ExoMars


ExoMars is an astrobiology programme led by the European Space Agency (ESA) to search for evidence of past or present life on Mars through atmospheric analysis and surface exploration.
The programme consists of two missions: the 2016 launch delivered the Trace Gas Orbiter (TGO), which successfully entered Mars orbit and continues to map trace gases like methane that could indicate geological or biological activity, and the Schiaparelli demonstration lander, which crashed during its descent on 19 October 2016 due to a computer software error that misread accelerometer data and prematurely jettisoned the parachute and backshell.
The second mission centers on the Rosalind Franklin rover, designed to drill up to 2 meters into the Martian subsurface to collect and analyze samples for organic compounds using instruments including a mass spectrometer provided by NASA, marking Europe's first mobile planetary rover.
Originally a joint effort with Roscosmos for launch and landing elements, the mission faced indefinite suspension in March 2022 after Russia's invasion of Ukraine eroded trust in the partnership, prompting ESA to develop an independent European landing platform and reschedule the launch for 2028 aboard an American rocket, with arrival on Mars anticipated in 2030.

Programme Overview

Scientific Objectives and Rationale

The ExoMars programme seeks to determine whether life has ever existed on Mars, addressing a core question in by investigating potential biosignatures in the atmosphere, surface, and subsurface. This pursuit is grounded in evidence from prior missions, including morphological indicators of past liquid water, detection of organic compounds, and atmospheric compositions suggestive of active processes that could be biological or geological in origin. Mars' geological stability, with minimal tectonic resurfacing, has preserved rocks older than 3 billion years, offering a record of early habitable conditions analogous to Earth's environment but less altered by subsequent biological overprinting. The (TGO), operational since 2018, targets trace atmospheric constituents, particularly (CH₄) and its isotopes, to map their global distribution, seasonal variations, and vertical profiles with unprecedented resolution. 's short atmospheric lifetime (approximately 200–600 years) and observed plumes imply recent production, potentially from subsurface geological venting or microbial , necessitating precise source localization to discriminate biogenic from abiotic origins. Complementary measurements of other trace gases, such as and , provide context for and escape processes influencing . The Rosalind Franklin rover complements TGO by focusing on surface and subsurface exploration, using a 2-meter to access samples shielded from ultraviolet , perchlorate oxidants, and cosmic rays that degrade surface organics within millions of years. Key objectives include characterizing the shallow subsurface geochemical and hydrological environment, analyzing ancient sedimentary formations and evaporitic deposits for preserved organics and minerals indicative of past aqueous activity, and assessing degradation mechanisms. The Pasteur suite enables in-situ detection of complex organics via , gas chromatography-mass spectrometry, and microscopy, targeting sites with high potential for early Mars to test for molecular evidence of extinct life. These efforts also demonstrate technologies for future sample return missions, enhancing prospects for definitive life detection.

International Partnerships and Structure

The ExoMars programme is coordinated by the (ESA) as part of its Programme, with contributions from its 22 member states and select cooperating nations. Originally conceived in collaboration with , which planned to provide launch and landing technologies, the partnership shifted after NASA's withdrawal in February 2012 due to U.S. budget shortfalls exceeding $2 billion. ESA then formalized a joint endeavour with on 14 March 2013, whereby Russia supplied the launcher, components for the Entry, Descent and Landing (EDL) system including parachutes and propulsion, and instruments such as the ADRON-EM neutron spectrometer and the ISEM infrared spectrometer. This agreement allocated approximately €1 billion of the programme's €1.5 billion cost to ESA, with Roscosmos covering the balance through hardware and launch services. Contributions from ESA member states are distributed across industrial consortia and scientific payloads, with the serving as the second-largest funder at €287 million and leading rover platform development through UK. , , and —ESA's top overall contributors—provide major shares of funding and expertise, including in for the 's structure and panoramic instruments, and 's for subsurface radar elements. Additional inputs come from nations such as and (up to €70 million combined for instrumentation), (drill mechanisms), and (mass spectrometry), with nine instruments led by principal investigators from seven countries. The programme's governance falls under ESA's ministerial councils, where member states approve budgets and milestones, such as the €450 million commitment in November 2012 for the 2016 and 2020 missions. In response to Russia's invasion of Ukraine, ESA suspended Roscosmos cooperation on 17 March 2022, citing inability to proceed under existing terms, and formally terminated the partnership in July 2022 amid European Union sanctions. This necessitated replanning, with ESA securing €360 million from member states in December 2022 to advance the Rosalind Franklin rover toward a 2028 launch. On 16 May 2024, ESA and NASA agreed to new terms, with the U.S. providing a commercial launch vehicle, EDL hardware (including parachutes and descent propulsion), and radioisotope heater units to ensure rover viability in Mars' cold environment, marking NASA's re-entry as a key partner without Russian involvement. This structure emphasizes ESA's industrial core while leveraging U.S. expertise for critical mission enablers, with ongoing ESA efforts to finalize a dedicated Mars telecommunications orbiter.

Historical Development

Inception and Initial Planning (2005–2010)

The ExoMars programme emerged as a key component of the European Space Agency's (ESA) , which was established in 2001 to define a long-term strategy for solar system , including robotic precursors to potential human missions. The initial ExoMars concept focused on an exobiology rover mission designed to search for evidence of past or present microbial through subsurface sampling up to 2 meters deep, surface mobility, and in-situ analysis. On 12 December 2005, ESA's Ministerial Council in approved the continuation of the Programme and granted formal approval for ExoMars as its robotic , with a budget of approximately €650 million. This decision saw subscriptions from 14 member states, including newcomers and , committing to the project's development as Europe's first led surface , targeted for launch in 2011. The architecture comprised a carrier module for interplanetary cruise and Mars orbit insertion, paired with a descent module delivering the rover to the surface. Following approval, ESA initiated detailed planning phases, including Phase A feasibility studies and Phase B1 preliminary design in 2006–2007, refining the rover's instrumentation for organic detection, , and while addressing entry, descent, and landing challenges. To overcome Europe's lack of a suitable , ESA pursued collaboration with , leading to a (MoU) for contributions such as an launch, entry-descent-landing technologies, and possibly scientific instruments. These early efforts emphasized technological demonstrations for future human exploration, such as hazard avoidance and subsurface access, amid ongoing budget deliberations and concept iterations. By 2008, preliminary contracts for Phase B2 detailed design were anticipated, signaling a shift toward an enhanced mission scope incorporating an orbiter for analysis, though the core remained central to initial planning through 2010. This period solidified ExoMars as a cornerstone of European , prioritizing astrobiological objectives over broader atmospheric or geological surveys initially proposed in roadmaps.

Partnership Shifts and 2016 Mission Approval

The ExoMars programme initially pursued collaboration with , which was set to provide launch vehicles for both the 2016 orbiter-lander mission and the planned 2018 rover mission, along with contributions to the entry, descent, and landing (EDL) systems. However, in 2011, notified the (ESA) of its inability to commit due to uncertain budget projections, prompting ESA to seek alternative partners to avoid mission cancellation. This shift was driven by 's prioritization of its own Mars exploration architecture, including the and subsequent missions, which strained resources for international commitments. In October 2011, ESA formally invited , Russia's space agency, to become the full-fledged partner, replacing and assuming responsibilities for Proton rocket launches, EDL technology contributions, and partial funding. Negotiations culminated in a bilateral agreement signed on March 14, 2013, at ESA headquarters in , formalizing joint development of the 2016 (TGO) paired with the Schiaparelli Entry, Descent and Landing Demonstrator Module (), and the subsequent 2018 rover mission. Under this pact, committed to providing two launches, while ESA led spacecraft design and operations, with retaining a minor role via the Electra telecommunications package on TGO. The partnership enabled ESA's Ministerial Council to greenlight full-scale implementation, with the final industrial contract for the 2016 mission elements signed on June 17, 2013, at the , securing for orbiter assembly. This approval resolved prior funding and technical uncertainties, aligning the mission with a March 14–25, 2016, launch window from using a /Briz-M . The agreement emphasized complementary expertise—ESA's in orbital science and Roscosmos's in heavy-lift launches—facilitating the programme's progression despite geopolitical risks later realized.

