Slum upgrading

Slum upgrading consists of in-situ interventions to improve , , and services in informal settlements, aiming to enhance resident welfare without displacement, typically encompassing provision of , , , roads, and secure tenure alongside community-driven enhancements. Pioneered in large-scale programs such as Indonesia's Kampung Improvement starting in , which reached over 20 million people by providing basic services to thousands of settlements, the approach gained traction through and UN-Habitat advocacy as a participatory alternative to demolition and relocation amid accelerating global . While evaluations document short-term gains in health outcomes like reduced incidence and improved access to utilities, long-term impacts remain limited, with meta-analyses showing inconsistent alleviation and evidence from rigorous studies indicating that upgrading can preserve low-density, low-productivity land uses, constraining city-wide growth and formal development. Defining characteristics include emphasis on cost-recovery mechanisms and resident involvement, yet controversies persist over fiscal inefficiencies, unintended via appreciating property values displacing original inhabitants, and the policy's inadequacy in addressing causal factors like rural migration and land market distortions, prompting debates on whether eradication or preventive yields superior outcomes.

Conceptual Framework

Definition and Objectives

Slum upgrading refers to a set of targeted, in-situ interventions aimed at improving the physical, social, and economic conditions of existing informal settlements, or slums, without necessitating large-scale relocation of residents. This approach contrasts with historical methods by preserving community networks and leveraging residents' incremental investments in and . Unlike broader , slum upgrading focuses on addressing core deprivations in informal areas characterized by substandard , overcrowding, and lack of basic services, as operationally defined by criteria such as inadequate access to improved , , sufficient living , durable structures, or secure tenure. The primary objectives of slum upgrading include enhancing access to essential and services, such as piped , facilities, , paved roads, and solid , to mitigate risks and improve daily . A key goal is to provide partial or formalized tenure security, reducing the threat of evictions and enabling residents to invest in property improvements without fear of . Additionally, programs seek to promote community-driven, incremental self-upgrading, where residents gradually enhance their dwellings and surroundings, fostering long-term over top-down impositions. These objectives are necessitated by the scale of global conditions, with over 1 billion people—approximately 24% of the urban population—residing in such areas as of , a figure underscoring the impracticality of eradication in favor of adaptive, cost-effective enhancements. Upgrading thus prioritizes causal interventions that directly target empirical deficiencies, such as disease transmission from poor or from insecure land rights, rather than relying on ambiguous metrics that may overlook contextual variations in slum formation.

Distinction from Alternative Approaches

Slum upgrading differs from by targeting incremental improvements to existing informal settlements rather than wholesale and resident , thereby avoiding the substantial social and economic disruptions inherent in eradication campaigns. During the and in Latin American cities like , government-led bulldozing operations under military regimes displaced hundreds of thousands from central favelas to remote peripheral sites, often lacking adequate , which fostered new ghetto-like informal expansions and into traps as relocated households struggled with costs and severed ties. Such policies exacerbated urban inequality by failing to scale formal supply commensurately with migration-driven demand, resulting in net increases in substandard habitation despite initial clearances. Unlike sites-and-services schemes, which supply basic utilities and plots on peripheries to encourage self-construction but necessitate , slum upgrading modifies in-situ layouts and services to leverage established assets and minimize interruptions. This preserves proximity to economic hubs, reducing transport burdens estimated at 10-20% of low-income incomes in relocated scenarios, though it risks entrenching convoluted spatial configurations that hinder future scalability without complementary regularization. Upgrading's causal foundation acknowledges slums' persistence as rational responses to regulatory distortions in formal markets, where mandates, minimum lot sizes, and prescriptive building codes elevate compliant unit costs by factors of 2-5 times in cities like those in , pricing out the bottom income quintiles and channeling demand into unregulated alternatives. Verifiable cost-benefit evaluations prioritize upgrading's superior long-term returns—such as 15-30% welfare gains from health and productivity boosts in programs like Medellín's—over clearance's hidden externalities like intergenerational losses, favoring pragmatic integration of informal economies over unattainable eradication absent market reforms.

Historical Evolution

Dominance of Slum Clearance Pre-1970s

Slum clearance emerged as a dominant urban policy in the , exemplified by Baron Georges-Eugène Haussmann's renovation of Paris from 1853 to 1870, which demolished overcrowded working-class districts under the guise of and modernization, displacing hundreds of thousands of poor residents to the city's outskirts and inadvertently fostering new peripheral settlements. This approach prioritized aesthetic and hygienic reforms over addressing underlying shortages driven by rapid industrialization and , resulting in short-term eradication of central slums but long-term exacerbation of informal peripheral due to restricted supply and without adequate alternatives. In the United States, slum clearance gained federal momentum through the and intensified via the 1949 Housing Act's Title I provisions, which funded large-scale demolition of "blighted" areas and their replacement with projects, relocating over 300,000 families by the mid-1960s, more than half of whom were non-White. These initiatives, critiqued by urban theorist in her 1961 book The Death and Life of Great American Cities for destroying viable mixed-income neighborhoods under the pretext of renewal, often ignored rural-urban migration pressures and restrictions that constrained housing supply, leading to concentrated high-rise projects plagued by maintenance failures, , and elevated crime rates that fostered dependency rather than self-sufficiency. Similar patterns unfolded in post-World War II developing regions influenced by colonial-era planning legacies, such as in Bombay (now ), where clearance drives from the mid-1950s under policies like the 1956 Slum Clearance Act demolished central informal settlements but relocated residents to distant, underserviced peripheries, prompting the rapid formation of new unauthorized slums amid unchecked urban influxes from rural areas. Empirical outcomes revealed temporary reductions in visible central squalor—such as fewer inner-city tenements—but sustained overall slum proliferation, with displaced populations facing heightened and policy-induced scarcity from land-use controls that failed to expand stock, underscoring clearance's inability to counter migration-driven demand without supply-side reforms.

Emergence of Upgrading Paradigm Post-1970s

The inefficiencies of pre-1970s slum clearance programs, which displaced residents without resolving migration pressures or housing shortages, became evident through empirical evaluations showing persistent slum regrowth and high relocation costs. analyses in the 1970s documented how such top-down demolitions often exacerbated urban poverty by ignoring residents' adaptive building practices and informal economies, leading to new informal settlements forming in peripheral or reoccupied areas. This critique coalesced around John F.C. Turner's advocacy, drawn from his fieldwork in Peru's barriadas during the 1960s, for enabling resident-led incremental self-help over destructive clearance; he posited that legal tenure security allowed dwellers to invest in progressive housing improvements suited to their resources and needs, rather than imposing standardized relocations that disrupted livelihoods. Turner's 1976 book Housing by People and earlier UN reports formalized this view, influencing international donors to recognize slums as functional adaptations requiring support, not eradication. The integrated these principles into lending policies by the mid-1970s, shifting from clearance subsidies to programs fostering community-managed enhancements. A landmark implementation was Indonesia's Kampung Improvement Program (KIP), launched in in 1969 as the world's first systematic slum upgrading initiative, which installed basic infrastructure—such as piped water, drainage, and footpaths—in existing kampungs while granting verbal tenure assurances to avert evictions. By 1984, KIP had reached approximately 5 million residents in alone, expanding nationally to improve conditions for tens of millions by the through cost-effective, non-disruptive interventions that boosted health, education, and local economies without requiring full rehousing. evaluations confirmed KIP's efficacy in reducing morbidity and enhancing infrastructure access, validating the model's scalability over clearance alternatives. The upgrading paradigm disseminated globally in the 1980s via UN-Habitat's advocacy, amid accelerating that rendered clearance fiscally untenable; in , where 1970s relocation schemes frequently saw displaced populations revert to due to unaffordable alternatives and land scarcity, upgrading gained traction as a pragmatic response prioritizing tenure stabilization to harness residents' incremental capacities. This era's policy documents emphasized evidence from pilot projects showing lower and higher when interventions built on existing social structures, embedding upgrading in frameworks like the World Bank's urban poverty strategies.

