A fixture unit is a standardized unit of measure in plumbing engineering that quantifies the probable hydraulic load or discharge demand imposed by individual plumbing fixtures on building drainage, waste, and vent (DWV) systems or water supply piping, based on factors such as the rate of discharge, duration of operation, and frequency of use. This concept allows engineers and designers to size pipes and related infrastructure appropriately to ensure efficient flow without excessive pressure loss or backups, as defined in major plumbing codes like the International Plumbing Code (IPC) and Uniform Plumbing Code (UPC). There are two primary types of fixture units: drainage fixture units (DFUs), which assess the likely volume of entering the drainage system from fixtures like sinks, toilets, and showers, and water supply fixture units (WSFUs), which evaluate the anticipated demand on the supply for the same fixtures. DFUs are particularly crucial for sizing and vertical drains, as well as vents, where the total DFU load from multiple fixtures determines pipe diameters—for instance, a private-use typically equates to 3 DFUs, while a lavatory is 1 DFU. Similarly, WSFUs guide the dimensioning of supply lines by accounting for peak usage scenarios, often varying by whether the fixture is for private or public use. Fixture units originated as a practical in early 20th-century standards to replace simplistic flow-rate assumptions with more realistic probabilistic models, and they remain integral to modern building codes for ensuring sanitary and efficient . Values are assigned per fixture type and summed across a building or to calculate overall , with adjustments for intermittent to avoid overdesign. For example, in applications, the DFU is based on the drainage of one of water—equivalent to 7.48 gallons (28.3 L)—through a 1¼-inch (32 mm) pipe in one minute, corresponding to approximately 7.48 gallons per minute (0.47 L/s), but serves as a composite applied via curves to estimate probable rates rather than a direct .

Overview

Definition

A fixture unit (FU) serves as a relative measure of the probable or load imposed by a on the or system, enabling engineers to assess the overall hydraulic demand without relying on direct flow measurements. This value is arbitrary and non-dimensional, approximating the hydraulic load by accounting for the fixture's type, the probability of its usage, and its characteristics, such as volume rate, operation duration, and frequency of use. By quantifying the intermittent nature of fixture demands, the fixture unit principle helps in sizing pipes appropriately to avoid over- or under-design, thereby promoting efficient water flow, minimizing pressure losses in supply lines, and preventing backups in drainage systems.

Types of Fixture Units

Fixture units in plumbing are categorized into two primary types based on their application in water distribution and waste management systems: water supply fixture units (WSFU) and drainage fixture units (DFU). These distinctions allow engineers to accurately size piping systems according to the unique demands of supply and drainage, ensuring efficient flow and preventing overloads. While both types quantify the load from plumbing fixtures, they address different hydraulic principles—pressurized delivery versus gravity-based evacuation. Water supply fixture units (WSFU) measure the probable hydraulic demand on incoming water lines from various plumbing fixtures, accounting for the probability of simultaneous usage to estimate peak flow rates. Defined as a numerical factor representing the load-producing effect of a single fixture, WSFU is used to size water service mains, branch lines, and risers in pressurized distribution systems. This approach factors in intermittent usage patterns, such as flushing or showering, to convert fixture loads into equivalent gallons per minute for pipe sizing. In contrast, drainage fixture units (DFU) quantify the probable into sanitary systems, based on the volume, rate, and frequency of from fixtures to determine hydraulic loads on gravity- pipes. DFU serves as a relative measure of the load, guiding the sizing of horizontal branches, stacks, and vents in drain, , and vent (DWV) systems to maintain proper and prevent backups. Unlike WSFU, which emphasizes supply-side intermittency, DFU focuses on weir capacities and overall efficiency. The key differences between WSFU and DFU lie in their operational focus: WSFU addresses peak demand in pressurized water supply networks, often expressed in flow rate equivalents, while DFU evaluates cumulative loads in gravity drainage setups, prioritizing discharge dynamics. For instance, WSFU is applied to design residential or commercial water delivery infrastructure, ensuring adequate pressure under concurrent use, whereas DFU informs the configuration of sewer lines and venting to handle waste evacuation reliably. These categories stem from standardized plumbing codes, such as the International Plumbing Code (IPC) and Uniform Plumbing Code (UPC), to promote system integrity across building types.

