Mars Express

Mars Express is a led by the (ESA) to investigate the planet Mars, launched on 2 June 2003 from in aboard a Soyuz-Fregat . The comprises an orbiter spacecraft that entered Mars orbit on 25 December 2003 and has been conducting scientific observations ever since, complemented by a small lander called that was deployed on 19 December 2003 but failed to communicate after landing. As ESA's inaugural planetary , Mars Express focuses on mapping the Martian surface at resolutions down to 10 meters per pixel (and 2 meters in selected areas), analyzing its , , atmosphere, and subsurface structure, with a primary emphasis on searching for evidence of past and present water. The orbiter, developed by a of 15 European countries and the under lead contractor Astrium SAS, carries eight scientific instruments powered by solar panels and a . Key instruments include the High Resolution Stereo Camera (HRSC) for high-definition surface imaging, the spectrometer for mineralogical mapping, the MARSIS radar for subsurface probing up to several kilometers deep, and others such as the Planetary Fourier Spectrometer (PFS), SPICAM for atmospheric studies, ASPERA for plasma analysis, the Visual Monitoring Camera (VMC), and the Mars Express Radio Science experiment (MaRS). These tools enable comprehensive data collection on Mars' climate evolution, potential habitability, and interactions with its moons, and Deimos. Notable achievements include the discovery of hydrated minerals indicating ancient water flows, subsurface ice deposits, evidence of relatively recent volcanic activity, and detailed atmospheric gas variations, such as the absence of methane during specific events monitored in coordination with NASA's Curiosity rover. In 2015, the wreckage of Beagle 2 was imaged on the Martian surface by NASA's Mars Reconnaissance Orbiter, confirming it reached Isidis Planitia but likely failed due to a partial deployment issue. More recently, Mars Express has supported NASA's Perseverance rover by observing the Jezero crater landing site, revealing insights into its formation and ancient lake history, and has monitored dust storms at Mars' north pole. As of November 2025, the mission remains operational after more than two decades in orbit, with ongoing science activities including data calibration and archival releases, such as VMC from 2007 to mid-2020 now available on ESA's Planetary Science Archive. In May 2025, a software update was implemented to potentially extend operations into the spacecraft's third decade, and recent HRSC observations in November 2025 revealed remnants of a past Martian in Coloe Fossae. Originally planned for a two-year primary mission, it has been extended multiple times, demonstrating the spacecraft's durability and continued contributions to Mars science.

Mission Background

Objectives and Naming

The Mars Express mission, approved unanimously by the European Space Agency's (ESA) Science Programme Committee on 19–20 May 1999, represented ESA's debut in planetary exploration as part of the Horizon 2000 long-term scientific program. Classified as the inaugural flexible, low-cost mission within this framework, it capitalized on off-the-shelf components from the mission to enable accelerated development and budget efficiency, with a total cost capped at approximately 150 million euros for the orbiter. The project emerged as a partial successor to the ill-fated Russian Mars-96 mission, aiming to salvage and advance several of its unachieved scientific aspirations following the 1996 launch failure. Primary scientific objectives centered on unraveling Mars' geological and hydrological history, atmospheric , and potential for . These encompassed high-resolution photogeological of the surface at 10-meter global resolution—focusing on , , and paleoclimatic indicators—with super-resolution of targeted sites down to 2 meters per pixel to reveal detailed landforms and volcanic features. The mission prioritized probing the subsurface for ice and water signatures at kilometer-scale depths, extending to layers, to assess past liquid water presence and stability. Atmospheric studies targeted global circulation patterns, vertical structure, and , including interactions with the surface and the , while the lander was tasked with in-situ searches for biosignatures through geochemical analysis and exobiology experiments at a selected site. Complementing these core aims, secondary objectives provided broader contextual data to support primary findings. mineralogical mapping extended from kilometer-scale surveys to resolutions of several hundred meters, identifying compositional variations indicative of aqueous alteration and volcanic activity. Investigations into the environment examined ionospheric and magnetospheric interactions between the Martian atmosphere and , while radio science experiments utilized signals to delineate the planet's interior density profile, neutral atmosphere, and ionospheric layers. The designation "Mars Express" originated from the mission's unprecedented development pace, spanning only five years from initial approval to launch in June 2003, far quicker than the typical decade for similar planetary probes, and its emphasis on cost-effective "express delivery" of scientific payloads. This nomenclature highlighted ESA's streamlined approach, reusing hardware and minimizing new developments to achieve rapid orbital insertion and data return by December 2003.

Development and International Collaboration

The Mars Express mission was preliminarily approved by the European Space Agency's (ESA) science program committee on 2-3 November 1998 as a low-cost endeavor to explore Mars, with the orbiter budget strictly capped at 150 million (equivalent to approximately 150 million euros) to demonstrate efficient and practices. This approval followed the failure of Russia's Mars 96 mission in 1996, prompting ESA to repurpose available resources for a swift response to scientific opportunities at Mars. The final unanimous approval occurred on 19-20 May 1999. Development proceeded rapidly, achieving launch in just under five years from approval, a timeline enabled by extensive reuse of hardware and designs from the canceled Mars 96 mission and ESA's ongoing Rosetta comet probe, which significantly reduced costs and development risks. The prime contractor, Astrium SAS (now Airbus Defence and Space) in Toulouse, France, led a consortium of 24 companies from 15 European countries and the United States. International partnerships were central: Russia provided the Fregat upper stage for the Soyuz-Fregat launch vehicle, procured through the company Starsem for a cost of about 32 million euros, enabling a low-cost liftoff from Baikonur Cosmodrome on 2 June 2003. The United States, through NASA, contributed to instrument development—particularly the MARSIS radar in collaboration with the Italian Space Agency—and provided Deep Space Network support for communications during portions of the mission. Contributions from ESA member states and international partners underscored the collaborative model. The Beagle 2 lander, developed as a UK-led hitchhiker payload under separate national funding, was integrated onto the orbiter without impacting the core mission budget; its total cost was approximately 45 million GBP, sourced from a mix of UK government grants, private sponsorships, and limited ESA contributions of about 20 million euros. The mission's cost structure emphasized affordability: the orbiter development remained within the 150 million euro cap, the launch added roughly 80 million euros including vehicle and site preparations (with the Soyuz-Fregat portion at 32 million euros), and initial operations for the two-year nominal phase were budgeted at about 110 million euros, covering ground segment and data handling. This breakdown highlighted Mars Express as ESA's first planetary mission, achieved at a fraction of comparable international efforts through strategic reuse and multinational efficiency.

Spacecraft Design

Orbiter Structure and Dimensions

The Mars Express orbiter employs a compact, box-shaped main body measuring 1.5 m in height, 1.8 m in width, and 1.4 m in depth, providing a stable platform for its scientific in Martian . This structure utilizes aluminum honeycomb panels clad in an aluminum skin, offering high strength-to-weight ratio essential for launch stresses and long-duration while minimizing mass. The overall launch mass reached 1223 , encompassing the 116 orbiter scientific instruments, the 71 Beagle 2 lander, propellants, and structural elements. The orbiter's architecture divides into a payload module, which accommodates the instruments for direct of Mars, and a service module that supports core bus functions such as attitude control and management. Instrument bays within the payload module are strategically arranged to provide isolation—using and heaters—and , preventing interference between sensitive detectors like spectrometers and systems. Deployable elements enhance operational flexibility; for instance, the two-winged solar arrays unfold to a 12 m tip-to-tip span, optimizing power collection in the varying solar conditions of a . Prominent external components include a 1.6 m high-gain mounted on the nadir-facing side, enabling high-data-rate communications with over distances up to 400 million km. The MARSIS subsurface instrument deploys three booms—two 20 m antennas orthogonal to the solar arrays and a 7 m to them—to facilitate ionospheric and ground-penetrating measurements while maintaining structural integrity and minimal electromagnetic coupling with other systems. This design draws heritage from the and Cluster II platforms, with adaptations for the mission's highly elliptical to ensure stability during pericenter passes at altitudes as low as 300 km.

