Microsoft Project

Microsoft Project is a suite of developed and marketed by , designed to help individuals and teams plan, organize, execute, and track projects of varying complexity. It provides tools for creating detailed schedules, assigning resources, monitoring progress, managing budgets, and analyzing workloads, making it a staple for professional in businesses worldwide. Originally released in 1984 as an application, Microsoft Project has evolved significantly over four decades, transitioning from a standalone desktop tool to a cloud-integrated platform within the ecosystem. The software's early versions focused on basic scheduling and , but subsequent releases introduced advanced features like Gantt charts, critical path analysis, and integration with other products such as Excel and . In its modern form, Microsoft Project encompasses multiple components tailored to different needs: the desktop client (available as Project Standard and Project Professional) for robust, on-premises planning; (incorporating the functionality of the retired Project for the web), a lightweight, browser-based tool for simple work management; and Project Online, a cloud service for enterprise-level portfolio management and collaboration. Note that Project for the web was retired in August 2025 and integrated into , while Project Online is scheduled for retirement on September 30, 2026. These offerings support licensing through subscription plans like Plan 1, Plan 3, and Plan 5, which unlock features such as interactive roadmaps, automated scheduling, and AI-powered insights via integration with . Key features include customizable templates based on industry standards, visual timelines for communication, resource optimization to avoid overallocation, and reporting capabilities enhanced by Power BI for data-driven decision-making. As of 2025, the platform emphasizes seamless collaboration within , enabling real-time updates, task assignments, and progress tracking to streamline workflows in hybrid work environments.

History

Origins and Early Versions

Microsoft Project originated as an internal tool at in the early , designed to streamline the management of projects by tracking tasks, resources, and timelines. The software's first commercial release, version 1.0, arrived in 1984 for , marking a pivotal step in accessible tools for personal computers. This edition focused on core functionalities like task scheduling via the , resource allocation, costing, and the generation of basic Gantt charts to visualize project timelines. It also supported the for navigation and included built-in help, competing with contemporaries such as VisiSchedule and Harvard Project Manager. However, the version operated primarily through a text-based, , which required users to input commands and navigate menus without modern graphical elements, and it demanded at least 128 KB of , a double-sided 5.25-inch floppy drive, and a graphics adapter for output. In 1990, released a ported version 1.0 specifically for , resetting the numbering to align with the new platform and introducing significant graphical interface improvements. This adaptation leveraged Windows' to enhance , allowing for more intuitive interaction with Gantt charts and scheduling features while maintaining with Windows 2.x environments. The shift addressed some DOS-era constraints by providing a more visual and mouse-driven experience, though early dependency linking remained basic, limited to straightforward finish-to-start relationships without advanced types like start-to-start or lag adjustments. Key limitations of these initial versions included the DOS edition's inability to install on hard drives, reliance on copy-protected floppy disks that complicated backups, and rudimentary task interdependencies that did not fully support complex project networks. These constraints reflected the era's hardware and software boundaries but established Microsoft Project as a foundational tool for professional .

Evolution Through Major Releases

Microsoft Project 95 (version 4.1) was the first 32-bit version, designed for , and enhanced integration with the ecosystem through a streamlined interface, ODBC support for database connectivity, Answer Wizard help, and autocorrect features. It also improved reporting capabilities, providing more customizable templates and graphical outputs for better visualization of project progress and resource utilization. In Microsoft Project 98, web publishing became a key innovation, enabling users to embed hyperlinks to external documents and websites directly within project plans for easier navigation and collaboration. Additionally, the software introduced direct export to format, allowing project files to be saved and shared as web pages for broader accessibility without requiring the full application. Microsoft Project 2000 expanded enterprise capabilities through the introduction of Project Central (later renamed Project Server), a companion tool that facilitated collaborative across teams by centralizing data storage and access. It also incorporated (VBA) support, enabling users to automate tasks and customize workflows via scripting, aligning with the suite's extensibility. With Microsoft Project 2003, visual reporting tools were added, permitting the export of project data directly into Excel for analysis and into Visio for diagrammatic representations, streamlining the creation of executive summaries and dashboards. This integration enhanced interoperability, allowing project managers to generate dynamic charts and graphs without manual data transfer. Microsoft Project 2007 introduced multi-level undo functionality, permitting users to reverse up to 99 actions across views, data entries, and settings, which improved planning flexibility and reduced errors during schedule development. It also refined timeline views, offering customizable bars and critical path highlighting for clearer visualization of project phases and dependencies. The 2010 release of Microsoft Project adopted the ribbon interface, reorganizing commands into contextual tabs for Task, , , View, and Format, making frequently used tools more accessible and intuitive. Backstaging for was introduced, allowing managers to stage unassigned work and visualize team capacity before final assignments. A built-in timeline view was also added, providing a high-level graphical summary of the project schedule that could be easily copied into presentations. Microsoft Project 2013 incorporated tools, enabling the capture and prioritization of project requests through workflows integrated with Project Server, facilitating from initiation to execution. analysis features were enhanced, allowing optimization of project selections based on business drivers, resource availability, and budget constraints using drag-and-drop prioritization. In Microsoft Project 2016, agile support was bolstered with built-in templates for and methodologies, including sprint planning boards and backlog management to accommodate iterative development. Kanban boards enabled visual tracking of work-in-progress limits and task flow, while new reporting options provided customizable dashboards for progress updates tailored to executives and team members. Microsoft Project 2019 advanced multi-project timelines, supporting the combination of tasks from multiple files into a single, layered view for overseeing interconnected portfolios. The team planner view was refined, offering drag-and-drop reallocation of resources across projects with improved conflict detection and capacity forecasting.

