Fact-checked by Grok 2 weeks ago

Iore

The Iore, often stylized IORE (), is a class of heavy-haul electric locomotives designed specifically for transporting on the Malmbanan railway line in and . Comprising 34 individual sections forming 17 permanently coupled double units, these locomotives were built between 2000 and 2014 by (later ) for MTAB, the rail subsidiary of the Swedish mining company . Each double unit features a Co'Co' + Co'Co' with 12 axles, a total weight of 360 tonnes, and a power output of 10,800 kW (approximately 14,500 hp) from AC traction motors, enabling it to haul trains of up to 8,600 tonnes at speeds of 60 km/h on gradients as steep as 11%. With a maximum speed of 80 km/h and a starting of 1,200 kN, the Iore class is among the world's most powerful electric locomotives, optimized for conditions and high-reliability operations in freight. Developed to replace the older locomotives and increase transport capacity on the to and Luleå routes, the Iore fleet has been instrumental in 's logistics, supporting the hauling of 750-meter-long s consisting of 68 cars loaded with 6,800 tonnes of (total train weight 8,600 tonnes). Operations faced disruptions from derailments in late 2023 and early 2024, leading to temporary halts in ore transport. The initial order of nine double units was placed in 1999 and delivered from 2000 to 2004, followed by four more in 2007 (delivered 2009–2010) and another four in 2011 (delivered 2013–2014), bringing the total to 17 operational pairs. These locomotives operate under 15 kV AC , with advanced control systems allowing up to six units to be managed from a single cab, and include features like 41 tractive steps and for . Ongoing modernization efforts, including the installation of (ETCS) signaling, completed in 2025, and refurbishments coordinated with Bombardier (now ), ensure their continued role in sustainable rail freight, contributing to handling 44% of Sweden's cargo (as of 2023).

Development and Design

Origins and Requirements

, Sweden's largest producer, operates the Malmtrafik railway division to transport from its mines in and Malmberget to the port of , . By the late 1990s, the company faced the need to replace its aging fleet of locomotives, which were limited to hauling trains of approximately 5,200 tonnes, as production expansions demanded heavier trains to maintain efficiency on the demanding route. In 1998, issued a tender for new locomotives capable of hauling 8,500-tonne trains along the (Malmbanan) and , operating under 15 kV 16.7 Hz AC , with a top speed of 80 km/h and high starting to handle the route's demands. These requirements were driven by economic pressures from mine expansions in and Malmberget during the 1990s, which aimed to boost annual iron ore production; produced approximately 22 million tonnes gross in 1997, with plans to increase capacity to around 25-30 million tonnes by the mid-2000s. The initial contract was awarded to in September 1998, with a formal agreement signed in for 18 locomotives (nine double units) valued at approximately 1.2 billion (about $140 million USD). This procurement was part of broader infrastructure upgrades to support increased throughput, including new hopper cars ordered earlier that year. The Iron Ore Line's steep gradients—up to 12.5‰ (1.25%)—and harsh conditions, including extreme cold and snow, were key challenges influencing the tender's performance criteria.

Engineering Innovations

The IORE locomotives incorporate several engineering innovations tailored to the challenges of heavy-haul freight operations in environments, responding briefly to LKAB's tender requirements for hauling 8,500-tonne trains over demanding routes. A key feature is the adoption of a , consisting of two three-axle bogies per locomotive section, which provides enhanced stability on uneven tracks and superior adhesion in icy conditions prevalent in northern and . This configuration distributes the locomotive's weight—up to 180 tonnes with —across six powered axles, enabling reliable traction for loads exceeding 8,600 tonnes while minimizing wheel slip on frozen rails. The body design emphasizes modularity and durability, utilizing lightweight aluminum construction to resist corrosion in sub-zero temperatures and facilitate maintenance in remote locations. At 22.9 meters in length per section, the structure accommodates dual cabs for bidirectional operation without turning, promoting efficiency on linear ore transport lines while keeping the overall weight optimized for a 30-tonne axle load limit. This modular approach allows for straightforward component replacement, enhancing long-term operational reliability in harsh Arctic climates above the polar circle. Traction and control systems represent a significant advancement, featuring IGBT-based inverters that deliver smooth power output and enable to recapture energy during descents on steep gradients. These inverters support precise management across the six asynchronous AC traction motors, reducing wear and improving for sustained heavy-haul performance. The regenerative capability is particularly vital for routes involving elevation changes, where downhill braking generates surplus power that can offset uphill energy demands. Signaling integration includes compatibility with ETCS Level 2, preparing the locomotives for future upgrades to advanced train control systems, alongside built-in automatic train protection (ATP) for enhanced safety on mixed-traffic lines. Environmentally, the design adheres to EU standards for noise and , minimizing emissions and interference suitable for railway operations while supporting broader sustainability goals like energy recovery and reduced lifecycle impacts.