Key Influences and Global Policy Shifts

Hernando de Soto's research in the 1980s and 1990s, culminating in his 2000 book The Mystery of Capital, emphasized the concept of "dead capital" in informal settlements, where residents hold substantial assets—estimated at trillions globally—but lack formal titles, preventing their use as for loans or investments. This argued that titling and legal recognition could mobilize these assets, fostering self-sustained improvement over externally imposed clearance, influencing by highlighting how informal systems, while extralegal, represent untapped economic potential rather than mere poverty traps. International organizations provided empirical backing through comparative analyses; World Bank reports from the 1970s onward documented that slum upgrading typically costs 20-50% less than clearance and resettlement due to avoided relocation expenses and utilization of existing structures, while preserving community networks essential for social stability. Similarly, studies underscored upgrading's role in generating local employment during implementation, contrasting with clearance's disruptive job losses, thereby shifting focus from demolition to incremental enhancements grounded in cost-benefit data. Global policy pivoted in the 1990s via precursors to the , notably the 1996 Habitat Agenda from the UN Conference on Human Settlements in , which committed 171 nations to "cities without slums" through in-situ upgrading rather than , prioritizing secure tenure and services to integrate informal areas into fabric. This marked a departure from 1960s-1970s clearance dominance, embedding upgrading in multilateral frameworks like the Millennium Development Goal 7 (2000), which targeted halving populations by 2015 via on-site solutions. In the 2000s, Brazil's Favela-Bairro program exemplified integration of upgrading with social policies, upgrading in over 100 favelas from 1995-2000s while aligning with national conditional cash transfers like (launched 2003), which incentivized school attendance and health checkups to complement physical improvements. By the 2010s, upgrading policies had been adopted in over 100 developing countries, facilitated by and UN-Habitat lending, contributing to a reported reduction of 227 million dwellers between 2000 and 2010 per UN estimates. However, critics, including de Soto, contend that heavy reliance on international fosters dependency, crowding out local property markets and incentives for self-financed tenure formalization, as aid-driven projects often prioritize short-term over sustainable legal reforms.

Core Components

Physical Infrastructure Enhancements

Physical infrastructure enhancements in slum upgrading target the foundational to mitigate risks, improve , and reduce vulnerability to hazards such as , , and flooding. Core interventions include paving s to facilitate access for removal and services, thereby curbing the spread of vector-borne illnesses like dengue through better mobility. Experimental from a randomized of road paving in slums demonstrated increased economic activity and property values, though direct outcomes like reduced respiratory infections showed limited short-term effects due to incomplete coverage. Piped water supply and sewerage installation address chronic water contamination, which drives high diarrheal disease burdens in informal settlements. Evaluations of water, sanitation, and hygiene (WASH) improvements in Kolkata slums linked better sanitation infrastructure to lower diarrheal incidence, with households using improved facilities reporting fewer cases compared to those reliant on open defecation or shared latrines. Similarly, electrification extends formal grid connections to replace kerosene lamps and open flames, substantially cutting fire ignition sources; studies in South African informal settlements found that legal connections reduced open-flame-related fires, which account for a majority of incidents, though illegal tapping introduced overload risks without regulatory enforcement. Drainage system upgrades, including channel clearing and piped networks, prevent recurrent flooding that contaminates living spaces and exacerbates waterborne pathogens. In low-income communities, enhanced has empirically lowered flood-related disruptions, with data from Asian slums indicating reduced waterlogging duration post-intervention, though lapses often revert gains. Incremental deployment of these enhancements—phased additions allowing modifications—enables cost-effective but frequently results in uneven grids, where peripheral areas lag and benefits concentrate among early adopters. Comprehensive strategies, deploying full networks at once, promote uniform coverage and synergies (e.g., integrated water-sewerage systems averting 20-30% of events per audits), yet demand high and risk temporary ; meta-analyses of upgrading programs reveal higher long-term efficacy in comprehensive models when backed by ongoing fiscal commitments, as partial grids perpetuate gaps and informal adaptations that undermine durability. Densification enabled by these upgrades can intensify resource pressures, such as overload straining capacities and elevating levels if discharge lacks controls. Empirical monitoring in upgraded Asian settlements notes trade-offs where improved access spurs inflows, amplifying per-capita generation by up to 15% without proportional scaling, underscoring the need for in phases. Secure tenure underpins sustained slum upgrading by mitigating risks and enabling residents to invest confidently in durable improvements, as insecure discourages long-term enhancements that could otherwise be lost to . Empirical studies demonstrate that formalizing through titling generates stronger private-sector responses than provision alone, since residents prioritize structural upgrades when perceiving reduced uncertainty, thereby activating markets and access. Primary mechanisms involve in-situ titling, which legalizes existing occupations without relocation, and usufruct rights, conferring usage and benefit entitlements to land while often retaining public ownership to facilitate gradual integration. These approaches deter informal evictions by establishing evidentiary claims enforceable in courts, contrasting with clearance policies that exacerbate . In Peru's urban titling initiative launched in 1996 under COFOPRI, over 1.2 million households received titles by 2003, spurring resident-led renovations as titled properties became collateralizable assets. Causal evidence links titling to heightened : Erica Field's analysis of Peruvian slums revealed titled households were 24 percentage points more likely to initiate home improvements, including expansions and materials upgrades, compared to untitled peers, with effects driven by alleviated occupancy insecurity rather than mere effects. This outperforms isolated inputs, where gains often dissipate without rights enforcement, as residents underinvest anticipating relocation. Bureaucratic hurdles, such as protracted verification and unregistered post-titling transactions, erode these benefits by delaying formalization and reintroducing informality, as observed in where untitled sales undermined regularization gains for up to 20% of properties within years. Such delays perpetuate vulnerability, underscoring the need for streamlined administrative processes to realize tenure's catalytic potential.

Social and Community Interventions

Social and community interventions in slum upgrading prioritize non-infrastructural enhancements such as improved access to and care, alongside skills and efforts aimed at building . These measures seek to address immediate deficits, including low rates and health vulnerabilities prevalent among slum populations, often through targeted programs like on-site schooling, mobile clinics, and vocational workshops. For example, randomized controlled trials in slums have demonstrated that home-visiting stimulation interventions can significantly boost cognitive and socio-emotional development in young children from disadvantaged households, with effect sizes indicating sustained gains over 18-24 months post-intervention. Similarly, cluster-randomized efforts in slums improved antenatal care attendance by 20-30% and reduced neonatal mortality risks through behavior change in and delivery practices. Community-focused components, such as groups for ongoing maintenance of services and mutual support networks, aim to empower residents in sustaining gains. However, empirical studies reveal frequent , where influential local figures monopolize resources and decision-making, leading to inequitable outcomes. In Kenyan slum-upgrading programs, ethnographic analyses of participatory structures showed that elites, often tied to political or networks, diverted benefits like training opportunities away from the most marginalized, perpetuating intra-community hierarchies despite formal mechanisms. Despite isolated successes, rigorous evaluations, including Cochrane reviews of slum interventions, indicate marginal net impacts on broader when decoupled from economic opportunities, with no consistent effects on household income or long-term . Rural-to-urban migrants continue inhabiting s, rationally trading enhanced for proximity to potential work against rural deprivations, yet without viable employment integration, these interventions reinforce traps by failing to alter causal drivers like skill-job mismatches and informal labor . In Brazil's programs, social inclusions like yielded incremental literacy advancements—estimated at 10-15% in targeted cohorts per program evaluations—but regressed absent complementary supports, underscoring the limits of isolated investments.

Implementation Models

Government-Led Initiatives

Government-led initiatives in slum upgrading typically involve top-down approaches where national or local governments centralize planning, funding, and execution, often prioritizing large-scale physical interventions such as , , and housing provision without robust private market integration. These programs rely on public budgets and bureaucratic oversight, aiming for rapid deployment of infrastructure to address immediate humanitarian concerns, but they frequently overlook long-term due to fiscal constraints and weak enforcement mechanisms. For instance, Kenya's Slum Upgrading Programme (KENSUP), launched in 2004 under presidential directive, sought to deliver and basic services to over 1.5 million residents in informal settlements like , scaling efforts nationally through partnerships with local authorities. Despite initial progress in laying pipes and constructing units—KENSUP completed pilot projects in by 2013 providing around 900 units and 230 stalls—many initiatives stall due to fiscal shortfalls and mismanagement, with Kenya's facing repeated delays post-2010 from cuts and incomplete relocations leaving thousands in temporary shelters as of 2019. Empirical evaluations reveal that government-driven upgrades often achieve short-term gains, such as improved to and , but suffer from rapid decay; literature reviews of programs in and document relapse rates where 30-50% of benefits erode within 5-10 years owing to absent maintenance funding and resident disincentives under subsidized models that undermine cost-recovery. This deterioration stems from causal factors like overreliance on state provision, which crowds out private investment and fails to instill , leading to and neglect in the absence of tenure-linked responsibilities. Corruption exacerbates these issues, with procurement irregularities and diverting resources; in KENSUP's implementation, 31% of residents anticipated corruption blocking access to upgraded units, while broader audits in similar African programs highlight graft in contract awards inflating costs by 20-40%. Politicization further entrenches problems, as governments leverage upgrading promises as vote-buying tools in slum-heavy constituencies, fostering dependency rather than resolution—Nairobi's slums, 60% of the city's population, serve as reservoirs where incomplete projects sustain political leverage without addressing root housing shortages through market reforms. Such dynamics distort markets by imposing state-controlled allocations that ignore supply elasticities, perpetuating informal as upgraded areas quickly revert amid unaddressed pressures.

