Directional boring

Directional boring, also known as horizontal directional drilling (HDD), is a trenchless method of installing underground utilities such as pipelines, conduits, and cables by drilling a small along a predetermined curved path and then enlarging it to accommodate the desired infrastructure, all while minimizing surface disruption. The technique originated in the early 1960s when Martin Cherrington, a utility contractor in , conceived the idea of guided drilling for installing gas lines without trenching, leading to the construction of the first HDD rig in 1964 by Titan Contractors Inc. By 1971, the first commercial river crossing was completed—a 500-foot, 4-inch gas line for Pacific Gas & Electric in —marking a key milestone in its practical application. HDD gained prominence in the within the oil and gas industry for accessing deposits under obstacles, and by the late 1980s, advancements like magnetic steering tools enabled precise tracking, expanding its use to public utilities through research by organizations such as the Electrical Power Research Institute and Gas Research Institute. The process typically involves several steps: surveying the site and locating existing utilities to avoid conflicts, drilling a small-diameter pilot hole using a steerable drill head guided by surface tracking systems, reaming the hole to a larger diameter in multiple passes, and finally pulling the product pipe—often (HDPE) or —through the enlarged while simultaneously installing a lubricating fluid to reduce friction. Applications span a wide range, including the installation of mains, lines, gas pipelines, electrical conduits, and fiber-optic cables beneath roads, rivers, railways, and environmentally sensitive areas, with capabilities for pipe diameters from 50 mm to 1,200 mm, lengths up to 1,500 m, and depths up to 61 m. HDD is classified into mini-, midi-, and maxi-rigs based on project scale, with costs ranging from $16 to $1,640 per meter depending on size and complexity, offering significant advantages over traditional open-cut trenching by reducing traffic interruptions, environmental impacts, and restoration expenses—for example, in a highway project, the integration of subsurface utility engineering with trenchless methods like HDD reduced utility relocation costs by over $1.3 million compared to conventional approaches. Despite these benefits, successful implementation requires subsurface utility engineering (SUE) to map existing infrastructure and mitigate risks like inadvertent returns of or collapse in unstable soils.

Fundamentals

Definition and principles

Directional boring, also known as horizontal directional drilling (HDD), is a method used to install underground pipelines, conduits, or cables by a curved path from a surface entry point to an exit point, minimizing disruption to the ground surface above. This technique follows a predetermined bore path designed to avoid obstacles such as roads, buildings, or environmentally sensitive areas, requiring only small entry and exit pits rather than extensive excavation. The core principles of directional boring involve a head along the planned trajectory using specialized steerable bits equipped with cutting edges and electronic guidance systems for real-time monitoring and adjustments. is fluid-assisted, where a (typically a ) is circulated through the to lubricate the bore, stabilize the walls, and remove cuttings via the return flow. After completing a small-diameter (typically 4 to 6 inches or 100 to 150 mm), the path is enlarged through successive reaming passes to accommodate the product , which is then pulled back through the bore. Unlike open-cut trenching, which involves digging continuous surface trenches and backfilling, directional boring avoids large-scale surface disturbance, making it suitable for or constrained sites. It also differs from vertical used in oil and gas extraction, where the focus is on deep, deviated wells (often thousands of feet) to access reservoirs, whereas HDD employs shallower arcs (typically tens to hundreds of feet deep) for installations. The bore path in directional boring is characterized by an entry angle (generally 8-20 degrees to balance steerability and equipment limits), a (designed as large as possible, often 500-1000 feet or more, constrained by the pipeline's ), and an exit alignment that mirrors the entry for smooth product .

History

The concept of horizontal directional drilling (HDD) for utility installations originated in the early 1960s, when Martin Cherrington, working on gas line projects in , envisioned adapting directional control techniques to trenchless underground boring. Inspired by observing a handheld air drill installation, Cherrington developed the first HDD rig, which he built in 1964 as part of Titan Contractors Inc. to perform road borings without surface disruption. A key milestone came in 1971, when Cherrington's company, contracted by Pacific Gas & Electric Company (PG&E), successfully installed a 500-foot, 4-inch-diameter gas line across the near . This pioneering river crossing demonstrated the feasibility of the method for utility work in sensitive environmental areas where traditional trenching was impractical. Commercialization accelerated in the late 1980s, with Melfred Borzall developing and introducing the first market-ready HDD rig around 1989, known as the , which made the technology accessible for widespread utility installations. In the , companies like Vermeer expanded the market by launching compact rigs, such as the 1991 Navigator model, enabling smaller-scale operations for and other utilities. Early HDD methods relied on dry boring, which faced limitations including drill head overheating and restricted bore diameters and lengths due to friction and debris accumulation. To address these issues, the technology evolved to fluid-assisted wet boring in the 1970s and 1980s, using drilling fluids to cool the bit, remove cuttings, and stabilize the borehole for longer and larger installations. This adaptation drew from oil and gas industry techniques pioneered in the , which emphasized wellbore and deviation control, but HDD repurposed them for shallow, trenchless utility applications.

Equipment

Drilling rigs

Directional boring rigs, also known as horizontal directional drilling (HDD) rigs, are classified into three primary categories based on size, capacity, and application: mini (or compact) rigs, midi (or mid-sized) rigs, and maxi (or large) rigs. Mini rigs are designed for urban environments and short bores, typically up to 600 feet (183 meters) in length, with product pipe diameters of 2 to 10 inches (50 to 250 mm), thrust/pullback forces up to 20,000 pounds (89 kN), and torque up to 950 foot-pounds (1.3 kN-m). These rigs are lightweight, weighing less than 9 tons (80 kN), making them suitable for installing small-diameter utilities like telecom cables, power lines, water, and gas lines in confined spaces. Midi rigs handle medium-scale projects, such as utility installations under rivers or roadways, with bore lengths up to 900 feet (274 meters), pipe diameters of 10 to 24 inches (250 to 600 mm), thrust/pullback from 20,000 to 100,000 pounds (89 to 445 kN), and torque ranging from 900 to 7,000 foot-pounds (1 to 9.5 kN-m), while weighing up to 18 tons (160 kN). Large maxi rigs are employed for long-distance pipeline installations, capable of bores exceeding 5,000 feet (1,500 meters), pipe diameters up to 48 inches (1,200 mm), thrust/pullback over 100,000 pounds (445 kN), and torque up to 80,000 foot-pounds (108.5 kN-m), with machine weights reaching 30 tons (267 kN). Key operational features of these rigs include hydraulic systems that provide for the drill head and for advancing the , as well as pullback force for product installation. Rod handling capacity typically accommodates drill rods of 2 to 5 inches (50 to 127 mm) in , with onboard storage for hundreds of feet of rods to minimize downtime during operations. Power ratings vary by rig size, generally ranging from 50 horsepower for compact models to over 500 horsepower for maxi units, enabling efficient performance across types and project scales. Setup requirements for directional boring rigs emphasize stability and management. Anchor systems, such as deadman anchors or stakes driven into the , are essential to counteract thrust forces and prevent rig movement, particularly in soft or sandy soils where additional pinning may be needed. Mud mixing systems, often comprising centrifugal pumps, hoppers, and tanks with capacities from 100 to 1,000 gallons, prepare fluids like slurries to lubricate the bore path, stabilize the hole, and facilitate cuttings removal. As of 2025, modern directional boring rigs increasingly incorporate telematics for real-time monitoring and diagnostics, automated rod exchange systems to reduce manual labor and downtime, and advanced mud recycling technologies for improved efficiency and environmental compliance.