Post-2016 Delays and Replanning

Following the successful orbit insertion of the in October 2016 and the of the Schiaparelli demonstration lander during its descent attempt the same month, the ExoMars —initially targeted for launch in 2018—faced repeated postponements due to persistent technical challenges. Primary issues included failures in qualifying the large parachutes required for the 's entry, descent, and (EDL) system during high-altitude tests, as well as problems with electronic components in the platform provided by . These setbacks, compounded by the need for additional integration and testing time, led the (ESA) and to defer the launch first to July 2020, then definitively to the 2022 Earth-Mars alignment window (August–October 2022) in a joint announcement on March 12, 2020. The further exacerbated delays by disrupting supply chains, testing facilities, and international collaboration, though ESA maintained that core technical resolutions were progressing. However, geopolitical tensions escalated in February 2022 with Russia's invasion of Ukraine, prompting ESA's Ministerial Council to suspend all ongoing cooperation with on March 17, 2022, citing the impossibility of proceeding with the Russian-provided Proton rocket for launch and the Kazachok descent module for the rover's surface platform. This decision effectively halted preparations for the 2022 slot, as Roscosmos contributions accounted for critical EDL hardware and launch services integral to the mission architecture agreed upon in 2016. Replanning efforts intensified post-suspension, with ESA prioritizing European autonomy in deep-space access. In July 2022, formal termination of the partnership was confirmed, shifting focus to alternatives such as an Airbus-developed lander platform to replace Kazachok and potential launches via ESA's Ariane 6 rocket or NASA's Space Launch System. By November 2022, ESA secured €730 million in additional member-state funding to sustain rover development and initiate lander redesign, preserving the Rosalind Franklin rover's core instrumentation despite integration uncertainties. The revised timeline targets a 2028 launch during the next viable Earth-Mars window, allowing 2–3 years for lander qualification and EDL testing, though Airbus has noted risks of further slippage in constructing the third lander iteration. As of early 2025, ESA reports ongoing reconfiguration without Russian elements, emphasizing enhanced subsurface drilling capabilities to meet astrobiology goals amid these adaptations.

Geopolitical Suspension and Restart (2022–Present)

In response to 's invasion of on , 2022, the (ESA) suspended cooperation with on the ExoMars programme on March 17, 2022, halting preparations for the rover's planned September 2022 launch aboard a Proton rocket. This decision followed Roscosmos' withdrawal of personnel from Europe's Spaceport in and broader Western sanctions against Russia, which disrupted supply chains for critical components like the lander's system and elements previously allocated to contributions. The suspension preserved the nearly completed rover hardware, which was placed in controlled storage to mitigate degradation risks, but it stranded ESA without a viable or certain descent technologies integral to the mission's architecture. By July 12, 2022, ESA formally terminated its partnership with on the rover mission, citing irreconcilable geopolitical constraints and the need to realign with European security priorities, despite the mutual investments exceeding €1 billion and the mission's advanced development stage. ESA member states then initiated a search for alternative partners, prioritizing independence from technology while addressing gaps in launch capabilities, radioisotope heaters, and systems; initial discussions with focused on leveraging U.S. expertise in Mars entry, descent, and (EDL) to replace elements. This shift underscored the causal impact of state-level conflicts on international scientific endeavours, where prior collaborative frameworks—built over years of technical integration—proved vulnerable to abrupt diplomatic ruptures, forcing costly redesigns and delays estimated at two to three years. Restart efforts gained momentum in late 2022, with ESA securing commitments to maintain the programme through ministerial-level funding and exploring European or U.S. launch options, such as adaptations to or commercial providers. In April 2024, ESA awarded a €150 million to and partners to resume rover assembly, instrumentation integration, and testing, signaling a commitment to proceed without Russian involvement. A formal partnership agreement with , finalized by mid-2024, provides U.S. support for EDL technologies, radioisotope power units, and potential launch assistance, enabling the mission's revival under a revised timeline targeting an October-December 2028 and a 2030 landing at Oxia Planum. As of early 2025, the rover remains on track despite U.S. budget uncertainties, with ESA emphasizing self-reliance in propulsion and launch to mitigate future geopolitical dependencies.

2016 Mission Components

Trace Gas Orbiter (TGO) Design and Operations

The (TGO) is a bus derived from Thales Alenia Space's , measuring 3.2 m in height by 2 m in width and depth, with deployable arrays spanning 17.5 m tip-to-tip to generate approximately 2000 W of electrical power. The orbiter's launch was 3732 kg, excluding the 577 kg Schiaparelli lander, with a of 113.8 kg dedicated to scientific instruments. Propulsion systems include bipropellant thrusters for major maneuvers such as orbit insertion and monopropellant for attitude control, enabling precise pointing for observations. The scientific comprises four instrument suites optimized for detection and surface : the Nadir and Occultation for Mars Discovery () spectrometer with two channels and one ultraviolet-visible channel for near-continuous atmospheric profiling; the Atmospheric Chemistry Suite (ACS) with three spectrometers targeting mid- absorption features of species; the Colour and Stereo Surface Imaging System () for high-resolution at 4.5 m/pixel; and the Fine-Resolution Epithermal Detector (FREND) for hydrogen-rich subsurface deposits to depths of about 1 m. These instruments operate primarily in nadir-viewing and solar occultation modes to achieve sensitivities down to parts-per-billion for gases like . Additionally, NASA's Electra proximity link provides UHF relay capabilities for communicating with future Mars surface assets, supporting data rates up to 2 Mbps from landers or rovers. TGO launched on March 14, 2016, aboard a rocket from and arrived at Mars on October 19, 2016, executing a propulsive insertion burn to enter an initial with a pericenter of about 400 km and apocenter exceeding 33,000 km. commenced in October 2016, using repeated atmospheric passes to reduce apocenter gradually, with over 10,000 dips completed by 2018, transitioning to a near-circular at 400 km altitude and 74° inclination relative to the Martian equator, with a period of approximately 4.65 sols. operations fully activated in 2018 following payload commissioning, focusing on repeated global mapping of atmospheric composition, temperature profiles, and surface features, with and ACS conducting measurements during every to track diurnal and seasonal variations in trace gases. As of October 2025, TGO remains fully operational, continuing nominal observations while demonstrating extended functionality, including support for potential future ExoMars elements and ad-hoc tasks such as interstellar objects like comet 3I/ATLAS on October 3, 2025. The spacecraft's design incorporates radiation-hardened and fault-tolerant to withstand Mars' harsh environment, ensuring longevity beyond the baseline two-year mission.

Schiaparelli Lander Development and Deployment

The Schiaparelli Entry, Descent and Landing Demonstrator Module () was conceived as a technology demonstration for Mars , descent, and landing (EDL) capabilities, essential for the subsequent ExoMars rover mission. Development began following the approval of the ExoMars 2016 mission in 2012, with the primary goal of validating EDL systems including a , deployment, , and propulsion for final braking. The lander, named Schiaparelli in November 2013 after the Italian astronomer , featured a 2.4-meter aeroshell with a 70° sphere-cone front shield and a truncated conical back shell, designed to withstand entry velocities of approximately 21,000 km/h. Key subsystems included a altimeter for terrain-relative , liquid-propellant thrusters for powered descent, and a system to decelerate from supersonic to subsonic speeds. The payload comprised the DREAMS meteorological package with instruments for measuring , , , and , alongside COMARS+ sensors on the back cover for aerothermal during entry. Designed for a controlled but unguided landing on Meridiani Planum capable of handling slopes up to 12.5° and rocks up to 40 cm high, Schiaparelli lacked obstacle avoidance and relied on passive systems for . Development involved ESA-led efforts with contributions from European industries, including for structural elements, and focused on testing through drop tests and simulations to mitigate risks identified in prior failures. Schiaparelli launched on 14 March 2016 aboard a rocket from , , integrated with the (TGO) as a hitchhiker with a total launch mass of 577 kg. After a seven-month interplanetary cruise, the lander separated from TGO on 16 October 2016 at 14:42 GMT, initiating a three-day coast phase toward Mars . The EDL sequence commenced on 19 October 2016, with entry interface at about 120 km altitude, followed by aerodynamic deceleration via the peaking at over 1,500°C, deployment at , and backshell separation at around 1.5 km altitude. However, an anomaly occurred when the (IMU) saturated, generating erroneous velocity data that the navigation software interpreted as an altitude of 1.8 km while the actual height was 40-50 meters, triggering premature thruster shutdown after only three seconds instead of the planned 7-10 seconds. This error, compounded by inadequate modeling of parachute detachment dynamics and software handling of conflicting sensor inputs, resulted in a hard impact at approximately 300 km/h, creating a 40-meter crater and scattering debris including the parachute and back shell. Post-flight analysis confirmed partial success in entry and parachute phases, with telemetry received for 9 seconds post-impact before battery depletion, but the lander was destroyed on impact without achieving a soft landing. The ESA inquiry highlighted root causes such as insufficient conservatism in simulations and IMU software vulnerabilities, informing design improvements for future missions despite the failure.