Propulsion, Power, and Thermal Systems

The propulsion system of Mars Express employs a bipropellant configuration using monomethyl hydrazine (MMH) as fuel and nitrogen tetroxide (NTO) as oxidizer, pressurized by helium gas to deliver precise for insertion and maneuvers. The system features a single 400 N main engine for major delta-V changes, such as the initial Mars insertion that required approximately 800 m/s, with the overall capability supporting up to 1.3 km/s total delta-V including corrections and attitude adjustments. Complementing this are eight 10 N thrusters arranged in two sets of four for fine attitude control, momentum dumping, and minor trajectory adjustments during cruise and orbital phases. This setup, derived from heritage telecommunications satellite designs, has a capacity for about 595 kg of propellants but was loaded with 427 kg in two tanks, ensuring reliable performance despite the mission's demanding interplanetary transfer and elliptical around Mars. Power generation on the orbiter relies on two deployable wings equipped with triple-junction (GaAs) cells, providing a total illuminated area of 11.42 m² and nominal output of approximately 650 W at Mars distance (1.52 average), though early wiring anomalies reduced effective to about 70% of planned levels, or roughly 450 W under optimal conditions. is distributed via a 28 V regulated bus through a power conditioning unit that manages regulation and charging, with three lithium-ion batteries offering a combined of 67.5 Ah (22.5 Ah each) to support operations during orbital eclipses lasting up to 90 minutes. Over the mission's lifespan, has degraded at an average rate of 1.4% per year due to and micrometeoroid impacts; as of November 2025, after more than 22 years, the batteries retain about half their original , necessitating adaptive budgeting for extended operations beyond the original two-year design life. Thermal control maintains operational temperatures across the spacecraft's components in the harsh Martian , where surface temperatures fluctuate from -140°C to +20°C and orbital distances vary. The system combines passive elements like (MLI) blankets covering most surfaces to minimize heat loss and radiators for dissipating excess from and instruments. Active regulation includes 14 redundant electric heater lines, powered selectively to keep critical subsystems—such as scientific payloads and the propulsion tanks—within a -20°C to +40°C range, with specialized coolers and dedicated radiators for infrared detectors like those on PFS and OMEGA to prevent overheating during periapsis passes. This hybrid approach ensures stability without fluid loops for primary control, relying instead on ground-commanded heater profiles adjusted for seasonal periods and varying solar illumination.

Avionics, Communications, and Data Handling

The Mars Express orbiter employs a redundant onboard computer (OBC) system based on the ERC32 single-chip processor, which operates under a real-time operating system to manage command execution, fault detection, and spacecraft autonomy. The OBC forms the core of the Data Management System (DMS), interpreting telecommands from Earth, distributing them to subsystems, and collecting telemetry data for downlink, with redundancy allowing seamless switching between primary and backup units in case of anomalies, as demonstrated during solid-state memory faults in 2011. This setup ensures reliable operation in the harsh radiation environment of interplanetary space, supporting onboard control procedures (OBCPs) that have been updated since 2009 to enhance autonomy and reduce ground intervention. Communications rely on dual-band transponders for X-band (8.4 GHz downlink at 65 W ) and S-band (2.3 GHz at 5 W) operations, enabling telemetry rates from 9.3 bps in up to 228.5 kbps for science data transmission, depending on the Mars- distance. The primary 1.6 m high-gain (HGA), fixed to the body along the +X , is oriented toward Earth through 3-axis attitude control maneuvers for optimal signal strength during passes, while two omnidirectional low-gain antennas serve as backups for emergency low-rate communications and initial acquisition. Uplink telecommands are received at rates up to 2 kbps via S-band. Data handling is centered on a solid-state mass (SSMM) unit with 12 Gbit capacity, providing redundant buffering for up to 1.7 Gbit of science data and 100 Mbit of housekeeping information per day before transmission. The system uses prioritized downlink schemes, including AI-driven selection since , to manage data flow efficiently, with onboard software patches enabling file activity on short timelines (FAST) to store and execute command timelines autonomously. Instrument-specific algorithms, such as those for the High Resolution Stereo Camera, reduce image data volume by factors of 3-5 times to fit within and constraints. Ground interactions occur via ESA's network, utilizing 35 m antennas at Cebreros () and New Norcia (Australia), with additional support from NASA's Deep Space Network stations at Goldstone, , and for extended coverage. These facilities enable daily tracking passes of approximately 8 hours, facilitating real-time reception, command uplink, and essential for mission longevity. The avionics draw power from the spacecraft's arrays and batteries to maintain continuous operation.

Beagle 2 Lander

Design and Objectives

The lander was primarily designed to perform in-situ astrobiological investigations on Mars, focusing on the search for evidence of extinct or extant through the detection of molecules, minerals, and atmospheric gases that might indicate past biological processes. Its objectives also encompassed assessing whether conditions at the landing site in Isidis Planitia had ever been suitable for , while conducting environmental monitoring to characterize local geology, atmosphere, and surface properties post-landing. This approach aimed to complement orbital observations by providing ground-truth data on potential . The lander's design emphasized compactness and minimal for integration with the Mars Express orbiter, featuring a foldable entry, descent, and landing system with a deployed of 0.65 m and a total landed of 33 . The EDL configuration included an for atmospheric deceleration, parachutes for initial slowing, and an system to cushion the impact at speeds up to 17 m/s, enabling a soft without . This lightweight, integrated structure, constructed with materials like and carbon fiber, allowed for efficient deployment via a spring-ejection from the orbiter. Scientific instruments were selected to support the astrobiology goals, including the PAW (Panoramic Annular Window) camera system mounted on a for and sample collection, a gas chromatograph/ spectrometer (PZ) within the Gas Analysis Package (GAP) for detecting organic volatiles and isotopic ratios, a offering 4 μm resolution for examining dust and microfossils, and environmental sensors to measure temperature, pressure, wind, UV flux, and radiation. These instruments enabled the analysis of surface soils and rocks, with the facilitating sample delivery to internal analyzers for precise chemical characterization. Power for operations was supplied by four fold-out panels using triple-junction cells, providing up to during daylight hours for 60-90 minutes of active daily science collection, supplemented by lithium-ion batteries to maintain survival through the cold Martian nights. This energy system supported a primary duration of approximately 180 sols, prioritizing efficient use of limited insolation at the equatorial landing site.

Integration and Deployment Plan

The Beagle 2 lander was mounted on the base of the Mars Express orbiter during final spacecraft assembly at the Astrium facility in Toulouse, France, following its delivery there on 30 January 2003. Integration occurred at the Intespace cleanroom in Toulouse, where the lander was secured using a clamp band assembly and pyrotechnic bolts to ensure structural integrity during launch and cruise. This setup allowed for a spin-stabilized ejection mechanism, which would impart an axial velocity of approximately 0.35 m/s to the lander upon release, providing rotational stability during its independent coast phase toward Mars. The deployment plan called for jettisoning six days prior to the orbiter's Mars orbit insertion, specifically on 19 December 2003, to position it on a targeting a landing in Isidis Planitia at coordinates 11.6°N, 265.0°W on 25 December 2003. Separation would be initiated by firing pyrotechnic devices to release the bolts, followed by of a spring-powered to eject and spin up the lander at about 14 rpm, ensuring it entered the Martian atmosphere with the correct and orientation. The six-day coast phase after separation was designed to be passive, with no active propulsion on the lander, relying solely on the initial ejection dynamics for control. Upon at approximately 20,000 km/h ( 31.5), the lander's would provide initial deceleration to speeds, after which pyrotechnic bolts would release the back cover and deploy a pilot to pull away the heatshield and initiate main deployment at around 2.6 km altitude. The main would further slow the descent to a of 16-18 m/s over about 15 seconds, triggering airbag inflation at roughly 200 m altitude to cushion the impact, which was expected to involve 10-20 bounces across the surface before coming to rest. Once stationary, the airbags would be jettisoned, and the lander's four petals—along with the lid—would open via hinges to expose the panels for generation, enabling instrument activation. As a non-redundant component of the mission, had no backup deployment systems or redundant hardware for separation or entry; failure in any phase would preclude landing success. Communication post-landing was planned exclusively via a UHF to the Mars Express orbiter, using the CCSDS Proximity-1 for during overflights, with no direct capability.