Participatory and Community-Driven Efforts

Participatory and community-driven efforts in slum upgrading prioritize resident involvement in , from consultations on needs to co-design of layouts and ongoing , aiming to foster and adapt interventions to local contexts. These approaches draw on community associations or committees to identify priorities, such as routing or allocation, contrasting with purely expert-led models by incorporating endogenous knowledge. In , favela residents formed committees in the 1980s amid , influencing early upgrading pilots by advocating for in-situ improvements over relocation, which informed later programs like Rio de Janeiro's Favela-Bairro initiative launched in 1995. This involved over 250,000 residents across 90 projects by 2000, with communities participating in selecting interventions like paving and to integrate favelas with formal urban grids. Empirical data from such efforts reveal mixed outcomes, with resident input correlating to higher adoption rates and upkeep in select cases due to aligned incentives, though quantification varies. For instance, evaluations of Latin American participatory upgrading found community-engaged sites maintained 15-30% longer before deterioration compared to non-participatory controls, attributed to voluntary contributions in and minor repairs. However, free-rider dynamics—where non-contributors benefit from collective goods like shared —erode participation over time, as individuals withhold effort absent enforceable mechanisms, leading to uneven implementation in larger settlements. Coordination costs, including time-intensive meetings and consensus-building, further constrain effectiveness, with studies noting dropout rates exceeding 40% in extended projects due to opportunity costs for low-income dwellers. Critics highlight frequent , where governments solicit input superficially to legitimize top-down decisions, overriding resident preferences for expediency or fiscal limits; in Brazilian upgrades, post-consultation revisions to layouts occurred in over 60% of cases to align with municipal standards, undermining . remains limited, as informal coordination struggles in dense, heterogeneous exceeding 10,000 households, often requiring external facilitation that reintroduces hierarchical elements and inflates costs by 20-50% relative to standardized models. Despite these, where communities self-organize around clear, low-complexity tasks like incremental — as in some Thai slum cooperatives—sustained emerges through social norms enforcing reciprocity, though such successes are site-specific and rarely generalize without supportive policies.

Private Sector and Market Integration

Public-private partnerships (PPPs) facilitate private sector engagement in slum upgrading by combining government oversight with corporate expertise and capital for infrastructure delivery, such as sanitation and utilities. In , PPP frameworks under national urban missions have enabled private operators to build and manage community sanitation facilities in slums, achieving higher utilization rates through user fees and maintenance contracts compared to subsidized government models that often suffer from underfunding and poor upkeep. For example, initiatives like Suvidha Centers demonstrate how private innovation addresses urban sanitation gaps, with partnerships leading to scalable toilet blocks serving thousands in dense settlements. Property titling programs, drawing from Hernando de Soto's framework of formalizing extralegal assets, integrate slums into market systems by enabling residents to leverage homes as for formal , reducing reliance on informal lending or subsidies. Evidence from titling efforts in developing contexts shows increased investments in durable improvements and access to banking, as titled properties signal lower risk to lenders, unlocking an estimated $9.3 trillion in global dead capital per de Soto's analysis. In Peru's program, which titled over 1.2 million urban properties, participants exhibited 20-30% higher rates of home renovations and formalization than non-titled peers, illustrating causal links between secure tenure and market-driven upgrades. Private incentives, rooted in recovery via efficient operations, yield more sustainable outcomes than subsidy-dependent approaches, as firms prioritize long-term viability to sustain revenue from services or asset development. Studies of slum water PPPs reveal providers expanding coverage to underserved areas where utilities failed, with cost-recovery models ensuring facility longevity and reducing fiscal burdens on governments. This contrasts with aid-heavy interventions, where short-term funding leads to decay post-project, as signals compel ongoing adaptation to demand.

Empirical Evidence and Case Studies

Successful Outcomes in Select Programs

The Kampung Improvement Program (KIP) in , initiated in in 1969 and expanded nationwide through the 1970s and 1980s, upgraded in over 400,000 kampungs, benefiting an estimated 20 million residents by 1990 through investments in roads, , , and . Evaluations indicated significant gains, with KIP areas showing higher rates of piped water access (up to 80% in treated kampungs versus 40% in controls) and coverage, contributing to reduced prevalence and better overall resident compared to non-upgraded areas. These outcomes persisted over decades, attributed to community-driven and partial tenure regularization that encouraged resident investments in housing durability, as evidenced by sustained functionality in follow-up assessments. In , the Favela-Bairro program, launched in in 1994 and extended into the 2000s across multiple phases, integrated favelas into the urban grid by paving streets, installing utilities, and formalizing property titles without resident displacement, serving over 250,000 people in 160 communities by 2008. Post-upgrade surveys documented doubled commercial activity, rising from approximately 1,100 to 2,250 businesses in sampled favelas, alongside enhanced service delivery that boosted housing stability and reduced vulnerability to landslides. The program's emphasis on in-situ improvements aligned with property incentives, as legalized tenure spurred private reinvestments, yielding measurable gains in living standards without the social costs of relocation. Longitudinal analyses of slum upgrading initiatives, including those in and , confirm that targeted interventions outperform non-treated controls in housing quality metrics, such as structural integrity and access to basic amenities, with in-situ programs increasing durable and materials by 15-25% over 10-15 years. Where upgrades incorporated tenure , resident-driven enhancements sustained reductions, with treated areas exhibiting 10-20% higher home values and lower vacancy rates relative to baselines, underscoring the causal role of ownership incentives in long-term viability. These findings from quasi-experimental designs highlight upgrading's efficacy when avoiding and leveraging local property rights.

Mixed or Negative Results from Key Examples

In 's early slum upgrading efforts under programs like the Kenya Informal Settlements Improvement Project (KIP) in the 1980s and subsequent initiatives such as KENSUP launched in 2004, initial gains—including piped and in sites like —were largely eroded by the 2000s due to unchecked population pressures from rural- migration and the failure to provide formal land titling, which perpetuated insecurity and informal redevelopment. Absolute populations continued to rise despite proportional declines from 54.9% of residents in 1990 to 50.8% in 2020, highlighting how upgrading without tenure reforms sustains informality amid demographic surges exceeding project capacities. India's slum upgrading schemes, including the Basic Services to the Urban Poor (BSUP) under the National Urban Renewal Mission (2005–2014), encountered substantial setbacks from and execution failures, with investigations uncovering diverted funds and fraudulent allocations in Mumbai's Slum Rehabilitation Authority projects, such as a 2018 case where assets worth Rs 462 were attached for in . Audits and reports indicated widespread incomplete works, diverting resources from intended beneficiaries and leaving many upgraded sites reverting to prior conditions due to graft and poor oversight, exacerbating persistent substandard housing without resolving underlying tenure ambiguities. Empirical analyses from the , including Harari and Wong's 2024 study of Indonesia's long-running Kampung Improvement Program, reveal that slum upgrading often entrenches informal areas over decades, preserving low-density settlements at the expense of formal land reallocation—reducing adjacent high-rise development by approximately 20% and impeding efficient market transitions to denser forms. These patterns underscore upgrading's tendency to stabilize rather than eradicate slums, particularly absent reforms to regulatory barriers that hinder private investment and formalization.

Challenges and Criticisms

Operational and Logistical Barriers

Operational barriers in slum upgrading frequently arise from bureaucratic inefficiencies and funding constraints that hinder timely execution. Dysfunctional systems, characterized by and excessive , delay critical steps such as tenure ratification, as evidenced in Kenya's Udongo project where administrative hurdles have prolonged insecure land status. Poor inter-agency coordination and political interference further exacerbate stalls, with programs like Medellín's PRIMED experiencing disruptions from unmet stakeholder expectations and shifting municipal priorities. Funding shortfalls compound these issues, often forcing adjustments to project standards mid-way, as in Dar es Salaam's Community Infrastructure Upgrading Programme where rising costs necessitated scaled-back infrastructure provisions. Land disputes represent a persistent logistical impediment, frequently postponing physical works by entangling projects in legal and communal conflicts. In Nairobi's slums, insecure tenure impacting 28.8% of residents—often on invaded private or land—triggers eviction threats and compensation negotiations that extend timelines, as observed in ongoing efforts in , , and Korogocho since the Kenya Slum Upgrading Programme's launch in 2003. Conflicting stakeholder interests, with tenants comprising 86% of occupants versus structure owners resisting changes to rental dynamics, amplify resistance and bureaucratic delays in issuing title deeds. Such disputes not only inflate administrative costs but also deter investor confidence, stalling infrastructure rollout in high-density areas covering 1,184 hectares and housing 1.4 million people as of 2012. The intricate logistics of retrofitting dense urban layouts pose substantial on-site challenges, complicating equipment access and construction sequencing. Slum densities averaging 1,167 persons per —and peaking at 12,000 per hectare in areas like Nairobi's Commercial ward—severely restrict space for machinery and temporary works, often mandating manual methods that escalate labor and time requirements. Unplanned narrow road networks, as in Cairo's sanitation upgrades serving 36,000 residents over 2.2 km, demand specialized maneuvering widths of at least 2.8 meters and algorithmic route optimization to avoid impractical sequences, yet disruptions from resident resistance and co-located utilities frequently prolong excavations. These constraints elevate overall project risks, with inadequate site profiling leading to unforeseen topographic or accessibility issues that mirror broader implementation bottlenecks. Post-handover maintenance neglect undermines long-term viability, stemming from ambiguous responsibility assignments and insufficient community integration. In programs like PRIMED in , unclear roles resulted in the deterioration of upgraded facilities such as parks and classrooms due to lack of sustained after initial . While models like Tanzania's upgrades require residents to bear 100% of ongoing costs, failure to embed maintenance into municipal budgets often leads to fund depletion and reversion to substandard conditions, as operating subsidies prove unsustainable without enforced cost recovery. This pattern highlights the causal link between upfront logistical oversights—such as excluding maintenance planning from design phases—and rapid post-upgrade entropy in resource-constrained settings.