2016 Mission Outcomes and Data Yield

The ExoMars 2016 mission launched on March 14, 2016, from Baikonur Cosmodrome aboard a Proton-M rocket, with the Trace Gas Orbiter (TGO) and Schiaparelli Entry, Descent, and Landing Demonstrator Module (EDM) separating en route to Mars. Both components arrived at Mars on October 19, 2016, marking the partial success of the mission: while Schiaparelli failed to achieve a soft landing, TGO successfully entered an initial elliptical orbit and began its operational phases. The Schiaparelli EDM, intended to demonstrate entry, descent, and landing technologies for future missions, encountered a critical anomaly during its descent to Meridiani Planum. Schiaparelli's descent commenced with atmospheric entry at approximately 21,000 km/h, followed by parachute deployment at 11 km altitude and heatshield separation. However, an erroneous saturation of the (IMU) during the parachute phase caused the onboard computer to miscalculate velocity and altitude, registering a false signal about 1.2 km above the surface. This triggered premature backshell and parachute separation, followed by overfiring of the retrorockets for roughly 3 seconds instead of the planned 25 seconds, leading to a high-velocity at around 180 m/s and subsequent tumbling destruction. Despite the , Schiaparelli transmitted data during descent, including measurements of atmospheric , wind speeds up to 100 m/s, and environmental parameters, totaling over 15,000 data packets relayed via . These yielded insights into Mars' lower atmosphere but no surface operations or long-term science. The crash site was later imaged by NASA's , confirming debris scatter over 1 km. In contrast, TGO achieved successful Mars orbit insertion on October 19, 2016, into a highly elliptical path, followed by an 11-month aerobraking campaign ending in April 2018, which circularized its orbit at 400 km altitude with a 74-degree inclination. Nominal science operations commenced thereafter, utilizing instruments such as NOMAD and ACS spectrometers for trace gas detection, CaSSIS for high-resolution imaging, and FREND for neutron spectroscopy. Key data yields include precise mapping of atmospheric water vapor distribution, seasonal ozone variations, and chlorine monoxide levels, enhancing models of Mars' hydrological cycle and photochemistry. TGO's observations have set stringent upper limits on methane concentrations (below 50 parts per trillion by volume globally), resolving prior sporadic detections by ground-based assets like Curiosity rover as localized or measurement artifacts rather than widespread plumes. By 2025, TGO had completed multiple Martian years of data collection, contributing over 240,000 solar occultation measurements that detected no significant hydrocarbons and mapped seasonal nightside oxygen emissions indicative of atmospheric dynamics. Surface reflectance data from CaSSIS revealed ice exposures and mineral distributions, while FREND subsurface hydrogen maps supported water ice inventories up to several meters deep in mid-latitudes. These findings, integrated with missions like Mars Express, have advanced understanding of trace gas sinks, dust interactions, and potential habitability signals without confirming active biological sources. The mission's longevity, extending beyond its planned five-year primary phase, underscores TGO's role as a cornerstone for Mars atmospheric science, despite the lander setback informing refined entry systems for the delayed Rosalind Franklin rover.

Rosalind Franklin Rover Mission

Rover Design and Instrumentation

The Rosalind Franklin rover, constructed by Airbus Defence and Space in Stevenage, United Kingdom, measures approximately 3.5 meters in length, 2 meters in width, and 2 meters in height, with a dry mass of 310 kilograms excluding the landing platform. It employs a six-wheeled rocker-bogie mobility system derived from prior Mars rover designs, enabling traversal of rocky terrain at speeds up to 0.2 meters per second while maintaining stability on slopes up to 30 degrees. Power is supplied by body-mounted solar arrays generating about 700 watts at landing, augmented by lithium-ion batteries for operations during dust storms or night, with a design life targeting at least 500 Martian sols. A key feature is the 2-meter subsurface mounted on the rover's front, capable of extracting samples from depths up to 2 meters to access regions less altered by surface radiation and oxidants, preserving potential material. Samples are processed in an internal laboratory via a sample distribution system that crushes, sieves, and delivers portions to analytical instruments, prioritizing detection while minimizing through seals and sterilization protocols. The rover includes a 2-meter topped with the Panoramic Camera (PanCam) for high-resolution and multispectral analysis of the terrain, , and atmosphere. The Pasteur payload comprises seven principal instruments focused on exobiology, geology, and mineralogy:
  • PanCam: Provides panoramic, 3D color imaging and spectroscopy for site characterization and navigation.
  • CLUPI (Close-Up Imager): Captures microscopic images of rock textures and potential biosignatures at centimeter-scale resolution.
  • WISDOM (Water Ice Subsurface Deposit Observation on Mars): Ground-penetrating radar operating at 100-500 MHz to map subsurface stratigraphy up to 3 meters deep.
  • MicrOmega-IR: Infrared hyperspectral microscope identifying mineral compositions in samples at micrometer resolution.
  • RLS (Raman Laser Spectrometer): Detects organic molecules and minerals via Raman spectroscopy on solid samples.
  • MOMA (Mars Organic Molecule Analyzer): Combines mass spectrometry and laser desorption to analyze complex organics in crushed samples.
  • ENFYS: Near-infrared spectrometer mounted on the mast, replacing the original Russian ISEM to measure surface mineralogy and hydration states from 1-2.5 micrometers.
Following the suspension of Russian collaboration, the ENFYS instrument was developed by a UK-led to maintain spectroscopic capabilities without foreign dependency. This suite enables in-situ analysis for biosignatures, with data relayed via the or direct Earth communication.

Entry, Descent, and Landing System Challenges

The Entry, Descent, and Landing (EDL) system for the Rosalind Franklin rover must decelerate the 320 kg payload from hypersonic entry velocities exceeding 20,000 km/h through Mars' thin atmosphere (about 1% of Earth's density at sea level) to a soft touchdown at less than 3 m/s, using a sequence of heatshield ablation, dual-stage parachutes, retrorockets, and crushable legs on the carrier platform. This process, lasting approximately six minutes, demands precise timing and redundancy to mitigate risks from variable atmospheric density, dust storms, and terrain irregularities, with no real-time communication possible during descent due to the one-way light-time delay of 4–24 minutes. A primary technical hurdle emerged in parachute development, as the large supersonic and subsonic chutes—each over 15 m in diameter for the main stages—must extract rapidly and withstand dynamic pressures up to 1,000 without tearing. High-altitude drop tests in , , in October 2019 revealed structural failures, with the s sustaining rips and incomplete inflation during simulated Mars conditions at speeds around 1.6 km/s, necessitating a full redesign by and . These issues, compounded by underperforming electronics in the Russian-supplied descent module and integration problems, delayed the launch from July 2020 to September 2022. Lessons from the 2016 Schiaparelli demonstrator's EDL failure informed subsequent mitigations, where a software anomaly caused erroneous data interpretation, leading to premature backshell separation, uncontrolled spin-up to 240 deg/s, and a high-velocity at over 300 km/h instead of the targeted 70 km/h. The inquiry board recommended revisiting the rover's EDL algorithms for enhanced , improved altimetry for terrain-relative , and better modeling of parachute-induced vibrations, which had been underestimated in pre-flight simulations. Post-2022 geopolitical shifts prompted a pivot to a fully European carrier platform, requiring requalification of propulsion (throttled engines firing for 6–10 seconds) and sky crane-like descent mechanics to ensure stability over uneven Oxia Planum terrain. Ongoing challenges include validating the system's performance under Mars' variable entry corridors (e.g., 120–140 km altitude) via end-to-end simulations and ground tests, as partial failures in any phase could result in total loss, a risk heightened by the absence of prior successful heavy landings by ESA. Current efforts emphasize autonomous hazard detection and avoidance, though full implementation remains constrained by computational limits during the brief window.

Surface Operations and Subsurface Sampling

The Rosalind Franklin rover is designed for autonomous surface operations lasting a nominal 218 sols, enabling it to traverse several kilometers across Martian terrain while avoiding hazards and selecting scientifically valuable sites. Its six-wheeled chassis, equipped with rock wheels for enhanced traction, supports travel of approximately 100 meters per sol, with capabilities to climb slopes and navigate rocky landscapes using onboard stereo cameras and hazard detection systems. Subsurface sampling represents a core capability of the rover, facilitated by a specialized regolith and rock drill that extends up to 2 meters deep—the deepest reach of any planned Mars rover mission—to access materials preserved from surface radiation and oxidation. The drill, powered by approximately 100 watts, rotates at 60 revolutions per minute and penetrates at rates of 0.3 to 30 mm per minute, depending on regolith density; it employs a drill string with extension rods and a two-degree-of-freedom positioner to retrieve core samples measuring up to 1 cm by 2 cm. During operations, the rover uses the WISDOM ground-penetrating radar to map subsurface layers up to 3 meters deep, identifying fractures, ice deposits, or organic-rich strata for targeted drilling. Collected samples are retained via an internal shutter, retracted to the surface, and transferred through a drawer system to a crushing and distribution station, where they are pulverized and analyzed onsite by the Pasteur instrument suite, including panoramic cameras, spectrometers, and microscopes, to detect organic compounds, minerals, and potential biosignatures. Ground testing in Mars soil simulants achieved 1.7 meters depth, extracting intact samples from cemented clay, validating the system's performance under simulated low-gravity conditions.