Scientific Instruments

Orbiter Payload Overview

The Mars Express orbiter carries a suite of eight core scientific instruments designed to investigate the Martian surface, subsurface, atmosphere, , and interaction with the , providing a comprehensive for understanding the planet's , climate history, and potential . These instruments collectively enable global mapping, mineralogical analysis, atmospheric profiling, and plasma measurements, with data acquired during the spacecraft's to cover diverse terrains and seasonal variations. The core payload includes the MARSIS (Mars Advanced Radar for Subsurface and Sounding), a sounder that probes subsurface structures up to several kilometers deep for evidence of or and maps ionospheric using low-frequency signals. The HRSC (High Resolution ) captures high-resolution color stereo images at 10-meter resolution to generate 3D and monitor surface changes. OMEGA (Visible and Mineralogical Mapping Spectrometer) identifies surface minerals and atmospheric components across visible to near- wavelengths, revealing geological processes and -related signatures. The PFS (Planetary Spectrometer) measures atmospheric temperature, composition, and trace gases like in the , aiding studies. SPICAM ( for Investigation of Characteristics of the ) profiles , , and aerosols in and spectra to assess atmospheric dynamics and escape. ASPERA (Analyzer of Plasmas and Energetic Atoms) analyzes ions, electrons, and neutral atoms to quantify atmospheric loss driven by interactions. The VMC (Visual Monitoring Camera) provides wide-angle imaging for monitoring operations, public outreach, and scientific observations of surface features and atmospheric phenomena. Finally, the MaRS (Mars Express Radio Science Experiment) uses radio signals for field measurements, atmospheric occultations, and ionospheric sounding without dedicated hardware. Additional elements encompass the integration of the lander for delivery to the surface. The total orbiter payload mass is approximately 116 kg, with a maximum power draw of up to 100 W across instruments, enabling efficient operation within the spacecraft's solar-powered constraints. Many components draw heritage from earlier missions, such as the Mars-96 orbiter for HRSC, , PFS, and SPICAM, and radio science techniques from Cassini for MaRS, allowing cost-effective reuse of proven technology. Pre-launch calibration of the instruments occurred at ESA's European Space Technology Centre (ESTEC) in , , involving tests, spectral verification, and performance checks to ensure data accuracy. In-flight commissioning included further validation during the initial orbital phase, confirming operational readiness for long-term science acquisition.

Key Instrument Capabilities

The High Resolution Stereo Camera (HRSC) on the Mars Express orbiter provides high-resolution stereo imaging with a of approximately 10 meters per pixel, enabling the creation of detailed topographic models of the Martian surface. It employs a pushbroom technique using nine parallel line sensors, capturing simultaneous stereo views at different angles along with color and photometric data in five spectral bands, which supports the generation of orthorectified image mosaics and digital elevation models with vertical accuracy down to 2 meters. The Mars Advanced Radar for Subsurface and Ionospheric Sounding (MARSIS) utilizes low-frequency pulses in the 0.2–7.5 MHz range, with a 40-meter , to penetrate up to several kilometers into the Martian subsurface, though effective depths for detection are typically around 100 meters in dry . It transmits chirped signals with 1 MHz and receives echoes to map subsurface interfaces, such as potential water layers, while also profiling the through active sounding modes that distinguish between surface reflections and buried structures. The Observatoire pour la Minéralogie, l'Eau, les Glaces et l'Activité (OMEGA) performs hyperspectral imaging across the 0.35–5.1 μm wavelength range, with spectral sampling of 7–20 nm, to map mineral compositions on the surface and atmospheric components. Operating in pushbroom mode, it acquires 352 contiguous channels per pixel, achieving spatial resolutions from 300 meters to several kilometers depending on orbital altitude, which allows identification of key minerals like hematite and phyllosilicates through diagnostic absorption features in the visible-near infrared spectrum. The Analyzer of Space Plasmas and Energetic Atoms (ASPERA-3) includes an Mass Analyzer (IMA) that serves as an ion mass spectrometer, measuring major ion species such as H⁺, O⁺, and molecular ions in the energy range of 0.01–40 keV to study wind-Mars atmosphere interactions. It employs with electrostatic analyzers to determine ion composition, directionality, and , enabling quantification of processes with rates on the order of 10²⁵ ions per second through in-situ sampling and energetic neutral atom . The Spectroscopy for Investigation of Characteristics of the Atmosphere of Mars (SPICAM) and Planetary Fourier Spectrometer (PFS) together provide complementary atmospheric profiling capabilities. SPICAM, a dual UV-IR spectrometer, measures vertical distributions of CO₂, H₂O vapor, and dust via viewing and /stellar occultation modes, with UV coverage from 118–310 nm (1.5 nm resolution) for detection and IR at 1.3–1.7 μm for . PFS, a interferometer, offers high of 2 cm⁻¹ across 1.2–45 μm in two channels, enabling precise mapping of trace gases like and temperature profiles through infrared emission and .

Launch and Trajectory

Pre-Launch Preparation

The final assembly of the Mars Express orbiter took place at Alenia Spazio's facility in , , where assembly, integration, and testing activities began in the summer of 2001 under the leadership of prime contractor Astrium SAS. This phase involved integrating the spacecraft bus, scientific instruments, and subsystems derived from the mission to achieve cost efficiency and rapid development. The Critical Design Review, a key milestone confirming the spacecraft design maturity, was successfully completed in August 2001. Following assembly, the orbiter underwent comprehensive environmental testing to verify performance under launch and space conditions. This included vibration, , and thermal vacuum tests conducted at facilities such as ESA's ESTEC in , the , and INTESPACE in , , spanning 2002 and early 2003. These tests simulated acoustic loads, mechanical stresses, and extreme temperature variations to ensure structural integrity and operational reliability. The lander flight model was delivered to in in February 2003 for integration with the orbiter, followed by joint system tests to validate interfaces and overall functionality. The Flight Acceptance Review for , approving its readiness, occurred in March 2003. The integrated spacecraft was transported to the in on 19 March 2003 via an Antonov An-124 aircraft for launch site preparations. At , final ground operations included fueling the orbiter with 427 kg of propellant, including approximately 178 kg of and 249 kg of nitrogen tetroxide for the main bipropellant engine, and hydrazine monopropellant for the thrusters, as well as mating it to the upper stage of the Soyuz-Fregat . These steps culminated in the Flight Acceptance Review for the full stack in late May 2003, clearing the mission for launch during the open window from 23 May to 20 June.

Launch Sequence and Early Operations

The Mars Express spacecraft was launched on June 2, 2003, at 17:45 UTC from the in aboard a rocket, marking the European Space Agency's (ESA) inaugural venture to another planet. The launcher placed the upper stage and Mars Express stack into a low Earth at approximately 200 km altitude about 9 minutes after liftoff. Shortly thereafter, the Fregat's first burn circularized this orbit, followed by a second burn starting around 19:14 UTC, which injected the stack into a direct Mars transfer trajectory with a heliocentric velocity of roughly 32.7 km/s, setting the stage for a 180-day covering approximately 400 million kilometers. Separation of Mars Express from the upper stage occurred nominally at 19:17 UTC on the same day, about 1 hour and 32 minutes after launch, with the achieving initial acquisition and deploying its arrays by 19:51 UTC to generate power. Ground control at ESA's ESOC in established at 19:44 UTC via the New Norcia station, confirming signals and initial health. However, a temporary loss of measurements prompted a transition to safe hold mode at 23:22 UTC, which was resolved through slews and software patching by June 5. The high-gain was activated on at 02:47 UTC, enabling higher data rates, and normal operations were fully restored by 21:21 UTC that day, with comprehensive health checks verifying all subsystems as nominal. The initial trajectory followed a standard Hohmann transfer path optimized for the , with the spacecraft's onboard navigation systems and ground-based tracking used to monitor deviations. Two primary mid-course corrections were executed during the early cruise: the first on September 10, 2003 (TCM-2), imparting a delta-v of 0.49 m/s to refine the path, and the second on November 10, 2003 (TCM-3), with a delta-v of 0.96 m/s to adjust for an emerging collision risk with Mars and ensure precise targeting for subsequent lander release. These maneuvers, performed using the spacecraft's main engine, confirmed the robustness of the propulsion system and kept the mission on track for Mars arrival in December.