Economic and Incentive Misalignments

Slum upgrading initiatives frequently introduce subsidies and free services, such as and , which can distort local incentives by fostering among residents rather than promoting self-sustaining improvements. Economic analyses indicate that such provisions reduce the for households to invest personally in or upgrades, as the perceived benefits accrue without corresponding costs or stakes, leading to underutilization and deterioration over time. A core misalignment arises from the absence of formal property titling in many programs, which prevents residents from capitalizing on improvements through loans or , thereby stifling investment in quality. Quasi-experimental evidence from titling interventions in urban demonstrates that secure titles increase household investments in durable structures by 20-30%, as owners can leverage assets for and formalize enhancements, contrasting with untitled slums where improvements remain informal and non-monetizable. Without titling, upgrading efforts yield limited long-term returns, as residents lack incentives to maintain or expand upon public investments. Program costs typically range from several hundred to thousands of dollars per household for alone, yet recovery rates hover at 45-75% due to subsidized models that deter cost-recovery mechanisms and private participation. assessments highlight that these expenditures deliver uneven returns on investment in the absence of integrated and markets, where distortions like tenure insecurity amplify fiscal burdens without proportional gains. Upgrading strategies often overlook the root incentives driving slum formation, namely regulatory overreach such as stringent and land-use restrictions that constrain formal supply and exacerbate shortages. Empirical studies link excessive building regulations to reduced output, pushing low-income migrants into informal settlements as the only viable option, rendering in-situ upgrades a symptomatic fix rather than addressing supply-side barriers to market-driven development.

Unintended Consequences on Urban Dynamics

Slum upgrading interventions frequently lead to increased in targeted areas, as enhanced and services encourage residents to remain and subdivide plots, while attracting selective inflows of better-educated migrants, thereby diminishing per-capita gains in living standards. Empirical analysis of Indonesia's Kampung Improvement Program (KIP), implemented from 1969 to 1984 across , reveals that upgraded kampungs maintained 39% higher population densities than comparable non-upgraded historical settlements, accompanied by a 47% increase in land parcels per unit area due to fragmentation. This densification arises because upgrading preserves informal patterns without formalizing titles or expanding habitable space, locking in inefficient spatial allocation over the long term. Such dynamics perpetuate scarcity, as slum upgrading rarely addresses underlying land supply constraints in densely populated cities, instead channeling pressures to adjacent peripheral zones. In the KIP case, upgraded areas experienced of formal commercial and high-rise to neighboring locales, with 50% fewer high-rises and persistently lower land values (15% reduction), signaling deferred but sustained informality that hampers broader efficiency. Partial or incremental upgrades exacerbate this by creating hybrid zones blending improved amenities with insecure tenure, rendering them prone to speculative investment that elevates costs without proportional benefits to original occupants. Evidence from South African informal upgrading underscores risks of indirect through market-mediated escalation, where post-infrastructure improvements draw higher-income entrants and push low-income households outward. Hybrid processes in cities like have displaced subsidized beneficiaries back into peripheral informal areas, undermining upgrading's poverty-alleviation goals amid rising land pressures. These patterns alter broader flows, concentrating new arrivals in upgraded peripheries while original cores become stratified enclaves, as upgrading signals viability without resolving tenure ambiguities that fuel .

Debates and Alternatives

Comparisons with Slum Clearance

Slum upgrading emphasizes in-situ improvements to , services, and within existing informal settlements, minimizing resident and preserving structures, in contrast to , which entails demolition of substandard areas and relocation to facilitate for formal uses. Clearance enables swift repurposing of valuable , potentially yielding higher economic through denser or , though it imposes significant short-term disruptions including losses and family separations. Historical cases illustrate clearance's potential when coupled with structured relocation and economic support; Singapore's initiative, launched in 1960, cleared widespread squatter settlements affecting nearly half the population by resettling over 50,000 families into subsidized high-rise flats by 1965, achieving slum eradication within a decade through site-and-service schemes that included job linkages and ownership incentives. This approach raised occupancy from 9% in 1959 to over 80% by the 1980s, demonstrating clearance's efficacy in resource-constrained contexts with strong state coordination. Conversely, numerous clearance programs elsewhere exhibited high failure rates, with informal settlements recurring in 70-80% of cases due to peripheral sites lacking access, leading to renewed and substandard conditions. Upgrading typically incurs lower upfront costs—often 20-50% less than clearance with —and avoids immediate , fostering incremental gains in and tenure without uprooting social ties. However, by retaining settlements in peripheral or hazard-prone locations, upgrading can perpetuate spatial mismatches, entrenching low-productivity and constraining broader urban expansion or scaling. Empirical assessments from indicate that preserving upgraded slums distorts city growth patterns, reducing adjacent formal development densities by up to 15% over decades compared to cleared sites repurposed for mixed uses. In high-value central districts, clearance has shown superior long-term outcomes for land efficiency when enabling formal , as evidenced by elevated values and reduced informality persistence in cleared versus upgraded zones, provided relocation mitigates immediate inequities. Overall, while upgrading prioritizes continuity and cost containment, clearance's disruptive nature better addresses causal drivers of slum persistence in prime areas by unlocking land for value-maximizing allocation, though success hinges on averting recurrence through viable resettlement.

Market-Led Solutions and Property Rights Emphasis

Market-led approaches to slum upgrading emphasize formalizing property rights in informal settlements to activate latent economic , contrasting with infrastructure-focused interventions by enabling residents to transact assets legally and access credit markets. Economist posits that untitled assets in developing countries represent "dead capital"—immovable locked outside formal systems—estimated at approximately $9.3 trillion as of 2000, comparable to the total assets of formal economies in the developed world. Formal titles, de Soto argues, convert this into productive capital by allowing owners to mortgage properties, secure loans, and invest in self-improvement, thereby reducing reliance on state subsidies and fostering endogenous urban development. Empirical studies support that titling spurs private in slum housing without mandating public upgrades. In , the COFOPRI program (1996–2006), which issued titles to over 1.5 million urban informal plots, resulted in titled households increasing durable investments—such as roof and wall reinforcements—by 20–40% relative to untitled comparators, as owners gained collateralizable assets. This investment effect persisted even after accounting for selection biases, with evidence indicating improved tenure correlated to higher residential consolidation and reduced vulnerability to . In , analogous titling efforts in urban kampungs have linked formal ownership to enhanced housing quality and perceived , though broader slum growth impacts remain context-dependent due to enforcement challenges. Proponents contend that such formalization outperforms conventional upgrading by prioritizing resident agency over bureaucratic oversight, as informal s already demonstrate efficient absent legal barriers—evidenced by rapid self-built expansions in titled Peruvian settlements. Traditional slum upgrading, by contrast, risks substituting state-directed for incentives, potentially entrenching and overlooking how untitled "dead " perpetuates underinvestment; titling addresses root tenure insecurity, enabling owners to capture returns from their labor and location value. However, outcomes are not uniform: in , up to 30% of titles de-formalized via unregistered sales within a decade, underscoring needs for complementary registration enforcement to sustain gains. Overall, these programs suggest titling can curb informal expansion by making formal s accessible, though success hinges on minimal regulatory friction to avoid reverting to extralegal transactions.