Landing Site and Mission Timeline

Oxia Planum, located at approximately 18°N, 24°E near the Martian equator, was selected as the primary landing site for the Rosalind Franklin rover due to its extensive exposures of Noachian-era clay-rich sediments, estimated at 3.9 billion years old, which formed in the presence of liquid water and offer high potential for preserving organic biosignatures. The site's phyllosilicate-bearing layered deposits, identified through orbital spectroscopy from missions like Mars Express and CRISM, provide stratigraphic access to ancient habitable environments, while the landing ellipse—spanning about 100 by 15 km—features low elevation variance and minimal hazards for safe touchdown. Recent analyses indicate recent rockfalls and flood-related exposures may enhance access to subsurface organics, bolstering the site's astrobiological value despite challenges like dust cover potentially obscuring surface signatures. The selection process, finalized by ESA in March 2019 after evaluating candidates including Mawrth Vallis and Hypanis Planitia, prioritized Oxia Planum for its balance of scientific return—targeting aqueously altered minerals—and engineering feasibility, as assessed by the Landing Site Selection Working Group using data from and other assets. High-resolution geological at 1:30,000 has further delineated units like the Oxia Chaos formation, aiding rover traverse planning to access drillable targets up to 2 meters deep. The mission timeline has been repeatedly adjusted due to technical, budgetary, and geopolitical factors, with the current plan targeting a in October 2028 aboard a NASA-provided , following ESA's 2024 agreement to replace contributions suspended after 2022. The rover's cruise phase will last approximately two years, culminating in entry, descent, and landing at Oxia Planum by late November 2030, leveraging the ExoMars parachute system tested in 2025 drop trials. Post-landing, operations are projected to span at least 500 sols (Martian days), focusing on subsurface sampling to address past questions before potential battery degradation limits mobility. As of October 2025, integration and testing continue, with no further delays reported, though full mission success hinges on unresolved solutions.

Scientific Achievements and Findings

Trace Gas Detections and Atmospheric Insights

The ExoMars Trace Gas Orbiter (TGO), entering its nominal science phase on 21 April 2018, employs the Nadir and Occultation for MArs Discovery (NOMAD) and Atmospheric Chemistry Suite (ACS) spectrometers to map trace gases in Mars' atmosphere with unprecedented sensitivity, targeting potential biosignatures or geological indicators such as methane. Observations via solar occultation, nadir, and limb geometries have yielded global upper limits for methane (CH₄) at 0.05 parts per billion by volume (ppbv), with a detection precision of 0.012 ppbv at 3 km altitude, contradicting sporadic prior detections reported by Mars Express (up to 10 ppbv) and Curiosity rover (0.2–0.7 ppbv baseline, with spikes). This absence across broad spatial and temporal coverage underscores enigmas in methane's hypothesized sources—potentially serpentinization or microbial activity—and sinks, such as soil oxidation or photochemistry, without resolving debates on transient plumes. ACS mid-infrared observations first detected (HCl), a halogen-bearing gas, during the global (Martian year 34), with abundances peaking at ~1 ppbv in both hemispheres and correlating with seasonal lifting. HCl's transient nature ties to surface-atmosphere exchange involving salts and , forming via reactions like NaCl + HCl → NaCl·HCl in aerosols, marking the inaugural observation of cycling on Mars and implying active mineral-atmosphere interactions previously undetected. NOMAD solar occultation data spanning April 2018 to September 2021 reveal the global vertical distribution of water vapor (H₂O), exhibiting stark seasonal contrasts: confinement below 10–40 km at aphelion due to ice cloud formation (Clancy effect), versus ascent above 80 km at perihelion over southern latitudes, driven by meridional circulation and elevated temperatures. Dust storms amplify this, injecting vapor to >80 km within days, as seen in the 2018 global event and a January 2019 regional storm, facilitating escape to space. Deuterium-to-hydrogen (D/H) ratios, measured at ~6 times Earth's value, vary rapidly with altitude and season, showing heavy fractionation during upward transport and storm-induced loss, consistent with Mars' historical desiccation from an ocean-equivalent water volume. ACS-derived () climatology over multiple Martian years highlights an , with CO depleted in ¹³C relative to CO₂, attributable to preferentially breaking lighter ¹²CO bonds in the upper atmosphere. Vertical profiles indicate CO enrichment in the middle atmosphere during perihelion, modulated by and , refining models of and carbon cycling without invoking exotic sources. These findings collectively enhance causal understanding of Mars' atmospheric , dust-water interactions, and volatile retention, informing assessments while prioritizing empirical limits over unverified biogenic hypotheses.

Contributions to Mars Astrobiology Research

The ExoMars (TGO), operational since 2016, has advanced Mars by providing high-precision measurements of atmospheric trace gases, such as , that could signal or geological processes. Instruments like and ACS have mapped seasonal and spatial variations in gases including , , and , establishing upper limits for at approximately 0.02 by volume, which constrains hypotheses of active biogenic sources. These observations help differentiate potential biosignatures from abiotic mechanisms, such as photochemical reactions or serpentinization, by revealing correlations with atmospheric dynamics and solar influences. For instance, TGO data explained isotopic anomalies in through sunlight-driven processes rather than biological fractionation, refining models of Mars' and . TGO's detection of mid-infrared signatures has implications for stability, as reacts with methane, potentially limiting its atmospheric lifetime and aiding in the interpretation of prior ambiguous detections by orbiters like . By failing to confirm transient plumes reported elsewhere, TGO's dataset supports abiotic explanations or instrument artifacts in earlier claims, emphasizing the need for multi-instrument validation in . This contributes to broader assessments by quantifying escape rates of and other volatiles, linking atmospheric loss to past inventories and potential for subsurface life. The Rosalind Franklin rover, planned for launch in 2028, will extend ExoMars' astrobiology contributions through subsurface exploration, targeting ancient terrains with evidence of past habitability. Equipped with a 2-meter drill and instruments like RLS for mineral identification and ISEM for subsurface composition, it aims to detect organic molecules preserved below the radiation-altered surface layer, addressing whether microbial life existed in Mars' wetter past. Unlike prior rovers limited to surface sampling, Rosalind Franklin's mobility and in-situ analysis will enable contextual geological mapping alongside biosignature searches, such as complex organics or isotopic evidence of biological processes. This approach prioritizes sites like Oxia Planum, selected for its phyllosilicate-rich delta deposits indicative of long-term water activity.

Data Integration with Other Missions

The ExoMars Trace Gas Orbiter (TGO) serves a critical role in the Mars relay network by using NASA-provided Electra UHF transceivers to receive and forward scientific data from surface assets, including the Curiosity and Perseverance rovers, to Earth via its X-band high-gain antenna. This capability, operational since TGO's aerobraking phase concluded in 2018, supports daily data transmission from NASA's rovers, enhancing mission efficiency amid the constellation of Mars orbiters that includes Mars Reconnaissance Orbiter (MRO) and Mars Odyssey. TGO's relay function has been essential for maintaining communication continuity, particularly as older orbiters like Odyssey approach resource limits, with TGO handling significant portions of rover data volume—up to several megabits per second during overflights. Scientifically, TGO's atmospheric observations, particularly its non-detection of methane at global scales (upper limits of 0.05 parts per billion by volume or lower), integrate with Curiosity's ground-based measurements to probe discrepancies in trace gas distributions. Curiosity's Tunable Laser Spectrometer has recorded seasonal background levels around 0.4 ppbv and episodic spikes up to 21 ppbv in Gale Crater, suggesting localized sources or rapid vertical mixing not resolvable from TGO's ~400 km orbital altitude. This contrast, confirmed in overlapping temporal windows (e.g., 2018–2019), informs models of methane sinks like hydroxyl radical oxidation and atmospheric transport, with inverse Lagrangian simulations testing hypotheses such as plume dilution aloft to reconcile datasets without invoking widespread biological production. TGO data further synergizes with MAVEN's upper atmospheric escape measurements and MRO's contextual profiling to refine global circulation models, enabling cross-validation of trace gas inventories against surface fluxes inferred from rover in-situ sampling. For instance, TGO's mapping of water vapor and carbon monoxide isotopologues complements Curiosity's boundary-layer data, constraining photochemical models that predict trace gas lifetimes under varying solar conditions. These integrations, archived in NASA's Planetary Data System, facilitate multi-mission analyses that prioritize empirical constraints over speculative origins, highlighting methane's potential geological rather than biogenic dominance given the lack of persistent orbital signals.

