Passing loop

A passing loop, also known as a passing siding in n terminology, is a short section of parallel secondary track on a single-line railway that enables one to pass or meet another traveling in the opposite without collision. These loops are essential for efficient operations on single-track networks, which constitute approximately 70% of principal mainlines in , allowing bidirectional traffic without the need to double-track the entire route. Passing loops are typically positioned at or near stations and designed to accommodate the longest trains expected on the line, ensuring full clearance of the main track during passes. Operationally, they rely on signaling systems, such as token-based controls in the UK or track warrants issued by dispatchers in the US, to coordinate train movements and prevent conflicts; for instance, one train may halt in the loop while the opposing train proceeds on the main line. In regions with high freight or passenger volumes, the strategic placement and length of these loops directly impact capacity, delay recovery, and overall network reliability, often requiring engineering considerations for curves, gradients, and integration with adjacent infrastructure.

Definition and Purpose

Basic Concept

A single-track railway consists of a single line of track shared by trains traveling in both directions, in contrast to a , which provides separate parallel tracks for each direction to allow continuous movement without interruption. This configuration is common on lower-traffic lines where cost constraints make full double-tracking impractical, but it requires mechanisms to manage opposing or overtaking traffic safely. A passing loop, also known as a passing siding, is a section of auxiliary track parallel to the main single track, connected at both ends to enable two trains to pass each other without halting operations across the entire line. Its primary purpose is to facilitate the crossing of trains moving in opposite directions or the of slower trains on single-track railways, as well as on tramways and systems where similar constraints apply. Key components include points (or switches) at each end to divert trains onto the loop, signaling systems to control movements and prevent collisions, and a sufficient to accommodate at least one full , typically ranging from 1,800 to 2,300 meters in modern networks to handle standard freight or passenger consists. In operation, one pulls into the passing loop via the switches, allowing the other to proceed unimpeded on the main , with signals ensuring clear paths and adherence to speed restrictions during the . This setup maintains line while minimizing delays, though the loop's effectiveness depends on its strategic placement and integration with overall signaling infrastructure. Loops often incorporate platforms for passenger convenience at stations, enhancing accessibility during stops.

Historical Development

The passing loop originated in the early as a practical solution for managing train movements on single-track railways, where cost constraints limited the construction of double tracks. The , the world's first public railway to use steam locomotives for both passengers and freight, opened in 1825 as a single-track line spanning 26 miles with passing loops at intermediate stations to facilitate train crossings. In the United States, early railroads like the Delaware and Hudson Canal Company's operated a single-track line in 1829 with inclined planes worked by stationary engines. These early implementations addressed bottlenecks on single-track sections, allowing opposing trains to pass safely while prioritizing the economic benefits of reduced land and material requirements over full duplication. The 1830s and 1840s saw the proliferation of single-track lines during the initial railway booms in and America, necessitating standardized passing arrangements. The opening of numerous single-track routes around 1830, such as extensions of early American lines like the , highlighted the essential role of loops in enabling scheduled operations without constant delays. In , the Railway Mania of the 1840s led to authorize hundreds of miles of single-track railways, as seen in the rapid approval of over 1,500 miles of track between 1836 and 1840. Colonial expansions amplified this trend; in , the first railway from Bombay to opened in 1853 as a 21-mile single-track line for bidirectional traffic to minimize construction costs in resource-limited territories. Similarly, Australia's inaugural public railway, a short line in launched in 1854 by the Melbourne and Hobson's Bay Railway Company, served local passenger and goods traffic economically. A pivotal advancement came in the with signaling improvements, including the introduction of electric telegraphs and the absolute block system, which coordinated train movements into fixed sections and enhanced safety at passing loops by preventing collisions on single lines. In the , passing loops integrated with more sophisticated signaling technologies, evolving from manual telegraphs to automated systems that optimized single-track efficiency. Post-1900 developments, such as electro-pneumatic and permissive signaling, allowed loops to handle increased traffic volumes on mixed passenger-freight routes, as documented in early 20th-century reports. Following , electrification efforts in , particularly in countries like and , revitalized some single-track lines by enabling higher-speed operations through upgraded loops, though this often coincided with selective double-tracking on busier corridors. Entering the , passing loops have declined in developed nations as double-tracking projects eliminate single-track constraints on high-demand routes, reducing reliance on sidings for . However, they persist in rural and remote areas, including segments of Amtrak's long-distance services where single-track with passing loops accommodates freight and limited upgrades.

Track Configurations

Main and Loop with Platform

In the main and loop with platform configuration, the primary main track runs parallel to an adjacent track, with both equipped with dedicated platforms of sufficient to serve trains. This double-ended siding arrangement connects to the single main line at both ends via turnouts, allowing a stopping to enter the loop while a through train continues on the main track. Platforms typically extend the full length of the loop to facilitate boarding and alighting, promoting efficient use of station facilities in remote or intermediate locations on single-track lines. This design offers key advantages by enabling express or faster trains to overtake services without halting passenger operations on the loop platform, thereby minimizing delays and enhancing overall line capacity. It is particularly suited to mixed-traffic routes where stops must balance with through-running demands, as seen in configurations separating stopping tracks from passing tracks to maintain and speed. Coordinated signaling, including and starting signals at each end, ensures that only one enters the section at a time, with overlaps beyond the signals to prevent collisions during passing maneuvers. A representative example appears at Williton station on the , a heritage line, where the passing loop includes two platforms serving as the primary crossing point for opposing trains on the single-track section. Loop lengths are generally sized to hold the longest operational train, often exceeding 200 meters in heritage and regional applications for operational flexibility. Modern stations incorporate surfaces on platforms—using corduroy hazard patterns at edges and platform-to-train gaps—to meet accessibility standards for visually impaired users.

Platform Road and Through Road without Platform

In railway passing loop configurations featuring a and without , the designates the looped equipped with passenger facilities, such as a station , enabling stopping trains to board and alight while occupying the loop. Conversely, the through functions as the primary mainline , optimized for uninterrupted high-speed transit and lacking any infrastructure to avoid delays for non-stopping services. This arrangement proves ideal for lines supporting mixed traffic patterns, including semi-express operations where local or slower trains halt on the platform road to permit faster express trains to overtake seamlessly on the through road, thereby minimizing schedule disruptions for priority services. Design considerations emphasize efficiency and safety: the through road is generally aligned straighter with superior grading to support elevated speeds, whereas the platform road may include minor curvature to accommodate positioning. Additionally, the through road often avoids steep gradients where feasible to maintain momentum for passing trains. Such setups were prevalent on early 20th-century single-track branch lines in the United States, including those of the , where passing sidings integrated with platforms facilitated operational meets on secondary routes like the Petersburg Branch. In contemporary urban environments, integration of environmental measures on the through road, such as noise barriers, aligns with regulations under the Environmental Noise Directive, which mandates action plans to mitigate rail noise exposure where Lnight exceeds 50 dB(A) or Lden exceeds 55 dB(A) in populated areas.

Up and Down Working

In railway operations, particularly in systems derived from practices, the "up" direction refers to the route towards a principal or major urban center, while the "down" direction refers to the route away from it. Passing loops enable safe crossings for operating in these opposing directions on single-track sections, where one pulls into the loop to allow the opposing to proceed unimpeded on the main line. This configuration ensures bidirectional without collision , with loops typically positioned at intervals based on schedules and . Procedural coordination relies on token-based or signal-controlled systems to authorize movements. In token systems, prevalent on single lines, the block token—representing authority for the entire section—is issued to the train designated to enter the loop, preventing any other train from accessing the section until the crossing is complete and the token is returned at the far end. Signals or staff then guide the waiting train back onto the main line, and if the timetable requires, the up and down roles can reverse for the next pair of trains, with the previously main-line train now using the loop in the adjacent section. Absolute block signaling is essential for these operations, dividing the line into protected blocks and using instruments like electric token blocks or staff-and-ticket systems to enforce occupancy rules. During loop occupation, points are electrically or mechanically locked to maintain the 's position and prohibit conflicting routes, ensuring the section remains secure for the approaching . Such working is a cornerstone of single-line operations in British and railways, where it supports efficient scheduling on resource-constrained networks. In , for instance, section controllers oversee these crossings via VHF radio communications, issuing real-time instructions to loco pilots and station staff to synchronize arrivals at passing loops. European networks have integrated digital enhancements, with the Global System for Mobile Communications – Railway () rolled out from the early 2010s to improve coordination through dedicated radio channels for train-to-control voice and exchange, reducing reliance on fixed lines and enhancing reliability during crossings. In left-hand traffic regions like the , loop designs accommodate entry from the outer side for both directions to align with standard running rules.