Prototyping and Testing

The prototype IORE locomotive was constructed in 2000 at Adtranz's plant in , where it underwent static and dynamic testing to assess structural integrity, electrical systems, and basic performance metrics under controlled conditions. On-track trials in began in 2001 along the , where the prototype simulated full-load hauls using configurations equivalent to 68 cars to rigorously evaluate limits and cooling in extreme low temperatures reaching -40°C. These trials yielded critical outcomes, including the verification of a 1,200 kN starting and the successful resolution of initial bogie suspension challenges, which improved and capabilities on the Ofoten Line's steep gradients of up to ‰ (1.5%). The certification process involved extensive validation, culminating in approval from the Swedish Transport Agency (Transportstyrelsen) in 2002 following more than 10,000 km of accumulated testing, which incorporated overload scenarios to ensure reliability under operational stresses. The modular aluminum body structure enhanced test adaptability by allowing targeted modifications during evaluation phases.

Production and Variants

Manufacturing Process

The IORE locomotives were primarily manufactured at the facility in , , following the acquisition of by Bombardier. This site served as the main production hub for the fleet, handling the assembly of the modular TRAXX-based design tailored for heavy-haul iron ore transport. The transition from Adtranz to Bombardier occurred during the early stages of production, ensuring continuity in the build for the initial units. The assembly sequence involved integrating key components across European facilities, with final outfitting and testing completed in . Bogies and underframe elements were fabricated using Adtranz's established Flexifloat design, which supports high axle loads up to 30 tonnes per axle for demanding freight operations. Electrical systems, including traction converters and control equipment, were supplied by ABB to ensure compatibility with the 15 kV 16.7 Hz electrification system used on the Malmbanan line. Pantographs and carbon contacts were integrated to maintain reliable contact in harsh conditions, contributing to the locomotive's operational reliability. Quality assurance at the plant adhered to ISO 9001 standards, with certifying its manufacturing sites to support consistent production of high-reliability . Non-destructive testing, such as ultrasonic inspections on welds, was applied during structural assembly to detect defects without compromising integrity. Vibration analysis was conducted during dynamic testing phases to verify bogie and performance under load . These measures ensured the IORE's robustness for extreme temperatures and heavy loads exceeding 8,500 tonnes per train. The emphasized compatibility with Swedish-Norwegian rail infrastructure, sourcing propulsion components from established European suppliers like ABB for traction motors rated at 918 kW each. This modular approach allowed for efficient scaling, with peaking at up to six units annually during the main build phases from 2000 to 2014. Each required approximately 12-18 months from component to final delivery, reflecting the complexity of integrating twin-section designs with advanced .