Challenges, Criticisms, and Controversies

Technical Failures and Engineering Setbacks

The Schiaparelli entry, , and landing demonstrator module, part of the ExoMars 2016 mission, experienced a during its attempt to land on Mars on October 19, 2016. An erroneous signal from the (IMU), caused by a one-second saturation error during the phase, led the onboard computer to incorrectly estimate the module's altitude and velocity, prompting it to initiate landing procedures prematurely while still approximately 3.7 kilometers above the surface. This triggered the detachment of the parachute and prolonged firing of the backshell thrusters, resulting in uncontrolled rotation and a high-velocity impact at around 500 kilometers per hour, which destroyed the module upon cratering the Meridiani Planum surface. The European Space Agency's inquiry, completed in May 2017, confirmed the issue stemmed from unhandled software interactions between the IMU and navigation systems, highlighting gaps in error-handling protocols for the heritage Viking-era architecture adapted for ExoMars. Subsequent engineering efforts for the rover's entry, descent, and landing (EDL) system revealed persistent challenges with the parachute deployment mechanism, critical for decelerating the 3,000-kilogram capsule from supersonic speeds post-heat shield separation. High-altitude drop tests in 2019, conducted from a C-180 over , , demonstrated that while the pilot and initial main inflated, the primary 16-meter disk-gap-band sustained radial tears due to excessive aerodynamic loads exceeding design margins, necessitating redesigns to reinforce the canopy fabric and suspension lines. These failures, compounded by integration delays in qualifying the parachute control electronics and , forced the postponement of the rover's launch from September 2020 to March 2022, as insufficient time remained for qualification under the original schedule. Further setbacks emerged in 2021 drop tests, where the parachute system failed to achieve stable deployment under simulated Martian entry conditions, with issues traced to release mechanisms and dynamic stability at Mach 1.7–2.0 speeds, prompting iterative redesigns and additional ground-based wind tunnel validations. These EDL vulnerabilities, rooted in the mission's ambition to achieve precise landing in Oxia Planum without reliance on prior Mars atmospheric data refinements, underscored broader engineering risks in scaling unproven supersonic deceleration technologies for heavier payloads compared to predecessors like NASA's Curiosity rover. Despite partial resolutions by mid-2025, the cumulative testing shortfalls contributed to the mission's effective reset, with ESA pursuing independent qualification absent Russian contributions.

Cost Overruns and Resource Allocation Debates

The ExoMars program, particularly its Rosalind Franklin rover component, has incurred substantial cost overruns driven by repeated delays, technical redesigns, and the abrupt end to Russian collaboration. Originally conceived with a joint ESA-Roscosmos budget capped at 1 billion euros in 2011, the mission's expenses ballooned as development hurdles mounted, including parachute failures and instrumentation redesigns that pushed costs to around €1 billion by late 2019. Each major postponement, such as the 2020 shift from a 2020 to 2022 launch window, added approximately €100 million in sustaining and rework expenses. The total program cost has exceeded $1.3 billion as of 2025, encompassing the Trace Gas Orbiter, failed Schiaparelli lander, and rover elements. The 2022 prompted ESA to terminate involvement, which had supplied the lander and proton launcher, forcing a full of entry, descent, and landing systems. This pivot included a 522 million contract awarded to in 2024 for a new landing platform, alongside sourcing alternative propulsion from for rover sterilization. ESA member states endorsed these changes via a 16.6 billion ministerial budget in November 2022, allocating funds to "revamp" ExoMars by replacing and aiming for a launch. Proponents within ESA framed this as a necessary safeguard for Europe's independent Mars exploration capabilities, arguing that forgoing the would forfeit sunk investments exceeding 1 billion s and unique subsurface . Resource allocation debates have intensified among ESA's 22 member states, with critics questioning the prioritization of ExoMars amid fiscal pressures and competing programs like or climate monitoring. Early concerns from delegates in 2011 highlighted risks of the budget cap eroding scientific quality, potentially favoring over . The European Foundation critiqued ESA's model in 2012 for excluding post-mission exploitation costs, arguing it inefficiently allocates resources by underfunding of ExoMars outputs despite high upfront expenditures. Some observers, including policy analysts, contend the overruns reflect systemic issues in multinational consortia, such as optimistic initial estimates and over-reliance on foreign partners, diverting funds from more cost-effective missions like orbital . Nonetheless, the 2022 approval—despite a 25% budget hike request—underscored consensus on ExoMars' strategic value for , with and providing outsized contributions to offset overruns.

Geopolitical Risks and Dependency Issues

The ExoMars mission's second phase, involving the Rosalind Franklin rover, depended heavily on Roscosmos for critical components, including the Kazachok landing platform, parachute system for entry, descent, and landing (EDL), and the Proton-M launch vehicle scheduled for a 2022 liftoff. This dependency stemmed from a 2016 bilateral agreement between the European Space Agency (ESA) and Roscosmos, under which Russia would supply approximately 20% of the mission's hardware value, leveraging expertise from prior Soviet-era Mars landings. Such reliance created vulnerabilities to disruptions in international relations, as Russia's control over these elements could delay or halt progress amid political tensions. Russia's full-scale invasion of on February 24, 2022, prompted immediate repercussions for ExoMars. ESA suspended cooperation with on March 17, 2022, citing alignment with sanctions imposed by its Member States on and 's withdrawal of personnel from Europe's in , which affected launches. This decision, unanimously approved by ESA's Council, halted integration of Russian-provided systems and indefinitely postponed the rover's launch, originally targeted for September 2022 after prior delays from technical issues and the . The suspension underscored broader risks of entangling scientific missions with geopolitically volatile partners, where sanctions and retaliatory actions—such as 's refusal to deliver hardware—could jeopardize multi-year investments exceeding €1.5 billion for ESA alone. In July 2022, ESA formally terminated the partnership, upgrading the suspension to a permanent exclusion of elements, which necessitated redesigns for the EDL system and alternative launch options like or Vega-C. Dependency challenges persisted, as replacing Russia's EDL expertise—untested for the rover's mass and derived from the failed 2016 Schiaparelli demonstrator—required validating new European parachutes and shields, potentially adding years and hundreds of millions of euros in costs. By early 2025, ESA awarded a on to develop a new landing platform, substituting the Kazachok module and enabling resumption without Russian input, though launch is now projected no earlier than 2028. These developments highlight ongoing risks of fragility in space exploration, where geopolitical conflicts amplify technical and fiscal dependencies on state-controlled entities.

