SLDC as envisaged in the Electricity Act, 2003, is as under: “32. (1) The State ...
  34. [34]
    [PDF] EM-Ancillary-Services-Regulations.pdf
    In the Indian context under Availability Based Tariff (ABT) mechanism, the generators recover their fixed charge based on declaration of availability or ...
  35. [35]
    [PDF] KERC (Intra-State Deviation Settlement Mechanism and Related ...
    Aug 28, 2024 · AVAILABILITY BASED TARIFF (ABT) AND DEVIATION SETTLEMENT MECHANISM. 4. The tariff under the ABT regime will have three components namely the.<|separator|>
  36. [36]
    [DOC] PROJECT INFORMATION DOCUMENT (PID)
    Introduction of availability based tariffs and grid discipline incentives have helped garner large economic gains from efficient merit order operation and ...
  37. [37]
    [PDF] Electricity in India: Providing Power for the Millions (EN) - OECD
    The Availability-Based Tariff (ABT) and Wholesale Power Trade . ... It could bring benefits in the form of greater price and cost transparency, gains in economic.
  38. [38]
    Availability Based Tariff: An Economic Instrument for Grid Discipline
    Under ABT, a generator can do so only at its own risk. The beneficiary can get free power at high frequency! The above UI rates, at various frequencies, are ...Missing: advantages disadvantages
  39. [39]
    Tariff-based incentives for improving coal-power-plant efficiencies in ...
    The scheme provides direct tariff-based incentives for efficiency improvements, while benefiting consumers by reducing electricity costs in the long run.<|separator|>
  40. [40]
    (PDF) Energy Efficiency Improvement of Auxiliary Power Equipment ...
    May 4, 2017 · Operation of the plant at improved plant load factor reduced the auxiliary power from 12.05 % at 70 % PLF to 8.74 % at 100 % PLF that reduced ...
  41. [41]
    (PDF) Grid failure in Northern, Eastern and North-Eastern grid in 2012
    Aug 8, 2025 · This paper describes as to how grid failure has occurred in the northern region, eastern region and north-eastern region of India and its effect on economy of ...
  42. [42]
    Flexibility requirement for large-scale renewable energy integration ...
    But, most of the existing gas-based plants in India are either lying idle or operating at reduced plant load factor (PLF) due to fuel shortage (Fig. 5) ...
  43. [43]
    Availability Based Tariff and its impact On different Industry Players ...
    ABT scheme is for unscheduled interchange of power. The paper reviews ABT issues, its components, clauses, mechanism, benefits and the impact of grid on ...
  44. [44]
    Harsh Penalties for Deviation Settlement is Playing Havoc with Solar ...
    Jun 27, 2019 · The CERC has day-ahead regulations, and there are several penalties that solar and wind projects have to bear due to this.
  45. [45]
    India's new DSM regulations: Wind plants may become unviable as ...
    Sep 8, 2022 · For existing wind plants, the cost of deviations could potentially increase to 5-6% of the total revenue (from current levels of 1-2%). Figure ...Missing: generation | Show results with:generation
  46. [46]
    No Compensation for Over Injection of Wind and Solar Power Under ...
    Jan 7, 2022 · According to the proposed regulations, wind and solar power generators will not have to pay penalties for up to 10% deviation in scheduling power.<|separator|>
  47. [47]
    Integrating higher shares of variable renewable energy in India
    Jul 13, 2023 · Converting India's coal power fleet to run flexibly will lead to some technical, financial, and regulatory/contractual challenges. The solutions ...
  48. [48]
    [PDF] Integrating Higher Share of Variable Renewable Energy in India
    Converting India's coal power fleet to run flexibly will lead to some technical, financial, and regulatory/contractual challenges. The solutions include ...
  49. [49]
    A linear regression penalty estimator programme for the mitigation of ...
    Oct 6, 2025 · A linear regression penalty estimator programme for the mitigation of shortcomings in availability based tariff scheme adopted in Indian power ...
  50. [50]
    [PDF] Deviation Settlement Mechanism
    The unscheduled interchange (UI) mechanism introduced in Indian power sector with the implementation of. Availability Based Tariff (ABT) in January, 2000 ...
  51. [51]
    [PDF] Increasing Competition in India's Transmission Sector | IEEFA
    Comparing cost-plus tariffs for electricity against tariffs reached by competitive bidding clearly shows the benefits of competition. For cost-plus bids, the ...