Transition to Cloud and Subscription Models

In the early 2020s, Microsoft began emphasizing -based delivery for Project, marking a shift from traditional perpetual licenses. Project 2021, released in October 2021, served as a significant perpetual license edition that introduced enhanced capabilities, allowing users to connect on-premises installations to resources like Project Online for synchronized data and across environments. This version supported features such as exporting schedules to the while maintaining local control, bridging desktop and online workflows without requiring a full . A key milestone in this transition was the launch of Project for the web in October 2019, positioned as a lightweight, browser-based alternative to the full desktop application. It offered simplified interfaces including view for task lists, board view for Kanban-style management, and view for high-level portfolio visualization, enabling quick project setup without complex installations. Designed for accessibility in modern work settings, this tool integrated natively with and other ecosystem apps, appealing to teams seeking agile, low-overhead planning over traditional Gantt-heavy approaches. By 2020, Project's cloud components were fully integrated into subscriptions, expanding availability through tiered plans: Project Plan 1 for basic web access at $10 per user per month, Plan 3 for advanced portfolio management and reporting at $30 per user per month, and Plan 5 for enterprise-level resource optimization and compliance tools at $55 per user per month (billed annually). These subscriptions replaced standalone purchases, embedding Project functionalities within broader suites to streamline licensing and enhance cross-app interoperability. This subscription focus continued with the emergence of Project 2024 LTSC (Long-Term Servicing Channel) in September 2024, tailored for on-premises deployments in regulated or disconnected environments. As a perpetual option, it prioritizes long-term stability with five years of mainstream support until October 2029, delivering security updates without frequent feature changes that could disrupt operations. Unlike subscription variants, LTSC avoids dependencies, catering to organizations needing predictable, offline-capable tools. The subscription model has notably improved accessibility by lowering entry barriers through scalable pricing and multi-device support, allowing small teams to adopt professional tools without large upfront investments. Integrated with , it ensures users receive continuous updates, including AI-driven features like Copilot for task automation, keeping projects aligned with evolving best practices without manual upgrades. This shift led to the retirement of Project for the web on August 1, 2025, with users transitioned to Microsoft Planner's premium plans (formerly Project Plans 3 and 5) for continued cloud-based work management. This migration preserves core capabilities like grid and roadmap views while unifying them under Planner, reflecting Microsoft's consolidation of tools for hybrid work.