References

  1. [1]
    ESA - What is ExoMars? - European Space Agency
    The primary goal of the ExoMars programme is to address the question of whether life has ever existed on Mars.<|separator|>
  2. [2]
    ESA - ExoMars - European Space Agency
    The ExoMars programme comprises two missions: the first – the Trace Gas Orbiter – launched in 2016 while the second, carrying the Rosalind Franklin rover, will ...ExoMars Factsheet · ExoMars programme · ExoMars rover · ExoMars 2016 FAQs
  3. [3]
    ESA - ExoMars rover - European Space Agency
    The rover will be the first mission to combine the capability to move across the surface and to study Mars at depth. It will collect samples with a drill down ...
  4. [4]
    ExoMars Factsheet - ESA
    This FAQ serves to answer the current status (as of early 2024) of the ExoMars Rosalind Franklin mission, and the way forward for Europe's exploration efforts ...
  5. [5]
    FAQ: The 'rebirth' of ESA's ExoMars Rosalind Franklin mission
    Mar 13, 2023 · This FAQ serves to answer the current status (as of early 2024) of the ExoMars Rosalind Franklin mission, and the way forward for Europe's exploration efforts ...
  6. [6]
    ExoMars Rosalind Franklin rover will have a European landing ...
    Mar 30, 2025 · Landing on Mars is one of the mission's most critical challenges. From atmospheric entry to landing, the spacecraft's descent will last just six ...
  7. [7]
    ESA - Scientific objectives of the ExoMars Rover
    A major goal of ExoMars is to study ancient (older than 3 billion years) sedimentary rock formations and evaporitic deposits. However, it is only trapped in the ...
  8. [8]
    Robotic Exploration of Mars - ExoMars Trace Gas Orbiter (TGO) - ESA
    Mar 12, 2020 · A key goal of this mission is to gain a better understanding of methane and other atmospheric gases that are present in small concentrations ( ...
  9. [9]
    ExoMars (Exobiology on Mars - 2016 Mission) - eoPortal
    Mar 2, 2016 · The ExoMars 2016 mission aimed to search for life signs, validate landing, gather atmospheric data, and observe Mars for two years.
  10. [10]
    ExoMars: ESA and Roscosmos set for Mars missions
    Mar 14, 2013 · ESA and the Russian federal space agency, Roscosmos, have signed a formal agreement to work in partnership on the ExoMars programme towards the launch of two ...
  11. [11]
    ExoMars 2022 - eoPortal
    Feb 7, 2019 · - The ExoMars program is a joint endeavor between ESA and Roscosmos. In addition to the 2022 mission, it also includes the Trace Gas Orbiter ...
  12. [12]
    Life on Mars? - ExoMars Programme - Case study - GOV.UK
    The missions are in collaboration with Roscosmos, the Russian Space Agency. The main aims of ExoMars are to examine the geological environment on Mars and ...
  13. [13]
    Exomars / Rosalind Franklin - CNES
    Jan 17, 2025 · The Rosalind Franklin Mission (RFM) is now planned to launch in October 2028 and land on Mars end November 2030.<|control11|><|separator|>
  14. [14]
    Europe goes to Mars | The Planetary Society
    Jun 13, 2024 · The second phase of the ExoMars program involved the ESA-Roscosmos partnership landing and operating a Mars rover, referred to as ExoMars 2018, ...
  15. [15]
    European Space Agency cuts ties with Russia on Mars rover mission
    Jul 13, 2022 · Now, the ESA Council has officially cut ties with Roscosmos on this joint project as a result of the war in Ukraine and ongoing sanctions, ESA's ...
  16. [16]
    ESA Gets Big Increase, Commits to ISS Through 2030 and ExoMars ...
    Nov 23, 2022 · France, Germany and Italy, ESA's three largest contributors, agreed today to fully support Ariane 6, Vega-C, and an Italian reusable vehicle ...
  17. [17]
    NASA, ESA Formalize Expanded Cooperation on ESA's Mars Rover
    May 16, 2024 · The rover is the second half of the ExoMars program that was a partnership between ESA and Russia's space agency Roscosmos. The first half ...
  18. [18]
    NASA, ESA join forces on life-hunting ExoMars rover - Space
    May 17, 2024 · U.S. contributions. Here's the new deal for ExoMars: NASA's Launch Services Program will procure a commercial U.S. rocket to launch Rosalind ...
  19. [19]
    ESA - Aurora's origins - European Space Agency
    As a result of this challenge, in 2001 ESA set up the Aurora Programme. The primary objective of Aurora is to create, and then implement, a European long-term ...
  20. [20]
    (PDF) Development of the ESA ExoMars rover - ResearchGate
    The ExoMars concept started as a part of ESA's Aurora Programme in 2001 (Van Winnendael, Baglioni, and Vago 2005) . Since then, ExoMars has gone through many ...
  21. [21]
    ESA Optimistic on Funding for Enhanced ExoMars Mission
    Jan 19, 2023 · ESA governments in 2005 agreed to spend 650 million euros on the original ExoMars mission, but program managers and scientists subsequently ...Missing: initial planning
  22. [22]
    European ministers approve the Aurora Exploration Programme and ...
    Dec 12, 2005 · In Berlin, 14 countries agreed to subscribe to the ExoMars mission: the twelve countries from the preparatory phase were joined by Denmark and ...Missing: details | Show results with:details
  23. [23]
    [PDF] ExoMars Mission Overview and Status - ESA Science & Technology
    Apr 21, 2006 · ❑ The current Scientific. Instruments mass is 12.5 kg, thus exceeding the 8 kg allocation. If necessary, Instruments from the aside list ...
  24. [24]
    The ExoMars Rover - Overview of Phase B1 Results - ResearchGate
    A core part of the mission is a Mars Rover, capable to acquire subsurface soil samples from down to 2 metres and analyze them on board.
  25. [25]
    Robotic Exploration of Mars - Key milestones in the ExoMars ... - ESA
    Key milestones in the ExoMars Programme. 2008. February (planned): Kick-off Phase 2B contracts for the Enhanced ExoMars mission. Phase B2 will conclude with the ...Missing: history 2005-2010
  26. [26]
    ESA - Aurora's roadmap to Mars - European Space Agency
    2007 – an entry vehicle demonstrator mission to validate and demonstrate high-speed re-entry technology · 2009 – ExoMars, an exobiology mission to send a rover ...
  27. [27]
    ESA Formally Invites Roscosmos To Join ExoMars Mission as Full ...
    Oct 13, 2011 · NASA has since informed ESA that its budget outlook is too clouded to be able to commit to the 2016 launch and the still-planned 2018 launch, ...
  28. [28]
    ExoMars Program - NASA Science
    Nov 30, 2017 · ESA's (European Space Agency) Exobiology on Mars program is a series of missions designed to understand if life ever existed on Mars.
  29. [29]
    At Paris Air Show, ESA Signs Final Contract for 2016 ExoMars Mission
    The European Space Agency (ESA) on June 17 signed the final industrial contract needed to complete ESA's work on a 2016 ...
  30. [30]
    ESA - Call for Media: ExoMars 2016 leaving Europe for launch site
    Nov 16, 2015 · The spacecraft will be launched on a Russian Proton rocket during the 14–25 March 2016 window, arriving at Mars in October 2016. TGO will take a ...
  31. [31]
    ExoMars rover mission delayed to late 2022 - SpaceNews
    Mar 12, 2020 · The ExoMars Rosalind Franklin rover mission will not launch in 2020 due to a lack of time to test and qualify problematic parachutes and electronics vital to ...
  32. [32]
    European Mars rover delayed until 2022 | Science | AAAS
    Multiple technical issues will delay the launch of the ExoMars mission for 2 years until 2022, the European Space Agency (ESA) and its Russian counterpart, ...
  33. [33]
    Launch of ExoMars rover delayed to 2022 - Spaceflight Now
    Mar 12, 2020 · The ExoMars mission will take off during the next Mars launch window between August and October 2022, officials said.
  34. [34]
    ESA - ExoMars suspended - European Space Agency
    Mar 17, 2022 · acknowledged the present impossibility of carrying out the ongoing cooperation with Roscosmos on the ExoMars rover mission with a launch in 2022 ...
  35. [35]
    Europe ending cooperation with Russia on ExoMars rover - Space
    Jul 13, 2022 · It's official: Russia will no longer be part of Europe's life-hunting Mars rover mission, which is scheduled to launch in the late 2020s.
  36. [36]
    Europe's first Mars rover mission saved by major investment - Nature
    Nov 23, 2022 · The ExoMars programme was imperilled after the European Space Agency cut ties with its former partner Russia.<|separator|>
  37. [37]
    Long-delayed ExoMars mission still dreams of 2028 launch - Phys.org
    Feb 3, 2023 · But the European Space Agency still hopes the mission can launch in 2028 on its long-delayed quest to search for extraterrestrial life on the ...
  38. [38]
    Europe's quest to finally land on Mars takes another turn
    Mar 31, 2025 · The ExoMars mission represents Europe's third attempt to land successfully on Mars, and at a cost of more than $1.3 billion.
  39. [39]
    ESA awards contract to Thales Alenia Space to restart ExoMars
    Apr 10, 2024 · The European Space Agency awarded a contract to a consortium of companies to resume work on a Mars rover mission that was derailed two years ago by geopolitics.
  40. [40]
    ExoMars/TGO Science Orbit Design - AIAA ARC
    Aug 16, 2012 · This paper describes the development of the science orbit for the 2016. ESA/NASA collaborative ExoMars/Trace Gas Orbiter (TGO) mission. The.Missing: function | Show results with:function<|separator|>
  41. [41]
    ESA - Trace Gas Orbiter instruments - European Space Agency
    TGO has four suites of science instruments: ACS (Atmospheric Chemistry Suite), CaSSIS (Colour and Stereo Surface Imaging System), FREND (Fine Resolution ...
  42. [42]
    NOMAD, an Integrated Suite of Three Spectrometers for the ...
    Jun 19, 2018 · NOMAD, the “Nadir and Occultation for MArs Discovery” spectrometer suite, was selected as part of the payload of the ExoMars 2016 Trace Gas ...
  43. [43]