History and Development

Origins

The concept of the fixture unit emerged in the 1920s and 1930s through research conducted by the National Bureau of Standards (NBS), now known as the National Institute of Standards and Technology (NIST), in collaboration with industry organizations to establish standardized methods for sizing and systems. This work was driven by the need to address widespread inconsistencies in pre-standardized designs, which often resulted in undersized pipes and frequent system failures during periods of peak demand, such as simultaneous use of multiple fixtures in buildings. Prior to these developments, engineers relied on estimates of maximum flow rates, leading to inefficient and unreliable installations that compromised and building performance. Central to this effort was Dr. Roy B. Hunter, who headed the NBS division during this period and pioneered the fixture unit as a probabilistic measure of load. Hunter's focused on empirical studies of fixture rates—such as the volume and of water from lavatories, water closets, and faucets—and the statistical probability of simultaneous use among multiple fixtures, applying binomial probability theory to model realistic scenarios rather than assuming full simultaneous operation. This approach allowed for more accurate estimation of peak flows without overdesigning systems, balancing cost and reliability. The foundational fixture unit tables, which assigned relative values to different fixtures based on their load characteristics, were first detailed in NBS publications from the 1930s, culminating in Hunter's seminal 1940 report, Methods of Estimating Loads in Plumbing Systems. These tables provided a scale (e.g., 1 to 10 units per fixture) derived from discharge data and usage probabilities, enabling engineers to convert aggregate fixture units into estimated flow rates for pipe sizing. This innovation marked a shift from empirical guesswork to a scientifically grounded framework, influencing early standards and laying the groundwork for uniform code adoption.

Evolution in Plumbing Codes

Following the foundational research by the National Bureau of Standards (NBS) in the 1940s, the fixture unit system was adopted into major model plumbing codes in the post-1940s period to standardize load estimation for and systems. The (UPC), first published in 1945 by the International Association of Plumbing and Mechanical Officials (IAPMO), incorporated significant fixture unit updates in the , drawing on probabilistic methods to account for fixture usage patterns and system demands. Similarly, the International Plumbing Code (IPC), introduced in 1995 by the (ICC), integrated the fixture unit approach from its inception, aligning it with broader frameworks to promote uniform application across jurisdictions. Key refinements occurred in the 1960s, with NBS researcher Robert S. Wyly's 1964 monograph expanding fixture unit applications to larger drainage systems, enhancing accuracy for multistory and high-load scenarios. By the , codes addressed the rise of water-efficient technologies through adjustments to fixture unit values, such as reductions for low-flow toilets limited to 1.6 gallons per flush under the Energy Policy Act of 1992, with further refinements to 1.28 gallons per flush in EPA WaterSense standards, reflecting decreased discharge rates and lower system demands. The 2021 further advanced sustainability by revising fixture unit calculations to incorporate water-saving fixtures and efficient drainage, supporting practices and reduced resource consumption. The 2024 editions of both the and UPC continued this evolution with updates to water supply fixture unit (WSFU) and drainage fixture unit (DFU) values for certain fixtures, aligning with current efficiency standards and usage patterns as of 2024. IAPMO and ICC have played pivotal roles in standardizing fixture units nationwide, with IAPMO's UPC and ICC's IPC influencing adoption in most U.S. states through triennial updates that harmonize requirements. These organizations continue to evolve the system, incorporating provisions for emerging technologies like recycling to promote and alternative systems in modern designs.

Assignment of Fixture Units

Factors Determining Values

The assignment of fixture unit values to fixtures relies on several primary factors that account for the hydraulic load each fixture imposes on and systems. These include the rate, encompassing both and of or waste flow; the frequency of use, which reflects typical usage patterns; the probability of simultaneous among multiple fixtures; and, for drainage fixture units (DFU), the of the fixture , which limits the maximum allowable load to prevent inadequate drainage capacity. Fixture unit values are adjusted based on the type of fixture and its intended use, distinguishing between (e.g., residential) and (e.g., ) settings, where higher values are assigned in public contexts due to increased likelihood of simultaneous use and greater overall demand. Intermittent-flow fixtures, such as lavatories or showers, typically receive lower values than continuous-flow ones like hose bibbs, as their shorter operational duration reduces loading. Both fixture units (WSFU) and DFU are affected by these adjustments to ensure accurate system sizing. The influence of fixture efficiency is particularly notable in modern designs, where low-flow fixtures compliant with standards like the EPA's WaterSense program—introduced in 2006—receive reduced fixture unit values to reflect their lower water consumption and demand on the system. For instance, water closets with flush volumes of 1.6 gallons per flush or less are assigned lower DFU ratings compared to higher-volume models, promoting without compromising code compliance. Special considerations apply to fixtures incorporating prevention devices or specialized equipment, such as those in medical facilities, which can alter load profiles by introducing additional hydraulic resistance or unique discharge characteristics that necessitate tailored fixture unit assignments to maintain system integrity.

Standard Tables for Fixtures

Standard tables for fixture units provide standardized values assigned to plumbing fixtures to estimate hydraulic loads on and systems. These values, known as water supply fixture units (WSFU) for supply systems and drainage fixture units (DFU) for systems, account for factors such as fixture type, usage context ( or ), and flush mechanism, as outlined in major codes.