Drill strings, bits, and reamers

In horizontal directional drilling (HDD), the drill string forms the backbone of the downhole assembly, consisting of multiple joints of high-strength steel pipe connected end-to-end to advance the borehole. These pipes are typically fabricated from steel alloys meeting standards such as API RP 7G-2 or TH Hill DS-1 to ensure durability under thrust, torque, and tensile loads. Joint lengths commonly range from 10 to 20 feet, though variations up to 31 feet exist depending on rig capacity, with threaded tool joint connections that allow efficient makeup and breakdown while transmitting rotational torque from the surface rig. Drill bits attached to the leading end of the are designed to cut the while enabling for path control. Common types include the duckbill bit for soft s, which features a fixed, asymmetrical for non-rotational , and tri-cone roller bits for mixed or rock formations, which use rotating cones to crush and shear material. Materials such as inserts provide abrasion resistance in rocky conditions, while milled-tooth designs suit softer grounds; is often achieved via a bent sub—a short, angled section of —or a mud motor that powers bit rotation independently of the using hydraulic pressure from . Fluid jets on the bit face aid in cooling and cuttings evacuation. Reamers are specialized expansion tools connected to the drill string to enlarge the pilot hole sequentially, preparing it for product installation. Types include fly cutters, such as ring-style or beavertail designs for soil, which use fixed or pivoting blades to shear and displace material without moving parts; barrel reamers for stabilizing larger bores in cohesive soils; and rock reamers or hole openers with roller cones or cutters for hard formations. Pilot holes typically start at 4 to 6 inches in diameter, with reamers progressively increasing to final sizes up to 48 inches or more, often in passes that incorporate multiple swab runs to remove debris and condition the borehole walls. Cutters are commonly tipped with tungsten carbide for wear resistance, and fluid ports facilitate lubrication and cuttings transport. Drilling fluids, primarily bentonite-based slurries mixed with water and polymers, are circulated through the to support bit and operations. These fluids provide to reduce on the tools and walls, cool cutting elements to prevent overheating, and suspend and remove cuttings to maintain stability. Bentonite's high swelling capacity forms a that seals the , minimizing fluid loss into permeable formations, while additives adjust properties for specific soils—viscosity is typically maintained at 30 to 50 seconds per for effective , and pump pressures range from 500 to 1,500 depending on depth and formation to avoid inadvertent returns. is pumped down the string, exiting at the tool face before returning to the surface via the annulus for recycling.

Installation Process

Site preparation and planning

Site preparation and planning for directional boring, also known as horizontal directional drilling (HDD), involves a series of pre-construction activities to evaluate conditions, the , secure necessary approvals, and identify potential , ensuring the project's feasibility, , and efficiency. These steps are critical to minimizing disruptions and avoiding costly failures, such as instability or utility strikes. Geotechnical surveys form the foundation of site preparation by analyzing soil composition and subsurface conditions to assess bore feasibility and determine requirements for drilling fluids. These investigations typically include borings and tests to classify soils as clay, sand, or rock, evaluating properties like permeability, shear strength, and groundwater levels, which influence fluid selection to maintain borehole stability and prevent collapse. For instance, rocky formations may require specialized tooling and higher-viscosity fluids, while unstable soils like silty sand with cobbles necessitate additional stabilization measures. Path design follows geotechnical data, utilizing specialized software to plot the optimal bore trajectory, including entry and exit points, while accounting for terrain elevation and obstacles such as roads or existing utilities. Designers specify a minimum curvature radius, typically 100-200 feet depending on pipe diameter and material, to avoid excessive stress on the installed product and ensure smooth navigation. Tools like TeraTrak software enable precise modeling of depths, entry pitches (often -20% to -30%, equivalent to approximately 11°-17°). Permitting and utility locates are essential regulatory and safety steps, beginning with a call to the 811 system (or equivalent one-call service) to mark existing underground lines and prevent accidental strikes during drilling. This process involves reviewing utility records, potholing to verify locations and depths, and incorporating required clearances (e.g., 3-5 feet from marked lines) into the bore plan, followed by obtaining permits from municipalities or agencies for work in public rights-of-way or sensitive zones. Risk assessment integrates findings from prior steps to evaluate hazards like groundwater intrusion, unstable soils, or environmentally sensitive areas, informing strategies such as minimum cover depths (e.g., 5-15 feet based on pipe size) and setbacks (e.g., 300 feet from structures like levees). Pressures are calculated to prevent hydrofracture, with contingencies like grouting for seepage control in areas prone to fluid loss or instability. This comprehensive evaluation helps prioritize safety and compliance, reducing the likelihood of project delays or environmental impacts.

Pilot hole drilling

The pilot hole drilling phase initiates the horizontal directional drilling (HDD) process by creating a small-diameter along a predetermined path from the entry point to the exit location. This step establishes the and for subsequent enlargement and product , typically using a attached to a steerable (BHA). The BHA includes components such as a non-rotating with an asymmetrical to facilitate directional control. Setup begins with precise alignment of the at the , positioned on an inclined ramp to achieve the calculated , commonly ranging from 10 to 20 degrees downward to transition from the surface to the subsurface path. The rig's and capabilities are calibrated based on conditions and project specifications, with the advanced incrementally using hydraulic while monitoring alignment through integrated guidance systems. , or mud, is injected through the at controlled pressures—typically 300 to 800 for standard operations—to lubricate the , cool the bit, and suspend cuttings for evacuation back to the surface. In softer , jetting nozzles on the bit facilitate advancement by eroding material, while and propel the assembly forward at rates of 20 to 50 feet per minute, depending on formation . Steering adjustments occur in real-time as the drill advances, with operators making corrections by orienting a slight bend (1 to 3 degrees) in the BHA toward the desired direction, guided by signals from downhole probes that track position and orientation. For straight sections, the drill string rotates continuously to maintain progress, while non-rotating mode enables curved paths with radii as tight as 100 to 500 feet. Pilot hole lengths typically range from 100 to 5,000 feet, influenced by soil type, groundwater levels, and rig capacity; softer, cohesive soils allow longer bores, whereas rocky or unstable formations may limit distances to under 1,000 feet. A common challenge is frac-out, where drilling mud inadvertently surfaces due to excessive pressure or weak overburden, potentially contaminating soil or water and requiring mitigation such as reduced flow rates or additives to increase mud viscosity.