Locomotive Numbers and Deliveries

The initial order for the IORE locomotives was placed by MTAB (later Malmtrafik) on 15 September 1998 with for 18 units, with deliveries occurring between 2000 and 2005. Numbered 101 through 118, these formed the core of the fleet to replace aging and 15 locomotives on routes. Production began under , but following Bombardier's acquisition of the company in May 2001, subsequent assembly shifted to Bombardier Transportation's facilities in , . The first units entered operational service in 2003 hauling freight on the Kiruna-Narvik route. A follow-up order on 23 August 2007 added 8 more locomotives, numbered 119 through 126, which were delivered between 2010 and to support growing ore transport demands. Further expansion came in with an order for 8 additional units, numbered 127 through 134 and delivered in 2013–2014, bringing the total fleet to 34 by 2014. All IORE locomotives remain owned by Malmtrafik and are dedicated to operations within and , with no units exported. The complete fleet achieved full operational status by 2014.
Order YearQuantityNumberingDelivery PeriodNotes
199818101–1182000–2005Initial batch; manufacturer shift to Bombardier in 2001
20078119–1262010–2011Expansion for increased capacity (4 twin units)
20118127–1342013–2014Further growth (4 twin units); fleet complete at 34 units

Variants and Modifications

The IORE locomotives, designated 101 through 134, share a core design based on the Octeon platform, featuring Co'Co' + Co'Co' configurations with 12 axles optimized for heavy haulage on the . Later production units incorporate enhancements for interoperability, including cabling compatible with the (ETCS) on the Norwegian section of the . A modernization program, coordinated with (formerly ), began in and is ongoing as of 2025. This includes upgrades to onboard systems and signaling, with ETCS installation targeted for completion by 2023 on the Malmbanan route, and further refurbishments extending to 2026 to ensure compliance with safety standards and support sustainable operations. The program, valued at approximately 600 million as of 2023, aims to extend the fleet's service life beyond 2060.

Technical Specifications

Electrical and Propulsion Systems

The IORE locomotive draws power from the single-phase 15 kV 16.7 Hz overhead system using two pantographs, one positioned on each end of the double-unit configuration to ensure reliable contact during heavy freight operations on the . The system features six ABB three-phase asynchronous (model 6-FRA 7072 D) per section, each rated at 900 kW for a total continuous power output of 5,400 kW per section (10,800 kW per double unit), optimized for high-traction demands in conditions. These are controlled by GTO thyristor-based VVVF inverters with a gear ratio of 1:6.267, allowing precise and speed regulation for smooth acceleration and adhesion management. Traction effort reaches up to 700 per section at starting (1,400 total), with continuous effort of 600 per section at 32.4 km/h. This effort can be modeled using the basic equation for : TE = \mu \times W where TE is the in , \mu is the (typically 0.25–0.35 on icy surfaces), and W is the effective in (30 tonnes per , or approximately 294 assuming g \approx 9.81 \, \mathrm{m/s^2}). The Co'Co' arrangement facilitates even distribution of this effort across the powered axles. Braking is achieved through a combined regenerative and rheostatic system, where the traction motors act as generators to recover during descents, feeding it back to the for approximately 25% overall savings under operational conditions. Excess is dissipated as in dynamic brake grid resistors, with electro-dynamic braking providing up to 750 kN total force, ensuring controlled deceleration for heavy loads while minimizing wear on mechanical s. Braking occurs in 30 steps for loaded trains and 10 steps for empty trains.

Structural and Mechanical Features

The IORE locomotive is engineered with a robust physical structure suited to the demanding conditions of heavy-haul on the Malmbanan line in northern . Each section measures 22.905 m in length, 2.95 m in width, and 4.465 m in height, contributing to a total weight of 360 tonnes per double unit and an of 30 tonnes, which supports the line's upgraded for trains exceeding 8,000 tonnes. The body employs a double-walled aluminum construction, enhancing to protect against the extreme while maintaining structural integrity under high loads. The bogies are fabricated from and incorporate primary hydraulic along with yaw dampers for stability on curved tracks. This design optimizes load distribution across the Co'Co' , contributing to reliable performance on the 1,435 mm gauge track. The running gear includes wheels suited to the 1,435 mm gauge, equipped with roller bearings for reduced friction and longevity, and sanders to improve during snowy conditions common on the route. These components ensure smooth operation and minimal maintenance in low-traction environments. The locomotive features two full-width cabs designed for operator comfort and efficiency, with adjustable seating and climate control systems rated for temperatures ranging from -50°C to +40°C, allowing year-round operations in subzero winters and mild summers. These ergonomic features integrate with the electrical systems to maintain overall vehicle stability during extended hauls.