Water Supply Fixture Units (WSFU)

WSFU values represent the probable demand load from fixtures in gallons per minute (GPM), adjusted for intermittent use patterns. The provides detailed WSFU in Appendix E, Table E103.3(2), distinguishing between and occupancy to reflect higher simultaneous usage in public settings. For example, a flush tank is assigned 2.2 WSFU, while a flush version reaches 10 WSFU. The (UPC), in Table 610.3, uses similar but slightly varied assignments, often without strict / splits for some fixtures but emphasizing sizing. Representative WSFU values from the IPC are shown below for common fixtures:
FixtureOccupancySupply TypeTotal WSFU
Water Closet (Flush Tank)PrivateCold only2.2
Water Closet (Flush Valve)PublicCold only10.0
LavatoryPrivateHot/Cold0.7
LavatoryPublicHot/Cold2.0
Kitchen SinkPrivateHot/Cold1.4
BathtubPrivateHot/Cold4.0
ShowerPublicHot/Cold4.0
PrivateCold only5.0
GeneralCold only2.5
In the UPC, values are generally comparable but lower for some items; for instance, a gravity flush tank water closet is 2.5 WSFU, a lavatory is 1 WSFU, a is 4 WSFU, and a hose bibb is 2.5 WSFU, with urinals at 2-5 WSFU depending on flush type.

Drainage Fixture Units (DFU)

DFU values quantify the hydraulic load on drainage pipes based on , , and frequency, with higher values for fixtures like water closets due to their significant waste . The IPC specifies these in Table 709.1, varying by flush and public/private use to account for occupancy density. A private 1.6 gallons per flush (gpf) water closet receives 3 DFU, escalating to 6 DFU for public models exceeding 1.6 gpf. The UPC, via Table 702.1, assigns more uniform values across contexts, such as 3 DFU for most private water closets, showing minor differences from the IPC in handling flushometer fixtures. Key DFU values from the IPC include:
FixtureContext/Flush TypeDFU Value
Water ClosetPrivate, 1.6 gpf3
Water ClosetPublic, >1.6 gpf6
LavatoryGeneral1
Kitchen SinkDomestic2
General2
Standard4
1 gpf or less2
General2
UPC values align closely, with a water closet at 3 DFU, lavatory at 1 DFU, kitchen sink at 2 DFU, at 2 DFU, and urinals typically at 4 DFU for standard installations. To apply these tables, the total fixture units for a system are calculated by summing the individual values of all connected fixtures, reflecting the aggregate load. For large buildings, factors—probable maximum percentages—are applied to the total to avoid oversizing, as multiple fixtures rarely operate simultaneously at full capacity. Less common fixtures, such as urinals (2-4 DFU in contexts) and hose bibbs (2.5 WSFU), follow similar summation principles to ensure system capacity matches expected usage.

Calculation and Conversion

From Fixture Units to Flow Rates

The conversion of fixture units to flow rates forms a critical step in system design, enabling engineers to estimate peak demands for sizing pipes, pumps, and other components. For systems, fixture units (WSFU) are transformed into estimated peak flow rates in gallons per minute (gpm) using demand curves that incorporate probabilistic usage patterns. The seminal Hunter's Curve, developed in the mid-20th century, plots total WSFU against gpm to reflect the low likelihood of all fixtures operating simultaneously, thus avoiding overdesign. In practice, codes provide explicit tables for this conversion, distinguishing between flush tank and flush valve systems due to their differing discharge profiles. The 2024 Appendix E, Table E103.3(3), bases its values on the Hunter's method and lists, for instance, 14.6 gpm for 10 WSFU in flush tank systems and 27 gpm for the same in flush valve systems. Flush valves, which deliver rapid, high-volume flushes, significantly higher flows, reflected in higher WSFU assignments (e.g., 10 for water closets vs. 3 for tank types) and separate tables to account for their peaky load characteristics. These conversions ensure supply lines can maintain adequate (e.g., 8 minimum for tanks, 15 for valves per IPC Table 604.3) without excessive velocity. For drainage systems, fixture units (DFU) are converted to rates primarily via tables that limit total load per and slope, prioritizing hydraulic efficiency over direct volumetric estimates. Table 710.1(1) specifies maximum DFU for horizontal branches and stacks at various slopes (e.g., 1/4 inch per foot), implying capacities derived from full- like Manning's with n=0.013 for smooth pipes. Individual fixture DFU assignments are derived from trap discharge rates using standard hydraulic principles, such as , to establish baseline loads (e.g., private lavatory: 1 DFU). Overall, conversions emphasize cumulative probabilistic loading rather than instantaneous peaks, with tables ensuring self-cleansing velocities of 2-10 .