Overtaking Siding

An siding is a specialized of a on single-track railways, designed primarily to enable faster to slower ones traveling in the same direction without halting the mainline operation. Unlike general passing sidings used for meetings of opposing , overtaking sidings feature a double-ended layout that allows the slower to pull clear of the main from either end, minimizing reversal maneuvers. These sidings are typically longer than standard ones—often exceeding the of the longest expected by 50-100%—and incorporate alignments with reduced and optimized gradients to support higher speeds on the main line during the . This design facilitates efficient throughput on lines where speed differentials between types are common. Typical lengths accommodate up to 2000 meters on mainlines, per UIC standards. Operationally, the slower train receives a signal to enter the siding, fully clearing the main to allow the faster to at its operational speed. Signaling systems, such as absolute block or , coordinate the movement by enforcing speed restrictions and ensuring adequate clearance distances, preventing rear-end collisions while accounting for braking and times. The siding must accommodate the combined lengths of both trains plus buffers, though the focus remains on enabling continuous motion for the overtaking . This process is managed through instructions or automated systems to maintain schedule adherence. Overtaking sidings significantly reduce propagation delays on mixed-traffic single-track lines by isolating slower movements off the main path, thereby improving overall line capacity and reliability. They are especially prevalent in networks combining freight and passenger services, where freight trains often operate at lower speeds than expresses. In the United States, Class I railroads such as BNSF employ sidings extensively on secondary and lines to handle variable speeds and enhance fluidity; for instance, strategic siding placements allow multiple freights to proceed without bunching.

Specialized Types

Dynamic Passing Loops

Dynamic passing loops represent an advanced form of passing on single-track lines, designed to facilitate the crossing of opposing without requiring either to halt completely. These loops are engineered to be substantially longer than standard configurations—typically three to five times the length of the operating on the route—enabling one to enter or exit the while the other passes by at a controlled reduced speed, often preserving overall momentum to minimize delays. This setup contrasts with traditional static loops by prioritizing fluid motion, which is particularly beneficial on branch lines or regional routes where frequent stops would otherwise constrain service frequency. The operational mechanics of dynamic passing loops demand meticulous coordination, including precise timing protocols and sophisticated signaling systems to manage train positions and speeds in . Advanced bi-directional signaling, such as color-light or LED-based setups, ensures clear authority for movements, while overlaps between signals and points provide safety margins to prevent conflicts during the pass. By allowing trains to maintain forward progress rather than accelerating from a standstill, these loops reduce and wear on equipment, enhancing on capacity-limited networks; for instance, they can increase line throughput by facilitating more frequent services without proportional infrastructure expansion. Notable implementations include the dynamic loop at Lugton on the Glasgow-Kilmarnock line in , commissioned in 2009 as part of a 5⅓-mile double-track section that supports half-hourly passenger services by permitting non-stop passes. Similarly, the planned dynamic loop on the UK's branch line, extending from Burneside station, aims to enable a two-trains-per-hour frequency on the Oxenholme-Windermere route, addressing current single-track limitations that restrict operations to hourly patterns. Design requirements for dynamic passing loops emphasize extended track lengths to accommodate simultaneous train movements safely.

Refuge and Crossing Loops

Refuge loops, often referred to as refuge sidings, are single-ended or dead-end tracks branching off the main line, designed to provide a temporary safe haven for a train to wait while another passes on the primary route. These structures are typically shorter than standard passing loops and are employed primarily for stops or crossing maneuvers in low-traffic, remote environments, where full double-ended configurations would be impractical or cost-prohibitive. In rural settings, they are frequently unmanned, serving as simple refuges without dedicated station facilities. In contrast to standard passing loops, refuge and crossing loops generally omit comprehensive signaling systems, instead depending on manual coordination methods like train orders issued via radio to ensure safe usage. This reliance on verbal or written directives from dispatchers allows flexibility in unmanned locations but requires strict adherence to protocols for entering and exiting the loop. Their length is usually calibrated to accommodate at least one full , often around 1,000 to 1,500 meters depending on regional standards, sufficient for basic refuge without excess track.

Design Elements

Overlaps and Catch Points

In railway passing loops, overlaps refer to an additional section of track beyond the clearance points of turnouts, ensuring that trains can safely clear signals and providing a buffer to prevent collisions with following or opposing movements. This extra track length allows the entire train to pass the signal-holding point before the route is released, maintaining a predetermined separation distance for safety. In the Australian Rail Track Corporation (ARTC) network, overlap distances typically range from 200 to 500 meters, varying based on train speed and operational conditions; for instance, running signals at speeds up to 80 km/h require 200 meters, while higher speeds necessitate 300 meters or more. The overlap distance is calculated using the formula for braking distance plus a safety buffer: \text{Overlap distance} = \frac{v^2}{2a} + b where v is the train speed, a is the deceleration rate, and b is the buffer zone for additional margins such as reaction time or track conditions. This equation derives from fundamental physics of stopping distance, ensuring the overlap accommodates worst-case overrun scenarios. In the Australian Rail Track Corporation (ARTC) network, a minimum overlap of 500 meters is mandated for train order working sections to enhance protection in regional single-line operations, as specified in their signalling design principles. International standards, such as those from the International Union of Railways (UIC), emphasize variable overlaps based on braking performance for interoperability. Catch points, also known as trap points, are spring-loaded derailing devices installed at the ends of passing loops or sidings to halt unauthorized or vehicles by tipping the wheels off the rails, thereby preventing incursions onto the mainline. These mechanisms consist of a pair of switch rails that default to the derailing position and are designed to activate under overrun conditions, directing derailed vehicles away from active tracks. In standards, implementation of is mandatory in high-risk areas such as steep gradients or freight sidings for unauthorized movement protection, where they serve as a final safeguard against SPAD () events or brake failures. In other regions, such as the , similar devices are used but requirements vary by network. With the integration of (ERTMS), overlaps can feature dynamic adjustments in some implementations, where lengths are automatically varied based on real-time factors like train speed, braking performance, and track occupancy to optimize and capacity. On steeper slopes, require reinforced derailing mechanisms to ensure effective stopping despite gravitational forces.

Gradient Adaptation

Passing loops situated on steep gradients present significant operational challenges, primarily the risk of trains stalling when attempting to restart after stopping, due to reduced on inclines. To mitigate construction costs, the main track is frequently leveled or maintained at shallower slopes, while the passing loop may conform more closely to the natural terrain, potentially introducing steeper grades within the loop itself. Engineers address these issues through partial leveling of the loop to limit gradients or by incorporating zig-zag alignments, which allow trains to ascend or descend mountains by reversing direction at switchbacks, effectively reducing the average slope. In North American freight networks like BNSF, design guidelines recommend maximum gradients of 1:200 (0.5%) for passing loops to ensure reliable operations, compared to 1:400 or gentler on main lines, though steeper sections may require additional safety measures like trap points if exceeding 1:500 (0.2%). Gradients vary by region and line type, with international standards like UIC allowing up to 1:300 in some contexts. In Swiss mountain railways using rack systems like the Abt system (invented in ), operations on inclines up to 50% are possible with rack-and-pinion drives for traction, and passing loops can be integrated into such steep sections. These adaptations adjust for elevation changes. Braking distances in such loops must account for gradients; a common adjustment formula incorporates the gravitational component as: S = \frac{U^2}{2(a \pm g \sin \theta)} + U t_d where S is the braking distance, U is initial speed, a is deceleration, g is gravity, \theta is the gradient angle, and t_d is delay time, effectively scaling the base distance by a factor related to \sin \theta (positive for downgrades). In the Andes, lines like the Transandine Railway in Bolivia and Argentina feature refuge loops adapted to sustained 3% grades (1:33), employing rack systems for sections exceeding 7-10% and zig-zag configurations to manage elevation gains up to 3,000 meters without full leveling. As of 2025, designs emphasize , incorporating elevated grading and drainage enhancements in passing loops to prevent flooding in monsoon-prone regions, as outlined in the ' Resilient Railways framework (launched March 2025), which promotes vulnerability assessments and adaptive infrastructure to withstand extreme rainfall.