Performance Metrics

The IORE locomotives achieve a maximum speed of 80 km/h when unloaded and operate at 60 km/h with loaded trains on the Malmbanan line. At full , operational speeds are limited to 50 km/h to maintain traction on gradients, with from 0 to 50 km/h taking approximately 45 seconds for an 8,500-tonne train. Haulage capacity reaches up to 8,500 tonnes on 1% gradients, supported by a of 30 kW/tonne. This capability stems from the propulsion systems, which deliver a combined 1,200 kN continuous per double unit, hauling trains consisting of up to 68 hopper cars. Efficiency metrics highlight the IORE's energy use at approximately 26 kWh/km for 8,500-tonne trains, with contributing to overall savings of about 25% on downhill sections through electro-dynamic systems. Reliability is evidenced by a mean distance between failures exceeding 200,000 km as of and availability greater than 95%, contributing to consistent heavy-haul operations. In comparison to the predecessor , the IORE provides 30% higher , allowing haulage of 8,500 tonnes versus 5,200 tonnes and reducing transit times by 15% on Kiruna-Narvik runs.

Operational Deployment

Introduction to Service

The IORE locomotives began on 10 2001, with the inaugural , designated Io1, operating on the Kiruna-Riksgränsen segment of the . This marked the transition to heavier-haul operations following infrastructure upgrades that enabled the 30-tonne required for the IORE's design. The growing IORE fleet gradually replaced the aging locomotives starting in the early , with full replacement achieved by 2013, allowing LKAB to increase train lengths and payload capacities significantly on ore transport routes. To support this rollout, launched a dedicated crew training program for more than 100 drivers, emphasizing adaptation to the new Automatic Train Protection (ATP) systems and specialized procedures for cold-weather operations in the environment. The program, which included hands-on simulations and protocols tailored to the IORE's advanced controls, was completed by mid-2004, ensuring operational readiness amid the harsh northern conditions. Key milestones included the full of IORE units into the route operations in 2005, enabling consistent heavy ore haulage across the Sweden-Norway border. The fleet expanded to 34 units by 2014, solidifying 's capacity for sustained ore deliveries.

Routes and Freight Haulage

The IORE locomotives primarily operate on the in , extending from Luleå through to Riksgränsen at the Norwegian border, with the steepest sections between and Riksgränsen spanning approximately 108 km. This route connects to the in , a 43 km line from Bjørnfjell to the Port of Narvik, facilitating the transport of iron ore from LKAB's mines in , Malmberget, and Svappavaara to export terminals. Train consists typically feature pairs of double-headed IORE locomotives pulling 68 four-axle hopper cars, with the cars weighing about 1,360 tonnes empty and the fully loaded reaching 8,500 tonnes of pellets over a length of 750 meters. These configurations enable efficient heavy-haul freight on the demanding , where the locomotives' high is essential for gradients up to 1.7%. Daily operations involve 12-16 round trips from the mines to the ports, primarily supporting the northern route to with around 10 loaded trains per day and the southern loop to Luleå with 4, ensuring continuous flow despite single-track constraints. The Port of handles the majority of exports, processing approximately 20 million tonnes of annually for shipment to . Cross-border coordination is managed jointly by the (Trafikverket) and Norwegian National Rail Administration (Bane NOR), adhering to EU Technical Specifications for (TSI) standards to harmonize signaling, loads, and scheduling. Winter operations include power derating on IORE locomotives to mitigate adhesion loss from and accumulation, maintaining safety on the Arctic routes.