Editions and Deployment Options

Desktop Editions

Microsoft Project desktop editions consist of the Standard and Professional versions, which provide on-premises for Windows environments. These editions are part of the Office LTSC (Long Term Servicing Channel) releases, with Project 2024 representing the current perpetual version as of 2025. Microsoft delivers essential tools, including basic task scheduling, visualization, pre-built templates, automated scheduling, and printing capabilities. Available in both 32-bit and 64-bit formats, it targets individual users or small teams managing standalone projects without requirements for multi-project resource sharing or enterprise connectivity. Priced as a one-time purchase at $679.99, it emphasizes simplicity and local file handling for cost-effective use in non-complex scenarios. Microsoft Project Professional builds on the Standard edition by incorporating advanced features such as resource pooling to share personnel and assets across multiple projects, Visual Reports for generating graphical data exports to Excel and Visio, and native integration with Project Server for centralized oversight. This enables more robust and scalability for larger initiatives. Like Standard, Professional is offered in 32-bit and 64-bit versions and can be licensed perpetually at $1,129.99 or via subscription models. Licensing for these desktop editions supports perpetual ownership through or under the Office LTSC model, allowing indefinite use post-activation without recurring fees. Alternatively, subscription access to the Professional desktop client is included in Project Plan 3 ($30/user/month) and Plan 5 ($55/user/month), which bundle it with cloud-based enhancements while maintaining on-premises installation options. Both editions share compatible hardware requirements, running on or with a minimum 1.6 GHz dual-core , 4 GB (2 GB for 32-bit installations), 4 GB of available disk space, and a 1280 x 768 screen supporting 9 graphics. For 64-bit versions, a 64-bit operating system and are recommended to handle larger datasets efficiently.
AspectProject StandardProject Professional
Core CapabilitiesTask scheduling, Gantt charts, printing, templates, automated schedulingAll Standard features plus resource pooling, Visual Reports to Excel/Visio, Project Server integration
Target Use CaseSmall/individual projects, no sharingEnterprise-scale, multi-project management
Architecture Options32-bit and 64-bit32-bit and 64-bit
Perpetual Pricing$679.99 one-time$1,129.99 one-time
Subscription InclusionNot included in M365 plansIncluded in 3/5
The primary distinctions position for straightforward, isolated project needs, whereas facilitates broader organizational coordination and .

Online and Cloud-Based Editions

Microsoft Project offers several cloud-based editions designed for collaborative without the need for local installations. Project Online serves as an enterprise-level cloud service focused on (PPM), enabling organizations to handle , , and timesheet tracking across multiple projects. It supports advanced features such as , dashboards, and integration with other tools for comprehensive oversight. Access to Project Online requires a 5 subscription, which provides the full suite of PPM capabilities; new subscriptions for Project Online-only SKUs ended on October 1, 2025. Note that Project Online is scheduled for retirement on September 30, 2026, after which its functionalities will transition to enhanced options within the Microsoft Planner ecosystem. Prior to its retirement, Project for the web functioned as a lightweight software-as-a-service () offering, providing simplified through intuitive task grids, boards, and roadmap views for visualizing progress. This edition was accessible directly via web browsers or integrated within , allowing users to create, assign, and track tasks in a modern, responsive interface without desktop software. It emphasized ease of use for smaller teams or individual contributors, supporting basic scheduling and collaboration features. Following the retirement of Project for the web on August 1, 2025, its core capabilities were absorbed into Microsoft Planner under the Premium plan, ensuring continuity for users. The updated Planner incorporates enhanced AI-driven insights via Microsoft 365 Copilot for task prioritization and predictive analytics, along with improved task history tracking to maintain audit trails and progress logs. As of August 2025, the Project Manager agent is integrated into Planner for the web, aiding task management and project coordination. Existing Project for the web plans were automatically migrated to equivalent Planner plans, with users redirected to the web version of Planner for seamless access. Pricing for these cloud-based editions is structured in subscription tiers to accommodate varying needs. The Planner Plan 1, at $10 per user per month (billed annually), offers basic web access for and . The Planner and 3, priced at $30 per user per month, combines desktop and web functionalities for more robust scheduling and reporting. For advanced enterprise features, including full and Project Online access, the Planner and 5 costs $55 per user per month. These online and cloud-based editions provide key advantages such as real-time collaboration, where multiple users can edit projects simultaneously without version conflicts, eliminating the need for software and enabling access from any device including mobiles. Automatic updates ensure users always have the latest features and security enhancements, reducing maintenance overhead compared to desktop installations.