Demand Estimation Methods

Demand estimation methods for plumbing systems extend beyond simple summation of fixture units by incorporating probabilistic models to account for the non-simultaneous usage of fixtures, thereby avoiding overestimation of peak flow rates. The probability of use concept recognizes that not all fixtures will operate at the same time, even during periods, due to diverse patterns and intermittent . This approach uses to determine the likelihood of multiple fixtures drawing concurrently, leading to more accurate sizing of systems. A seminal method in this domain is the Hunter's Curve methodology, developed in 1940 and widely adopted in plumbing codes such as the (UPC). The curve plots total fixture units against in gallons per minute (gpm), applying a that decreases as the number of fixtures increases—for instance, a of approximately 1.0 for fewer than 10 fixtures, tapering to 0.3 for over 100 fixtures, reflecting reduced probability of simultaneous operation. This graphical tool, based on a assuming congested usage scenarios, enables engineers to estimate demand without exhaustive enumeration of all possible combinations. However, it has been critiqued for overestimating in modern low-flow residential settings due to its origins in higher-flow fixtures. Load factors serve as occupancy-specific multipliers applied to the base fixture unit demand to adjust for varying usage intensities across building types. These multipliers refine the Hunter's Curve output, ensuring system capacity aligns with expected peak loads in diverse environments. For larger or complex systems, extended methods employ advanced statistical models and software simulations to enhance precision. These include the Wistort method, a normal approximation to the binomial distribution suitable for over 150 fixtures, and the zero-truncated Poisson binomial distribution (ZTPBD) for smaller installations, both incorporating fixture-specific probabilities of use (p) and flow rates (q). An illustrative equation for total demand in such models is Total demand = Σ (FU_i × probability factor), where FU_i represents individual fixture units adjusted by occupancy-derived probabilities to simulate realistic peak scenarios. Software tools like the Water Demand Calculator, integrated into recent UPC appendices, facilitate these simulations by inputting fixture counts and generating probabilistic demand curves. Recent updates, such as the 2024 UPC Appendix M, expand the Water Demand Calculator for broader applications, addressing limitations in traditional methods for modern low-flow fixtures. These methods rely on key assumptions, such as intermittent fixture operation typical of lavatories, showers, and toilets, and may not apply to continuous-flow fixtures like boilers or systems, which require separate calculations added to the probabilistic demand. Limitations include potential inaccuracies in non-congested settings, where actual usage probabilities are lower than assumed, leading to conservative designs that promote reliability but may increase initial costs.

Applications

Water Supply System Sizing

Water supply systems are sized using water supply fixture units (WSFU) to ensure adequate flow and pressure under conditions while minimizing energy loss and material costs. The process begins by calculating the total WSFU for the relevant portion of the system, such as a or main line, based on the connected fixtures. This total is then converted to an estimated peak flow rate in gallons per minute (gpm) using standardized demand tables that account for the probability of simultaneous use, as outlined in codes like the International Plumbing Code (IPC). For instance, conversions draw from probability curves where lower WSFU values yield near-linear gpm equivalents, but higher totals reflect diversity factors reducing the effective demand. For example, a residential with 20 WSFU might demand about 20 gpm in flush tank systems. Once the in gpm is determined, pipe sizes are selected to maintain water velocities below 8 feet per second () to prevent , , and excessive loss, with typical design velocities ranging from 4 to 7 for most materials. Pressure drop calculations ensure minimum residual pressures at fixtures (e.g., 8 flowing for standard outlets, 15 for valves) after accounting for , elevation changes (0.433 per foot of rise), fittings, and meters. The Hazen-Williams is commonly applied for estimation in water pipes: h_f = 10.67 \times \left( \frac{Q}{C} \right)^{1.852} \times \frac{L}{D^{4.87}} where h_f is head loss in feet of water, Q is flow in gpm, C is the pipe roughness coefficient (e.g., 140 for new copper, 100 for aged steel), L is pipe length in feet, and D is inside diameter in inches; pressure loss in psi is then h_f \times 0.433. This formula, derived empirically for water flows between 0.3 and 10 fps, guides iterative sizing to limit total friction loss to about 4 psi per 100 feet. Branch lines, serving individual fixtures or small groups, are sized using the full WSFU load without diversity adjustments, often requiring minimum diameters per IPC Table 604.5—for example, 1/2-inch for a single lavatory or supply, or 1-inch for a water closet. In contrast, main lines incorporate by applying the total system's converted gpm, allowing larger but more efficient pipes. and water lines require separate WSFU tallies using fixture-specific hot/cold values from tables; overall hot water demand is typically about 75% of total due to cold-only fixtures like water closets. systems are additionally sized for and potential recirculation. Recirculation systems in hot water lines reduce by minimizing initial draw-off waste through demand-controlled pumps that activate on fixture use, potentially lowering peak gpm by 20-30% in long runs while requiring separate pump sizing (e.g., 2-5 gpm circulation rate). Section 604 mandates minimum sizes scaled up from Table 604.5 based on calculated demands, with all systems designed to deliver the required gpm at specified pressures without exceeding 80 static. These steps ensure reliable performance, with final verification using pipe material-specific charts for and . Note: Values based on ; other codes like UPC may vary.
Fixture TypePrivate Minimum Supply Pipe Size (inches, cold/hot/both)Public Minimum Supply Pipe Size (inches, cold/hot/both)
Lavatory3/8 (both)1/2 (both)
Bathtub1/2 (both)1/2 (both)
Shower (single head)1/2 (both)1/2 (both)
Water Closet (flush tank)3/8 (cold)1/2 (cold)
Water Closet (flushometer valve)1 (cold)1 (cold)
This table illustrates baseline minimums under IPC 604.5 (2024 edition), which are increased for higher demands or longer runs to meet velocity and pressure criteria. Consult the latest code for updates.