Hole enlargement and product installation

After the pilot hole is drilled, the hole enlargement phase begins with back reaming, a process where a is attached to the end of the at the exit point and pulled back toward the while rotating to widen the . This operation is typically performed in multiple passes, incrementally increasing the —for instance, from an initial 8-inch to a final 24-inch —to accommodate the product pipe and allow for the removal of cuttings. is circulated during back reaming to lubricate the , stabilize the walls, and transport spoils to the surface, requiring greater volumes and machine loads than the pilot drilling stage. The size is selected based on the required enlargement, often aiming for a final at least 50% larger than the outer of the product pipe to ensure clearance and reduce risks. For larger installations, pre-reaming passes are conducted prior to product to gradually expand the hole in stages, typically in increments of 6 inches or less, which helps minimize , thrust forces, and potential issues like collapse or surface heaving. A swab pass, using a sized to match the final diameter, may follow as an optional cleaning step to remove residual debris, compact the walls, and polish the path for smoother product installation. These preparatory steps are particularly important in cohesive soils or for pipes exceeding 4 inches in diameter, where simultaneous back reaming and could otherwise exceed equipment limits. The product pullback phase involves connecting the prefabricated pipeline—commonly high-density polyethylene (HDPE) or steel—to the reamer via a swivel at the exit point, which prevents torque transfer to the pipe during the pull. The assembly is then pulled back to the entry point using controlled tension from the drilling rig, often monitored with breakaway links or load cells to avoid exceeding safe limits, such as 50,000 pounds for mid-sized installations or 1,350 psi stress for HDPE pipes. Pipe support systems, including roller stands or flotation ditches, are employed along the path to reduce frictional drags and bending stresses, with buoyancy control (e.g., water filling for pipes 30 inches or larger) applied to manage uplift forces. Pullback proceeds at a controlled speed, typically allowing for real-time monitoring of forces to detect obstructions. Upon completion of pullback, the borehole is flushed with drilling fluid to clear any remaining cuttings or sediment, ensuring the pipe interior is clean. The installed product is then tested for integrity, including pressure testing for leaks and visual inspections for damage, before surface restoration activities such as backfilling entry and exit pits and reseeding are performed to minimize environmental impact.

Guidance and Locating

Traditional locating methods

Traditional locating methods in horizontal directional drilling (HDD) primarily rely on walkover systems, where a surface uses a handheld to track the position of the drill head during the pilot hole phase. These systems employ a sonde, or transmitter, housed within or behind the drill head, which emits low-frequency electromagnetic signals detectable above ground. The sonde typically operates in the 8-33 kHz frequency range to minimize interference from underground utilities and ensure reliable signal through . The operator walks over the anticipated path of the bore, positioning the to measure signal strength and differences, which provide readouts for depth, (horizontal direction), and inclination (vertical angle). Handheld units display this data in , allowing the driller to steer the tool by adjusting thrust, rotation, and bevel orientation based on the operator's relayed instructions. Readings are commonly taken at intervals of about 30 feet to maintain path control during pilot . Despite their simplicity, methods have notable limitations, including the need for clear line-of-sight over the entire bore path, which can be challenging in densely urbanized areas with or . Accuracy is generally within 5% of the true depth, degrading further with increasing depth, variability, or from nearby metallic objects. Walkover locating emerged as the primary guidance technique in the , coinciding with the early of HDD for installations, and remained dominant for decades due to its cost-effectiveness and ease of use on shallow bores.

Advanced guidance technologies

Advanced guidance technologies in horizontal directional drilling (HDD) represent a shift toward automated, high-precision systems that enhance drill path control, particularly in challenging environments with magnetic interference or long distances. These innovations integrate sensors, , and computational tools to provide on the drill head's , , and environmental conditions, enabling operators to steer accurately and avoid obstacles. Unlike earlier methods, these systems rely on for predictive modeling and automated adjustments, significantly improving success rates for complex bores. As of 2025, advancements include enhanced monitoring and automated steering systems for improved accuracy. Gyroscopic and inertial systems are critical for downhole in areas prone to , such as urban settings near power lines or pipelines. These tools employ micro-electro-mechanical systems () gyroscopes and accelerometers to measure angular rates and accelerations, calculating the drill head's , , and toolface without reliance on . For instance, the Drillguide Gyro Steering Tool offers real-time measurements with accuracy of ±0.01 degrees and accuracy of ±0.04 degrees, and is unaffected by magnetic disturbances, making it suitable for precise in interfered zones. Similarly, pure inertial systems provide high-precision for measurement-while-drilling (MWD) applications in extended bores. These systems are particularly valuable for maintaining in non-conductive soils or deep installations, where traditional magnetic tools falter. Real-time kinematic (RTK) GPS and surface tracking technologies complement downhole sensors by providing precise alignment at entry and exit points, often integrated directly with rig controls for automated adjustments. RTK GPS uses carrier-phase measurements from a and to deliver centimeter-level accuracy in real-time positioning, enabling operators to map the bore path and align the drill head with surface references. In HDD, systems like the GPS Track from Drillguide facilitate real-time drill head positioning by overlaying GPS data onto planned paths, reducing alignment errors during punch-outs. Integration with rig hydraulics allows for automatic steering corrections based on GPS feedback, enhancing efficiency for bores exceeding 1,000 feet. This surface-based approach ensures compliance with design tolerances, especially in open areas where satellite visibility is optimal. Mud pulse telemetry serves as a robust data transmission method in HDD, encoding information from downhole sensors into pressure pulses within the drilling fluid (mud) column. By modulating valve positions to create positive or negative pressure waves, the system relays parameters such as depth, , , and inclination at rates up to several bits per second, even in deep or long bores. Commercial MWD tools from providers like ARC Systems utilize brushless motors to generate these pulses, transmitting reliably through fluid columns up to thousands of feet without . This telemetry is essential for monitoring drilling conditions, allowing operators to adjust proactively and prevent issues like stuck pipes. Software integration elevates these hardware systems through and tools that enable predictive steering and collision avoidance. Platforms like Vermeer's BorePlan incorporate GPS, gyro , and geological inputs to generate interactive bore profiles, simulating stress, pullback forces, and path deviations for pre-drill planning. These tools perform anti-collision scans against subsurface utilities, using algorithms to optimize trajectories and alert operators to potential risks in real-time. For example, the Horizontal Directional Drilling PowerTool (HDDPT) from Technical Toolboxes provides comprehensive calculations for drill paths, integrating to forecast outcomes and minimize inadvertent returns. Such software has become standard for ensuring and project safety in multifaceted installations. The widespread adoption of these advanced guidance technologies began in the mid-2000s, coinciding with the introduction of commercial gyro tools like the Drillguide system in (2005) and the U.S. (2007), driven by the demand for longer bores over 1,000 feet in and projects. By the , of RTK GPS and mud pulse systems had become routine, supported by falling sensor costs and improved software usability, enabling HDD crossings to extend beyond traditional limits while maintaining accuracies under 1% deviation. Today, these technologies are essential for high-stakes applications, with ongoing advancements in further expanding their accessibility to smaller rigs.