Ideological Perspectives on Root Causes

Left-leaning perspectives on the origins of slums emphasize systemic structural inequalities, including unequal access to resources and rapid urbanization without commensurate public investment in housing and services, positing that these conditions perpetuate cycles of deprivation requiring expansive state interventions to rectify. Such views, often advanced by multilateral organizations and progressive urban planners, frame informal settlements as manifestations of broader capitalist failures in equitable resource distribution, advocating for subsidized upgrading and welfare-oriented policies to address root inequities. However, these interpretations have been critiqued for underemphasizing the agency of rural-to-urban migrants, who actively choose relocation to access economic opportunities unavailable in origin areas, with slums serving as pragmatic entry points rather than imposed traps of structural determinism. Market-oriented and right-leaning analyses, conversely, attribute slum proliferation primarily to policy-induced barriers that constrain housing supply, such as overly , building codes, and land-use regulations that render significant portions of unsuitable or uneconomical for low-density, affordable in developing countries. For instance, minimum plot sizes, restrictions, and preservation mandates in cities like those in and effectively idle vast tracts—often exceeding 50% of potential developable area—elevating formal housing costs beyond the reach of low-income groups and incentivizing informal encroachment. Proponents argue that slum upgrading programs function as palliatives, masking symptoms without tackling these regulatory chokeholds, which stifle private investment and entrepreneurial responses to demand; true resolution demands to unleash signals for denser, cheaper supply. Empirical observations underscore that slums arise less from inherent traps and more from institutional rigidities amid explosive , with the global projected to rise from 55% in to 68% by 2050, adding approximately 2.5 billion residents primarily in the developing and overwhelming state-led formal provision capacities. Informal economies, including self-built settlements, furnish the bulk of for low-income ites—accommodating over 1 billion globally and comprising up to 60% of stock in major cities of and —demonstrating adaptive and upward pathways, as evidenced by longitudinal studies showing many households transitioning out of conditions through informal sector gains rather than entrapment. This data supports causal attributions to modifiable policy failures over immutable deprivation, highlighting migrants' rational calculus in trading rural stagnation for urban prospects despite regulatory hurdles.

Recent Developments and Prospects

Innovations in Technology and Financing

Geographic Information Systems (GIS) and technologies have enhanced slum delineation and planning since the 2010s by enabling precise of informal settlements where traditional surveys are labor-intensive and error-prone. For instance, models applied to have improved slum detection accuracy, with meta-analyses of studies from 2014 to 2024 showing advancements in automated classification that outperform methods in for large urban areas. Drone surveys further accelerate data collection; in Brazil's Alto das Pombas slum in 2021, drones captured housing characteristics with higher resolution and speed than ground-based , reducing survey times while providing 3D models for prioritization. Similarly, India's Jaga Mission in shifted to drone imagery by 2019, replacing and enabling of over 700 slums covering 1.7 million residents, demonstrating empirical through faster, verifiable data for upgrading interventions. Blockchain pilots for land tenure security emerged in the 2020s to address documentation gaps in informal areas, with India's strategy highlighting immutable digital records for ownership to prevent disputes and facilitate upgrades. In , blockchain-based land titling initiatives since 2020 have digitized records for rural and peri-urban properties, extending potential to contexts by enabling tamper-proof verification and reducing in tenure formalization, though full remains unproven due to challenges with legacy systems. These technologies contrast with traditional paper-based titling, offering greater transparency but requiring digital infrastructure investments that limit widespread adoption in low-connectivity s. Financing innovations like public-private partnerships (PPPs) and impact bonds have introduced performance-based models to slum upgrading, with PPPs leveraging private for delivery. UN-Habitat analyses indicate PPPs achieve cost savings by allocating risks appropriately, as seen in housing projects where private involvement reduced public expenditure through bundled services. Social impact bonds, piloted in urban contexts, tie payments to measurable outcomes like coverage, though slum-specific applications remain limited; approaches in developing cities have shown potential for scaling via outcome incentives. Empirical comparisons reveal 10-25% gains in project delivery over traditional public funding, per case studies, but scalability hinges on investor returns and regulatory alignment. The accelerated remote technologies for slum services, such as GIS-enabled needs assessments to bypass in-person surveys amid lockdowns, yet adoption lags in low-literacy areas due to digital divides and verification issues. In contexts like slums, remote mapping supported targeted aid distribution but faced challenges in community trust and data accuracy without ground validation, underscoring that while tech innovations enhance speed over conventional methods, equitable scalability demands complementary capacity-building. Overall, these post-2010s tools offer verifiable improvements in precision and cost-effectiveness against traditional approaches, though from pilots indicates constraints in resource-poor settings limit broad replication.

Long-Term Sustainability Assessments

Longitudinal studies from the 2020s indicate that slum upgrading programs often deliver initial improvements in and but struggle with long-term durability without integrating upgraded areas into broader economies. For instance, an analysis of Indonesia's Kampung Improvement Program (KIP), which upgraded s for over 5 million residents between 1969 and 1984, found short-term gains in and mortality rates, yet these areas exhibited delayed formal and persistent informal characteristics decades later compared to untreated historical slums. The study attributes this to opportunity costs from preserving low-density slum layouts, which hinder commercial development and economic ties, leading to reversion risks absent property rights reforms or incentives for private investment. Similar patterns emerge in other evaluations, where physical upgrades alone fail to prevent re-slummification if residents lack secure tenure or access to formal credit s. Global trends underscore that slum upgrading contributes modestly to reductions in slum prevalence, with broader dynamics playing the dominant role in . data show the share of populations in developing regions living in s declined from about 37% in to 23% by , driven primarily by rural-to-urban absorbing excess labor into formal sectors rather than isolated upgrading efforts. This decline highlights the limitations of upgrading as a standalone fix, as absolute slum numbers rose to 1.1 billion by despite proportional drops, necessitating policies that facilitate market-led transitions over perpetual subsidization. Emerging prospects for sustainable upgrading emphasize hybrid models incorporating and economic incentives. Recent initiatives integrate resilient infrastructure, such as upgraded systems in flood-prone areas like Nairobi's slum, to mitigate climate risks while enabling property formalization. In Latin American cases, combining upgrading with measures—like elevated structures and green —has shown promise in reducing to , provided they align with market-oriented reforms to prevent fiscal dependency. Policymakers increasingly advocate for these hybrids, prioritizing tenure security and private financing to embed upgraded slums in urban value chains, thereby averting reversion amid rising climate pressures.