Interplanetary Cruise and Mars Arrival

Cruise Phase Activities

The cruise phase of the Mars Express mission spanned approximately 206 days, from launch on 2 June 2003 to arrival at Mars on 25 December 2003, during which the spacecraft traveled about 400 million kilometers with an initial absolute velocity of 116,800 km/h relative to the Sun. Operations transitioned to routine housekeeping shortly after launch, including daily communication passes using the low-gain antenna near Earth and the high-gain antenna as distance increased, to monitor spacecraft health and perform minor trajectory correction maneuvers that refined the path toward Mars. The first such correction occurred two days after launch, at about 600,000 km from Earth, using the spacecraft's thrusters to adjust the trajectory onto a precise collision course with Mars. Instrument checkouts were conducted primarily in the first month post-launch, with most payloads powered down thereafter to conserve resources, though select activations occurred later for . For instance, the MARSIS radar instrument was tested on 19 June 2003, successfully transmitting radio waves in deep space to verify its functionality ahead of Mars operations. The High Resolution Stereo Camera (HRSC) was activated twice during : once in early July 2003 to capture images of and the from about 13.6 million km away, providing a unique outbound view of the home planet system, and again in November 2003 to image Mars from 5.5 million km, aiding approach navigation. These activities ensured payload readiness without interfering with the primary transit. On 19 December 2003 at 08:31 UTC, the lander was released from the spacecraft using pyrotechnic devices and a spring-powered ejection mechanism, imparting a stabilizing spin rate of approximately 11 rpm to the lander for its ballistic trajectory toward Mars, arriving six days later. Following release, Mars Express continued its uncrewed cruise, with ground teams focusing on final health verifications. A minor power subsystem anomaly emerged in early July 2003, stemming from a fault in the connection between the solar arrays and distribution unit, reducing available power to about 70 percent; this was managed through operational adjustments and software workarounds without impacting the mission . Overall, the cruise phase proceeded nominally, with no further significant issues affecting transit or arrival preparations.

Orbit Insertion Maneuver

The Mars Express spacecraft arrived at Mars on December 25, 2003, approaching the planet at approximately 20,000 km/h with an initial periapsis altitude of about 250 km. The orbit insertion maneuver (MOI) commenced around 03:00 UTC, marking Europe's first successful planetary orbit capture. This high-risk phase relied on the spacecraft's 400 N main engine to decelerate and transition from a hyperbolic trajectory into a bound orbit around the Red Planet. The MOI sequence featured a primary main engine burn delivering a delta-V of approximately 807 m/s, lasting about 37 minutes and establishing an initial with a periapsis of 250 km, apoapsis of 11,560 km, and 86° inclination. Four subsequent main engine firings, beginning on , 2003, refined the orbit to 259 km × 11,560 km while maintaining the near-polar inclination and achieving a 7.5-hour period. These adjustments collectively contributed to a total delta-V exceeding 1,200 m/s for the early orbital phase, ensuring stable conditions for instrument activation. By mid-2004, additional propulsive maneuvers had lowered the apoapsis to approximately 10,100 km and raised the periapsis to around 300 km, reducing the to 6.7 hours. success was confirmed via Doppler tracking from ground stations, which detected the expected velocity shift post-burn, and by the acquisition of the first High Resolution Stereo Camera (HRSC) images on , , during 8, verifying precise positioning over the Martian surface.

Orbital Operations

Nominal Mission Phases

Following orbit insertion on 25 December 2003, the Mars Express orbiter entered its nominal mission phase in a highly elliptical with a pericentre altitude of approximately 330 km, an apocentre of 10,530 km, an inclination of 86.9°, and a period of 7 hours. This was designed to enable comprehensive global mapping during pericentre passes, which lasted about 1 hour for observations, while the remaining 6.5–7 hours were allocated to communications with . The primary mission duration was planned for one Martian year, equivalent to 687 days starting from orbit insertion, focusing on systematic data across multiple orbital cycles. Additionally, the geometry included targeted passes over potential lander sites to support relay communications. The nominal mission began with a commissioning phase from January to March 2004, during which all eight scientific instruments were activated, calibrated, and tested in the Martian environment. This period involved initial payload verifications, orbit fine-tuning maneuvers, and assessments of spacecraft subsystems to ensure operational readiness. Following successful commissioning, the nominal science phase commenced in April 2004 and continued through December 2005, structured around sequential mapping cycles that covered the planet's surface, atmosphere, and subsurface in a coordinated manner. Science acquisition prioritized high-resolution imaging and spectroscopic observations during pericentre, with instruments operating in complementary modes to maximize coverage efficiency. Data return during the nominal phases averaged 1–5 Gbits per day, stored temporarily in the 12 Gbit solid-state mass memory before downlink via the ESA New Norcia at rates up to 230 kbps. Transmission priorities emphasized high-resolution data from instruments like the High Resolution Stereo Camera, with archiving handled at the European Space Astronomy Centre. The spacecraft entered twice in 2004—once on 15 March—due to subsystem anomalies, necessitating ground-commanded recoveries to resume operations. In parallel with its scientific role, Mars Express provided UHF relay support for surface missions, initially prepared for the lander and later demonstrated through successful data relay demonstrations with NASA's Mars Exploration Rovers ( and ) starting in 2004. This capability involved overflights for command uplink and telemetry downlink, establishing Mars Express as a key node in the international Mars relay network.

Extended Mission and Trajectory Adjustments

Following the successful completion of its nominal one-Martian-year mission in 2005, the (ESA) approved the first extension of Mars Express operations until 2009, citing the spacecraft's robust performance and ongoing scientific productivity. Subsequent extensions were granted in 2009 to 2012, in 2012 to 2014, in 2016 to 2018, in 2018 to 2022, and in 2022 to 2026 as the ninth overall extension, reflecting the mission's adaptability and value in studying Mars' atmosphere, surface, and moons. In March 2023, ESA further approved an indicative tenth extension from 2027 to 2028, contingent on supporting Japan's (MMX) mission and subject to review after MMX's launch. To sustain the and optimize observation opportunities during extended s, Mars Express conducts propulsive s roughly every one to two years, consuming modest amounts of (typically 50–165 g per ) for control and adjustments. For instance, targeted s, including adjustments in prior years, enabled a series of close flybys in 2019-2021, allowing detailed imaging and spectral analysis of the moon at distances under 100 . Early post-insertion adjustments progressively lowered the apoapsis from over 11,000 to approximately 10,000 by 2010, enhancing coverage of Mars' polar regions while preserving . As of 2023, Mars Express retains sufficient propellant—estimated at a few kilograms from its original 595 kg load—to support continued operations well into the 2030s, with annual consumption minimized through optimized thrusting strategies. This reserve underpins projections for longevity beyond 2030, barring unforeseen anomalies. In May 2025, ESA controllers uploaded a critical software to address recurring memory errors in the onboard computer, further securing the spacecraft's viability for a third decade of service. As of November 2025, Mars Express continues active observations, including imaging traces of a past Martian in Coloe Fossae and tracking the interstellar 3I/ATLAS during a close pass.