Applications

Utility and infrastructure

Directional boring, also known as horizontal directional drilling (HDD), is widely employed for installing underground utilities such as water lines, sewer pipes, distribution lines, fiber optic cables, and electrical conduits. These installations often occur beneath obstacles like roads, rivers, railroads, and buildings to avoid surface disruption. For instance, HDD facilitates the placement of pipelines and cables in densely populated areas or environmentally sensitive zones, such as wetlands or water bodies, where traditional trenching would be impractical. In urban environments, directional boring offers significant advantages by minimizing traffic disruption and preserving existing . Municipal projects, such as sewer line extensions, commonly utilize HDD for bores with diameters ranging from 6 to 36 inches and lengths between 200 and 1,000 feet, allowing for efficient expansion of and systems without extensive closures. This approach reduces the need for open excavations, thereby lowering the risk of accidents and maintaining community access during construction. Notable case studies illustrate these applications. For , HDD has been used to install fiber optic conduits under interstate highways, as seen in projects supporting intelligent transportation systems where conduits for power and data cables are bored beneath roadways to enable monitoring and communication networks. In water infrastructure, a river crossing for the Caribou Utilities District employed directional drilling to install a main beneath a , avoiding environmental impacts and costly bridge modifications while ensuring reliable supply to the community. As a core component of , directional boring accounts for a substantial portion of installations, driven by growing in and sectors, reflecting its role in replacing aging and supporting expansion, including recent applications in network deployments as of 2025.

Oil and gas pipelines

Directional boring, also known as directional drilling (HDD), plays a critical role in the installation of oil and pipelines, particularly for navigating challenging terrains such as riverbeds, highways, and environmentally sensitive areas. This trenchless method enables the placement of high-pressure product lines without extensive surface disruption, allowing pipelines to cross obstacles while minimizing ecological impact. Typical installations involve or composite pipes with diameters ranging from 12 to 48 inches, suitable for transporting crude oil, refined products, or over distances up to 5,000 feet in a single bore. In rugged terrains, HDD techniques are adapted using larger rigs capable of generating pullback forces exceeding 500,000 pounds and specialized rock reamers to enlarge pilot holes through hard formations like or . These reamers, often featuring roller cones or PDC cutters, progressively widen the from an initial 6-8 inch pilot to accommodate the final , ensuring stability in geologically complex areas common to oil and gas projects. A prominent example is the , where HDD was employed for multiple river crossings, including the , Platte, and Yellowstone Rivers, to install 36-inch segments over lengths exceeding 2,000 feet while avoiding open-cut methods in flood-prone zones. Regulatory requirements frequently drive the adoption of HDD in the energy sector, as federal and state guidelines mandate avoidance of wetlands, archaeological sites, and protected habitats to comply with the Clean Water Act and . For instance, the Interstate Natural Gas Association emphasizes HDD to bypass such sensitive features, reducing permitting delays and environmental liabilities in pipeline routing. This approach was integral to projects like extensions associated with the , where HDD crossings under rivers and zones help preserve archaeological resources and integrity. HDD is a key method for oil and gas pipeline installations, particularly for horizontal segments in major transmission lines under challenging conditions, reflecting its efficiency in meeting demands amid stricter environmental regulations as of 2025, including support for transitions such as pipelines.

Advantages and Limitations

Benefits

Directional boring offers significant reductions in surface disruption compared to traditional open-cut methods, as it requires only small entry and exit pits rather than extensive trenching, thereby minimizing damage to roads, landscapes, and existing . This approach can lead to restoration cost savings of up to 50% over open-cut excavation, as demonstrated in projects where horizontal directional drilling (HDD) costs ranged from $12.30 to $22.50 per foot versus $23.40 to $34.50 per foot for open-cut. For instance, a utility project achieved total costs of $2.67 million using HDD, compared to an estimated $10.9 million for open-cut alternatives. The technique excels in navigating obstacles such as , , highways, and waterways without interrupting surface activities, allowing utilities to be installed beneath these features while maintaining operational continuity. This capability is particularly valuable in or environmentally sensitive areas, where it avoids the need for closures or rerouting. Environmentally, directional boring reduces soil excavation, which in turn lowers the risk of , , and habitat disruption; for example, it preserves and vegetation by limiting ground disturbance, contributing to a smaller through decreased usage and site restoration needs. Projects like the York River crossing have successfully protected sensitive ecosystems, such as beds, without invasive digging. In terms of operational efficiency, directional boring enables faster installation for long runs, with crews achieving rates of up to 500 feet per day under favorable conditions, such as non-rocky soils, outperforming the slower progress of trenching in extended applications. This speed, combined with minimal surface impact, results in lower long-term maintenance costs, as there is less wear on overlying structures and reduced need for ongoing repairs. Additionally, it enhances by eliminating deep excavations that pose cave-in risks to workers and requiring fewer controls, thereby decreasing exposure to hazards and public disruptions in high-traffic zones.