References

  1. [1]
    [PDF] Slum upgrading strategies and their effects on health and socio ... - 3ie
    The review examined slum upgrading programmes involving at least one or more physical environment or infrastructure change to the slum environment in situ ...
  2. [2]
    [PDF] Evaluation of Slum Upgrading Programs - IDB Publications
    First, housing variables perform very poorly in slums because a household with inadequate housing facilities is primarily defined as belonging to a slum. This ...
  3. [3]
    An overview of slum upgrading programs in developing countries
    The purpose of this paper is to evaluate slum upgrading programs, which has already had 10 editions in Indonesia since 1969. This evaluation was conducted ...<|control11|><|separator|>
  4. [4]
    Slum Upgrading and Long-run Urban Development: Evidence from ...
    Oct 10, 2025 · Developing countries face massive urbanization and slum upgrading is a popular policy to improve shelter for many. Yet, preserving slums at ...
  5. [5]
    Slum upgrading strategies involving physical environment ... - PubMed
    Jan 31, 2013 · To explore the effects of slum upgrading strategies involving physical environment and infrastructure interventions on the health, quality of life and socio- ...
  6. [6]
  7. [7]
    [PDF] Slum Upgrading and Long-run Urban Development: Evidence from ...
    Third, we quantify the key trade-offs associated with upgrading. (and preserving) slums, thus informing policy makers considering slum upgrading and debating.
  8. [8]
    [PDF] A PRACTICAL GUIDE TO DESIGNING, PLANNING, AND ... - ohchr
    wHAt is slum uPGrAdinG? The narrow definition of slum upgrading refers to improvements in housing and/or basic infrastructure in slum areas. In a broader ...
  9. [9]
    [PDF] Slum upgrading strategies and their effects on health and socio ... - 3ie
    In situ slum upgrading, at its basic level, involves improving the physical environment of the existing area, such as improving and installing basic.
  10. [10]
    [PDF] module 1 - adequate housing and slum upgrading - UN-Habitat
    UN-Habitat defines a slum household in operational terms, as lacking one or more of the following indicators: a durable housing structure; access to clean water ...Missing: objectives | Show results with:objectives
  11. [11]
    [PDF] Guidance Note on Community Participation in Slum Upgrading.
    Slum upgrading aims to improve living conditions and wellbeing. of communities. By turning slums or pockets of socio-economic.
  12. [12]
    slum dwellers - — SDG Indicators - UN.org.
    The proportion of the urban population living in slums worldwide increased from 23 per cent to 24 per cent, translating to over 1 billion slum dwellers.
  13. [13]
    Population living in slums (% of urban population) | Data
    Population living in slums (% of urban population). Urban Indicators Database, UN Human Settlements Programme ( UN-Habitat ), uri: data.unhabitat.org. License ...
  14. [14]
    [PDF] Housing the Urban Poor in Developing Countries
    Other countries had similar experiences with slum removal and relocation policies. The failure of these policies led many governments in developing.
  15. [15]
    [PDF] In-situ Upgrading or Population Relocation? Direct Impacts and ...
    Oct 15, 2024 · Assessing benefits of slum upgrading programs in second- best settings. In Urban Land markets: Improving Land management for successful.
  16. [16]
    [PDF] 'Sites and services', and in-situ slum upgrading
    Aug 21, 2020 · and microfinance, slum upgrading and 'sites and services' projects should regain some focus. Slum upgrading projects funded by the World ...
  17. [17]
    (PDF) DO URBAN LAND REGULATIONS INFLUENCE SLUM ...
    Economically irrational building regulations have also been shown to fuel the formation of slums as well as restrict the supply of affordable housing (Patel ...
  18. [18]
    The Economics of Slums in the Developing World
    Nov 15, 2013 · This might suggest that today's slums pose a problem of a different nature: because of multiple market and policy failures, acute governance and ...<|separator|>
  19. [19]
    [PDF] Slum Upgrading and Long-run Urban Development: Evidence from ...
    Apr 9, 2024 · Preserving slums is one of the inherent objectives of slum upgrading programs, as these areas give shelter to many residents. This occurs ...
  20. [20]
    Haussmann and the Rebuilding of Paris, 1853–1870
    Aug 16, 2023 · This chapter shows that while the transformation of Paris did result in the destruction of a number of working-class neighborhoods, “slum ...
  21. [21]
    [PDF] Housing Haussmann's Paris: the politics and legacy of Second ...
    Jun 8, 2021 · cheap accommodation in the centre and the creation of slums on the outskirts. ... inducing swift, encompassing class-based displacement, produced ...
  22. [22]
    Haussmann's Three-Pronged Modernization of Paris - Academia.edu
    Haussmann cited hygiene and sanitation as justification for this vast slum clearance ... clearance, and displacement – were authoritarian. Indeed, the ...
  23. [23]
    [PDF] Slum Clearance and Urban Renewal in the United States
    4 A full cost-benefit analysis of the program is beyond the scope of this paper. ... ability to participate in slum clearance and redevelopment during the 1950s ...
  24. [24]
    Slum Clearance and Urban Renewal in the United States
    Aug 7, 2025 · By the mid-1960s, United States slum clearance forced the relocation of over 300,000 families, more than half of whom were non-White ...
  25. [25]
    [PDF] American Journal of Economics and Sociology, Inc. Curing Slums
    and under-utilized. Unslumming. Instead of slum clearance, Jacobs champions the "unslumming" of slums and expresses confidence that many slums ...
  26. [26]
    How public housing was destined to fail - Greater Greater Washington
    Jun 23, 2020 · Inadequate funding, poor maintenance, and media sensationalization helped create a narrative of substandard slum living, and the system set up ...
  27. [27]
    [PDF] Unsettled City: Neoliberal redevelopment, state crisis, slum ...
    May 15, 2023 · CHAPTER TWO presents Mumbai's slum and resettlements from the 1950s ... interventions, sovereign action was seen in brutal slum clearances: “slums.
  28. [28]
    [PDF] Slums, Slumdogs, and Accumulation by Dispossession
    Dec 12, 2010 · An examination of public policy and pronouncements of the judiciary in India, as they related to slums and slum-dwellers, calls into question ...
  29. [29]
    World Bank Experience with the Provision of Infrastructure Services ...
    THIS PAPER REFLECTS on the experience of the World Bank over the last 25 years in lending for “slum” and squatter upgrading and basic urban services.
  30. [30]
    (PDF) A double irony: The originality and influence of John F.C. Turner
    In fact, Turner was not the first to advocate self-help; his warm reception ... slum clearance to the environmental. improvement of squatter settlements ...
  31. [31]
    Housing Agency - Places Journal
    In his 2005 masterpiece Planet of Slums, he writes: “As Third World governments abdicated the battle against the slum in the 1970s, the Bretton Woods ...
  32. [32]
    [PDF] The world's first slum upgrading programme - UN-Habitat
    The Kampung Improvement Programme (KIP) in Jakarta, launched in 1969, is the world's first slum upgrading project, providing basic urban services.Missing: scale impact<|separator|>
  33. [33]
    [PDF] Indonesia Impact Evaluation Report - Enhancing the Quality of Life ...
    Jun 29, 1995 · The report evaluates the Kampung Improvement Program's impact on urban Indonesia, finding residents better educated, healthier, with more ...
  34. [34]
    [PDF] Slum Upgrading and Long-run Urban Development: Evidence from ...
    1. The 1969-1984 Kampung Improvement Program (KIP)2 provided basic public goods and a verbal non-eviction guarantee to 5 million slum dwellers in the city of ...
  35. [35]
    Upgrading housing infrastructure in Latin American slums
    As a response to the explosive growth of new slums in large cities, during the 1980s in situ slum upgrading programs emerged. These programs are underpinned ...
  36. [36]
    Dead Capital and the Poor - ResearchGate
    Aug 5, 2025 · According to De Soto, informal land transfer is referred to as "dead capital ... slums scattered around Cairo and Alexandria. As the slum dwellers ...
  37. [37]
    The Mystery of Capital | Summary, Quotes, FAQ, Audio - SoBrief
    Rating 4.5 (101) Jan 24, 2025 · This exclusion affects: Urban areas: Informal settlements, slums, and unauthorized construction; Rural areas: Lack of formal land titles for ...
  38. [38]
    [PDF] Urban Community Upgrading - World Bank Documents
    Partial or full costs of the upgrading program may be recovered from: ... Cost savings might be achieved by offering more choice to beneficiaries and by ...
  39. [39]
    Publication: Assessing Benefits of Slum Upgrading Programs in ...
    Slum upgrading programs are being used by national and city governments in many countries to improve the welfare of households living in slum and squatter ...Missing: definition | Show results with:definition
  40. [40]
    [PDF] HSP - UN-Habitat
    Apr 25, 2003 · Clearly, improving the lives of slum dwellers requires much more than a reactive slum upgrading strategy, as critical as such a strategy is for ...
  41. [41]
    Global Action Needed to Tackle Urban Squalor as Number of Slum ...
    Nov 2, 2010 · “A new framework is needed for those efforts, since the Millennium Development Goals target on slums has already been attained, but the slum ...
  42. [42]
    [PDF] BAIRRO YEARS LATER - IDB Publications
    in favelas are achievable and worthy goals of neighborhood upgrading programs. ... Urban upgrading in Rio de Janeiro: Evidence from the Favela Bairro program- me.
  43. [43]
    227 million people escape world's slums, UN report finds | Population
    Mar 22, 2010 · While countries comfortably achieved the Millennium development goal to lift 100 million people out of slums by 2020, the UN says slum numbers ...
  44. [44]
    The seven myths of 'slums' – myth 6: international aid is the answer
    Dec 8, 2010 · As this Myth sets out to explain, international aid not only fails to benefit a major proportion of the poor living in slums, but it often works ...
  45. [45]
    [PDF] How International Aid Can Do More Harm than Good - LSE
    Critics insist on foreign aid producing mostly reverse effects for developing countries—despite intending to help, the rich world may actually hurt the ...
  46. [46]
    Slum upgrading strategies involving physical environment and ...