Drainage and Venting System Sizing

In drainage system design, fixture units, specifically drainage fixture units (DFU), are summed for fixtures connected to branches and stacks to determine pipe capacities and prevent surcharging, where wastewater exceeds pipe flow limits and backs up. The total DFU load on a or vertical dictates the minimum , as outlined in plumbing codes like the (). For instance, a 3-inch is limited to a maximum of 20 DFU to maintain adequate and avoid solids deposition. Horizontal drainage pipes must be installed with a minimum to ensure self-cleansing , typically 1/4 inch per foot for pipes 2 1/2 inches or smaller in diameter, and 1/8 inch per foot for larger sizes, as specified in Table 704.1. This facilitates gravity flow of , with hydraulic load limits based on DFU to prevent overflow; exceeding these can lead to reduced flow efficiency or blockages. Building drains and sewers incorporate variations in their DFU capacities—for example, a 6-inch at 1/4 inch per foot accommodates up to 840 DFU, compared to 700 DFU at 1/8 inch per foot. Vertical stacks are sized by total DFU and the number of intervals ( levels), without considerations due to their ; a 4-inch stack supports up to 90 DFU per interval and 240 DFU total for three or fewer intervals. Venting systems complement drainage sizing by providing air circulation to maintain seals and prevent siphonage, with vent pipes sized based on the DFU load of connected . Stack vents and vent require a minimum determined by the total DFU and developed length, per Table 906.1; for example, a 4-inch serving 540 DFU over 990 feet needs a 4-inch vent. or vents are typically half the of the served but not less than 1 1/4 inches, ensuring adequate air flow equivalent to approximately 1/4 DFU per fixture in aggregate capacity. Offsets in greater than 45 degrees necessitate relief vents to admit air and avoid pressure imbalances, sized similarly to the . Special configurations like wet venting allow shared drainage and venting to reduce material use, particularly for groups on the same floor level. In wet venting, the common vent carries both and , sized one size larger than the largest fixture drain it serves—for instance, a 3-inch wet vent can handle up to 12 DFU total (e.g., 4 DFU from a private lavatory and water closet combination), with a separate dry vent required for the system. venting, applicable to single- systems in low-rise buildings, relies on the stack itself to provide venting without additional , limited to buildings under 75 feet (approximately 6 stories) in height and 24 DFU total connected load for a 3-inch , ensuring pressure equalization through annular . These methods optimize installation while adhering to DFU-based limits to maintain system integrity. Note: Values based on ; UPC may differ (see Standards and Variations section).

Standards and Variations

Major Plumbing Codes

The , developed by the , provides comprehensive provisions for fixture units in its guidance on and system design. In the 2024 edition, water supply fixture units (WSFU) are addressed in Appendix E, where Table E103.3(2) assigns values to various fixtures based on their probable demand, enabling conversion to peak flow rates using the Hunter's curve method outlined in Section E103.3. Drainage fixture units (DFU) are defined in Chapter 7, with Section 709.1 specifying that values in Table 709.1 represent the relative load of fixtures for estimating pipe capacities, as applied in Tables 710.1(1) and 710.1(2) for horizontal branches and stacks. The 2024 IPC also incorporates adjustments for low-flow fixtures through Section 604.4, which sets maximum flow rates (e.g., 0.5 gpm for public lavatory faucets) to ensure compatibility with reduced consumption without altering base fixture unit assignments. The (UPC), published by the International Association of Plumbing and Mechanical Officials (IAPMO), employs a parallel approach to fixture units but with distinct emphases on and regional applications. In the 2024 edition, 610.3 lists WSFU values and minimum branch pipe sizes for fixtures, assigning values for use to reflect greater simultaneous demand—for instance, 1 WSFU for a lavatory compared to the IPC's 1.5 WSFU. DFU values appear in 702.1 within 7, supporting drainage sizing similar to the IPC. The UPC particularly highlights adaptations for high-seismic areas like , where state amendments integrate enhanced prevention and measures tied to fixture unit calculations. Both the and rely on the as the foundational method for translating fixture units into estimated flow demands, promoting consistent probabilistic sizing across systems. However, the UPC offers more granular provisions for flush valve fixtures in Table 610.10, which adjusts fixture unit loads based on the number and type of valves to refine estimates. These model codes form the basis of regulations in most U.S. states, with the IPC adopted statewide in 37 jurisdictions and the UPC predominant in western states including , , and , typically subject to local amendments for site-specific conditions.