Train Length Accommodation

Passing loops must be sized to accommodate the longest trains expected to use them, ensuring safe and efficient operations on single-track lines. The minimum loop length is generally calculated as the length of the longest plus an overlap distance for signaling protection and additional clearance for safe shunting or . Overlaps typically measure at least 200 meters to provide a beyond the train's end where signals can be cleared without risk of the main line. This approach results in loop lengths that are often 1.2 to 1.5 times the longest length, allowing for operational flexibility such as partial dynamic use where the stationary train does not fully occupy the . Sizing varies significantly by train type and region due to differences in freight and passenger configurations. Freight trains, particularly heavy-haul operations like U.S. services, require longer loops—often up to 2 kilometers—to handle unit trains of 100 to 120 cars, which can exceed 1.8 kilometers in length. In contrast, passenger trains, with formations typically under 500 meters, necessitate shorter loops of around 500 to 750 meters to balance cost and capacity on denser networks. International efforts, such as those from the (UIC), recommend loop lengths of at least 750 meters to support for mixed freight and passenger services across borders, facilitating longer formations up to 740 meters while maintaining consistent infrastructure. In North American networks, passing sidings are designed for lengths up to 1.8 km or more, with the longest section between sidings determining overall line capacity. As of 2025, adaptations in regions like focus on extending loops to 1.5 kilometers or more for double-stack container s exceeding 1,500 meters.

Automation and Control

Traditional Automatic Systems

Traditional automatic systems for passing loops relied on electromechanical technologies to detect train occupancy and facilitate remote control of switches, ensuring safe train routing on single- or double-track sections. Track circuits, invented by William Robinson in 1872 and first installed that year in Kinzua, , formed the core of occupancy detection by completing an electrical circuit through the rails when unoccupied and breaking it upon train entry. These circuits prevented conflicting movements by automatically updating signal aspects at loops, allowing slower trains to enter sidings while faster ones passed on the main line. Electric point machines, introduced in the early and powered by or , enabled remote switching of points from centralized locations, replacing manual levers with motorized actuators for greater reliability and reduced operator exposure. By the 1910s, systems like General Railway Signal's electric integrated these machines with levers and tappets to enforce route safety. Centralized Traffic Control (CTC), pioneered in North America during the 1920s, allowed a single dispatcher to oversee multiple passing loops across extended territories using a control panel connected via telegraph or telephone lines. The first CTC installation occurred in 1927 on the New York Central Railroad between Stanley and Berwick, Ohio, developed by the General Railway Signal Company, which consolidated routing decisions and improved coordination for overtaking maneuvers. In this setup, the dispatcher manually authorized movements by throwing switches and clearing signals remotely, with track circuits providing real-time feedback on loop occupancy to avoid collisions. Early CTC panels displayed track status through lights and indicators, enabling efficient management of bidirectional traffic on single lines with passing facilities. In regions like the , token block systems served as a foundational automatic method for single-line sections with passing loops, using physical or staffs to authorize train entry and prevent unauthorized occupation. Electric block instruments, evolved from earlier train staff systems, employed paired devices at section ends that released a unique only when the line was clear, as confirmed by mechanisms and basic track detection. For instance, the Great Western Railway's electric apparatus included magazines holding multiple , with pointers indicating line status to ensure one train at a time per section, facilitating safe crossings at loops during up and down working. These systems, operational since the late and refined electrically by the early 1900s, minimized errors through mechanical failsafes but required train crews to handle exchanges. Despite their advancements, traditional automatic systems had inherent limitations, including the need for manual overrides during failures or complex , which could delay operations and introduce . Conventional CTC designs also struggled with expanding control areas due to wiring complexity and communication vulnerabilities, prompting gradual transitions to semi-automatic signaling in developing countries during the to balance cost and capacity. In North American examples from the , such as implementations, CTC enhanced loop coordination but still depended on telegraph-based oversight, limiting scalability without frequent manual interventions.

Modern Automation Technologies

Modern automation technologies in passing loops have advanced significantly since the early , integrating digital signaling, , and emerging sensor systems to enhance safety, enable dynamic operations, and boost efficiency on single-track lines. The (ETCS) under the (ERTMS) at Level 2 represents a of these developments, providing continuous radio-based without lineside signals. In passing loops, ETCS Level 2 facilitates automatic train protection by transmitting movement authorities via , ensuring precise positioning and braking enforcement to prevent incursions into occupied sections. The system's moving-block capability further allows dynamic entry into loops, where train positions are tracked in real-time, reducing the need for fixed blocks and enabling overtakes at closer intervals without compromising safety. Artificial intelligence and predictive systems have emerged as key enablers for optimized loop usage, employing algorithms to allocate passing loops based on such as train speeds, delays, and traffic patterns. These systems use techniques like and genetic algorithms to forecast and adjust loop assignments, minimizing conflicts and improving throughput on congested single-track segments. In the , ongoing initiatives under the Europe's Rail Joint Undertaking explore AI-driven platforms for pan-European capacity enhancement, including optimization. Practical implementations highlight these technologies' impact. India's Kavach system, rolled out progressively since 2023, incorporates automatic braking at passing loops to enforce speed restrictions and prevent collisions on single tracks, activating brakes if a train exceeds limits or approaches an occupied loop. Complementing this, GPS integrated with supports unmanned operations by providing high-accuracy localization for train integrity checks and loop coordination, fusing data from balises and inertial sensors to achieve sub-meter precision even in challenging environments. In the United States, (PTC) systems, required on most mainline tracks since 2020, use GPS and radio to enforce speed limits and movement authorities at passing sidings, preventing incursions into occupied loops. These advancements yield substantial benefits, including headway reductions of up to 50% through optimized signaling and , as seen in ETCS Level 2 deployments that enable trains to operate at intervals below two minutes on equipped lines. Conceptually, this can be modeled with the equation for reduction: h_{\text{new}} = \frac{h_{\text{old}}}{1 + \alpha} where h_{\text{old}} is the baseline , and \alpha is the factor (e.g., 1 for doubling ).

Capacity and Efficiency

Line Capacity Determination

The capacity of a single-track railway line is fundamentally determined by the placement and functionality of passing loops, which enable s traveling in opposite directions to meet and pass without halting the entire line. A basic analytical model for estimating this capacity in s per hour (tph) is given by K = \frac{60}{2 \left( \frac{D}{S} + T \right)}, where D is the between passing loops in kilometers, S is the average train speed in km/min, and T is the or crossing time in the loop in minutes (typically 5-10 minutes for deceleration, dwell, and ). This formula approximates the —the minimum time between successive train departures—as twice the round-trip travel time between loops plus the crossing time, often resulting in effective headways of 10-15 minutes per loop pair under optimal conditions with balanced scheduling. Key factors influencing include loop spacing and operational directionality. Optimal spacing balances travel time with costs, generally ranging from 20-50 km depending on speeds and ; closer spacing (e.g., 8-15 km minimum) reduces meet delays but increases construction expenses, while bidirectional use on shared loops halves effective compared to unidirectional configurations where loops serve only. For instance, a single-track section with loops spaced approximately 10 km apart over 100 km can support 2-3 tph total, assuming average speeds of 60-80 km/h and heterogeneous mixes. In the UK, rural single-track lines often operate at 2 tph per direction following upgrades. Capacity can be optimized through strategic loop placement, such as staggering loops to minimize simultaneous meets and reduce buffer times. Modern assessments increasingly rely on like OpenTrack, which models dynamic interactions for precise capacity forecasting as of 2025.