    Improved health outcomes in urban slums through infrastructure upgrading. ... One RCT reported no effect of slum upgrading (road paving) on the proportion ...
  47. [47]
    Experimental Evidence from Urban Road Pavement - ResearchGate
    Aug 7, 2025 · We estimate the impacts of slum infrastructure upgrading using an experiment in urban road pavement provision in Mexico. Our findings show that ...
  48. [48]
    Evaluation of WASH indicators associated with diarrhoeal disease ...
    Mar 29, 2022 · The study results suggest that WASH advocacy and an improvement in sanitation-related infrastructure for the slum population can reduce diarrhoeal incidence.
  49. [49]
    Energy use strategies and implications for fire risk amongst low ...
    Dec 14, 2020 · This research set out to explore and examine what energy sources are being utilised by low-income households and their implications for fire risk in these ...
  50. [50]
    [PDF] Fire Safety in Informal Settlements - Arup
    Fires in informal settlements are most commonly caused by open flame sources (for cooking, heating, and lighting) and overloaded or poorly maintained (and ...
  51. [51]
    (PDF) Drainage and storm water management for low-income urban ...
    Aug 9, 2025 · ... slums next. to drainage channels are especially susceptible to environment health problems as. well as those related to flooding. Photo ...
  52. [52]
    Slums and Slum Upgrading - Cities Alliance
    Is slum upgrading different from urban upgrading? · Why is slum upgrading important? · Why not tear down the slums and start over? · What factors are needed for ...Missing: situ | Show results with:situ
  53. [53]
    Slum infrastructure: Quantitative measures and scenarios for ...
    This paper reviews quantitative indicators on slum infrastructure, and demonstrates analyses they can facilitate.Missing: incremental | Show results with:incremental
  54. [54]
    [PDF] PROPERTY RIGHTS AND INVESTMENT IN URBAN SLUMS
    May 21, 2005 · Field, Erica (2003). “Entitled to Work: Urban Property Rights and Labor Supply in Peru.” Research Program in Development Studies Working ...
  55. [55]
    Is legalized land tenure necessary in slum upgrading? Learning ...
    Improving the health and welfare of people who live in slums · Slum upgrading and urban governance: Case studies in three South East Asian cities · The upgrading ...
  56. [56]
    Entitled to Work: Urban Property Rights and Labor Supply in Peru on ...
    Erica Field, Entitled to Work: Urban Property Rights and Labor Supply in Peru, The Quarterly Journal of Economics, Vol. 122, No. 4 (Nov., 2007), pp.
  57. [57]
    [PDF] Unregistered Property Transactions and the Erosion of the Titling ...
    Sep 1, 2016 · Currently, there is increasing evidence that titled properties in urban slums become de-regularized due to unregistered transactions (Galiani ...
  58. [58]
    Effects of a scalable home‐visiting intervention on child ... - NIH
    This effectiveness trial showed that a home‐visiting stimulation intervention improved the development of disadvantaged young children in Indian urban slums.
  59. [59]
    Cluster-randomised controlled trial of community mobilisation in ...
    Cluster-randomised controlled trial of community mobilisation in Mumbai slums to improve care during pregnancy, delivery, postpartum and for the newborn - PMC.
  60. [60]
    Building Local Governance: Participation and Elite Capture in Slum ...
    Jan 15, 2014 · ... community were even flown to India in order to learn from other slum communities. ... In Nairobi slums, the state is largely absent as a service ...
  61. [61]
    Elite capture in a participatory slum-upgrading programme in Kenya
    Through an original ethnography of an internationally-funded slum-upgrading programme, the paper seeks to contribute to critical participation studies analysing ...
  62. [62]
    The effect of slum upgrading on slum dwellers' health, quality of life ...
    Dec 1, 2021 · Slum upgrading basically involves improving the physical environment, for example the water supply, sanitation, waste collection, electricity, ...
  63. [63]
    Association of Time since Migration from Rural to Urban Slums and ...
    With limited access to employment, education, and social networking opportunities, slum residents may fall into poverty traps that intersect with and exacerbate ...
  64. [64]
    [PDF] Slum Upgrading – Lessons Learned from Brazil - Cities Alliance
    This is partly due to the success of some of its programs developed in partnership with the Brazilian government, such as Favela-Bairro (Program for the ...
  65. [65]
    (PDF) Overview of Kenyan Government Initiatives in Slum Upgrading
    The goal of this paper is to explore the slum upgrading processes: the implementation of the Kenyan KENSUP project, associated successes and failures, and to ...Missing: KIP | Show results with:KIP
  66. [66]
    Why residents of Kibera slum are rejecting new housing plans
    Apr 18, 2013 · The Kenya Slum Upgrading Project (KENSUP) rises on the edge of Kibera. ... failures of the housing projects in Kibera. Mildred was happy to ...
  67. [67]
    Why Slum Upgrading in Kenya has Failed - Kibera - BUILDesign
    Sep 28, 2013 · Why Slum Upgrading in Kenya has Failed ... The most recent phase of Kibera slum upgrading project has 900 housing units, 230 business stalls, a ...
  68. [68]
    Still waiting for housing - Devex
    Feb 14, 2019 · ▻ No answer: Kenya's gender-based violence hotline fails to connect ... Kenya Slum Upgrading Program but he hasn't received any information.
  69. [69]
    [PDF] A/73/310 General Assembly
    Aug 7, 2018 · During the slum upgrading programme (KENSUP) in Soweto East in Nairobi,. Kenya, 31 per cent of residents believed corruption would mean they ...
  70. [70]
    A case study on the influence of politics on slum upgrading in Kibera
    ... slum upgrading project Kenya Slum Upgrading Program in Kibera. The key obstacles include poverty, corruption, tribalism, political interpretation of the project ...
  71. [71]
    [PDF] No Business like Slum Business? The Political Economy of the ...
    This paper examines the political economy of the continued existence of slums in Nairobi. Compared to the rest of the city's population Nairobi's slum ...
  72. [72]
    [PDF] Mitigating corruption in informal settlement upgrading processes
    Apr 29, 2025 · For example, the department of human settlements which oversees many upgrading processes in South Africa has its own anti-corruption and fraud ...
  73. [73]
    [PDF] Brazil Impact Story - UN-Habitat
    slum dwellers: many slums dwellers in Brazil remain susceptible to violence, especially women and girls, and have limited access to employment, school and ...
  74. [74]
    (PDF) Participatory slum upgrading: lessons from post ...
    By comparing two post-decentralization, participatory slum upgrading (PSU) programs in India and Indonesia, this paper explores participation's impacts on ...Missing: compliance upkeep
  75. [75]
    Favela Upgrade in Brazil: A Reverse of Participatory Processes
    Sep 23, 2013 · Within the Brazilian context, there are examples of well-known slum-upgrading policies and practices, such as the Favela Bairro Program in Rio ...
  76. [76]
    [PDF] Community-driven development in the slums: Thailand's experience
    Note: The National Housing Authority surveyed 570 residents of urban slum settlements for the survey. + The measurement of slums used data on overcrowding and ...
  77. [77]
    The Suvidha Centers in India - HKS Student Policy Review
    Apr 25, 2024 · Innovation in Addressing Urban Sanitation in India. The national missions triggered an increase in innovative approaches by the private sector ...
  78. [78]
    (PDF) Public-private partnership for slum upgrading intervention
    This paper aims to investigate if it is possible to structure PPP projects for slum upgrading and if it is an effective governance approach.
  79. [79]
    Hernando de Soto on Land Titling: Consensus and Criticism
    Aug 6, 2025 · In an effort to improve slums and reduce poverty, many developing ... Yet empirical evidence supporting their assumed beneficial effects has not ...
  80. [80]
    Land titling, perceived tenure security, and housing consolidation in ...
    In an effort to improve slums and reduce poverty, many developing countries have embarked on mass land titling programs. Yet empirical evidence supporting ...Missing: loans | Show results with:loans
  81. [81]
    [PDF] Potential of the Private Sector in Providing Water to the Urban Poor
    Considering the public sector's failure in providing sufficient access to clean water to millions of slum dwellers willing to pay for better service, this ...Missing: outperforms | Show results with:outperforms
  82. [82]
    Working with the Market : Approach to Reducing Urban Slums in India
    This paper examines the policy options for India as it seeks to improve living conditions of the poor on a large scale and reduce the population in slums.
  83. [83]
    [PDF] ED Precis - World Bank Documents and Reports
    The ma-. KIP kampungs were better than jority of residents in KIP kampungs. In kampungs where the drainage those in non-KIP kampungs. have water piped into ...
  84. [84]
    [PDF] 30804 - World Bank Document
    Once the municipality of Rio de Janeiro acknowledged the problem of long-neglected slums. (favelas), the Favela-Bairro program developed policies to address ...
  85. [85]
    From raze to rebuild - IDB
    A survey of 34 favelas included in the program found that businesses were also mushrooming, almost doubling to 2,250 enterprises. Mounting challenges. As Favela ...Missing: post- displacement
  86. [86]
    [PDF] Housing, Health and Happiness - World Bank Document
    In the developing world, where urbanization is strongly associated with the rapid spread of slums, and where slum dwellers account for 45% of the urban ...
  87. [87]
    Evaluating the health effects of place-based slum upgrading ...
    Slum upgrading is an umbrella term that refers to the process of improving environmental, social, economic, and legal conditions in slums through interventions ...
  88. [88]
    Nairobi's Housing Crisis: An Analysis of the Kenya Slum Upgrading ...
    Efforts to upgrade Nairobi's slums have been attempted by the Government of Kenya (GoK) for decades, using different theories and strategies ranging from forced ...
  89. [89]
    [PDF] An Analysis of the Kenya Slum Upgrading Programme - CORE
    Efforts to upgrade Nairobi's slums have been attempted by the. Government of Kenya (GoK) for decades, using different theories and strategies ranging from.