Scientific Discoveries and Achievements

Subsurface and Atmospheric Findings

The Mars Advanced for Subsurface and Ionosphere Sounding (MARSIS) instrument on Mars Express has provided key insights into the planet's subsurface structure, particularly at the polar regions. Early observations in 2005 revealed that the south polar layered deposits consist primarily of water ice, with thicknesses varying from approximately 1 km to over 3 km in some areas, indicating vast reservoirs of frozen water equivalent to a global liquid layer about 11 meters deep if melted. In 2018, MARSIS data analysis identified unusually bright radar reflections beneath the south polar ice cap, at depths of about 1.5 km and frequencies around 1.5 MHz, suggestive of a of liquid water roughly 20 km wide. These reflections exhibit properties consistent with liquid water, potentially stabilized by high concentrations that lower the freezing point despite the cold temperatures. Atmospheric investigations by the SPICAM spectrometer detected auroral emissions in 2005, manifesting as localized glows driven by proton precipitation from particles interacting with the upper atmosphere, particularly over regions with crustal magnetic anomalies. Complementary measurements from SPICAM's channel and the Planetary Fourier Spectrometer (PFS) have mapped cycles, revealing seasonal abundances reaching up to 0.03% by volume in the lower atmosphere during northern summer aphelion, with transport from polar caps influencing global distribution. SPICAM observations also highlighted ozone dynamics, including a seasonal layer buildup over the during winter due to reduced photolysis, contrasted by depletions of up to 40% in summer near the pole from catalytic destruction involving and odd species. The Analyzer of Space Plasmas and Energetic Atoms (ASPERA-3) has quantified plasma interactions, measuring atmospheric escape rates of approximately 10^{25} ions per second, primarily oxygen and , stripped by through processes like charge exchange and pickup acceleration, resulting in a mass loss of about 1 kg per second. OMEGA near-infrared spectrometer data have confirmed extensive deposits of hydrated minerals, such as phyllosilicates and sulfates, within , indicating past aqueous alteration and water-rock interactions over large canyon wall exposures.

Surface Geology and Auroral Observations

The High Resolution Stereo Camera (HRSC) and Observatoire pour la Minéralogie, l'Eau, les Glaces et l'Activité () instruments aboard Mars Express have enabled extensive mapping of the Martian surface, achieving coverage of approximately 90% of the planet in stereo and color at resolutions better than 20 meters per pixel since 2004. This effort has produced detailed topographic and mineralogical datasets, revealing diverse geological features from ancient craters to volcanic constructs. 's infrared spectroscopy, in particular, has identified hydrated minerals across vast regions, providing insights into Mars' early aqueous history without relying on deeper subsurface probing. A key discovery came in 2007 when detected large outcrops of phyllosilicates, such as smectites and kaolins, in Noachian-aged terrains like Mawrth Vallis (around 25°N, 20°W), indicating prolonged water-rock interactions during the planet's wetter past. These minerals, formed through chemical alteration, are concentrated in layered deposits up to several hundred meters thick, suggesting stable lacustrine or pedogenic environments billions of years ago. In the region, HRSC and gravity data from the Mars Express subsatellite MaRS have traced volcanic evolution, showing that shield volcanoes like and the were active until approximately 100 million years ago, with lava flows densifying over time and influencing crustal thickness variations up to 50 kilometers. The SPICAM ultraviolet spectrometer has uncovered discrete auroral phenomena on Mars, distinct from planetary auroras elsewhere due to the absence of a global . In 2005, SPICAM detected localized proton aurorae during nightside observations from altitudes of 300 to 700 kilometers, with emissions peaking around 130 kilometers and spanning patches about 30 kilometers across in the (52°S, 177°E). These events, driven by protons precipitating along crustal magnetic anomalies, produce emissions from excited and , offering a window into upper atmospheric dynamics. Subsequent analyses, including a of SPICAM data, linked approximately 9 discrete auroral occurrences to strong crustal fields, revealing their patchy, short-lived nature (lasting minutes) and variability with solar activity, though high-resolution profiles rather than images highlighted emission intensities up to 3 kilorayleighs. HRSC imagery has facilitated the cataloging of more than 10,000 impact globally, aiding in the assessment of surface modification processes. In polar regions, such as the south polar layered deposits, crater depth-to-diameter ratios and preservation states indicate extremely low rates, less than 1 micrometer per year, reflecting minimal aeolian or periglacial activity over billions of years. These findings underscore the stability of icy terrains, where fresh craters remain sharp-edged despite exposure to cycles. During targeted flybys of , HRSC has captured images at resolutions down to a few meters per , enabling detailed of the moon's grooves—linear features up to 3 kilometers wide and 100 meters deep that crisscross its surface. These observations, part of over 150 flybys since 2004, reveal the grooves' radial patterns emanating from the Stickney crater, supporting models of tidal stress or impact-related fracturing rather than extensive .

Timeline of Major Events and Discoveries

The , launched by the (ESA), has marked numerous milestones since its , encompassing successful orbital insertion, instrument deployments, scientific breakthroughs, and operational challenges over more than two decades. This timeline highlights key events, from initial launch activities to recent extensions, drawing on verified mission logs and discoveries that have advanced understanding of Mars' , atmosphere, and subsurface.
  • 2003–2004: The spacecraft launched successfully on June 2, 2003, from aboard a Soyuz-Fregat rocket, marking ESA's first planetary mission. The lander separated on December 19, 2003, and attempted landing on December 25, but went silent with no communication received thereafter, later confirmed lost via orbital imaging. Following arrival and orbit insertion on December 25, 2003, the High Resolution Stereo Camera (HRSC) captured its first images of the Martian surface in January 2004, revealing detailed topography including . The Mars Advanced Radar for Subsurface and Ionosphere Sounding (MARSIS) instrument was activated in May 2004, though initial operations were limited pending antenna boom deployment, which was delayed until 2005 due to concerns over potential damage to the spacecraft.
  • 2005–2010: Mapping of Mars' polar layered deposits advanced significantly using HRSC and the Visible and Infrared Mineralogical Mapping Spectrometer (), identifying water ice-rich layers in the south polar region by 2005. The Planetary Fourier Spectrometer (PFS) detected localized plumes in the atmosphere in 2004, suggesting possible geological or biological sources. In August 2005, the Spectroscopy for the Investigation of the Characteristics of the Atmosphere of Mars (SPICAM) instrument observed the first aurorae on Mars, proton aurorae in the southern hemisphere.
  • 2011–2015: Analysis of recurring slope lineae (RSL) began intensifying in 2014 using HRSC and other instruments, linking these seasonal dark streaks to hydrated salts and possible transient water flows on slopes.
  • 2016–2020: Routine solar conjunction operations were conducted, including a two-week in October 2017, with pre-planned commands ensuring safe passage. Ground operations faced disruptions in 2020 due to restrictions, requiring remote working protocols for the ESOC team while maintaining spacecraft health. Close flybys of and Deimos occurred in March 2020, with Mars Express achieving its nearest approach to at 81 km, yielding high-resolution images.
  • 2021–2025: The mission celebrated its 20-year anniversary in June 2023, having completed over 25,000 orbits and contributing to more than 5,000 scientific publications. A software update in May 2025 optimized onboard systems, enabling a proposed extension of operations potentially to 2034 pending further reviews.
By November 2025, the mission has archived over 100 terabytes of data in the , supporting ongoing analysis and interdisciplinary research.