Short Loops and Limitations

Short passing loops, also known as short sidings, are sections of double track on single-track lines that are less than one full length, typically designed to accommodate shorter trains of around 100 railcars (approximately 6,000–7,500 feet or 1,830–2,285 meters). These are commonly employed on low-traffic lines or in systems where full-length sidings are impractical due to space constraints. A primary drawback of short passing loops is the need for partial shunting or mid-train uncoupling when longer trains must use them, leading to significant operational delays as portions of the train extend beyond the loop onto the main line. This reduces effective line capacity, with routes featuring fewer than 50% extended sidings experiencing exponential increases in average train delay, potentially dropping practical capacity to as low as 18 trains per day (TPD) or 1–2 trains per hour (tph) in constrained sections. Safety risks are elevated due to incomplete train clearance, increasing the potential for conflicts with oncoming traffic during passes. Applications of short passing loops are prevalent in low-traffic freight corridors, such as segments of the Canadian National Railway where 150-car trains operate unidirectionally to bypass the limitations of existing short . , examples include short sidings at Lyons, Espanola, and Edwall on the Everett–Spokane route, which restrict operations for trains exceeding 7,400 feet and contribute to overall capacity bottlenecks. Mitigation strategies include hybrid designs that combine short static loops with dynamic extensions, allowing partial train movement to simulate longer effective lengths, or selectively extending 50% of sidings to restore baseline delay performance for lengths. An economic analysis reveals that short loops reduce construction costs compared to full extensions but impose ongoing operational penalties, such as limited speeds of 45–50 mph (72–80 km/h) through the siding and higher delay-related expenses; longer trains enabled by extensions can cut and costs, though initial infrastructure investment is substantial.

Traffic Flow Optimization

Passing loops play a crucial role in optimizing on single-track railway lines by enabling efficient train meets and overtakes, particularly in mixed traffic scenarios involving express and slower services. One key technique is scheduling, where express trains are granted precedence at loops to minimize delays for high-speed or time-sensitive operations, while slower freight or local trains are directed to wait. This approach ensures that faster trains maintain momentum, reducing overall journey times and improving throughput on constrained . In high-density sections, loop clustering—placing multiple passing loops in close proximity—facilitates sequential overtakes and reduces bottlenecks, allowing for higher train frequencies without extensive line doubling. Modeling these optimizations often relies on simulation tools such as OpenTrack, which predicts traffic flows by simulating interactions, usage, and potential conflicts under varying schedules and speeds. These tools enable planners to evaluate scenarios and determine optimal placements, incorporating factors like lengths and arrival intervals. In freight-dominant networks like the U.S. , predictive dispatching systems use real-time data to anticipate meets and assign loops dynamically, enhancing reliability on long single-track segments. Conversely, European passenger-focused lines, such as those in the high-speed corridors of and , emphasize timetable integration with loops to prioritize intercity services, achieving smoother flows through coordinated scheduling. By 2025, AI-optimized routing in single-track corridors has emerged as a significant advancement, leveraging to adjust paths and reduce delays compared to traditional methods. Seamless integration of passing loops with double-track transitions is essential for maintaining flow, where loops serve as zones to stage before merging onto multi-track sections, preventing disruptions during changes. This allows single-track to extend into denser networks without abrupt drops.

Safety Considerations

Common Accident Scenarios

One common accident scenario involving passing loops is a (SPAD), where a disregards a stop signal and enters a loop occupied by another , leading to collisions or derailments. In such cases, the incursion often results from driver misinterpretation of signals protecting the loop entrance. Another frequent type is overrun accidents, where a fails to stop within the loop due to brake failure, potentially the main line and endangering oncoming traffic. Historical examples illustrate these risks. In the 1900 Casey Jones crash near Vaughan, Mississippi, , the passenger train, running late, sped through dense fog and misjudged a freight train protruding from a siding onto the main line, causing a head-on collision that killed the . More recently, the 2023 Balasore train collision in , , involved the entering a passing loop at high speed due to a signaling error, striking a stationary goods train, derailing, and then colliding with another passenger train, resulting in 296 deaths and over 1,200 injuries. Analysis of causes shows that accounts for approximately 70-80% of accidents, with technical factors such as signaling faults and flaws contributing to the remainder. These statistics are drawn from UK Rail Safety and Standards Board (RSSB) reports and broader analyses of incidents from 1945 to 2022. A recent incident highlighting overrun risks occurred in the 2024 Talerddig collision in , , where a entered a passing loop but slid past the stop due to brake failure from blocked sanders in wet conditions, colliding with a stationary and killing the driver. EU railway fatalities increased by about 5% from 803 in 2022 to 841 in 2023 (as of 2023 data), partly attributed to signaling and visibility issues. As of 2025, comprehensive 2024 EU railway safety data is pending, with no reported major passing loop incidents globally in 2024-2025. Passing loops particularly amplify accident risks in conditions of or poor , as reduced sightlines hinder timely detection of signals or occupied sections, contributing to both SPADs and overruns as seen in historical cases like . In some overrun scenarios, intended to derail errant trains have failed due to misalignment or overload, allowing fouling of adjacent tracks.

Prevention and Mitigation Measures

Prevention and mitigation measures for passing loop accidents primarily focus on automated systems, enhanced training, robust infrastructure, and adaptive technologies to address (SPAD) scenarios and other risks. In the , the Train Protection and Warning System (TPWS) serves as a key standard for automatic braking at passing loops, deploying overspeed sensors and train stop loops to enforce speed restrictions and apply emergency brakes if a . TPWS became mandatory on the UK network by 2003, following its initial rollout in the late 1990s to mitigate SPAD risks. In the United States, (PTC) provides similar functionality, preventing collisions and enforcing speed limits through continuous monitoring and automatic intervention; it was mandated by the Rail Safety Improvement Act of 2008, with full implementation required by 2020 on applicable lines. Training protocols emphasize simulator-based exercises to prepare drivers for passing loop maneuvers, simulating high-risk conditions like SPAD approaches and speed compliance under varying visibility. These programs align with international standards, such as the (UIC) safety codes, which promote human factors training to reduce error rates in complex track configurations. Infrastructure enhancements include redundant signaling systems to ensure operation during loop usage, where backup circuits prevent single-point failures in train detection and authorization. (CCTV) monitoring at passing loops provides real-time visual oversight, aiding in and rapid response to potential incursions. As of 2025, drone-based inspections have been integrated for remote sites, enabling efficient assessment of loop alignments and without disrupting operations. These measures have demonstrated significant effectiveness; for instance, TPWS implementation in the UK has been about 70% effective in preventing harm from SPAD-related accidents compared to pre-2000 levels. Similarly, the European Train Control System (ETCS), a standardized automatic protection framework, has contributed to broader safety gains across Europe, with overall SPAD rates declining substantially since its deployment on key corridors. To address environmental challenges, climate-adaptive measures such as anti-icing systems for have been adopted on Nordic railway lines, where severe winter conditions can impair derailment prevention mechanisms. These include heated switch actuators and de-icing fluids to maintain functionality, reducing weather-related loop failures in regions like and .