    NOMAD spectrometer on the ExoMars trace gas orbiter mission
    NOMAD consists of two infrared channels and one ultraviolet and visible channel allowing the instrument to perform observations quasi-constantly, by taking ...Missing: details | Show results with:details
  44. [44]
    ESA - ExoMars/TGO operations - European Space Agency
    TGO features a sophisticated radio relay capability provided by NASA. The Electra system is a telecommunications package that acts as a communications relay and ...Missing: parameters | Show results with:parameters
  45. [45]
    ESA's 2016 ExoMars Orbiter - NASA
    Trace Gas Orbiter seeks to detect methane and other gases that may be present in small concentrations in the Martian atmosphere.
  46. [46]
    ExoMars Spacecraft Flight Path to Mars - The Planets Today
    Aerobraking phase (Trace Gas Orbiter lowers its altitude to 400 km circular orbit), January 2017 - November 2017. Trace Gas Orbiter science operations begin.
  47. [47]
    Trace Gas Orbiter Captures New Images of Interstellar Object 3I ...
    Oct 8, 2025 · During its closest approach to Mars on October 3, 2025, 3I/ATLAS was 30 million km away from ESA's ExoMars Trace Gas Orbiter (TGO).
  48. [48]
    [PDF] EXOMARS 2016 - Schiaparelli Anomaly Inquiry
    May 18, 2017 · The EDM was conceived with the objective to validate and demonstrate entry, descent and landing on Mars in preparation for the ExoMars 2020 ...Missing: lander | Show results with:lander
  49. [49]
    The ExoMars Schiaparelli Entry, Descent and Landing Demonstrator ...
    Jul 27, 2022 · 1 Introduction. Schiaparelli originated from the ExoMars programmatic objective for the development, in-flight and in situ demonstration of ...
  50. [50]
    ExoMars lander module named Schiaparelli - ESA
    Nov 8, 2013 · The entry, descent and landing demonstrator module that will fly on the 2016 ExoMars mission has been named 'Schiaparelli' in honour of the Italian astronomer ...
  51. [51]
    Schiaparelli to make Europe's second Mars landing attempt
    Oct 22, 2016 · They include a special material for thermal protection, a parachute system, a radar Doppler altimeter system and liquid-propellant braking ...
  52. [52]
    [PDF] Aerothermal Loads Measured During Martian Entry of the ExoMars ...
    The instrumentation package COMARS+ was developed to measure aerothermal parameters on the back cover of the ExoMars Schiaparelli lander during Martian entry.Missing: specifications | Show results with:specifications
  53. [53]
    Schiaparelli: the ExoMars Entry, Descent and Landing Demonstrator ...
    Schiaparelli will be designed to be capable of landing on a terrain with rocks as high as 40 cm and slopes as steep as 12.5°. The ExoMars Schiaparelli Design.Missing: specifications | Show results with:specifications
  54. [54]
    Spacecraft of ExoMars 2016 mission - eoPortal
    Launch: The European-Russian ExoMars (TGO and the EDM Schiaparelli lander) satellite was launched on March 14, 2016 (09:31 GMT) on a Proton-M/Briz vehicle from ...<|separator|>
  55. [55]
    ExoMars-2016 Mars landing - RussianSpaceWeb.com
    On October 19, 2016, exactly at the time when its mother ship was entering orbit around Mars, the 577-kilogram Schiaparelli lander attempted a six-minute ...
  56. [56]
    European Mars lander released from ExoMars mothership
    Oct 17, 2016 · Schiaparelli deployed from a pod on its carrier craft, an instrument-laden satellite heading into orbit around Mars, as scheduled at 1442 ...
  57. [57]
    Schiaparelli landing investigation completed - ESA
    May 24, 2017 · The inquiry into the crash-landing of the ExoMars Schiaparelli module has concluded that conflicting information in the onboard computer caused the descent ...
  58. [58]
    Schiaparelli: Crashed lander was ill-prepared for Mars - BBC News
    Jun 18, 2017 · The crashed European spacecraft Schiaparelli was ill-prepared for its attempt at landing on the surface of Mars, a report suggests.
  59. [59]
    ExoMars Trace Gas Orbiter and Schiaparelli Mission (2016)
    The Trace Gas Orbiter will also be used to relay data for the 2022 rover mission of the ExoMars programme.Missing: parameters function
  60. [60]
    European Mars Lander Crashed Due to Data Glitch, ESA Concludes
    May 27, 2017 · The reason Europe's Schiaparelli Mars lander failed to touch down safely last fall is that conflicting data confused the craft's onboard computer.
  61. [61]
    Martian methane mystery: First results from the ExoMars Trace Gas ...
    Apr 11, 2019 · Reports of methane in the martian atmosphere have been intensely debated because detections have been very sporadic in time and location, and ...<|control11|><|separator|>
  62. [62]
    Scientists Closer to Explaining Mars Methane Mystery - NASA
    Jun 29, 2021 · But ESA's (the European Space Agency) ExoMars Trace Gas Orbiter hasn't detected any methane higher in the Martian atmosphere. “When the Trace ...
  63. [63]
    Comprehensive investigation of Mars methane and organics with ...
    Mar 15, 2021 · Here we present the results of an extensive search for hydrocarbons in the Martian atmosphere in 240,000 solar occultation measurements ...
  64. [64]
    Streaks on Mars – To Mars and back - ESA's blogs
    May 19, 2025 · Our Trace Gas Orbiter can capture how the sun glints off the surface at all times of day, allowing us to study surface properties such as the ...
  65. [65]
    Composition and Chemistry of the Martian Atmosphere as Observed ...
    Sep 24, 2024 · ... ExoMars Trace Gas Orbiter launched in 2016. Both missions are still providing high-quality data about the atmosphere of Mars, such as ...
  66. [66]
    All instruments onboard Rosalind Franklin rover - ESA
    Aug 20, 2019 · In addition to the cameras, spectrometers, drill and analytical lab, the rover also has sub-surface sounding radar and neutron detector. “Our ...
  67. [67]
    Robotic Exploration of Mars - The ExoMars Rover Instrument Suite
    Mar 12, 2020 · Data from the novel suite of instruments on-board the ExoMars rover will help scientists to conduct a step-by-step exploration of Mars.
  68. [68]
    Mission to explore life on Mars one step closer as UK team to ...
    Nov 23, 2023 · The UK team developing Enfys, led by the University of Aberystwyth, will replace the Russian-built Infrared Spectrometer for ExoMars ( ISEM ).
  69. [69]
    Rosalind Franklin ExoMars Rover - NASA Astrobiology
    The Rosalind Franklin rover aims to establish if life ever existed on Mars, using a drill and cameras to collect samples and look for organics.
  70. [70]
    Airbus to design and build ESA's ExoMars rover lander platform
    Mar 29, 2025 · The ExoMars landing system will need to slow the landing platform from 45m/s at the end of the parachute descent phase to less than 3m/s before ...
  71. [71]
    Parachute problems could delay Europe's ExoMars rover launch to ...
    Mar 4, 2020 · The ExoMars rover's two big parachutes failed multiple high-altitude drop tests in 2019, when they sustained significant damage as they ripped ...Missing: challenges | Show results with:challenges
  72. [72]
    ExoMars 2020: progress and challenges - ESA
    Jun 28, 2019 · The descent module needs two parachutes – each with its own pilot chute for extraction – to help slow the craft prior to landing. Following ...
  73. [73]
    ExoMars Rosalind Franklin: Rover mission delayed until 2022 - BBC
    Mar 12, 2020 · Launching in late 2022 means the rover will touch down in 2023, given the cruise time to the Red Planet. NASA/JPL/University of Arizona Oxia ...
  74. [74]
    [PDF] ExoMars 2022 Mission Brief description of the rover and surface ...
    Nov 30, 2020 · The nominal duration of the rover search-for-signs-of-life mission is 218 sols. In contrast to the. SP, rover operations require twice-daily ...
  75. [75]
    ESA - Moving on Mars - European Space Agency
    The rover is designed to calculate navigation solutions autonomously and safely travel approximately 100 m per sol, or martian day. Rosalind the rover is ...
  76. [76]
    First deep drilling success for ExoMars - ESA
    Sep 15, 2021 · The Rosalind Franklin rover is designed to drill deep enough, up to two metres, to get access to well-preserved organic material from four ...
  77. [77]
    ESA - Landing site - European Space Agency
    Oxia Planum contains one of the largest exposures of rocks on Mars that are around 3.9 billion years old and clay-rich, indicating that water once played a role ...
  78. [78]
    Oxia Planum: The Landing Site for the ExoMars “Rosalind Franklin ...
    The European Space Agency (ESA) and Roscosmos ExoMars mission will launch the “Rosalind Franklin” rover in 2022 for a landing on Mars in 2023.
  79. [79]
    The high-resolution map of Oxia Planum, Mars; the landing site of ...
    Mar 22, 2024 · This 1:30,000 scale geological map describes Oxia Planum, Mars, the landing site for the ExoMars Rosalind Franklin rover mission.
  80. [80]
    Fresh rockfalls near the landing site of ExoMars Rosalind Franklin ...
    Aug 21, 2025 · As a part of the ExoMars program, the European Space Agency (ESA) will launch the Rosalind Franklin (RF) Rover in 2028 with the goal of ...
  81. [81]
    Landing site for Rosalind Franklin rover may be ripe with ... - Space
    part of ESA's ExoMars program — is scheduled to launch in 2028 after facing years of setbacks. In ...
  82. [82]
    Investigating the Oxia Planum subsurface with the ExoMars rover ...
    Jun 1, 2023 · The ExoMars Rosalind Franklin rover is equipped with a drill able to collect samples from a maximum depth of 2 m for the first time on Mars.
  83. [83]
    [PDF] EXOMARS/ROSALIND FRANKLIN MISSION UPDATE. E. Sefton ...
    In a new partnership with NASA, RFM is on schedule for launch in the latter part of 2028 and landing at Oxia. Planum in 2030. Figure 1: Artist's view of the ...<|separator|>
  84. [84]
    ExoMars drop-test of martian parachutes at Esrange Space Center