International Differences

In standards, the 12056 series for systems inside buildings employs discharge units (DU) as a metric-based equivalent to fixture units, expressed in liters per second (l/s) to quantify probable discharge loads from fixtures. These units account for flow rates, duration, and frequency of use, with values adjusted downward for water-saving fixtures to comply with eco-design directives promoting reduced consumption, such as limits on flush volumes for toilets and low-flow rates for faucets and showers. For instance, a standard washbasin might rate at 0.3 DU, while a 6-liter water closet rates at 1.7 DU, enabling pipe sizing that prioritizes efficiency in multi-story buildings. The National Plumbing Code of (NPC) aligns closely with the International Plumbing Code () in its use of fixture units, distinguishing between water supply fixture units (WSFU) for demand estimation in and hot systems and drainage fixture units (DFU) for waste and vent sizing. This approach facilitates similar probability-based calculations for peak flows, with tables providing WSFU values like 3 for a lavatory or 6 for a flush-valve water closet, though adaptations for climates include requirements for and freeze protection in piping without directly altering base FU values. In and , the AS/NZS 3500 series for and utilizes both fixture units (FU) and discharge units (DU), where 1 DU approximates 1 DFU for compatibility in load calculations, focusing on hydraulic demands from fixtures in sanitary systems. Developing countries, including those in and the like and , frequently adopt the as a foundational model for fixture unit methods, incorporating local modifications to address , such as enhanced low-flow mandates and simplified sizing for resource-constrained installations. Global harmonization efforts aim to standardize fixture load assessments, yet regional variations persist in probability factors for simultaneous use—often higher in dense urban Asian contexts due to high-rise density, leading to adjusted demand curves for elevated peak flows.