Maintenance and Upgrades

The IORE locomotives are maintained primarily at LKAB's depot, where routine inspections focus on wheels and other wear-prone components after approximately 13,000 km of operation. Given their typical monthly mileage of 10,000 km hauling trains, this schedule supports near-monthly checks to ensure operational reliability on the demanding Ore Line. A comprehensive refurbishment program for 18 IORE units commenced in 2021, coordinated by and supported by engineering consultants such as Vysus Group, with the initiative projected to span up to six years through 2026. This effort includes upgrades to onboard systems and signaling to align with European safety standards, notably the deployment of the (ETCS) Level 2, which began in 2024 and was commissioned in June 2025, with full rollout across the entire Ore Line expected by 2029. Reliability enhancements through the program incorporate modernized components to extend component lifespans and reduce unplanned downtime, building on the locomotives' established electro-dynamic braking systems that contribute to overall fleet efficiency. LKAB's investments in this refurbishment, part of broader logistics upgrades totaling nearly SEK 1 billion for the Ore Line infrastructure, underscore efforts to sustain heavy-haul performance amid increasing transport demands.

Incidents and Safety

Notable Accidents

In December 2023, a fully loaded iron ore train derailed near Vassijaure station on the Malmbanan line en route from Kiruna to Narvik, causing significant damage to tracks and overhead lines with no reported injuries; operations were disrupted until late March 2024. Another derailment occurred on the same line in February 2024 at Vassijaure, involving an empty iron ore train returning from Narvik to Kiruna, again with no injuries but leading to further closures and repairs. In November 2021, an train derailed near Rutjejaure on the Luleå–Kiruna section, spilling pellets and causing damages estimated at up to 100 million, with no injuries reported. These incidents reflect ongoing challenges from track conditions and heavy loads on the routes.

Safety Enhancements and Reliability

The IORE fleet is undergoing a multi-year refurbishment program coordinated with (formerly ), focusing on engineering, risk management, and regulatory compliance to European safety standards. This includes preparation for the (ETCS) installation on the Malmbanan by 2023, with the program extending up to 2026 to enhance reliability in conditions. Annual safety audits are conducted in accordance with EU Directive 2016/797 on railway and safety, supporting cross-border operations. Training for operators emphasizes handling , contributing to overall safety on heavy-haul routes without passenger services.