Variations and Terminology

Right- and Left-Hand Traffic

In railway operations, right-hand traffic (RHT) denotes the standard where trains proceed on the right-hand track relative to the direction of travel, a convention adopted in the United States, , and the majority of continental European nations. Left-hand traffic (LHT), by contrast, directs trains to the left-hand track, as implemented in the , , , , and various former British colonies. These directional norms stem from historical influences, including early British engineering practices for LHT and the spread of RHT through American and continental European railway development, shaping global infrastructure standards. Passing loop designs are fundamentally adapted to align with the prevailing traffic direction to ensure operational fluidity and safety. In RHT systems, points (switches) and signals are positioned to favor the right side, allowing the through to remain on the straight mainline with reduced crossover maneuvers, thereby facilitating smoother entries and exits for . LHT configurations mirror this setup on the left, orienting infrastructure to minimize deviations for the faster while the slower one diverts into the . Such adaptations prevent conflicts and support efficient train passing without extensive reconfiguration. Conversions between RHT and LHT are infrequent due to the high costs of altering extensive . A notable example is Sweden's 1967 transition, known as , which shifted road traffic from LHT to RHT on to harmonize with neighboring countries and accommodate imported left-hand-drive vehicles; however, the railway network retained its LHT operations, obviating the need for rebuilds to passing loops or related signaling. This decision preserved railway compatibility across borders while avoiding disruptions to established double-track alignments. Operationally, LHT systems often integrate platforms at passing loop stations to optimize flow, enabling seamless access from either side in alignment with door positions on the right of trains. This contrasts with RHT preferences for side platforms in some contexts, though both support bidirectional passing; working aligns directly with the to designate primary and secondary lines. At international borders, particularly in Euro-Asian corridors like the Russia-China crossing at Manzhouli, both countries use RHT, but differences in gauge (Russian 1520 mm vs. Chinese 1435 mm) require bogie exchanges or transshipment facilities to maintain continuity, addressing mismatches that could impede cross-continental freight flows. These adaptations have grown in importance amid rising trade volumes along the Eurasian rail network.

Regional Names and Types

In railway engineering, terminology for passing loops varies significantly by region, reflecting local conventions and historical development. In North America, these facilities are typically termed "passing sidings," which are parallel tracks connected at both ends to the main line, allowing trains to pass on single-track sections. In the United Kingdom, the preferred term is "loop," a similar configuration used to enable one train to wait while another passes. Australia employs "crossing loop" for the same purpose, often integrated into regional and freight networks to manage opposing traffic on single lines. Other regions use distinct nomenclature influenced by linguistic and operational traditions. In , the designates them as "voie de croisement," emphasizing the crossing function for train encounters on voie unique (single track). Russia's extensive single-track network refers to them as "razyezd," short sidings or loops designed for efficient passing in remote areas, a term rooted in the imperial-era expansion of the . In , "taihi-sen" (wait-avoid line) or informal translations like "wait track" describe specialized passing tracks, particularly on Shinkansen branch lines where high-speed services bypass slower regional trains.
RegionCommon NameKey Characteristics
Passing sidingDouble-ended parallel track for on single lines; common in freight-heavy networks.
LoopShort parallel section for passing; integrated with signaling for single-line sections.
Crossing loopUsed on rural and interstate lines to handle bidirectional traffic.
Voie de croisementAvoidance track for crossing; standard on single-track routes.
RazyezdPassing loop in vast single-track systems, often in isolated terrains.
Taihi-sen (wait track)High-speed compatible loops on branches for priority .
Unique variants emerge from regional needs and historical contexts. In , "wait tracks" on feeder lines, such as those branching from the Tokaido mainline, allow Nozomi express trains to overtake local services without disrupting overall capacity, a design adapted for dense, high-velocity operations. African colonial-era railways, particularly in southern regions like and , feature short passing sidings under 1 km long, built during the late 19th and early 20th centuries to support resource extraction on narrow-gauge lines with limited traffic. These were often placed in remote areas to minimize construction costs while enabling basic freight passing. China's vast , spanning over 162,000 km as of 2024, relies heavily on passing loops in remaining single-track sections, especially in mountainous or underdeveloped areas, to maintain flow on its mixed passenger-freight network. Newer intercity lines, such as the 2025-approved Yining-Aksu route in , incorporate 12 passing loops to support speeds up to 160 km/h on single-track segments. These are sometimes referred to as "duplication lines" in contexts, denoting temporary or partial double-tracking via loops to capacity without full . In the , high-speed developments like Saudi Arabia's Haramain line, operational since 2018, saw fleet expansions in 2025 with additional high-speed trains to handle increased pilgrim traffic between and .