Mission Challenges and Extensions

Technical Anomalies and Resolutions

During the early operational phase of the Mars Express mission, the spacecraft entered safe mode multiple times in 2004 and 2006, primarily due to radiation-induced errors in the attitude control system and star trackers, triggered by cosmic ray impacts during periods of high solar activity. These events, including a notable entry on March 15, 2004, were addressed via ground-commanded reboots and activation of redundant star trackers, allowing recovery within hours to days and minimizing operational downtime. In mid-mission, the Mars Advanced Radar for Subsurface and Sounding (MARSIS) instrument faced a significant deployment in May 2005, when the first dipole boom only partially extended due to a stuck at approximately 40 degrees, preventing full configuration for ionospheric . Engineers resolved this by using the spacecraft's to expose the hinge to heating, which straightened and locked the boom into position after several days; the second boom deployed successfully in June 2005 following adjusted slew maneuvers. Partial operations continued in subsurface mode, enabling limited ionospheric and geological observations without full boom extension. During the 2011 Martian season, which raised atmospheric opacity and reduced array efficiency, the spacecraft's power budget became critically tight, compounding issues with the Solid-State Mass Memory (SSMM) that caused command execution s in the mission timeline. This was mitigated by switching to a FAST operational concept with shortened timelines and onboard procedure calls (OBCPs) to reduce command volume by up to 50%, preserving power margins and ensuring no extended science interruptions. More recently, in May 2024, Mars Express reported a sharp increase in onboard memory errors, linked to fluxes from heightened solar energetic particle activity, a also observed simultaneously on the mission. These errors, detected via (EDAC) counters in housekeeping data, posed risks to data integrity and command processing but were contained through immediate activation of redundant memory banks and selective reboots. Across all these incidents, resolutions relied on redundant systems, targeted ground interventions, and iterative software enhancements, ensuring no exceeded one month and sustaining the mission's longevity beyond its nominal duration.

Operational Extensions and Future Prospects

The rationale for extending the Mars Express mission stems from its continued high scientific return, including synergies with other Mars missions such as relaying data from NASA's Perseverance rover as part of the Mars Relay Network. This capability enhances data transmission efficiency for surface operations, allowing more time for scientific activities on the rover. Additionally, the mission's robust performance, supported by innovative operational adjustments like reduced reliance on aging gyroscopes, justifies further prolongation beyond the nominal phases. Future plans include the ninth mission extension, approved in 2023, which secures operations until the end of 2026, with an application for a tenth extension under review in 2026 to cover 2027-2028. A recent software update implemented in May 2025 enables potential operations into the spacecraft's third decade, possibly extending to 2030-2034 through optimizations that minimize hardware wear, such as a 97% reduction in usage via compensation. Prospects for the mission encompass continued monitoring of in support of JAXA's Mars Moons eXploration (MMX) mission, which launches in 2026 and arrives at Mars in 2029, providing complementary orbital observations. Mars Express is also positioned to assist with the Mars Sample Return campaign starting in 2028 by offering relay services and atmospheric data. Ongoing tracking of Mars' climate dynamics, including seasonal changes in the atmosphere, will further contribute to long-term environmental models. At end-of-life, the spacecraft is planned for a controlled deorbit to minimize orbital debris risks, adhering to international sustainability guidelines. As ESA's inaugural Mars orbiter, launched in , Mars Express has laid foundational infrastructure for subsequent missions like , demonstrating cost-effective deep-space operations and yielding a vast for future scientific reanalysis.