    Jul 22, 2025 · The mission is now targeting a 2028 launch, with the Rosalind Franklin rover expected to land on Mars in 2030. The primary goal is to search ...
  85. [85]
    Rosalind Franklin Mission - Sener
    Search for life on Mars. Rosalind Franklin is a rover designed to look for traces of life on Mars by doing advanced scientific research on the planet's surface.
  86. [86]
    Journey to Mars: Rosalind Franklin Rover's Quest for Life
    The Rosalind Franklin rover will go to Mars in 2028 to look for life. Oxia Planum is a safe, flat region, selected as its landing place. Why Oxia Planum?<|separator|>
  87. [87]
    First results from the ExoMars Trace Gas Orbiter - ESA
    Apr 10, 2019 · Reports of methane in the martian atmosphere have been intensely debated because detections have been very sporadic in time and location, and ...
  88. [88]
  89. [89]
    ExoMars discovers new gas and traces water loss on Mars - ESA
    Feb 10, 2021 · The ESA-Roscosmos ExoMars Trace Gas Orbiter has detected a new gas. The spacecraft is also providing new information about how Mars is losing its water.
  90. [90]
    Transient HCl in the atmosphere of Mars | Science Advances
    Feb 10, 2021 · HCl has never been observed in the atmosphere of Mars but has been suggested and sought as an indicator of active magmatic processes (3).
  91. [91]
    Relationships Between HCl, H2O, Aerosols, and Temperature in the ...
    Aug 27, 2024 · The detection of hydrogen chloride (HCl) in the atmosphere of Mars was among the primary objectives of the ExoMars Trace Gas Orbiter (TGO) ...Abstract · Plain Language Summary · Results · Discussion
  92. [92]
    Global Vertical Distribution of Water Vapor on Mars ... - AGU Journals
    Sep 15, 2022 · Global vertical distribution of water vapor on Mars retrieved from 3.5 years of TGO/NOMAD science operations, presented in Aoki et al., 2022.
  93. [93]
    Water heavily fractionated as it ascends on Mars as revealed by ...
    Feb 10, 2021 · From measurements performed with ExoMars/NOMAD, we observe marked and rapid variability of the D/H along altitude on Mars and across the whole planet.
  94. [94]
    Unusual carbon balance at Mars explained by sunlight, finds ExoMars
    May 31, 2023 · The ExoMars Trace Gas Orbiter (TGO) has revealed how oddly 'light' carbon monoxide forms in Mars' atmosphere.
  95. [95]
    Climatology of the CO vertical distribution on Mars based on ACS ...
    We present the first climatology of the CO vertical distribution lasting more than one Martian year based on solar occultations by the. ExoMars Trace Gas ...
  96. [96]
    ExoMars orbiter continues hunt for key signs of life on Mars - ESA
    Jul 20, 2021 · TheESA-Roscosmos Trace Gas Orbiter has set new upper limits on how much methane, ethane, ethylene and phosphine is in the martian atmosphere.
  97. [97]
    Questioning the Reliability of Methane Detections on Mars by the ...
    Apr 13, 2025 · For the past two decades, several reports of methane detections on Mars have sparked interest about the possibility of life beyond Earth.Abstract · Introduction · The SAM-TLS Instrument and... · Methane Contamination...
  98. [98]
    ExoMars Finds That The Unusual Carbon Balance At Mars ...
    Nov 3, 2023 · The ExoMars Trace Gas Orbiter (TGO) has revealed how oddly 'light' carbon monoxide forms in Mars' atmosphere. The finding paints a better ...
  99. [99]
    First Detection Of Ozone In The Mid-infrared At Mars
    Jun 16, 2020 · The ExoMars Trace Gas Orbiter (TGO) was sent to Mars in March 2016 to search for trace gases diagnostic of active geological or biogenic ...
  100. [100]
    Robotic Exploration of Mars - TGO's search for methane on Mars - ESA
    The ExoMars Trace Gas Orbiter's first analysis of the martian atmosphere at various points around the globe finds an upper limit of methane 10–100 times less ...Missing: integration | Show results with:integration
  101. [101]
    ESA's Mars orbiters did not see latest Curiosity methane burst
    Nov 13, 2019 · The ESA-Roscosmos Trace Gas Orbiter (TGO), the most sensitive detector for trace gases at Mars, also did not detect any methane while flying ...Missing: conjunction | Show results with:conjunction
  102. [102]
    Can Curiosity and TGO be Both Correct About Methane on Mars?
    We use an inverse Lagrangian transport model to test if this proposed solution could reconcile the discrepancy between Curiosity and TGO, and if yes, what could ...
  103. [103]
    ExoMars Archive - PDS Atmospheres Node
    Feb 12, 2025 · On 19 October, the Trace Gas Orbiter was inserted into an elliptical orbit around Mars. In January 2017, the orbit was adjusted to 74°relative ...Missing: details | Show results with:details
  104. [104]
    TGO's search for methane on Mars - ESA
    Apr 10, 2019 · The difference between TGO's dataset and that of NASA's Curiosity, which previously reported a seasonal background variation of methane, is ...
  105. [105]
    ESA: Mars lander crash caused by 1-second inertial measurement ...
    Nov 23, 2016 · The European Space Agency on Nov. 23 said its Schiaparelli lander's crash landing on Mars on Oct. 19 followed an unexplained saturation of its inertial ...
  106. [106]
    European Mars rover in a 'race against time' to fix parachutes | Science
    Nov 26, 2019 · When the approaching spacecraft first hits the thin martian atmosphere, drag on its heat shield slows it from 21,000 to 1700 kilometers per hour ...
  107. [107]
    Europe's ExoMars rover launch delayed to 2022 due to parachute ...
    Mar 12, 2020 · European and Russian space leaders have decided to postpone the launch of the ExoMars rover until 2022 due to issues with its parachutes and ...Missing: EDL | Show results with:EDL
  108. [108]
    Europe's ExoMars parachute still experiencing problems in drop test
    Jul 2, 2021 · In the case of ExoMars, the capsule will first use its heat shield to slow down before deploying the supersonic parachute. After decelerating ...
  109. [109]
    ExoMars parachutes ready for martian deployment - Phys.org
    Jul 21, 2025 · The most complex parachute system to ever deploy on Mars has successfully slowed down an ExoMars mock-up landing platform for a safe touchdown ...
  110. [110]
    French Concerns Throw ExoMars Plan Into Doubt - SpaceNews
    Jun 21, 2011 · With the entire ExoMars mission budget capped by ESA governments at 1 billion euros ($1.4 billion), d'Escatha said CNES is worried that the ...
  111. [111]
    Race against time to launch Europe's troubled mission to Mars
    Dec 15, 2019 · ExoMars will first use a heat shield to slow its approach to Mars from 21,000 to 1,700kph. Then a 15-metre wide parachute will be deployed to ...
  112. [112]
    NASA and ESA complete agreement for cooperation on Mars rover ...
    May 17, 2024 · ESA is now developing its own landing system for the rover, awarding a contract worth 522 million euros ($566 million) to Thales Alenia Space ...
  113. [113]
    Europe's record-breaking space budget to save ExoMars rover
    Nov 24, 2022 · ESA approved a record-breaking nearly 17 billion Euro budget that will, among others, help cover the cost of rebuilding the landing platform of the beleaguered ...
  114. [114]
    For ESA, a good enough budget - The Space Review
    Nov 28, 2022 · ESA's final proposal to its member states sought a little more than 18.5 billion euros (US$19.1 billion) over three years, more than 25% above ...
  115. [115]
    European Science Foundation Questions ExoMars, ISS Funding ...
    Oct 29, 2012 · The ESF is not the first to criticize the fact that ESA's convention prohibits the agency from funding data analysis and exploitation of science ...
  116. [116]
    NASA Requests Funding for ExoMars While Warning MSR Costs ...
    Mar 13, 2023 · NASA rescoped the project for launch in 2028, but the cost doubled to $1.2 billion for development. The FY2024 request includes funding to keep ...
  117. [117]
    ESA suspends work with Russia on ExoMars mission - SpaceNews
    Mar 17, 2022 · ESA has formally halted plans to launch its ExoMars mission on a Russian rocket in September in response to Russia's invasion of Ukraine.Missing: replanning | Show results with:replanning
  118. [118]
    Secrets of ExoMars - The Space Review
    Oct 2, 2023 · ExoMars. ESA decided to cancel cooperation with Roscosmos on ExoMars just days after the invasion of the Ukraine, and weeks before the ...<|separator|>
  119. [119]
    European Space Agency suspends Mars mission with Russia - CNN
    Mar 17, 2022 · The decision to suspend cooperation with Roscosmos on the project was made unanimously by ESA's ruling council, which met in Paris on Wednesday ...
  120. [120]
    European space agency suspends Mars mission with Russia
    Mar 17, 2022 · The European Space Agency has confirmed that it's indefinitely suspending its ExoMars rover mission with partner Roscosmos, Russia's state space corporation.
  121. [121]
    European Space Agency Cuts Ties With Russia on Its Mars Mission
    Jul 12, 2022 · The European Space Agency is formally ending its partnership with Russia on a rover mission to explore the surface of Mars.
  122. [122]
    How Russia's war in Ukraine almost derailed Europe's Mars rover
    Jun 27, 2023 · After Russia's invasion of Ukraine, Roscosmos was summarily cut out of the ExoMars project, taking with it the rocket that was to deliver the Rosalind Franklin ...
  123. [123]
    Airbus wins contract for ExoMars lander platform - SpaceNews
    Mar 28, 2025 · ... Space will build the landing platform for ESA's ExoMars rover, replacing a critical component originally to be provided by Russia.Missing: alternatives | Show results with:alternatives
  124. [124]
    Airbus replaces Russian space agency in search for life on Mars - BBC
    Mar 31, 2025 · Airbus Defence and Space has replaced a Russian corporation in a European project to search for signs of life on Mars.Missing: geopolitical dependency