References

  1. [1]
    Single Line Operation | PRC Rail Consulting Ltd
    In the US, a passing loop is often referred to as a siding. The length of the loop must allow for the accommodation of the longest train using the route ...
  2. [2]
    [PDF] Relative train length and the infrastructure required to mitigate ...
    advantages of long trains are limited by the inadequate length of many existing passing sidings (passing loops). To alleviate the challenge of operating ...
  3. [3]
    [PDF] Comparison of Capacity of Single- and Double-Track Rail Lines
    Single-track line capacity is limited by the need for trains to decel- erate, stop, and accelerate out of sidings to allow other trains to use.
  4. [4]
    CSX.com - Railroad Dictionary
    A track adjacent to the main track for purposes other than for meeting and passing trains. Siding, An auxiliary track for meeting or passing trains. It is ...
  5. [5]
    [PDF] to double-track railway lines with nonlinear regression analysis
    Most of the North American railway network is single. track with passing sidings (also known as passing. loops) for meets and passes between trains. Of all. ...
  6. [6]
    [PDF] Optimization of Siding Location for Single-track Lines with ... - RailTEC
    Single-track with proper allocation of passing sidings (loops) is a substantial option to save investment and maintenance cost in both passenger and freight ...
  7. [7]
    A History of the Stockton to Darlington Railway - Steam Sounds
    The line was initially single track with passing loops at intermediate stations but this soon became inadequate and double tracking commenced between Towside ...
  8. [8]
    First Railroads in North America
    Nov 13, 2004 · Lieper's 1810 railroad was the first in the U.S. planned as permanent. ... In 1830, the line first operated, from the coal pits of the ...
  9. [9]
    Chronology of America's Freight Railroads | AAR
    America's first intercity railroad, the 13-mile Baltimore and Ohio Railroad was completed in early 1830. By 1850, more than 9,000 miles of railroad were in ...Missing: loops | Show results with:loops
  10. [10]
    [PDF] The development of the railway network in Britain 1825-19111 Leigh ...
    In a single year, 1839, more than 530 miles of railway track were added to the existing network whilst in 1847 1,100 miles were added followed by another 570 ...
  11. [11]
    How Britain's Colonial Railways Transformed India
    Jun 13, 2017 · The railways built during India's colonial times provided the enormous nation with unlimited connectivity and vital transportation.
  12. [12]
    History of rail transport in Australia - Wikipedia
    In the 19th century, railways were created to enable agricultural and minerals traffic to be carried to ports for export, and to allow passenger and freight ...
  13. [13]
    Signalling Changes - LIFE AND THE RAILWAY
    Technological advances including mechanical fixed signals in the 1840s, the electric telegraph and block working in the 1850s, and proper mechanical ...
  14. [14]
    A brief visual history of rail electrification in Italy - Italian (urban) Letters
    Oct 11, 2022 · Immediately after the end of WWII, electrification was completed in a few more lines where works were already started before the conflict ...
  15. [15]
    US Passenger Rail Is Struggling But Advocates Remain Hopeful
    Dec 2, 2022 · On a network where much of the railroad is single-tracked, this can mean serious delays if even a single freight train needs to pass an Amtrak ...
  16. [16]
    [PDF] THE CASE FOR A 21st CENTURY PUBLIC RAIL SYSTEM
    Without double trackage, trains must fit into passing sidings in order to pass yet the Class Is have failed to extend many of their passing sidings long freight ...
  17. [17]
    None
    ### Layout of the Passing Loop and Platforms
  18. [18]
    [PDF] Station design on high speed railway in Scandinavia
    Passing loop - Förbigångsspår. Plattform loop - Plattformsspår ... If implementing platform fences on Scandinavian rail lines the design must meet the.
  19. [19]
    Williton Station on the West Somerset Railway
    It has two platforms and is the principal intermediate train crossing place on the West Somerset Railway, where most trains will pass one going in the opposite ...
  20. [20]
    [PDF] Guidance on the Use of Tactile Paving Surfaces - GOV.UK
    The end of the platform shall either be fitted with a barrier that prevents public access or shall have a visual marking and tactile walking surface indicators ...
  21. [21]
    [PDF] T HR SC 10029 ST Signalling Design Principle - Transport Standards
    Dec 3, 2019 · It is not the passing siding or passing loop. Where each ... Platform Road. The straight road is designated the Through Road or Main Road.
  22. [22]
    Clinchfield Loops (NC): Map, History, Operation - American-Rails.com
    Aug 24, 2024 · They were constructed by the Clinchfield Railroad in the early 20th century to navigate the steep terrain of the Blue Ridge Mountains. What ...
  23. [23]
    [PDF] 2013 HV Strategy - Final - ARTC
    Jun 30, 2013 · The passing loop at Scone is short (410 m) and has an asymmetric ... the Through Road, a further speed restriction of 20 km/h has been ...
  24. [24]
    Track Segment: Middle Division - Petersburg Branch
    Jul 5, 2022 · Track Guide ; 5147, Carlim, Pa. Passing Siding ; 5149, Junc. Middle Division - Clover Creek Branch ; 5151, Williamsburg, Pa. ; 5154, Ganister, Pa.
  25. [25]
    Environmental Noise Directive - Environment - European Commission
    The Directive serves as a knowledge base to amend or introduce noise limits on road, railway and aircraft vehicles. Background. Noise is a health problem for at ...Missing: 2020s | Show results with:2020s
  26. [26]
    [PDF] GSM-R Implementation and Procurement Guide
    Mar 15, 2009 · This guide is about GSM-R implementation and procurement, based on UIC's experience, and aims to offer the benefit of this rich experience.Missing: coordination | Show results with:coordination
  27. [27]
    What is a Buffer or Buffer Stop or Dead End in Railways?
    Oct 11, 2020 · BUFFER STOPS / DEAD END : Dead-end sidings are often fitted with buffer stops to prevent vehicles running off the end of the track.Missing: engineering configuration<|separator|>
  28. [28]
  29. [29]
    [PDF] Buffer Stops and Restraining Devices for Dead End Tracks
    Jul 2, 2012 · This ARTC Engineering Guideline (ETH-00-01) covers buffer stops and restraining devices for dead end tracks, and is for internal use.Missing: configuration | Show results with:configuration
  30. [30]
    (PDF) DESIGN PARAMETERS OF BUFFER STOPS - ResearchGate
    Aug 6, 2025 · The rail ends of railway yards or the ends of the line usually have a buffer stop to prevent the train from advancing [200] . Although both the ...Missing: configuration | Show results with:configuration
  31. [31]
    The Old Malbon Railway Station (Malbon, North West Queensland)
    ... railway saw Malbon used as the rail loading point for these ores. A dead end ore siding and loading ramp was built at the time. The ore traffic predominated ...<|separator|>
  32. [32]
    [PDF] Buffer stops behavior due to rail impact loads with LISA FEA
    Buffer stops absorb train energy, stop trains, and prevent collisions. They compress and deform, and fixed types act like a solid wall, returning energy to the ...
  33. [33]
    [PDF] Missouri Freight and Passenger Rail Capacity Analysis
    The single track is supplemented by sidings that are used for meeting and passing of opposing directional trains. Sidings are also used for overtaking like- ...
  34. [34]
    [PDF] 12 - Safety - Federal Railroad Administration
    If some sidings are short in comparison to operating freight train length, the effective distance between sidings is increased, directly reducing capacity.
  35. [35]
    Appendix A - Discussion of Train Prioritization and Effect on Line ...
    One train can overtake another on a single track, but this will cause ... Consider a typical single track line with passing sidings located 10 miles apart.
  36. [36]
    [PDF] guidelines for industry track projects - BNSF Railway
    Jul 1, 2023 · All new tracks constructed will maintain a minimum distance of 25 feet for track centers from any main track, controlled siding or passing track ...Missing: overtaking | Show results with:overtaking
  37. [37]
    The BNSF rail line through Seattle's Eastside
    The Eastside railroad is mostly single tracked. However, there are several passing sidings (as well as a number of spurs to nearby industries) along the route, ...
  38. [38]
    Lakes Line railway improvement plans | RailBusinessDaily
    Feb 6, 2023 · The dynamic passing loop would be several times the length of the trains using the line, enabling them to pass each other without having to ...
  39. [39]
    What are "dynamic loops" on single line branches? - RMweb
    Jun 24, 2017 · A dynamic loop is designed in such a way that, on a single line, crossing trains should pass each other without needing to stop.<|control11|><|separator|>
  40. [40]
    Dynamism doubles Lugton's loop | Jobs in the Railway industry
    Feb 24, 2010 · The idea of a dynamic loop - allowing two trains to pass without stopping - was first mooted in 1986. There was no business case for ...Missing: concept | Show results with:concept
  41. [41]
    Windermere passing loop heads South Cumbria rail plans
    Jun 30, 2022 · The Windermere-Oxenholme 'Lakes Line', recommending the building of a dynamic passing loop at its halfway point to enable a two-train, 30-minute frequency.
  42. [42]
    Passing loops - Victoria's Big Build
    Mar 5, 2024 · New and upgraded passing loops provide greater network flexibility with more options for trains to pass each other at Elmhurst, Emu and Tourello.Missing: dynamic 10-15 km/
  43. [43]
    Re-doubling of single track lines or reinstatement of passing loops