Challenges and disadvantages

Directional boring, also known as horizontal directional drilling (HDD), involves significant initial costs due to specialized and the need for skilled expertise, making it less economical for short bores under 100 feet where fixed setup costs result in higher expenses compared to traditional trenching methods. These expenses are particularly pronounced for small-scale utility installations, as the setup of drilling rigs, mud mixing systems, and guidance tools requires substantial investment regardless of bore length. Technical risks in directional boring include stuck drill pipes, borehole collapse in unstable soils, and inadvertent returns (frac-outs), where drilling mud escapes to the surface, potentially causing spills of thousands of gallons. Frac-outs occur in approximately 50% of HDD projects, often exceeding 60% during the pilot hole phase, due to excessive annular pressure in loose or shallow soils. Borehole instability arises from inadequate management, leading to collapses that can halt operations and necessitate abandonment. The process demands highly trained operators to manage and pressures effectively; without this expertise, failure rates increase in challenging conditions like rock or mixed soils, resulting in project abandonment. Directional boring is limited to diameters typically under 48 inches for most applications, as larger sizes increase pullback forces and issues, and it struggles with significant vertical depths beyond 200 feet due to constraints. Mud-based systems are sensitive to , with or freezing temperatures disrupting and containment, potentially exacerbating frac-out risks. Operationally, directional boring proceeds more slowly in cobbles or , where obstructions can increase time by up to 50%, raising overall costs and complicating cuttings removal. These economic factors, combined with geotechnical uncertainties, often make the method less viable in heterogeneous terrains without extensive pre-boring surveys.

Safety and Environmental Aspects

Safety practices

Safety practices in horizontal directional drilling (HDD) emphasize comprehensive protocols to mitigate risks to workers, including strikes on underground utilities, equipment failures, and inadvertent fluid releases. These practices are guided by regulatory standards and industry best practices to ensure safe operations throughout the drilling, reaming, and pullback phases. training is a foundational element, with certified programs providing essential instruction on rig handling, precise steering techniques, and emergency responses. For instance, the HDD Academy offers intensive two-day courses covering pre-construction planning, equipment operation, and hazard recognition, awarding units (CEUs) upon completion to validate operator competency. Similarly, OSHA requires employers to train workers on safe HDD equipment operation, utility avoidance, and site-specific hazards, permitting only qualified personnel to handle machinery under 29 CFR 1926.20(b)(4). This training reduces incidents by equipping operators to respond effectively to issues like drill path deviations or pressure anomalies. Site controls form a critical barrier against accidents, incorporating , clear signage, and thorough utility verification to protect the work area and prevent unauthorized access or strikes. Before commencing, operators must contact services (e.g., via "Call 811" in the U.S.) and use techniques like potholing to expose and confirm the depth of buried lines along the planned path, as mandated by OSHA to avoid contact. and delineate the site perimeter, while pressure testing of systems—ensuring pumps and lines withstand operational stresses—helps prevent blowouts from excessive fluid . These measures align with Common Ground Alliance best practices for minimizing utility damage during trenchless installations. Daily equipment checks are essential to maintain integrity and avert failures, focusing on rod condition, hydraulic systems, and pullback capacities. Inspections should verify straightness and absence of cracks to prevent buckling under stress, alongside scanning for hydraulic leaks at fittings, hoses, and cylinders that could lead to uncontrolled movements. Pullback operations require monitoring tensile loads via rig gauges to stay below manufacturer-specified limits, avoiding snaps that could whip and injure personnel. Routine checks also include tracking calibration to ensure accurate drill head location, with any anomalies prompting immediate halts. Incident response protocols prioritize rapid containment and worker safety for events like stuck tools or frac-outs (inadvertent drilling fluid releases). For drill strings, operators follow sequenced procedures such as gradual , reduced pull force, or targeted jetting to dislodge obstructions without exacerbating , always under trained to avoid further entanglement. In frac-out scenarios, drilling stops immediately, affected areas are isolated with containment booms, and workers evacuate if fluid volumes pose hydrostatic risks, followed by notification to authorities per site plans. OSHA mandates an Emergency Action Plan (EAP) outlining evacuation signals, assembly points, and first-aid responses, including for potential gas leaks from strikes. Adherence to established standards reinforces these practices, with OSHA guidelines under 29 CFR Part 1926 governing trenchless work, including mandatory (PPE) such as hard hats, gloves, , and (Subpart E). Fatigue management protocols limit shift durations and require rest breaks to maintain alertness, addressing the general duty clause for safe working conditions. Industry resources like the North American Society for (NASTT) further promote these through guidelines emphasizing pre-job hazard assessments and post-incident reviews.

Environmental considerations

Directional boring, also known as horizontal directional drilling (HDD), presents several potential environmental impacts, primarily related to the release of drilling fluids and site preparation activities. A key concern is frac-outs, which occur when drilling fluid unintentionally escapes the and surfaces, potentially releasing sediments, clay, or chemical additives into nearby water bodies or soils. This can increase water , harm aquatic life by smothering habitats, and contaminate if fluids migrate through fractures. Additionally, the setup of heavy drilling rigs can cause , reducing soil permeability and affecting vegetation regrowth in entry and exit pits. To mitigate these risks, operators employ various strategies focused on fluid management and . Biodegradable mud additives, such as vegetable-based polymers, are increasingly used to replace synthetic chemicals, allowing fluids to break down naturally and minimizing long-term and . booms and fences are deployed around bore sites to capture any spills, while of borehole pressures and quality helps detect and prevent frac-outs. These measures are outlined in site-specific contingency plans that require immediate shutdowns and cleanup upon detection of releases. Regulatory frameworks in the United States enforce strict compliance to protect sensitive environments during directional boring projects. The Agency (EPA) provides guidelines for wetland crossings, requiring permits under the Clean Water Act to prevent fluid discharges into jurisdictional s. For federal projects, the (NEPA) mandates erosion control plans, including sediment barriers and revegetation, to assess and minimize impacts on ecosystems. The U.S. Army Corps of Engineers' Nationwide Permit 12 specifically addresses HDD under s and s, prohibiting activities that could harm aquatic resources without mitigation. Despite these challenges, directional boring offers benefits over traditional trenching methods. It significantly reduces habitat disruption by avoiding extensive surface excavation, preserving , , and corridors in sensitive areas. Drilling fluids can also be recycled through solids separation and , significantly reducing volumes and resource consumption. Notable case examples highlight the consequences of inadequate environmental management. In 2017, during construction of the Rover Pipeline in , multiple frac-outs released millions of gallons of drilling mud into wetlands, leading to a proposed $40 million from the (FERC) in 2021, with proceedings ongoing as of 2024, and prompting stricter requirements for additives and protocols.