References

  1. [1]
    ESA - Mars Express overview - European Space Agency
    Mars Express is Europe's first mission to the Red Planet. It carries eight instruments and deployed a lander, Beagle 2.
  2. [2]
    Mars Express - ESA Science & Technology - European Space Agency
    Oct 16, 2020 · Mars Express, so called because of the rapid and streamlined development time, represents ESA's first visit to another planet in the Solar System.
  3. [3]
    PR 22-1999: Europe is going to Mars - ESA Science & Technology
    The European Space Agency's Mars Express mission has won unanimous approval. It will be the first mission Europe has sent to the red planet.
  4. [4]
    Objectives - ESA Science & Technology
    The scientific objectives of the Mars Express mission represent an attempt to fulfil part of the lost scientific goals of the ill-fated Russian Mars-96 mission.
  5. [5]
    [PDF] ESA's Mars Express Mission – Europe on Its Way to Mars
    The scientific objectives of the mission include the remote and in-situ study of the surface, subsurface, atmosphere and environment of the planet Mars. ESA's.
  6. [6]
    Mars Express Frequently Asked Questions (FAQs) - ESA
    About Mars Express. Where does the name 'Mars Express' come from? Mars Express is so called because, at the time, it was built more quickly than any other ...Missing: origin | Show results with:origin
  7. [7]
    Mars Express milestones: two-year mission enters third decade - ESA
    Jun 2, 2023 · In-depth. Mars 'Express' was given its name because it was built and launched in record time and at a much lower cost than previous, similar ...Missing: origin | Show results with:origin
  8. [8]
    Mars Express wins unanimous support - European Space Agency
    N° 47–1998: Mars Express wins unanimous support​​ "The green light for Mars Express shows that Europe is perfectly capable of seizing special chances in ...
  9. [9]
    Mars Express: 20 Years of Mission, Science Operations and Data ...
    Mar 13, 2024 · The original mission design requirement was for the spacecraft to remain operational in Mars orbit for a minimum of one Martian year following ...Missing: 1998 | Show results with:1998
  10. [10]
    Mars Express: From the Launch Pad to a 20-Year Success Record ...
    May 28, 2025 · Mars Express was the only mission to Mars in the ESA Directorate of Science's Horizon 2000 programme, but became an essential precursor to ...Missing: approval 1999
  11. [11]
    ESA Science & Technology - Launch Vehicle
    Mars Express was launched by a Soyuz-Fregat launcher from the Baikonur Cosmodrome in Kazakhstan in June 2003. Soyuz-Fregat rockets are procured through Starsem ...
  12. [12]
    Mars Express - NASA Science
    Jun 2, 2003 · The mission's main objective is to search for subsurface water from orbit. Seven scientific instruments on the orbiting spacecraft have ...
  13. [13]
    ESA - International collaboration - European Space Agency
    Each of the seven orbiter instrument teams on Mars Express has Russian co-investigators who contribute their intellectual expertise to the project.
  14. [14]
    [PDF] Government support for Beagle 2 - Parliament UK
    Apr 1, 2003 · The €150 million ceiling for the Mars Express within which ESA was operating represented an important limitation. On a practical level, the ...
  15. [15]
    Summary - ESA Science & Technology - European Space Agency
    With its complement of seven instruments, Mars Express was designed to study all aspects of the Red Planet, including its atmosphere and climate, and the ...
  16. [16]
    ESA - Mars Express operations - European Space Agency
    The mission's main objective is to search for sub-surface water and deploy a lander onto the Martian surface. Seven scientific instruments on board the orbiter ...<|separator|>
  17. [17]
    Fact Sheet - ESA Science & Technology
    Nov 3, 2020 · Mission Name​​ Mars Express is so called because it was built more quickly than any other comparable planetary mission. The Beagle-2 lander was ...Missing: origin | Show results with:origin
  18. [18]
    ESA - Serving the spacecraft - European Space Agency
    Sometimes, these are bolted to the service module superstructure, as in the case of Mars Express. ... payload module that is then mated with the service module.Missing: structure | Show results with:structure<|control11|><|separator|>
  19. [19]
    ESA - The spacecraft - European Space Agency
    Spacecraft bus dimensions, 1.5 x 1.8 x 1.4 m. Thrust of main spacecraft engine, 400 N. Attitude thrusters, 8 at 10 N each.Missing: span | Show results with:span
  20. [20]
    ESA - Mars Express radar ready to work - European Space Agency
    Jun 22, 2005 · MARSIS consists of three antennas: two 'dipole' booms 20 metres long, and one 7-metre 'monopole' boom oriented perpendicular to the first two.Missing: length | Show results with:length
  21. [21]
    [PDF] From the Launch Pad to a 20-Year Success Record at Mars - HAL
    Jul 22, 2025 · (6) Mars Express, together with NASA's MAVEN spacecraft and CNSA's Tianwen-1 spacecraft, can provide multi-point plasma measurements for the ...<|separator|>
  22. [22]
    [PDF] ESA's Report to the 34th COSPAR Meeting - European Space Agency
    Oct 17, 2002 · Propellant: bipropellant monomethyl hydrazine (MMH), nitrogen tetroxide (NTO) ... Mars Express, which comprises an orbiter and the small Beagle-2 ...
  23. [23]
    Planetary Orbit Insertion – A First Success for Europe with ESA's ...
    This requires a multi-team effort from various parties involved. Two and a half years in orbit around Mars for the first European planetary mission Mars Express ...
  24. [24]
    insthost.cat - NASA
    Electrical power is provided by two solar wings equipped with triple-junction GaAs cells. ... The Mars Express sensors were modified, using different solar cells ...
  25. [25]
    [PDF] Mars Express - The Scientific Investigations
    Due to a failure in the solar panel circuitry design only 70% of the planned solar array power is actually available on Mars Express. This leads to longer ...
  26. [26]
  27. [27]
    Blowing Hot & Cold: Flight Operations for Thermal Control on Mars ...
    Jan 22, 2016 · to comply with instrument unit minimum switch on temperatures. The heater system on Mars Express comprises 14 redundant heater lines (each ...
  28. [28]
    [PDF] Mars Express - European Space Agency
    Dec 26, 2003 · Planned achievements: first European Mars orbiter & lander. Launch date: planned for 1 June 2003 (11-day window), Mars arrival.
  29. [29]
    Engineering - ESA Science & Technology
    Most of the power needed to propel Mars Express from Earth to Mars is provided by the four stage Soyuz-Fregat launcher which will separate from the ...
  30. [30]
    Mars Express High Resolution Stereo Camera spectrophotometric ...
    Jun 16, 2007 · The onboard compression algorithm [Neukum et al., 2004] adjusts the degree of compression automatically on the basis of an analysis of the scene ...
  31. [31]
    Observations by the Mars Express Radio Science Experiment (MaRS)
    The NNO antenna can transmit an X-band uplink and receive X-band and S-band downlinks simultaneously. The CEB antenna transmits and receives X-band. only ...
  32. [32]
    [PDF] Beagle 2: the Exobiological Lander of Mars Express
    In late 2003, the Beagle 2 lander component of the Mars Express mission is planned to touch down in the Isidis Planitia region of Mars (265.0°W, 11.6°N).
  33. [33]
    None
    ### Summary of Beagle 2 Lander Details
  34. [34]
    Beagle 2 delivery for integration on ... - ESA Science & Technology
    The British-led lander will be delivered to the prime contractor (Astrium SAS) in Toulouse,for final integration with the Mars Express spacecraft on 30 January ...
  35. [35]
    ESA Press Event: See Mars Express before its departure to the Red ...
    On 18 September at INTESPACE, Toulouse, ESA will integrate a sample of Ferrari's 'Rosso Corsa' red paint with the Mars Express spacecraft. This event is ...
  36. [36]
    [PDF] RECONSTRUCTED BEAGLE 2 TRAJECTORY - ISSFD
    Following the formulae from [2] on the ejection impulse implied by the spring device, a nominal ∆v of 0.2919 m/s for Beagle2 and 0.018104 m/s for the MEX.Missing: 0.35 stabilized
  37. [37]
    Mechanisms for the Beagle2 lander
    After a seven month cruise to Mars, the complete probe is ejected from Mars Express. During this 5 day coast phase, Beagle2 is totally passive, spinning ...
  38. [38]
    [PDF] Mars Express Beagle 2 - Irvin Aerospace
    Figure 1 provides a summary depiction of the. Beagle 2 entry, descent, and landing operational sequence. ... in order to minimize parachute opening loads while ...
  39. [39]
    [PDF] “beagle-2 aftermath” : lessons learned and the post-landing phase
    The first landed phase operation is Lid and Solar Panel. (LSP) deployment. The lid main hinge is driven to 180° to open Beagle. The solar panels are released ...Missing: 60 90
  40. [40]
    ESA - Mars Express orbiter instruments - European Space Agency
    Mars Express orbiter instruments · Orbiter scientific payload · High Resolution Stereo Camera (HRSC) · Visible and Infrared Mineralogical Mapping Spectrometer ( ...
  41. [41]
    [PDF] MARS EXPRESS - European Space Agency
    Aug 14, 2004 · benefit from the advanced pointing capabilities of Mars Express for solar occultations. A solar aperture below the sensor will be pointed ...
  42. [42]
    HRSC – High Resolution Stereo Camera
    The High Resolution Stereo Camera (HRSC) is Germany's most important contribution to the European Space Agency (ESA) Mars Express mission.Missing: specifications | Show results with:specifications
  43. [43]
    MARSIS: Subsurface Sounding Radar/Altimeter - MPS
    Marsis is a radar instrument carried on Mars Express designed for the primary task of searching for water, water-ice or permafrost layers believed to exist at ...
  44. [44]
    Mars Express/OMEGA - Institut d'Astrophysique Spatiale
    OMEGA is a spectro-imaging instrument on Mars Express, observing Mars' surface and atmosphere, mapping minerals, ices, and atmospheric phenomena.
  45. [45]
    ASPERA-3 - Ion, electron and neutral particle detector package - MPS
    ASPERA-3 will perform the first ever Energetic Neutral Atom (ENA) measurements at another planet in the low energy range (100 eV - 10 keV).
  46. [46]
    [PDF] THE ESA MARS EXPRESS MISSION - Lunar and Planetary Institute
    The launch window has been updated and is now spread over thirty days, opening on May 23, 2003. The nominal mission lifetime is 687 days following Mars orbit.
  47. [47]
    Mars Express passes milestone with ... - ESA Science & Technology
    ... Mars Express spacecraft design, the spacecraft itself was taking shape at the premises of Alenia, Torino, Italy. "Normally, we would have the critical ...Missing: Spazio Turin