    Jul 15, 2022 · Axminster dynamic loop to allow hourly trains to Exeter. 15 Jul 2022.'Wrong line' working on the Cambrian? - RailUK ForumsCost of electrification OHLE vs 3rd rail | Page 4 - RailUK ForumsMore results from www.railforums.co.uk
  44. [44]
    India Unveils High-Speed Railway Test Track in 2025
    Nov 10, 2024 · India's first high-speed railway test track is scheduled to start operations by December 2025. Located in Rajasthan, this track will allow ...Missing: corridors dynamic
  45. [45]
    refuge - Safety Central - Network Rail
    May 19, 2016 · A place of safety in tunnels and alongside high speed lines where employees can stand in safety; also A dead end siding allowing trains to be shunted off the ...Missing: definition | Show results with:definition
  46. [46]
    CVE30003 - Railway Eng Tutorial 4 - Practice Exercises - 20240520
    May 25, 2024 · 1 EXERCISE 1 MINING RAILWAY OPERATION A mining company is proposing to construct a 150km line of single-track railway (with passing loops at ...
  47. [47]
    Train orders 101 - Trains Magazine
    Feb 6, 2024 · Train orders were issued by the dispatcher and superseded the timetable. They were used to advance an inferior train against a superior one, establish positive ...
  48. [48]
    New control system will reduce intervals between trains in Baikal ...
    Mar 23, 2021 · The new technology will make it possible to reduce the intervals between passing trains and thereby increase the throughput of the Trans- ...Missing: loops | Show results with:loops
  49. [49]
    Steps Taken By Government To Enhance The Level Of ... - PIB
    Feb 7, 2024 · A GPS based Fog Safety Device (FSD) is provided to loco pilots in fog affected areas which enables loco pilots to know the distance of the ...Missing: refuge | Show results with:refuge
  50. [50]
    [PDF] Common Signal Design Principles S1 - ARTC - Extranet
    Oct 13, 2015 · Long timing over a number of track circuits (e.g. in a loop) may be necessary to meet operational needs.Missing: refuge | Show results with:refuge
  51. [51]
    [PDF] Influence of Train Stopping Distance and Overlap on the Railway ...
    The main objective of this paper is to present train stopping distance, overlap, and their influence on railway traffic safety.
  52. [52]
    [PDF] AS 7724:2020 Unauthorized movement protection - RISSB's
    At wide-to-gauge catch points, several interrupters are required to ensure operation, as the course of a derailed vehicle is unpredictable. In the case of ...
  53. [53]
    Three track features you've never heard of - Network Rail
    Aug 30, 2024 · Trap points – or catch points – are a type of switch added at specific locations to prevent unauthorised trains moving onto the mainline from ...
  54. [54]
    Overlap (OVL) - WikiRail
    In some ERTMS implementations, the length of the overlap can be dynamically adjusted according to operating conditions, such as trainspeed, weight and braking ...
  55. [55]
    [PDF] SECTION 6.3 – Railway design criteria | La Grande Alliance
    Ballast forms the trackbed upon which the ties are laid. It is packed between, below, and around the ties. It is used to bear the load from the ties, ...
  56. [56]
    Zig zag (railway) - Wikipedia
    A railway zig zag or switchback is a railway operation in which a train is required to switch its direction of travel to continue its journey.
  57. [57]
    [PDF] RSC-G-002-B Guidelines For The Design Of Section 1 Railway ...
    (c) stations and passing loops on gradients steeper than 1 in 500 where vehicles are left unattended. 1.1.7. Catch points. 1.1.7.1. Catch points should be ...
  58. [58]
    None
    ### Summary of Abt Passing Loop and Related Details
  59. [59]
    Calculating Train Braking Distance | PDF - Scribd
    Rating 5.0 (1) 1 in 50 g = 50 1 in 50 at the Stop point is: where D = d1 + d2 +.....+ dn g = 50 · 2 Brake delay time distance are: Allowing 15-20% does not compensate for ...
  60. [60]
    Transandine Railway: Linking Argentina and Chile
    Opening in 1910, the 248km-long scheme was a major engineering feat of its day – climbing at often very steep gradients to 10,000ft (3,048m). The route has been ...Did You Know · Difference The Project Has... · How The Work Was Done
  61. [61]
    UIC launches Resilient Railways guidance for flooding and heatwaves
    Apr 9, 2025 · UIC hosted an event to launch the final outcomes of the Resilient Railways (RERA) projects for two critical hazards: heavy rainfall and high temperatures.Missing: passing loops
  62. [62]
    [PDF] SDS 04 - ARTC - Extranet
    Mar 2, 2005 · If a running signal is more than 1.5 Km and more than 1.5 times service braking distance from the next signal then the overlap distance for that ...
  63. [63]
    [PDF] Longer trains Facts & Experiences in Europe
    Sep 11, 2014 · In Poland, the maximum length of freight trains is defined as 600-750 m, but the designed total station track length is longer and consists of ...
  64. [64]
    [PDF] Methods to estimate railway capacity and passenger delays
    capacity calculation according to the UIC 406 method is based on an actual timetable. The timetable is worked out for the entire network and not only the ...
  65. [65]
    India's Speedy New Scheme - Railway Technology
    Jun 16, 2008 · To be diesel-worked and handle double-stack container trains and ... To provide operational flexibility and maintain timings, 1,500m passing loops ...<|separator|>
  66. [66]
  67. [67]
    HISTORY OF SIGNALING - IRFCA.org
    On July 25th 1927 the first CTC system, invested by Sedgwick N. Wight (the inventor of APB), commissioned between Stanley and Berwick, Ohio on the Ohio Division ...
  68. [68]
    Evolution of Switch Machines in Rail Industry
    The first automated switch machines were introduced in the early 20th century. These early machines were powered by electricity or compressed air.
  69. [69]
    Centralized Traffic Control on the C&O | WVRails.net
    Oct 2, 2011 · In 1927 General Railway Signal (GRS) developed the first installation of CTC on the New York Central between Stanley and Berwick, OH, a ...
  70. [70]
    Electric Token Block - Rail Signs
    Electric Token Block is a method of working for single lines that overcomes the inflexibility inherent in the more primitive systems such as Train Staff and ...
  71. [71]
    GWR electric token apparatus
    The GWR electric token apparatus includes a plunger, pointer, token, magazine, and indicator. It uses a token system for single lines between stations.
  72. [72]
    [PDF] 10. Increasing infrastructure capacity - ERTMS.net
    Basically, the use of ERTMS level 2 can offer considerable advantages in terms of capacity increase. Indeed, when using level 2 a continuous stream of data.
  73. [73]
    A literature review of Artificial Intelligence applications in railway ...
    In this paper, we present a systematic literature review of the current state-of-the-art of AI in railway transport.<|separator|>
  74. [74]
    [PDF] AMENDMENT N° 1 WORK PROGRAMME 2025-2026 | Europe's Rail
    Jun 24, 2025 · improve rail capacities by applying AI-based and machine-learning techniques and providing a B2B service platform on a pan-European level to ...Missing: trials | Show results with:trials
  75. [75]
    Kavach rail safety system passes trial, set for nationwide rollout by ...
    Sep 26, 2024 · The Kavach system, developed by the Research Designs and Standards Organisation (RDSO), automatically applies brakes in emergency situations ...Missing: 2023 | Show results with:2023
  76. [76]
    A Review on Technologies for Localisation and Navigation in ... - MDPI
    This paper investigates the strategies, techniques, architecture, and references used by different systems to resolve the location along the railway network.
  77. [77]
    [PDF] Infrastructure Capacity in the ERTMS Signaling System
    Higher levels of ERTMS generally leads to higher capacity as illustrated in Figure 1. Figure 1: Influence of different ETCS levels on line capacity (UIC, 2008) ...
  78. [78]
    [PDF] Quantum Technologies in Transportation
    Nov 1, 2024 · Quantum sensors are commercially available or are rapidly maturing for use in communications, finance, medicine, resource exploration, and ...
  79. [79]
    [PDF] Safety Analysis and Design Improvement for Semi-Automatic Train ...
    May 9, 2025 · In recent years, several high-speed rail operators, mainly in Japan, have announced plans to introduce automation at GoA2 or higher. For example ...
  80. [80]
    [PDF] A Simple Model of Rail Infrastructure Capacity and Costs. - CORE
    Only single track with three passing loops is provided. (ii)Pricing at SRMC results in point D and profits of ED. Only single track with one passing loop is.
  81. [81]
    Freight train capacity doubles to Port of Liverpool thanks to £8.3 ...
    Nov 19, 2021 · The upgrade allows up to 2 freight trains an hour in each direction, meaning more trains will be able to deliver vital goods to and from the port for import ...
  82. [82]
    OpenTrack Railway Technology - Railway Simulation
    OpenTrack is a well-established railway planning software and it is used by railways, the railway supply industry, consultancies and universities in different ...News / Events · Introduction · Simulation · Headway Calculation
  83. [83]
    [PDF] Capacity of Single-Track Railway Lines with Short Sidings ... - RailTEC
    long-train operations by indicating that two-thirds of unit trains. Capacity of Single-Track Railway Lines with Short Sidings to Support Operation of Long ...
  84. [84]
    [PDF] Technical Memo 3 - Rail Capacity Needs and Constraints
    Overtaking can involve two passenger trains, a passenger train and a freight train, or two freight trains. The capacity consumed is situational, depending upon ...
  85. [85]
    (PDF) Scheduling Trains with Priorities: A No-Wait Blocking Parallel ...
    Aug 6, 2025 · The paper investigates train scheduling problems when prioritised trains and nonprioritised trains are simultaneously traversed in a ...
  86. [86]
    Application of Data Clustering to Railway Delay Pattern Recognition