References

  1. [1]
    MTAB IORE - Elektrische Lokomotiven aus europäischer Produktion
    IORE stand for Iron Ore, the material the machines predominantly transport. One unit is composed out of two identical, fully-fledged singlecab Co'Co' ...
  2. [2]
    Locomotives to Further Serve as Backbone for Iron Ore Transport
    Jan 28, 2010 · Bombardier Transportation recently handed over the first of another four class BOMBARDIER IORE double-section heavy haul locomotives to MTAB.
  3. [3]
    From mine to port - LKAB
    With its impressive tractive effort of 1,200 kilonewtons, 17 IORE locomotives operate on the route. These are 750-metre-long trainsets consisting of 68 ore ...
  4. [4]
    Vysus supports IORE heavy haul locomotive refurbishment ...
    Jan 12, 2021 · The modernisation of the IORE locomotives is being undertaken with Bombardier Transportation, and is co-ordinated with the installation of ETCS ...Missing: specifications | Show results with:specifications
  5. [5]
    [PDF] formation of our industry toward a sustainable future - LKAB
    Apr 25, 2024 · powerful electric locomotive, the IORE loco. Freight carried on the return trip includes additives for the upgrading process. The capacity ...
  6. [6]
    [PDF] Iron Ore in 1998 - Amazon AWS
    Jernbaneverket, Norway's national rail administration, and. LKAB reached an agreement concerning the upgrading of the. Ofoten Line, which runs from the ...
  7. [7]
    [PDF] Improved wheel-rail system of Sweden's iron ore line - DiVA portal
    Trains are 750 m long and consist of 68 wagons with one pulling units – two IORE locomotives. Their gross weight is about 8500 tonnes.
  8. [8]
    Experience the trains of Narvik
    LKAB has entered into an agreement with ADtranz (ABB Daimler Benz) for the delivery of 9 ore train locomotives. This is part of an investment of SEK 1.1 ...Missing: contract | Show results with:contract
  9. [9]
    [PDF] UNIVERSAL REGISTRATION DOCUMENT 2024/25 - Alstom
    Jun 23, 2025 · The Universal Registration. Document may be used for the purposes of an offer to the public of securities or admission of securities to trading ...
  10. [10]
    Malmtrafik i Kiruna IORE - loco-info.com
    ... trains weighing 8,600 tonnes and containing 6,880 tonnes of iron ore. The vehicles are designed for the harsh climate north of the Arctic Circle and also ...
  11. [11]
    [PDF] DesignandSimulationof Heavy Haul Locomotives
    ... locomotive is equipped with an improved traction control sys- tem which uses technologies from the IORE heavy haul locomotives produced by. Adtranz (now ...
  12. [12]
    Malmbanan iron ore railway reopens after derailments
    Mar 13, 2024 · Malmbanan trains had run with 25 tonne axleloads until March 2001, when the limit was raised to 30 tonnes. Testing for a further increase to 31 ...
  13. [13]
    [PDF] Zero-emission locomotive technologies: Pathways for U.S. rail ...
    Sweden. Adtranz, Bombardier. Transportation40 (Iore). Freight. (mining, iron ore trains). 5.4 MW or 7,200 hp. In operation from. 2000. Catenary system.
  14. [14]
    Bombardier Traxx | PDF | Rail Transport | Rolling Stock - Scribd
    The Bombardier TRAXX family is a series of dual and quad voltage mainline locomotives built by Bombardier Transportation for both freight and passenger use ...
  15. [15]
    Heavy Hauler from Sweden - Overseas Modelling - RMweb
    Nov 24, 2009 · The resulting locomotive, designed and built by ADtranz at the Kassel works in Germany and the Oerlikon works in Switzerland, was named IORE.
  16. [16]
    0:00 First you see an LKAB IORE locomotive, one of the most ...
    Aug 24, 2025 · Each locomotive is named after places along the Malmbanan. IORE locomotives were delivered in the period 2013 to 2014 from Bombardier's factory ...Powerful Iore electric locomotives are used to haul these trains ...LKAB IORE Locomotive Details and Technology - FacebookMore results from www.facebook.com
  17. [17]
    Pantographs Rail | Schunk Transit Systems
    Pantographs from high-speed rail to freight transport. Always connected to power and quiet, with reduced weight and a compact design.Missing: IORE | Show results with:IORE
  18. [18]
    [PDF] Bombardier Transportation Sustainability Report 2008
    One of our major goals is to certify our sites with less than. 150 employees to the ISO 9001, ISO 14001, and OHSAS. 18001 standards. We will also be asking ...
  19. [19]
    Measurements of friction coefficients between rails lubricated with a ...
    Feb 15, 2015 · The IORE locomotive was manufactured by Bombardier between the years 2000 and 2010 and consists of two pair-connected locomotives with a total ...
  20. [20]
    Heavy haul hand over | News | Railway Gazette International
    Jan 28, 2010 · SWEDEN: The first of a second batch of Bombardier Transportation IORE 2 x 5·4 MW twin-unit electric locomotives was handed over to the ...Missing: press release engineering