References

  1. [1]
    Fixture Unit, Drainage (D.F.U.) - UpCodes
    A measure of probable discharge into the drainage system by various types of plumbing fixtures, used to size DWV piping systems.
  2. [2]
    Fixture Unit, Water-Supply (W.S.F.U.) - UpCodes
    A measure of the probable hydraulic demand on the water supply by various types of plumbing fixtures used to size water-piping systems.
  3. [3]
    DFU - Drainage Fixture Units - The Engineering ToolBox
    A Fixture Unit is not a flow rate unit but a design factor based on the rate of discharge, time of operation and frequency of use of a fixture. A fixture unit ...
  4. [4]
    B.5.2 Water Supply Fixture Units (WSFU) Assigned to Fixtures
    The water supply fixture unit (WSFU) is a factor so chosen that the load-producing effects of different kinds of fixtures under their conditions of service can ...Missing: definition | Show results with:definition
  5. [5]
    APPENDIX E SIZING OF WATER PIPING SYSTEM - ICC Digital Codes
    The peak demand must be determined in each part of the hot and cold water supply system that includes the corresponding water supply fixture unit and ...
  6. [6]
    Water Supply Fixture Units WSFU - The Engineering ToolBox
    The WSFU (Water Supply Fixture Units) is defined by the Uniform Plumbing Code (UPC) and can be used to determine water supply to fixtures and their service ...
  7. [7]
    CHAPTER 2 DEFINITIONS - 2018 INTERNATIONAL PLUMBING ...
    DRAINAGE FIXTURE UNIT. Drainage (dfu). A measure of the probable discharge into the drainage system by various types of plumbing fixtures.
  8. [8]
    CHAPTER 7 SANITARY DRAINAGE - ICC Digital Codes
    Fixtures not listed in Table 709.1 shall have a drainage fixture unit load based on the outlet size of the fixture in accordance with Table 709.2. The minimum ...
  9. [9]
    2021 Uniform Plumbing Code - IAPMO
    C 303.2 Water Supply Fixture Unit Values. C 303.3 Drainage Fixture Unit Values. C 304.0 Drainage System Sizing. C 304.1 Drainage Fixture Units. C 304.2 Size ...<|control11|><|separator|>
  10. [10]
    History of Plumbing Research at NIST
    A “fixture unit” is a unit of measure that estimates the water load that ... In 1972, the National Bureau of Standards erected a 5-story plumbing tower ...
  11. [11]
    Our Plumbing Codes Are Based on 100-Year-Old Data
    May 12, 2020 · Standards date back to research pioneer Roy B. Hunter, who studied usage and wrote formulas we still use. The National Institute of Standards ...
  12. [12]
    The Basis for Most Plumbing Codes - PHCPPros
    Mar 6, 2023 · Dr. Roy B. Hunter's research at the National Bureau of Standards helped discover inexpensive ways to provide indoor plumbing.
  13. [13]
  14. [14]
    Hunter Fixture Units in Plumbing Design | PDF - Scribd
    1) Dr. Roy Hunter developed the concept of "fixture units" in the 1920s and 1930s based on his application of binomial probability theory to model water ...
  15. [15]
    The Law of Conservation of Fixture Units - Bentley Blog
    Apr 29, 2021 · Hunter developed a method based on sound probability theory and empirical data to calculate the flow that would not be exceeded 99% of the time.Missing: 1930s | Show results with:1930s
  16. [16]
    [PDF] Methods of estimating loads in plumbing systems - GovInfo
    ROY B. HUNTER. ISSUED DECEMBER 16, 1940. The National Bureau ... tween 193 gpm 880 fixture units and 210 gpm. 1,040 fixture units, indicating again that the.Missing: 1930s | Show results with:1930s
  17. [17]
    A Brief History of Plumbing Codes - Working Pressure Magazine
    Dec 31, 2019 · The plumbing industry has a long history of plumbing code and standards development. The oldest code dates back to the Hammurabi code.
  18. [18]
    Designing Right-Sized Plumbing Systems for Housing Affordability ...
    Hunter introduced the concept of “fixture units,” which allowed designers to categorize fixtures by their relative load on the water supply system. Each type of ...
  19. [19]
    The International Code Council's 30th Anniversary Highlights Three ...
    Dec 10, 2024 · The International Plumbing Code® (IPC) became the Code Council's first model code when it was published in 1995. “The IPC has many provisions ...Missing: units | Show results with:units
  20. [20]
    [PDF] A5) “Hunter” Fixture Units Development
    The review provides an historical perspective for insights on methods developed that introduced “Hunter Fixture Units” into practices for plumbing systems and ...
  21. [21]
    [PDF] GAO WATER INFRASTRUCTURE Water-Efficient Plumbing Fixtures ...
    Aug 31, 2000 · Table 4: Evolution of Industry Testing Requirements for Low-Flow. Toilets. 27. Table 5: State and Local Standards for Water-Efficient Plumbing.
  22. [22]
    CHAPTER 4 FIXTURES FAUCETS AND FIXTURE FITTINGS - 2021 ...
    This chapter shall govern the materials, design and installation of plumbing fixtures, faucets and fixture fittings in accordance with the type of occupancy.
  23. [23]
    Uniform Plumbing Code (UPC) - IAPMO
    Update water supply fixture unit (WSFU) and drainage fixture unit (DFU) values for bathroom groups in Appendix C;; New Appendix O providing minimum non ...
  24. [24]
    International Plumbing Code (IPC) - ICC
    The International Plumbing Code (IPC) is a proven, comprehensive model plumbing code that works seamlessly with ICC's family of building codes.Missing: units 1995-2025
  25. [25]
    [PDF] Sizing Plumbing Water System - PDH Online
    The method is based on assigning a fixture unit. (f/u) value to each type of fixture based on its rate of water consumption, on the length of time it is ...
  26. [26]
    709.1 Values for Fixtures - UpCodes
    Section 709.1 values are drainage fixture unit values used to estimate the load of soil or waste pipes. Table 709.1 lists these values for different fixtures.
  27. [27]
    702.1 Trap Size - UpCodes