  48. [48]
    See Mars Express before its departure to the Red Planet - ESA
    The main objective of the Mars Express mission is to detect the presence of water below the surface of Mars. This could be in the form of underground rivers, ...
  49. [49]
  50. [50]
    ESA - Mars Express leaves for Baikonur - European Space Agency
    It will be launched early June 2003 onboard a Russian Soyuz-Fregat rocket. Mars Express, Europe's first mission to a planet, was built by Astrium , the prime ...
  51. [51]
    Mars Express en route for the Red Planet - ESA
    The 60 kg capsule containing the tiny lander does not incorporate its own propulsion and steering system and will be released into a collision trajectory with ...
  52. [52]
    [PDF] OPERATIONAL IMPLEMENTATION OF MARS EXPRESS ORBIT ...
    On December 25th Mars Express performed a perfect insertion manoeuvre with the 400N main engine that led to capture into Mars orbit. Eleven further orbit.
  53. [53]
    Cruise Phase - ESA Science & Technology - European Space Agency
    On 30 December 2003 the first major correction took place. This positioned the spacecraft into a polar orbit: pericentre 300 km, apocentre 10 000 km, ...Missing: maneuver | Show results with:maneuver
  54. [54]
    ESA - Mars Express releases Beagle 2 - European Space Agency
    Since the Beagle 2 lander has no propulsion system of its own, it had to be put on the correct course for its descent before it was released.Missing: objectives | Show results with:objectives
  55. [55]
    Beagle 2: discovering the lost Mars lander - ROOM Space Journal
    The spacecraft bounced to a halt, cushioned by 2-metrewide airbags. Once it detected that Beagle 2 was stationary, the software commanded the 3 airbag segments ...Missing: petal | Show results with:petal<|separator|>
  56. [56]
    Glitch cuts Mars Express power to 70 percent - New Scientist
    Jul 3, 2003 · Engineers discovered a fault with the connection between the spacecraft's solar panels and its power distribution unit during a routine check-up ...Missing: cruise phase August software patches
  57. [57]
    Mars Express power glitch a minor annoyance, ESA says
    "The (memory unit) issue is largely understood and a software patch will cure it," Schmidt told Spaceflight Now. Perhaps a more serious problem ...Missing: August | Show results with:August
  58. [58]
    [PDF] Mars Express - The Scientific Investigations - Freie Universität Berlin
    Mars Express is the first European mission to another planet, following ESA missions to other Solar System bodies (Giotto to Comet Halley and Huygens to ...<|control11|><|separator|>
  59. [59]
    Mars Express - Wikipedia
    Mars Express is a space exploration mission by the European Space Agency (ESA) exploring the planet Mars and its moons since 2003Background · Orbiter and subsystems · Mission timeline · Timeline of notable...
  60. [60]
    Assessment of AOCS In-Orbit Performance for Mars Express and ...
    MAIN ENGINE CALIBRATION On December 25, 2003 Mars Express was inserted into orbit around Mars by a delta-v manoeuvre of 807 mIs. The thrust for the ...
  61. [61]
    Mars Express
    Prime contractor was Astrium, Toulouse, France, leading a consortium of 24 companies from 15 European countries and the United States.Missing: involvement | Show results with:involvement
  62. [62]
    HRSC - ESA Mars Express Mission - PDS Geosciences Node
    The HRSC (High/Super Resolution Stereo Colour Imager) is a stereoscopic camera that photographs the Martian surface to reveal detail as small as 2 m.Missing: specifications | Show results with:specifications
  63. [63]
    Conjunction over, engineers wake Mars Express - ESA
    Sep 28, 2004 · The solar conjunction, however, meant that radio command signals travelling to and from Mars Express passed through the Sun's super-heated, ...Missing: cruise | Show results with:cruise
  64. [64]
    ESA - Mars Express mission extended - European Space Agency
    Sep 22, 2005 · ESA's Mars Express mission has been extended by one Martian year, or about 23 months, from the beginning of December 2005.
  65. [65]
    Mars Express | CNES
    Jan 27, 2025 · The Mars Express satellite was launched by ESA in June 2003 to map the planet Mars, analyse its surface and subsurface, and study its atmosphere.
  66. [66]
    Extended life for ESA's science missions
    Mar 7, 2023 · The science operations of Mars Express are extended until end of 2026 and the SPC also approved the indicative extension of Mars Express from 1 ...
  67. [67]
    Saving Fuel on Mars Express using “LowFAT” - AIAA
    Additional requirements arise from 1-2 orbit control maneuvers per year (approx. 50-165 g propellant) and occasionally from a safe mode (approx. 150 g ...
  68. [68]
    Mars Express – one of ESA's most successful missions to date
    Jul 21, 2020 · Mars Express was designed as a survey mission to study almost all fundamental aspects related to the geology and evolution, climatology, aeronomy, and ...
  69. [69]
    [PDF] Mars Express: 20 Years of Mission, Science Operations and Data ...
    Mar 15, 2024 · ... cost of the initial mission within the overall budget of 150M€, which is only a small fraction of most other interplan- etary missions. The ...Missing: breakdown euros
  70. [70]
    ESA's Mars Express continues to avoid retirement home - The Register
    Dec 24, 2023 · It was launched with 595 kg in its two propellant tanks, and Godfrey reckons only a few kilograms remain. However, with the spacecraft ...
  71. [71]
    Mars Express updates software, potentially extending spacecraft ...
    May 16, 2025 · Mars Express mission operators at ESOC successfully sent a new software patch that would allow the spacecraft to operate in its third decade.<|control11|><|separator|>
  72. [72]
    ESA Mars Express probe to last until 2034 thanks to software update
    May 19, 2025 · Mars Express will accompany the mission until at least 2029. However, the ESA now believes that the probe could even last until 2034. Read also ...
  73. [73]
    Mars Express radar gauges water quantity around Mars' south pole
    Mar 15, 2007 · The amount of water trapped in frozen layers over Mars' south polar region is equivalent to a liquid layer about 11 metres deep covering the planet.
  74. [74]
    Radar evidence of subglacial liquid water on Mars - Science
    Jul 25, 2018 · Orosei et al. used radar measurements from the Mars Express spacecraft to search for liquid water in Mars' southern ice cap (see the Perspective ...
  75. [75]
    Vertical distribution of ozone on Mars as measured by SPICAM/Mars ...
    Sep 9, 2006 · After southern winter solstice (Ls ∼ 100°), the peak abundance starts decreasing again, and this ozone layer is no longer detected after Ls ∼ ...
  76. [76]
    [PDF] Hydration state of the Martian surface as seen by Mars ... - HAL
    Feb 6, 2024 · The. OMEGA instrument has detected the 1.4 mm, 1.9 mm, and the 2.1–2.4 mm hydration bands, and thus the presence of phyllosilicates and sulfates ...
  77. [77]
  78. [78]
    Phyllosilicates in the Mawrth Vallis region of Mars - AGU Journals
    Jul 27, 2007 · OMEGA/Mars Express has discovered large outcrops rich in phyllosilicates in the region of Mawrth Vallis, Mars (around 20°W, 25°N).
  79. [79]
    First Mars Express gravity results plot volcanic history - ESA
    Apr 26, 2012 · The results show that the lava grew denser over time and that the thickness of the planet's rigid outer layers varies across the Tharsis region.
  80. [80]
    Mars
    The large volcanic regions of Tharsis and Elysium, which were active until just a few million years ago, show that thermal convection continues to take place ...
  81. [81]
    Observations of the Proton Aurora on Mars With SPICAM on Board ...
    Dec 29, 2017 · Lyman-α emission signatures of proton aurora have been observed with the SPICAM ultraviolet spectrometer on board Mars Express between July 2004 ...
  82. [82]
    Mars Express discovers aurorae on Mars - European Space Agency
    Jun 9, 2005 · ESA's Mars Express spacecraft has for the first time ever detected an aurora on Mars. This aurora is of a type never before seen in the Solar System.Missing: 2020 | Show results with:2020
  83. [83]
    [PDF] Observations of the Proton Aurora on Mars with SPICAM on Board ...
    Aug 3, 2020 · Abstract We report observations of the proton aurora at Mars, obtained with the Spectroscopy for the. Investigation of the Characteristics ...
  84. [84]
    Investigations of the Moon Phobos by Mars Express and ...
    Apr 23, 2025 · Mars Express has opened a new chapter in the exploration of Phobos, thanks to its elliptical orbit that allows for regular flybys, sometimes as close as 50 km.
  85. [85]
    The high-resolution stereo camera (HRSC) experiment on Mars ...
    May 29, 2025 · This paper discusses the measurement principles and operations of the instrument as well as the acquisition, calibration and processing of ...Missing: heritage | Show results with:heritage
  86. [86]
    (PDF) Lessons Learned from Safe Modes on ESA's Interplanetary ...
    PDF | On May 12, 2008, Martin Shaw and others published Lessons Learned from Safe Modes on ESA's Interplanetary Missions: Mars Express, Venus Express and ...Missing: glitches | Show results with:glitches<|separator|>
  87. [87]
    Mars Express radar on hold : Nature News
    May 9, 2005 · UPDATED - 11 May 2005. The first MARSIS radar boom has now successfully locked into place, ESA says. Mission engineers guessed that the ...
  88. [88]
    Lenticular Jointed Antenna Deployment Anomaly and Resolution ...
    The two dipole booms are the longest known lenticular hinged structures with the largest number of serially deployed hinges ever flown and deployed in space.
  89. [89]
    ASU Mars camera keeps a watchful eye for dust - Phys.org
    Feb 2, 2011 · The picture emerging from THEMIS data shows dust activity increasing as the Martian season nears southern summer, which begins April 9, 2011. ( ...<|control11|><|separator|>
  90. [90]
    Glitch on BepiColombo: Work ongoing to restore spacecraft to full ...
    May 16, 2024 · BepiColombo, the joint ESA/JAXA mission to Mercury, has experienced an issue that is preventing the spacecraft's thrusters from operating at ...
  91. [91]
    Detection of visible-wavelength aurora on Mars | Science Advances
    May 14, 2025 · Mars Express memory errors. To investigate whether SEPs affected Mars close to the time of observation, we used an error detection and ...
  92. [92]
    ESA - Mars Express sets data relay record - European Space Agency
    Nov 10, 2022 · ESA's Mars Express spacecraft recently conducted tests in which it relayed data gathered by NASA's Perseverance rover back to Earth.Missing: UHF | Show results with:UHF