References

  1. [1]
    Directional Boring: What You Need To Know | SafetyCulture
    Aug 20, 2024 · Directional boring is often used to install water and gas lines, sewer and storm drains, and even power and communications cables. There are ...Missing: history | Show results with:history
  2. [2]
    Horizontal Directional Drilling With Ductile Iron Pipe
    HDD, also known as directional boring, was developed in the early 1960s and was first used by the oil and gas industry on large-diameter, cross-country pipeline ...How Is Hdd Applied To Water... · Step 1: Drill/bore The Pilot... · How Big Is Your Rig?...Missing: definition | Show results with:definition
  3. [3]
    A Brief History of Directional Drilling: The Birth and Development of ...
    Jul 4, 2012 · Horizontal directional drilling is an idea Martin Cherrington first conjured up in the early 1960s when he was working for a utility install ...Missing: definition | Show results with:definition
  4. [4]
    4. Reducing Pavement Cuts by Integrating Technology - Design
    Apr 19, 2018 · The original application of horizontal directional drilling (HDD) originated in oil fields in the early 1970s. It was used to access deposits of ...
  5. [5]
    What is Horizontal Directional Drilling (HDD)? - Trenchlesspedia
    Mar 23, 2017 · Horizontal directional drilling (HDD) is a trenchless construction method used to install pipes underground without disturbing the ground surface.
  6. [6]
    [PDF] The Horizontal Directional Drilling Process
    HDD involves three stages: drilling a pilot hole, enlarging it, and then pulling the pipeline back into the enlarged hole.
  7. [7]
    Directional Drilling vs Directional Boring - Behm Enterprises
    Directional Drilling: While directional drilling includes directional boring, it is also used for oil and gas exploration, where the goal is to reach a ...
  8. [8]
    HDD Alignment & Borehole Geometry - Technical Toolboxes
    Penetration Angles: Entry angles are limited by equipment capabilities and should generally be designed between 8° and 20°.
  9. [9]
    Horizontal Well Geometry 101 - Ellingson-DTD
    Feb 8, 2022 · Since our tooling doesn't really work at steeper angles, HDD equipment typically has a maximum entry angle of 6-20 degrees.
  10. [10]
    History of Horizontal Directional Drilling - MTI Equipment
    Martin Cherrington observed the installation of a gas line using a hand-held air drill that the seeds of the HDD process were planted.
  11. [11]
    A Survey of Current Horizontal Directional Drilling Practices in ...
    The first known river crossing using the HDD method took place in 1971 when approximately 600 ft of 4 inch diameter steel pipe was installed across the ...
  12. [12]
    CELEBRATING HDD AT 50 - American Augers
    May 5, 2021 · In 1971, Martin Cherrington was in Watsonville, California, drilling gas lines for Pacific Gas & Electric (PG&E). While in town, PG&E asked him ...
  13. [13]
  14. [14]
    Building A Culture of Innovation - Vermeer Corporation
    Horizontal directional drill. In 1991, Vermeer entered horizontal directional drilling (HDD) with the Navigator® drill, pioneering trenchless technology that ...
  15. [15]
    History of horizontal directional drilling - Hart Energy
    Aug 31, 2005 · The first installation was accomplished in 1971 for Pacific Gas ... For utility work, bore lengths generally range from 50 to 600 ft ...
  16. [16]
    History of Horizontal Wells - Ellingson-DTD
    Nov 22, 2022 · The very first use of HDD for the installation of horizontal remediation wells was in 1987 in Ponca City, Oklahoma. The wells were used for ...
  17. [17]
    [PDF] TR-46: Guidelines for Use of Mini-Horizontal Directional Drilling for ...
    1 The “Radius of Curvature”, or “Bend Radius”, is the distance from the center of the circular path or configuration, in a plane, to the perimeter. 3.3.2 The “ ...
  18. [18]
    [PDF] HDD Horizontal Directional Drills
    Jul 7, 2019 · 260-hp (201-kW) engine efficiently delivers tremendous power to all drilling functions so you can get the job done faster. ... KEY FEATURES.
  19. [19]
    Directional Drilling Site Setup: 7 Critical Steps for HDD Success
    Apr 18, 2025 · Anchoring: Secure the rig according to manufacturer specifications and soil conditions. Fluid system setup: Connect and test mud mixing and ...
  20. [20]
    How to Choose a Mud Mixing System for Directional Drilling
    Dec 20, 2022 · Size and horsepower, system configuration, tank capacities and ease of use are a few variables you should consider when purchasing a mud mixing system for ...Missing: anchor | Show results with:anchor
  21. [21]
    [PDF] HDD Tooling and Equipment - Notes - GeoEngineers
    Horizontal Directional Drilling (HDD) drill rigs come in various shapes ... without rotation of the drill string. In soils, the drilling fluid pumped ...
  22. [22]
    [PDF] Horizontal Drilling
    The drill string consists of many joints of steel alloy drill pipe, drill collars, ... Preliminary directional drilling plan. Special Regulatory ...Missing: materials | Show results with:materials
  23. [23]
    Drill Pipe Considerations - Ditch Witch
    Dec 6, 2022 · Consider utilizing forged drill pipe, designed for the drill. Forged pipe lasts longer and helps minimize the risk of losing HDD tooling downhole.
  24. [24]
    Horizontal Directional Drilling (HDD): How the Drill Bit is Steered
    Horizontal Directional Drilling (HDD): How the Drill Bit is Steered. Planning ... A bent sub at the drill head houses an internal drill motor, which ...
  25. [25]
  26. [26]
    Horizontal Directional Drilling - Bentonite Performance Minerals
    Horizontal Directional Drilling. Bentonite Performance Minerals manufactures a full suite of bentonite and drilling fluid additives for large diameter HDD ...
  27. [27]
    Characterizing the non-Newtonian viscosity of high-solids drilling ...
    May 12, 2022 · A significant challenge to increasing speed in horizontal directional drilling is pressure and flow rate management of drilling fluids ...
  28. [28]
    Horizontal Directional Drilling (HDD): Designing for Success
    Apr 28, 2025 · Ensure HDD Success by focusing on site surveys, subsurface analysis, and risk-based HDD Designing for safer, reliable crossings.
  29. [29]
    Guide to Planning and Preparing Pipeline HDD Projects
    Aug 24, 2023 · Learn how to optimize your HDD project with this comprehensive guide. Understand the steps involved, prepare equipment and plan for ...
  30. [30]
    iMIS
    **Summary of Site Preparation and Planning for HDD (Chapter 12, Handbook of PE Pipe, 2nd Ed., 2008):**
  31. [31]
    None
    ### Summary of Horizontal Directional Drilling (HDD) Site Preparation and Planning
  32. [32]
    How to Plan an HDD Bore - Why Preparation Makes All the Difference
    Feb 27, 2025 · A bore plan is a comprehensive document that acts as a step-by-step guide for executing the optimal bore path.