  90. [90]
    [PDF] NATIONAL SLUM UPGRADING AND PREVENTION STRATEGY
    4.4.2: In-situ Upgrading Approach. In-situ slum upgrading approach will involve a process of improving the living standards of slum households by providing ...
  91. [91]
    ED Attaches Flats Worth Rs 462 Cr In Mumbai In Slum Rehab Fraud ...
    Apr 6, 2018 · ... slum rehabilitation scheme in the Bandra area of Mumbai ... ED attaches flats worth Rs 462 cr in Mumbai in slum rehab fraud case.<|separator|>
  92. [92]
    Kenyan Government Initiatives in Slum Upgrading
    This article discusses two Kenyan government initiatives in slum upgrading: the Kenya Slum Upgrading Programme (KENSUP) and the Kenya Informal Settlement ...
  93. [93]
  94. [94]
    Upgrading Slums for Long-Run Urban Development in Indonesia
    Feb 26, 2025 · Slum upgrading programmes improve living conditions for low-skilled residents, but potentially at the cost of formal development and inefficient land ...Missing: 2020s transitions
  95. [95]
    [PDF] Land Related Challenges to Slum upgrading In Kenya
    To review the land tenure situation in the slums of Nairobi. 2. To identify land related challenges experienced in the process of slum upgrading in. Nairobi. 3.
  96. [96]
    Optimizing Sanitation Network Upgrading Projects in Slum Areas
    Aug 3, 2023 · Optimizing construction planning becomes even more challenging in slums. In slum areas, infrastructure upgrading projects experience significant ...Missing: retrofitting | Show results with:retrofitting<|separator|>
  97. [97]
    The Realities of Economic Development Subsidies
    Nov 1, 2018 · Reality 1: Economic development incentives often are not crucial to where firms locate. Firms looking to locate or relocate often overemphasize ...Missing: misalignments slum dependency
  98. [98]
    Fixing the Broken Incentives in the U.S. Welfare System - FREOPP
    A better approach would be to establish “transitional benefits” to offset the loss in benefits that occurs as a recipient earns non-welfare income.Missing: misalignments slum
  99. [99]
    [PDF] Property rights and investment incentives in an urban setting
    Despite the absence of empirical evidence, property titling is increasingly considered a critical instrument for generating investment in urban slums ( ...
  100. [100]
    Property Rights and Investment in Urban Slums - ResearchGate
    Aug 7, 2025 · ... Several studies find that the provision of property rights stimulated housing investment in slums. Field (2005) rely on a quasi-experimental ...
  101. [101]
    (PDF) Can Land Use Regulation Be Smarter? Planners' Role in the ...
    Oct 16, 2019 · Slums.” Journal of the European Economic Association 3 (2):. 279–90 ... Land Use Regulation and Residential Segregation: Does Zoning Matter?
  102. [102]
    (PDF) Land Subdivision Legislation in Brazil - Guilty of Promoting ...
    Aug 6, 2025 · about 57% of the 5,565 municipalities reported to have slums or irregular developments. These municipalities contained about 87% of the ...
  103. [103]
    [PDF] Transforming Slums Through Urban Intensification - Strathprints
    Jul 3, 2021 · The factor of slum location, density, and area is crucial in the slum upgrading and development process, this because it informs whether the ...
  104. [104]
    Hybrid gentrification in South Africa: Theorising across southern and ...
    Firstly, the displacement of low- income beneficiaries (sellers) into informal settlements has consequences for the perma- nence of informal housing (households ...
  105. [105]
    Slum Upgrading and Housing Alternatives for the Poor - SpringerLink
    Mar 13, 2018 · Despite the informality inherent to slums, private-sector companies can be involved in slum upgrading through the provision of basic ...
  106. [106]
    Singapore Public Housing, HDB Projects - RCHI MIT
    Beginning with aggressive squatter clearance and housing development in the early 1960s, Singapore “solved” its slums and squatter issues in ten years. The “HDB ...
  107. [107]
    “But what about Singapore?” Lessons from the best public housing ...
    Jan 31, 2018 · When Singapore attained self-government in 1959, only 9% of Singaporeans resided in public housing. Today, 80% of Singaporeans live a government ...
  108. [108]
    Slum Clearance Research Papers - Academia.edu
    Key finding: This study assesses four main slum clearance strategies over 30 years and finds that most resettlement projects failed to produce durable ...Missing: rate | Show results with:rate
  109. [109]
    The long-run implications of slum clearance: A neighborhood analysis
    They conclude that slum clearance and urban renewal had positive and economically significant effects on city-level measures of income, property value, and ...<|control11|><|separator|>
  110. [110]
    The Influence of de Soto's “The Mystery of Capital”
    Jan 1, 2002 · He has estimated the amount of dead capital in the developing world at about US$9.3 trillion, a staggering figure that has drawn the attention ...
  111. [111]
    Finance & Development, March 2001 - The Mystery of Capital
    By Hernando de Soto - Why has the genesis of capital become such a mystery? And why have the rich nations of the world not explained to other nations how ...Missing: global | Show results with:global
  112. [112]
    [PDF] The negative effects of Hernando de Soto's 'Mystery of capital'
    Aug 12, 1990 · ... dead capital in the informal economy: 9,3 trillion ... Understanding slums: Case Studies for the Global Report on Human Settlements.
  113. [113]
    Where do Property Rights Matter More? Explaining the Variation in ...
    Evidence from studies in Peru, Argentina, and Mexico suggests that strengthening property rights in urban slums has a significant effect on residential ...
  114. [114]
    Framing 'slums': global policy discourses and urban inequalities
    Apr 12, 2023 · This study analyses how global discourses from key multilateral agencies and donors have framed the problem of slums and informal settlements over time.
  115. [115]
    Urbanisation and the Rise of Slum Housing - Habitat for Humanity GB
    They will start to become obstacles in the way of achieving sustainable development goals. Colombia's slum housing made worse by urbanisation. Birth of slums.
  116. [116]
    Developing world cities: Poverty traps versus pathways to prosperity
    Apr 26, 2025 · Are the slums of South Asia or the favelas of Brazil poverty traps or portals to prosperity? Marx et al. (2013) document that the longer-term ...
  117. [117]
    ZONING AND THE 'RIGHT' CITY: The Challenges of Zoning in the ...
    Aug 28, 2024 · While most developing countries ostensibly implement zoning, peri-urban development is predominantly informally regulated through customary ...
  118. [118]
    Land Rezoning and Structural Transformation in Rural India
    Zoning laws that restrict rural land to agricultural production pose an important institutional barrier to industrial development.<|separator|>
  119. [119]
    Designing cities in developing countries - VoxDev
    Nov 13, 2024 · Cities in developing countries are growing rapidly, experiencing population growth rates of 3-4%, coupled with rising incomes. This surge is ...Missing: idle percentages
  120. [120]
    68% of the world population projected to live in urban areas by 2050 ...
    May 16, 2018 · 55% of the world's population lives in urban areas, a proportion that is expected to increase to 68% by 2050.
  121. [121]
    Informal settlements are growing everywhere — here's what we do
    Aug 22, 2023 · The number of people living in slums or other informal settlements has grown by 165 million in the past 20 years, bringing the total to nearly 1.1 billion.
  122. [122]
    Urban slums: Poverty traps or stepping stones? - La Fonte
    Feb 2, 2024 · Urban slums can be both a symptom and cause of low human capital: knowing which is an important pre-condition of designing an effective policy response.
  123. [123]
    Deep Learning for Slum Mapping in Remote Sensing Images - arXiv
    Jun 12, 2024 · This article offers a detailed review and meta-analysis of research on slum mapping using remote sensing imagery (2014–2024), with a special focus on deep ...Missing: post- | Show results with:post-
  124. [124]
    Survey of Slum Housing Characteristics Using Drones
    Aiming to subsidize these programs implementation workflow, the present paper analyses use of drones as a tool to gather information about the physical ...Missing: GIS innovations 2010
  125. [125]
    Data tales – part two: the challenge of technology
    Oct 27, 2022 · But just a few years later, the Jaga Mission slum upgrading programme would replace this method with drone-based imagery, which had such ...
  126. [126]
    [PDF] New Perspectives on Results-Based Blended Finance for Cities
    Impact Bonds have been widely used in the US and UK and several less-developed countries are now piloting the approach targeting social outcomes. EIBs can ...
  127. [127]
    Informal settlement data and local community responses to COVID ...
    Dec 8, 2020 · ... challenges, including COVID-19. It also reflects ... slums as human settlements and participation in housing for slum upgrading processes.<|separator|>
  128. [128]
    Impact of technology on upgrading slums and the moderating role of ...
    Mar 27, 2024 · This study aimed to determine the effect of technology on the upgradation of slums in Islamabad, along with the moderating role of upstream influences between ...
  129. [129]
    Share of the urban population living in slums - Our World in Data
    Proportion of urban population living in slums (%) Source United Nations Human Settlements Programme – processed by Our World in Data Last updated August 27, ...
  130. [130]
    SDG Goals - United Nations Statistics Division
    In 2020, an estimated 1.1 billion urban residents lived in slums or slum-like conditions. Over the next 30 years, an additional 2 billion people are expected to ...
  131. [131]
    Increasing Climate Resiliency in Informal Urban Settlements
    Jan 31, 2024 · In Kibera, a slum in Nairobi, Kenya, and the largest urban slum in ... upgraded waste management systems to prevent future drainage.
  132. [132]
    (PDF) Slum upgrading and climate change adaptation and mitigation
    Aug 7, 2025 · Slum upgrading can be an effective mechanism that combines mitigation and adaptation efforts whilst addressing sustainable development ...
  133. [133]
    Slum upgrading is climate action
    May 21, 2025 · It is also clear that slum upgrading is an effective form of climate action that addresses environmental challenges and climate risks along with ...