  21. [21]
  22. [22]
    Moving mountains in the Land of the Midnight Sun
    Jun 19, 2019 · LKAB operates 34 5.4MW IORE locomotives supplied by Bombardier and a fleet of more than 1100 Famoo bogie hopper wagons built locally by Kiruna ...<|control11|><|separator|>
  23. [23]
    [PDF] formation of our industry toward a sustainable future - LKAB
    the world's most powerful electric locomotive, the IORE loco. We have 17 such locos and the 750-metre long train set is made up of. A mine with two separate ...Missing: locomotives | Show results with:locomotives
  24. [24]
    Trackside in Norway / Sweden with Deane Motis - The Diesel Shop
    "LKAB trains run in 17, four wagon sets with two IORE electrics. End of train devices are not used, thus the LKAB trains are limited to the 68 cars/wagons ...Missing: size history deliveries numbering
  25. [25]
    Vysus supports IORE heavy locomotive repair program
    Jan 14, 2021 · The IORE locomotive modernization is being carried out in conjunction with Bombardier Transportation and coordinated with the ETCS installation, ...Missing: variants upgrades
  26. [26]
    LKAB acquires 49 percent of Duroc Rail shares
    Nov 7, 2023 · High capacity and availability of the Ore Railway and rolling stock in the form of locomotives and wagons is therefore business critical. The ...
  27. [27]
    Alstom begins upgrading the LKAB IORE fleet - Railcolor News
    Aug 10, 2021 · Alstom begins upgrading the LKAB IORE fleet. Written by Konstantin Planinski on 10.08.2021 in Bombardier, Bombardier TRAXX H80 AC / LKAB IORE.Missing: variants modifications
  28. [28]
    Signalling down the mine - Rail Engineer
    Sep 3, 2013 · In 2007 it was upgraded to increase the axle load limit from 25 to 30 tonnes and passing loops were increased to 790 metres to accommodate ...
  29. [29]
    [PDF] Safety Evaluation of High-Speed Rail Bogie Concepts - ROSA P
    3-a. In a Bo-Bo wheel arrangement, each of the two locomotive trucks has two powered axles. Such an arrangement provides a symmetrical truck layout and ...Missing: icy | Show results with:icy
  30. [30]
    World's most powerful locos to increase LKAB's iron ore transport ...
    May 2, 2011 · ... LKAB's CEO Lars-Eric Aaro. LKAB currently has 13 IORE-locomotives and is now increasing that number to 17 (Im, September 2010, pp36-40).
  31. [31]
    [PDF] Use of electro-dynamic braking on locomotives and its ... - DiVA portal
    A train consists of 68 wagons attached to the front- end locomotive, resulting in a train length of 750 m and reaching a gross weight of 8,500 tonnes. Maximum ...<|control11|><|separator|>
  32. [32]
    History of Railways in Sweden - Iron ore
    Mar 18, 2021 · LKAB Malmtrafik AB, previously Malmtrafik i Kiruna aktiebolag (MTAB) ... The old Dm3 locomotives are now replaced by the new double ...
  33. [33]
    Full article: Long freight trains & long-term rail surface damage
    Jun 13, 2022 · The 120 km-long route between Kiruna and Riksgränsen is almost exclusively traversed by heavy haul freight trains corresponding to 30 tons/axle ...
  34. [34]
    Ofoten Line - Wikipedia
    The Ofoten Line (Norwegian: Ofotbanen) is a 43-kilometre (27 mi) railway line in Narvik Municipality, Norway. It runs from the Port of Narvik to RiksgränsenMissing: bogie suspension curve
  35. [35]
    Monitoring energy usage of heavy-haul iron ore trains with on-board ...
    Jun 6, 2023 · The train used in this paper is a typical heavy-haul iron ore train as operated by the company LKAB in northern Sweden and Norway, consisting of ...
  36. [36]
    [PDF] We create competitive advantages through innovation - Cision
    Mar 27, 2025 · Around 25 million tonnes of iron ore products are transported annually by rail to the ports of Narvik and Luleå. This represents around 45 ...<|control11|><|separator|>
  37. [37]
    Technical Specifications for Interoperability (TSIs)
    The Technical Specifications for Interoperability (TSIs) define the technical and operational standards which must be met by each subsystem or part of subsystem ...Missing: Iron Ofoten cross- border
  38. [38]
    How Norway's railways wins the fight against snow
    Nov 19, 2014 · Defrosting stations were set up to routinely remove built up ice and snow, which otherwise would be cluttering onto the lower parts of rolling ...
  39. [39]
    LKAB appoints consultants for heavy-haul locomotive upgrade project
    Feb 16, 2021 · The locomotives haul iron-ore trains with axle loads of up to 32.5 tonnes in northern Sweden and Norway.
  40. [40]
    LKAB invests close to SEK 1 billion to meet the challenges on the ...
    Apr 20, 2024 · High capacity and availability both on the Iron Ore Line and for rolling stock in the form of locomotives and rail cars are business-critical.
  41. [41]
    Not Found | Emerald Publishing
    No readable text found in the HTML.<|separator|>