  33. [33]
    [PDF] HDD Construction Process - Notes - GeoEngineers
    installation of 1,530 feet of electrical cable using a 2,000 pound push/pull drill rig with 500 ft-lbs of rotary torque. Page 4. In 1971, Cherrington was the ...
  34. [34]
    Understanding Limitations for HDD - Technical Toolboxes
    Aug 16, 2023 · HDD limitations include borehole length, pipe diameter, surface/subsurface conditions, coarse-grained soils, hard rock, and the need for ...Missing: evolution dry wet
  35. [35]
    What is a frac-out in Horizontal Directional Drilling? - Utility Magazine
    May 4, 2016 · A 'frac-out' is the unintentional return of drilling fluids to the surface during horizontal directional drilling (HDD).Missing: length limits
  36. [36]
    Back-Ream - Plastics Pipe Institute
    The back-reaming and pullback operation typically requires greater time, machine load, and drilling fluid volume than the initial pilot bore due to the creation ...
  37. [37]
    [PDF] TR-46: Guidelines for Use of Mini-Horizontal Directional Drilling for ...
    The creation of the pilot bore hole and the reaming operations are typically accomplished by fluid jet cutting and/or the cutting torque provided by rotating ...
  38. [38]
    [PDF] Introduction to HDD - Chester County Engineers
    Back Reaming is the process of opening and stabilizing the bore hole to the appropriate size for installing the pipe. Back Reaming uses the reverse thrust, ...
  39. [39]
    Frequencies - Radiodetection Support
    Nov 24, 2020 · Choice of frequency for active location​​ Active signals between 8kHz and 33kHz are commonly used for these applications. For more comprehensive ...
  40. [40]
  41. [41]
  42. [42]
    [PDF] Overview of Horizontal Directional Drilling for Utility Construction
    Table of Contents. Abstract. Chapter 1: Introduction. Chapter 2: Design Information, Construction Process. 2.1 Geotechnical and Design Data.
  43. [43]
    NASTT'S Horizontal Directional Drilling (HDD) Good Practices ...
    expectations of typical HDD steering capabilities. Walkover guidance system minimum accuracy is reported as 5% of depth. This translates to spatial. Next ...Missing: traditional | Show results with:traditional
  44. [44]
    Utilizing Directional Boring for Safer Utility Installation
    Oct 13, 2020 · Directional boring offers an innovative solution for safer, non-invasive utility installation, especially on a busy site with potential surface obstacles.Missing: definition applications
  45. [45]
    Utilities That Can Be Installed via Directional Drilling Services
    Oct 8, 2024 · Applications: Directional drilling is commonly used to install main water pipelines, service lines, and irrigation systems. · Applications: This ...
  46. [46]
    When & When Not to Use Directional Drilling vs. Auger Boring
    Nov 22, 2021 · “Auger boring machines can install casing ranging from 4 inches to 72 inches (10.2 cm to 182.9 cm) in diameter, and up to 600 feet (182.9 m) in ...
  47. [47]
    Why Directional Boring is the Most Efficient Way to Install Utilities in ...
    Jan 30, 2025 · Directional boring eliminates open trenches, reducing the likelihood of accidents such as falls or vehicle collisions. The method also ...Missing: applications | Show results with:applications
  48. [48]
    HDD Helps Build an Intelligent Highway
    HDD is used to install conduits for fiber optic and power cables, enabling intelligent highway systems. The process involves directional drilling and reaming ...Missing: crossing | Show results with:crossing
  49. [49]
    How a Directional Drilled River Crossing Water Main Saved ...
    Utilizing horizontal directional drilling for the installation of a river crossing water main saved the Caribou Utilities District in Caribou, ...
  50. [50]
    Horizontal Directional Drilling Market Size Report, 2030
    The global horizontal directional drilling market size was estimated at USD 8.18 billion in 2024 and is projected to reach USD 16.08 billion by 2030, ...
  51. [51]
    2020's Top 50 Trenchless Engineering Firms
    Dec 2, 2020 · Horizontal directional drilling (HDD) also remains a top market discipline with more than 6,100 completed projects. ... 2025 Trenchless Technology ...
  52. [52]
    24" and 30" Diameter Pipelines in Permian - Ellingson-DTD
    Mar 7, 2019 · Thirty-six inch and larger diameter HDD bores require specialized equipment and are significantly more complex than the average trenchless ...Missing: typical | Show results with:typical
  53. [53]
    Oil and Gas Pipeline Construction: Step-By-Step Visual Guide
    The width of the right-of-way is determined based on the diameter of the pipe (8 – 42 inches), with widths ranging from 80 – 125. While existing roads are used ...
  54. [54]
    [PDF] TransCanada Keystone XL Pipeline Project
    Nov 30, 2020 · ... Keystone's plan to use horizontal directional drill (HDD) when crossing the Missouri, Platte, Elkhorn,. Niobrara, Cheyenne, and Yellowstone ...
  55. [55]
    [PDF] Building Interstate Natural Gas Transmission Pipelines: A Primer
    These regulations also require applicants to avoid, to the extent practicable, historic sites, national landmarks and parks, wetlands, recreational and wildlife ...
  56. [56]
    Horizontal Directional Drilling Explained - GPRS
    By drilling a precisely controlled, horizontal bore path underground, HDD minimizes surface disruption and reduces the environmental impact of utility ...
  57. [57]
    Top 7 Environmental Benefits of Horizontal Directional Drilling
    HDD keeps the ground intact, with minimal excavation. By leaving topsoil and vegetation undisturbed, HDD significantly reduces the risk of soil erosion, making ...
  58. [58]
    Horizontal Directional Drilling Chester County
    We can drill up to 500 feet per day with the right conditions. Why Choose Us for All Your Horizontal Drilling Needs? Directional Drilling Inc. utilizes the ...Missing: rate 500 ft
  59. [59]
    The Benefits of Directional Drilling and Boring - Behm Enterprises
    Minimized Surface Disruption: Directional boring significantly reduces the need to dig up roads, sidewalks, and other infrastructure. This is especially ...
  60. [60]
    Minimise Traffic Disruption With Directional Drilling Solutions
    Apr 4, 2025 · The greatest advantage of directional drilling is its ability to preserve the surface. With fewer road closures and detours, vehicles and ...
  61. [61]
    [PDF] Chapter 14 - Trenchless Construction
    directional boring for short bores of 60 feet or less; however, directional drilling is generally better suited for longer bores. Page 21. Chapter 14 ...
  62. [62]
    [PDF] FINAL REPORT HORIZONTAL DIRECTIONAL DRILLING
    Horizontal directional drilling (HDD) is a trenchless construction process for drilling boreholes and installing pipe without disturbing the surface and area ...