    Maximum drainage fixture units for a fixture trap and trap arm loadings for sizes up to 4 inches (100 mm) shall be in accordance with Table 702.1(1).
  28. [28]
    10.5.13 Protection From Special Equipment - UpCodes
    Faucets on laboratory sinks shall be protected against backflow from backsiphonage and backpressure by the attachment of an ASSE 1035 laboratory faucet backflow ...
  29. [29]
  30. [30]
  31. [31]
    Drainage and venting fixture unit values - King County, Washington
    Provide a 2-inch (51-mm) minimum branch drain beyond the trap arm. Trap sizes must not be increased to the point where the fixture discharge may be inadequate ...Missing: supply | Show results with:supply
  32. [32]
    APPENDIX E SIZING OF WATER PIPING SYSTEM - ICC Digital Codes
    LOAD VALUES, IN WATER SUPPLY FIXTURE UNITS (wsfu). Cold, Hot, Total. Bathroom group, Private, Flush tank, 2.7, 1.5, 3.6. Bathroom group, Private, Flushometer ...
  33. [33]
    Christoph Lohr: Understanding the reasoning behind Hunter's Curve
    Jul 6, 2022 · Dr. Hunter realized that each plumbing fixture in a building could be “on” or “off.” For example, if someone is washing their hands, the ...
  34. [34]
    [PDF] Peak Water Demand Study - IAPMO
    This method, commonly known as “Hunter's Curve,” is a design curve using fixture units to determine the peak demand flow rate. As early as 1974, a US Commission ...
  35. [35]
    [PDF] Improved Estimates of Peak Water Demand in Buildings
    To arrive at design demand values for single fixtures using the current method, Hunter's curve had to be extrapolated from 5 Fixture Units (FU) and 4 gpm to ...
  36. [36]
    The risks of sizing plumbing systems using Hunter's curve
    Mar 16, 2022 · The Hunter's Curve method has been used to size plumbing systems, including booster packages, supply and drainage piping, and storage tanks.
  37. [37]
    Water Supply Fixture Units - WSFU vs. GPM and Liters/sec
    The Water Supply Fixture Unit - WFSU - is defined by the American Uniform Plumbing Code (UPC) and is used to calculate the demand in water supply systems.
  38. [38]
    Hazen-Williams Water Flow Formula: Head Loss, Data, Charts ...
    The Hazen-Williams equation can be used to calculate the pressure drop (psi) or friction loss in pipes or tubes. Hot Water Systems - Equivalent Length vs.
  39. [39]
    Hazen-Williams Pressure Loss Equation - The Engineering ToolBox
    The Hazen-Williams equation can be used to calculate the pressure drop (psi) or friction loss in pipes or tubes. · Hazen-Williams Formula in Imperial Units.
  40. [40]
    CHAPTER 6 WATER SUPPLY AND DISTRIBUTION
    The minimum size of a fixture supply pipe shall be as shown in Table 604.5. The fixture supply pipe shall terminate not more than 30 inches (762 mm) from the ...
  41. [41]
  42. [42]
    Domestic Hot Water Recirculation System - MEP Academy
    May 3, 2023 · We'll show you how residential and commercial domestic hot water recirculation systems work to save water, energy, time and money.
  43. [43]
    710.1 Maximum Fixture Unit Load - UpCodes
    The maximum number of drainage fixture units connected to a given size of horizontal branch or vertical soil or waste stack shall be determined using Table 710 ...
  44. [44]
    Digital Codes
    **Summary:**
  45. [45]
    906.1 Size of Stack Vents and Vent Stacks - UpCodes
    The minimum required diameter of stack vents and vent stacks shall be determined from the developed length and the total of drainage fixture units connected ...
  46. [46]
  47. [47]
  48. [48]
  49. [49]
    The Future of Domestic Water Sizing | McHugh Engineering
    Dec 15, 2021 · if you want to size a pipe you must sum all fixture unit values that the pipe serves and then use Hunter's curve to convert that value to GPM.
  50. [50]
    Using IAPMO's Water Demand Calculator™ Can Lead to Energy ...
    Jun 13, 2023 · Arup compared the Water Demand Calculator with the Hunter's Curve method found standard in both the Uniform Plumbing Code (UPC®) and the ...
  51. [51]
    [PDF] Designing drainage without compromising BS EN 12056 - CIBSE
    Jan 28, 2022 · Total Discharge Units = 115. One hundred WHBs = 100 x 0.3 = 30. Fifty 6-litre WCs = 50 x 1.7 = 85. BS EN 12056-2 Table 2 - Discharge Units (DU).
  52. [52]
    L_2013299EN.01003801.xml - EUR-Lex - European Union
    Nov 9, 2013 · Toilet suites delivering a full flush volume of more than 4,0 litres and toilet flushing systems shall be equipped with a water-saving device.
  53. [53]
    [PDF] ABCB Sanitary plumbing and drainage pipe sizing
    Sep 11, 2019 · The BS EN 12056-2:2000 standard uses discharge units (DU) which use flow rates (l/s) for fixtures. This differs to the AS/NZS 3500.2:2018 ...
  54. [54]
    [PDF] National Plumbing Code of Canada 2020 - à www.publications.gc.ca
    Nominal Pipe Sizes for Water Systems Based on Number of Fixture Units Served Using the Average Pressure Loss Method. Nominal Pipe. Size. Water Velocity. 3.0 m/s ...
  55. [55]
    National Plumbing Code of Canada 2020
    Jun 14, 2023 · Direct access to codes and user's guides in electronic format! Codes and user's guides published by the National Research Council of Canada ...Missing: units | Show results with:units
  56. [56]
    Why the IPC - ICC - International Code Council
    The IPC is the most widely adopted plumbing code across the United States. · The IPC is also used in Saudi Arabia, the United Arab Emirates, Columbia, Mexico, ...
  57. [57]
    [PDF] summary of mathematical models for the design of water distribution ...
    Probabilistic methods employing the binomial probabilistic distribution are suitable for groups of homogenic fixture, that is groups of fixtures of the same.
  58. [58]
    A comparison between the fixture unit approach and Monte Carlo ...
    Oct 9, 2025 · The fixture unit approach with an arbitrarily assumed reference flow rate is commonly used for the estimation of probable maximum ...