    Apr 29, 2018 · K-means clustering is employed to identify recurrent delay patterns on a high traffic railway line north of Copenhagen, Denmark.
  87. [87]
  88. [88]
    Changing tracks: identifying and tackling bottlenecks in European ...
    Mar 18, 2022 · The main goal of the European policy to improve international rail services is to optimise the use of the existing railway infrastructure. This ...Missing: passing loops
  89. [89]
    These are the top 10 trends in rail technology for 2025 | News | Tracsis
    Dec 9, 2024 · Deep learning algorithms can be used to optimize train schedules and reduce the possibility of delays, disruptions, and collisions. AI can also ...
  90. [90]
    [PDF] Estimation of conditions of using combined single-track and double ...
    Passing loops allow increasing the capacity of single-track railway lines. Increase in the number of passing loops reduces the distance between them, reduces ...Missing: formula | Show results with:formula
  91. [91]
    Signals Passed at Danger - RSSB Graphic Insights
    260 SPADs occurred in 2022. Around two-thirds of SPADs could potentially result in a collision involving at least one passenger train. Only a small number pass ...<|control11|><|separator|>
  92. [92]
    [PDF] Data Definitions - ATSB
    ... SPAD – Signal passed at danger; or signal passed without authority. Includes: • When signals blacked out. Excludes: • Failure to comply with hand signal.Missing: incursion | Show results with:incursion
  93. [93]
    The tragic train accident that created an American folk hero
    Aug 17, 2023 · Casey Jones, a railroad engineer, died heroically at age 37 in a train crash while attempting to save his passengers' lives by applying the ...
  94. [94]
    More than 80 bodies unidentified after India train crash - BBC
    Jun 6, 2023 · The crash saw a passenger train derail after wrongly entering into a loop track by the side of the main line and colliding with a stationary ...
  95. [95]
    Human reliability and Organizational factors—How do Human ...
    The majority of railway incidents happen due to human error. Historically, human error has been split into active and latent errors, both to be investigated ...
  96. [96]
    Railway Accidents Caused by Human Error | Request PDF
    Aug 6, 2025 · This paper analyzes railway accidents involving human error for the period 1945 to 2012. The purpose of the analysis is twofold.
  97. [97]
    Train safety system failed before fatal crash, report says - BBC
    Nov 5, 2024 · A safety system designed to help a train stop failed on one of the trains involved in a fatal crash in mid Wales, investigators have revealed.
  98. [98]
    Rail transport fatalities continued to rise in 2023 - News articles
    Dec 13, 2024 · In 2023, the number of people killed in railway accidents in the EU rose to 841 deaths, compared with 803 in 2022.Missing: global | Show results with:global
  99. [99]
    Casey Jones Wreck - Railfanning.org
    At Vaughan, Mississippi, two freight trains – a northbound and a southbound – shared a siding but were too long and blocked the main line. Historians estimate ...
  100. [100]
    Collision between passenger trains near Talerddig - GOV.UK
    Nov 5, 2024 · Although the train slowed while passing through the loop, it ... Report a problem with this page. Help us improve GOV.UK. Don't include ...
  101. [101]
    Requirements for a Train Protection and Warning System (TPWS)
    This document defines the requirements for a Train Protection and Warning System, the purpose of which is to reduce the number of, and minimise the ...
  102. [102]
    [PDF] Rail Safety - Train Protection and Warning System (TPWS) Fitment ...
    Jan 3, 2007 · It is designed to automatically apply a train's brakes if it approaches a designated point (for example on the approach to a set of signals) too ...
  103. [103]
    Positive Train Control (PTC) | FRA - Federal Railroad Administration
    Oct 10, 2023 · Positive Train Control (PTC) systems are designed to prevent train-to-train collisions, over-speed derailments, incursions into established work zones.PTC Development · PTC Analyses · PTC Testing & EvaluationMissing: 2000 | Show results with:2000
  104. [104]
    Positive Train Control (PTC): Overview and Policy Issues
    The Rail Safety Improvement Act of 2008 (RSIA08) requires implementation of positive train control (PTC) on railroads which carry passengers or have high- ...
  105. [105]
    Safety | UIC - International union of railways
    Jun 5, 2025 · Various workshops and training sessions and webinars on level crossing safety, safety management and human factors, safety culture, improving ...
  106. [106]
    [PDF] Applying Simulation Techniques to Train Railway Traction Drivers
    The author has established that simulation is an effective training medium for railway traction drivers, when implemented correctly. The attributes of the ...Missing: maneuvers | Show results with:maneuvers
  107. [107]
    Fail Safe Rail Signalling Redundancy Measures
    Dec 1, 2022 · This redundancy is crucial for maintaining the integrity of the signalling infrastructure and ensuring passenger safety.
  108. [108]
    Analysis and Assessment of Railway CCTV System Operating ...
    The aim of the paper is to review, analyse, and evaluate the operational reliability of railroad video monitoring systems.
  109. [109]
    How CSX Transportation is Mitigating Rail Risks using Autonomous ...
    Discover how CSX Transportation implemented FlytBase-powered autonomous drones to detect rail defects as small as 1/8 inch, enhancing safety and operational ...
  110. [110]
    Railway operations in icing conditions: a review of issues a
    This article focuses on studying the current literature about railway operations in icing conditions, identifying icing effects on railway infrastructure, ...
  111. [111]
    Improving climate risk preparedness - Railroads in Norway
    This paper presents a 'preparedness framework' for a comprehensive physical climate risk assessment, which is inspired by the Task Force on Climate-related ...Missing: catch | Show results with:catch
  112. [112]
    Right- and Left-Hand Traffic on the World Railways: History and Future
    Starting with historical references on traffic direction choice and how railway transport has become the reason for the predomination of righthand traffic ...<|separator|>
  113. [113]
    Left-Hand Vs. Right-Hand Traffic On Railway Lines In Europe
    Apr 10, 2025 · This one's fun: Sweden drove on the left until 1967 (known as “Dagen H“). The railways stayed left-hand running, even after road traffic ...
  114. [114]
    A 'thrilling' mission to get the Swedish to change overnight - BBC
    Apr 17, 2018 · Just over 50 years ago, Sweden conducted the biggest, most expensive traffic conversion project Europe had ever seen. Today, it's a success ...
  115. [115]
    Dagen H: the day Sweden switched to driving on the right – archive ...
    Sep 7, 2022 · Cheering crowds brought traffic to a halt here today as Sweden changed to driving on the right after four years of preparations, 40 years of ...
  116. [116]
    Why do some countries drive on the left and others on the right?
    Nov 1, 2024 · About a 35% of the world population drives on the left, and the countries that do are mostly old British colonies.
  117. [117]
    Assessing the impact on mode competitiveness of improvements of ...
    Feb 5, 2025 · This paper deals with the potential of the different modes of transport on the Eurasian connection, focusing on rail, and comparing with sea and air.
  118. [118]
    Russia-China Land Infrastructure: Changes to Cross-Border Road ...
    May 27, 2025 · Manzhouli, China – Zabaykalsk, Russia (Both road and rail crossing) All changes observed occurred on the Chinese side of the Manzhouli, China ...
  119. [119]
  120. [120]
    Jargon Buster - Safety Central - Network Rail
    Loop A line parallel to a running line, which by virtue of crossovers between the two lines, enables one train to pass or overtake another. LOS Limit of Shunt ...<|control11|><|separator|>
  121. [121]
    [PDF] Glossary | ARTC
    Jan 15, 2023 · work on track without a formally issued work on track authority. loop. See balloon loop; crossing loop; refuge loop low visibility. Visibility ...
  122. [122]
    Translating "TutorialExtendingBiDirNetwork__part1a" | COI Hub
    ... bypass, so neither train ever meets head-on. CONTEXT. trains tutorial. Commencez par construire une voie d'évitement (également appelée voie de croisement).
  123. [123]
    Transsiberian - Chita - Vladivostok - From Europe to Pacific
    It was founded in 1904 as a station (Razyezd 86, i.e. «Passing Loop No. 86») on the Chinese Eastern Railway. Since 1924, a detachment of the border guard ...
  124. [124]
    Shinkansen (Japanese Bullet Train) - Japan Guide
    Feb 28, 2025 · All shinkansen lines (except the Akita and Yamagata Shinkansen) run on tracks that are exclusively built for and used by shinkansen trains.
  125. [125]
    Southern Africa | Roger Farnworth
    Jun 20, 2025 · The railway then turns to the Southwest. A relatively short passing loop is provided seemingly in the middle of nowhere! [Google Maps, June 2025].
  126. [126]
    Nation's rail network continued to break records in 2024
    Feb 13, 2025 · As of the end of last year, China's railway network had stretched to 162,000 kilometers, with 48,000 km dedicated to high-speed rail, further ...
  127. [127]
    More new lines approved in China - International Railway Journal
    Aug 26, 2025 · Maximum speed will be 160km/h, with some sections limited to 120km/h and 100km/h. There will be 24 stations, including 12 with passing loops.
  128. [128]
    Haramain High Speed Rail, Saudi Arabia - Spanos Group
    The project called for 450 km of double track with a design speed of 320 km/hour, which will be primarily used by pilgrims traveling between two cities. Several ...Missing: single | Show results with:single