  63. [63]
    [PDF] IPC2022-87032 | BGC Engineering
    Sep 26, 2022 · Horizontal directional drilling (HDD) is a method of trenchless ... higher failure rate where HDD is the installation method. This.
  64. [64]
    Risks of Horizontal Directional Drilling (HDD) in Winter - Horton Group
    Sep 28, 2023 · This article aims to provide an understanding of the risks involved, focusing on elements such as drill rigs, drill string, and drill support trucks.
  65. [65]
  66. [66]
    [PDF] Synthesis of Trenchless Technologies
    Obstructions pose a significant risk for all types of trenchless work. In general, the risk of using the directional drilling method increases with pipe ...
  67. [67]
    HDD Academy | HDD Training and Education
    A two-day intensive course designed to equip attendees with knowledge of horizontal directional drilling pre-construction, design and material selection.Registration · 2026 Agenda · Hotel · Venue
  68. [68]
    [PDF] Avoiding Underground Utilities during Horizontal Directional Drilling ...
    Mar 13, 2018 · Drill the Pilot Bore: The HDD machine operator, makes a pilot bore by running the drill stem and head through the entire drill path, from the ...
  69. [69]
    What are Best Practices for Pre and Post Directional Drilling ... - GPRS
    Horizontal directional drilling (HDD) is a trenchless method used for installing underground utilities, such as pipes, cables, or conduits, without the need for ...
  70. [70]
    Horizontal Drilling Safety Protocols for Utility Trenching | Government
    NTSB recommended widespread use of the Common Ground Alliance's Best Practice 3-26 on 811 center membership. This will help ensure proper HDD safety standards.<|control11|><|separator|>
  71. [71]
    How to perform daily Vermeer horizontal directional drill inspections
    Mar 8, 2022 · Next, inspect the machine for hydraulic leaks and the electrical harnesses for loose connections and fraying. Common areas to inspect may ...
  72. [72]
    How to inspect a used directional drill - Equipment World
    Jan 9, 2012 · During your walk around, always look for hydraulic leaks, usually located at O-rings, fittings and hydraulic lines. Other checkpoints include ...
  73. [73]
    Using Drilling Fluids to Manage Risk in HDD - Trenchless Technology
    Nov 21, 2016 · A few major risks include. • costs associated with frac-outs from high downhole pressures • stuck pipe or tools because of hole collapse or poor ...
  74. [74]
    Understanding HDD Hydraulic Fracture (FRAC OUT) - JB Trenchless
    Quick response is critical. First, stop drilling. Then, contain the released fluid and notify appropriate environmental authorities if required. If FRAC OUT ...
  75. [75]
    Horizontal Directional Drilling Operations and Job Site Safety
    Only trained and qualified personnel shall operate horizontal directional drilling machines. OSHA Standard 1926.20(b)(4) The employer shall permit only those ...
  76. [76]
    Investigation of Horizontal Directional Drilling Construction Risks ...
    1 :Frac-out event, which in turn, could lead to an E 12 :Wait on Others ... 11 :Unscheduled Maintenance/Repair of Surface Equipment occurred on 80 out of 100
  77. [77]
    Enbridge, Pipelines and Horizontal Directional Drilling - Sierra Club
    Mar 15, 2022 · Why is HDD Harmful to the Environment? HDD is a hazardous process. "Frac outs" are likely to occur, especially in icy environments. A frac out ...
  78. [78]
    [PDF] Directional Drilling Contingency Plan (Frac-out) - TDEC Dataviewers
    The impact of the drilling fluid on a body of water consists of a temporary increase in the turbidity that can impact aquatic life. Purpose: The purpose of the ...
  79. [79]
    Horizontal Directional Drilling: Minimizing Impacts, Maximizing ...
    Oct 30, 2023 · Longer boreholes and larger diameter pipelines or conduits may allow lower entry and exit angles to achieve the desired curvature.
  80. [80]
    (PDF) Biodegradable eco-friendly drilling fluid: a study on the use of ...
    May 9, 2025 · Nevertheless, one of the major concerns of using WBDF is the fluid loss due to its penetration into the formation during the drilling operation.Missing: mitigation directional boring
  81. [81]
    How to Prevent and Mitigate Drilling Fluid Loss
    Oct 18, 2021 · To prevent inadvertent return (IR), ensure the formation's containment pressure is greater than the pressure in the hole. IR is when fluid goes ...Missing: strategies biodegradable
  82. [82]
    [PDF] HORIZONTAL DIRECTIONAL DRILLING CONTINGENCY PLAN
    The plan aims to minimize drilling fluid seepage or drill failure. If a frac-out is detected, immediate corrective actions are taken, including stopping pumps ...Missing: biodegradable additives<|control11|><|separator|>
  83. [83]
    [PDF] sample fraction mitigation contingency plan for directional drilling
    Ensure an organized, timely, and "minimum-impact" response in the event of a frac-out and release of drilling bentonite; and. 5. Ensure that all appropriate ...
  84. [84]
    [PDF] Horizontal Directional Drilling (HDD) Contingency Plan Guidance
    Planned HDD Crossing​​ All drilling fluids must be limited to a non-toxic clay, water and any drilling fluid additives used in accordance with the drilling fluid ...Missing: NEPA | Show results with:NEPA
  85. [85]
    [PDF] Best Management Practices (BMP) and Mitigation Measures
    • Use horizontal directional drilling where possible for stream crossings to avoid potential impacts to the streambed, banks, and associated fish habitat ...
  86. [86]
    [PDF] nationwide permit 12
    Mar 19, 2017 · 12 When directional boring or horizontal directional drilling (HDD) under waters of the. United States, including wetlands, permittees shall ...Missing: NEPA | Show results with:NEPA
  87. [87]
    Horizontal Directional Drilling: A Green and Sustainable Technology ...
    Jan 24, 2012 · Compared to other methods, HDD can reduce energy consumption during construction, reduce collateral environmental damage, and enhance other ...
  88. [88]
    [PDF] Guidance for Horizontal Directional Drill Monitoring, Inadvertent ...
    Oct 1, 2019 · Drilling Fluid. Composition. Use of loss control materials and other drilling fluid additives, including the quantity, timing, and location of ...
  89. [89]
    'Drill, buddy, drill!!!!' Inside FERC's $40M Rover fine - E&E News
    Mar 24, 2022 · Crews work in 2017 to remove diesel-laced pipeline drilling fluid, often referred to as "drilling mud," from a forested floodplain described as ...
  90. [90]
    Dakota Pipeline Builder Under Fire for Ohio Spill: 8 Violations in 7 ...
    May 12, 2017 · US regulators halted construction at new sites on an Ohio pipeline after several million gallons of drilling mud coated important state wetlands.Missing: frac- | Show results with:frac-