  52. [52]
    [PDF] Competitive Tariff vis-a-vis Cost plus Tariff- Critical Analysis
    To conduct a critical comparison of cost plus based tariffs for electricity generation vis-à-vis tariff adopted through competitive bidding route in India.
  53. [53]
    [PDF] More Power to India: The Challenge of Electricity Distribution
    of scheduling and dispatch of power based on an availability-based tariff (ABT). The system was designed to bring about grid discipline and promote ...
  54. [54]
    (PDF) Tariff Setting In the Indian Power Sector-An Overview
    Aug 7, 2025 · For example, India uses Availability Based Tariff (Rai et al., 2013) , Ghana employs End -User Tariff (Adom et al., 2019), Saudi Arabia ...
  55. [55]
    Nodal Pricing | How It Works, The Pros & Cons ... - Carbon Collective
    Jul 25, 2022 · Nodal pricing is an efficient way of regulating the energy market as it rewards those who can produce power at the lowest cost and provides incentives to ...
  56. [56]
    [PDF] Power Markets Across the Globe and Indian Power Market
    Maryland (PJM) was the first wholesale electricity market designed in North America. PJM now is considered as the most successful market in North America.
  57. [57]
    Towards efficient real‐time deviation settlement mechanism for the ...
    Dec 9, 2019 · This study proposes an efficient real-time deviation settlement mechanism for the Indian grid, which incorporates the locational signal in the deviation ...
  58. [58]
    MARKET MONITOR FINDS PJM WHOLESALE ELECTRICITY ...
    Aug 14, 2025 · Total energy uplift charges increased by $398.5 million, or 235.2 percent, in the first six months of 2025 compared to the first six months of ...
  59. [59]
    What are the advantages of ABT? - HPL
    Oct 7, 2023 · ABT allows operators to offer dynamic pricing, which means that fares can change based on the time of day or level of demand.Missing: definition | Show results with:definition<|separator|>
  60. [60]
    Nodal pricing of electricity: How much does it cost to get it wrong?
    Aug 9, 2025 · Nodal pricing provides several advantages to the market agents: increasing market welfare, providing proper investment signals to the generator, ...
  61. [61]
    Spotlight on the spot market: A review of the indian wholesale ...
    The day-ahead spot market (DAM) trading at ∼65 TWh in FY 22 remains only around 4.3 % of the 1491 TWh that were generated in the year. The real-time market (RTM) ...Missing: ABT | Show results with:ABT
  62. [62]
    Electricity trade at exchanges of the world: Contextual analysis of ...
    Oct 18, 2024 · Four kinds of market work at electricity exchanges in India: The day-ahead market (DAM), the term-ahead market (TAM), the season-ahead market ...
  63. [63]
    [PDF] Nodal vs Zonal - Veolia North America
    Nodal Pricing Has Some Clear Advantages. Estimates suggest that the direct benefits of nodal pricing can range from 1-4% of operational costs, translating to ...
  64. [64]
    [PDF] The Rise of Distributed Energy Resources:
    Nov 1, 2021 · Given the cost and complexity of full nodal pricing, alternative approaches can be used to improve economic efficiency in the context of a ...
  65. [65]
    [PDF] ENERGY METERING, ACCOUNTING & SETTLEMENT SYSTEM of ...
    Jul 15, 2016 · The system includes scheduling, accounting, metering, and settlement of transactions in electricity, with energy accounting and settlement, and ...
  66. [66]
    [PDF] Blackouts: The role of India's wholesale electricity market
    Blackouts impose substantial costs on electricity consumers in developing countries. We advance a new explanation for their continued prevalence in India, ...<|separator|>
  67. [67]
    Transforming India's Electricity Markets - RMI
    A new report explores how to successfully implement India's proposed Market-Based Economic Dispatch mechanism in wholesale electricity markets.
  68. [68]
    [PDF] Transforming India's Electricity Markets - Mongabay
    Mar 16, 2023 · various stakeholders such as generators, discoms, power exchanges, and system operators at the state, regional, and national levels. MBED ...
  69. [69]
    Fact Sheet | Capacity Release
    Aug 4, 2025 · The reservation charge is based on the amount of pipeline capacity reserved by the shipper, regardless of how much of that capacity the shipper ...
  70. [70]
    5.5 Natural gas capacity - PwC Viewpoint
    Feb 23, 2024 · A standard natural gas capacity agreement provides the customer with temporary use of a portion of a natural gas pipeline.
  71. [71]
    18 CFR § 284.8 - Release of firm capacity on interstate pipelines.
    (1) Firm shippers must be permitted to release their capacity, in whole or in part, on a permanent or short-term basis, without restriction on the terms or ...
  72. [72]
    PNGRB simplifies gas tariff structure, unified reduces zones from ...
    Jul 4, 2025 · PNGRB simplifies gas tariff structure, unified reduces zones from three to two. In a bid to accelerate natural gas adoption in the country, the ...
  73. [73]
    Optimizing India's Gas Market through Tariffs - ICF
    Jun 9, 2021 · Under the current structure, the pipeline tariffs of the northwestern region range between $0.25 and $0.60 per MMBtu. Pipelines in the southern ...
  74. [74]
    [PDF] Order N - Federal Energy Regulatory Commission
    In this Final Rule, the Commission revises its Part 284 regulations concerning the release of firm capacity by shippers on interstate natural gas pipelines.
  75. [75]
    PNGRB approves pivotal reforms in natural gas pipeline tariff ...
    Jul 4, 2025 · Among the key reforms, PNGRB has reduced the number of Unified Tariff Zones from three to two, simplifying the natural gas transportation system ...
  76. [76]
    [PDF] 1 Securing New Pipeline Capacity in Today's Turbulent Gas Market
    Such reservations are made by pipelines where the capacity is to be utilized for a planned expansion project. The required open season notice must give shippers ...
  77. [77]
    Hybrid renewable energy‐integrated Indian power system under ...
    Aug 14, 2019 · The integration of renewable sources into conventional grid may result in the grid indiscipline in terms of frequency instability and ...Missing: sector | Show results with:sector
  78. [78]
    Impact of ABT based control strategies on ALFC and AVR in DFIG ...
    This study investigates the impact of using various Frequency-Linked Pricing (FLP)-based operating strategies under Availability-Based Tariff (ABT) on combined ...
  79. [79]
    The reality of 'must run' status of renewable energy projects in India
    Apr 14, 2020 · 'Must run status' mainly means that evacuation of power from solar power plants and wind power plants should not be curtailed for factors other than on account ...Missing: penalties | Show results with:penalties
  80. [80]
    [PDF] Navigating risks to unlock 500 GW of renewables by 2030 - Ember
    Feb 21, 2025 · Project commissioning delays, driven by land acquisition challenges, grid connectivity issues and regulatory hurdles, remain a significant ...
  81. [81]
    India Renewable Integration Study | Energy Systems Analysis - NREL
    Apr 21, 2025 · Using advanced weather and power system modeling, the study explored operational impacts of meeting India's 2022 targets and identified actions ...
  82. [82]
    What is Deviation Settlement Mechanism in Power Sector of India?
    Dec 2, 2022 · We deconstruct the Deviation Settlement Mechanism (DSM) – a regulatory mechanism to maintain grid frequency in India.
  83. [83]
    Bihar Issues Draft DSM Regulations, 2025 to Strengthen Grid ...
    Aug 26, 2025 · BERC has released draft Deviation Settlement Mechanism Regulations ... Availability Based Tariff (ABT) at the state level. BERC had ...
  84. [84]
    CERC Proposes Phased Schedule-Based Deviation Mechanism for ...
    Sep 15, 2025 · Under the proposed revision, these bands will narrow to +/-5 percent for solar/hybrid and +/-10 percent for wind projects. The Commission ...
  85. [85]
    [PDF] ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION
    Apr 21, 2023 · The introduction of a commercial mechanism for Deviation Settlement for intra-state open access is very much necessary for the maintenance ...<|control11|><|separator|>
  86. [86]
    [PDF] The US Energy Sector - MIT Economics
    price has been demonstrated in India, which began using its Availability Based Tariff for pricing Unscheduled In- terchange on a dynamic basis in 2002 and 2003.
  87. [87]
    [PDF] 41582 - World Bank Documents and Reports
    To overcome these problems, the concept of Availability Based Tariff was introduced in mid 2002. This involves: (a) a fixed capacity charge/kW/month payable by ...
  88. [88]
    [PDF] Cross-Border Electricity Trade in South Asia - IRADe
    Jun 10, 2008 · mix, regulatory framework for discoms (MYT), availability-based tariff ... ABT meters. ▫ Congestion management through market splitting and ...