Core Functionality

Task and Schedule Management

Microsoft Project provides robust tools for task creation, enabling users to input project activities via a spreadsheet-like grid in the Task Sheet view. Tasks are defined with essential fields including name, duration, start and end dates, and links to predecessors or successors to establish dependencies between activities. This entry method supports hierarchical outlining of tasks and subtasks, facilitating the organization of complex projects into manageable components. The software employs the (CPM) as its primary scheduling approach, automatically calculating task dates based on dependencies, durations, and project calendar settings to determine the longest sequence of dependent tasks that dictate the overall project timeline. For resource-driven scheduling, Microsoft Project uses the formula duration = work / units, where adjustments to resource assignment units recalculate duration while keeping total work constant, particularly in fixed-work task types. This method ensures dynamic updates to the schedule as dependencies and constraints evolve, helping project managers identify potential delays early. Visualizations play a central role in task and schedule management, with the view displaying tasks as horizontal bars on a timeline to illustrate durations, overlaps, and dependencies through connector lines. The Network Diagram view represents tasks as nodes connected by arrows showing predecessor-successor relationships, offering a flowchart-like perspective on workflow logic and critical path identification. Additionally, the view presents tasks overlaid on a monthly or weekly calendar, highlighting resource availability and scheduling conflicts in a date-centric format. These views can be customized and switched via the View tab to suit different analytical needs. To track progress against plans, users set baselines by capturing the current scheduled start and finish dates for all tasks, which serves as a reference point for variance analysis. Schedule variance is then calculated as the difference between actual finish and baseline finish dates, allowing managers to quantify deviations and assess project performance quantitatively. This baseline functionality supports multiple iterations for interim tracking without overwriting the original plan. Constraints and deadlines further refine scheduling flexibility, with constraint types such as "As Soon As Possible" (default for forward scheduling), "Must Start On," and "Start No Earlier Than" restricting task dates and influencing calculations by limiting schedule movement. Deadlines, in contrast, act as non-restrictive markers for target completion dates, triggering indicators if tasks overrun without altering the underlying logic. These features help balance fixed milestones with dynamic dependencies while preserving overall project .

Resource and Cost Management

Microsoft Project categorizes resources into three primary types to facilitate accurate allocation and tracking: work resources, which represent labor or that expend time on tasks, such as employees or machinery; material resources, which denote consumable items like supplies or components measured in units (e.g., tons of or boxes of parts); and cost resources, which capture one-time or fixed expenses unrelated to time or quantity, such as fees or licensing costs. These resources are defined and configured in the Resource Sheet view, where users enter details including the resource name, type selection, maximum units for work resources (expressed as a of , e.g., 100% for full-time), standard pay rates (e.g., $50/hour), rates (e.g., $75/hour), and material labels for unit measurements. settings apply only to work resources to account for premium labor costs beyond standard hours. Assigning resources to tasks involves linking them through the Assign Resources dialog box or directly in task views, specifying assignment units (the portion of the resource's capacity dedicated to the task) and tracking actuals against planned values. The core scheduling equation governs these assignments:
\text{Work} = \text{Duration} \times \text{Units}
This formula dynamically adjusts duration, work, or units based on task type settings (fixed work, duration, or units) as resources are allocated, ensuring realistic scheduling. For instance, assigning a resource at 50% units to a 10-day task yields 5 days of work. Progress is monitored by entering actual work, costs, and durations, allowing comparison to baselines for variance identification. Task dependencies may influence resource timing by sequencing assignments, but resource management focuses on capacity and effort allocation.
Resource leveling addresses overallocations—situations where assigned work exceeds a resource's maximum units—through automated or manual processes accessed via the Resource tab. Automatic leveling prioritizes tasks using the Priority field (values from 0 for lowest to 1000 for highest, default ) and applies options like delaying tasks within available , splitting assignments, or leveling only during nonworking time to resolve conflicts without extending the project finish date when possible. Manual leveling allows targeted adjustments, such as changing priorities or delays, to balance workloads while minimizing schedule impacts. For example, if a is overallocated across overlapping tasks, leveling might delay lower-priority tasks to fit within the 100% maximum units. Cost management derives from resource assignments, with total project costs computed as the aggregate of work resource costs (actual or scheduled work multiplied by standard/overtime rates plus per-use fees), material costs (assigned quantities multiplied by unit rates), and fixed costs from cost or other resources. The formula simplifies to:
\text{Total Cost} = \sum (\text{Work} \times \text{Rate}) + \sum (\text{Quantity} \times \text{Material Rate}) + \text{Fixed Costs}
Earned value analysis enhances budgeting with metrics like the Cost Performance Index (CPI), calculated as:
\text{CPI} = \frac{\text{EV}}{\text{AC}}
where EV (earned value) is the budgeted cost of completed work and AC (actual cost) is the incurred expense; a CPI greater than 1 indicates cost efficiency. Budget resources, designated in the Resource Sheet and assigned solely to the project summary task, establish top-level baselines (e.g., annual labor budget) for high-level variance analysis against actuals, avoiding granular task assignments while supporting overall financial control.

Reporting and Collaboration Tools

Microsoft Project provides built-in reporting capabilities that enable users to generate insights from project data without external tools. Visual Reports allow for the creation of customizable graphical summaries that export directly to Excel PivotTables for or Visio diagrams for visual representations. These reports are categorized into areas such as Costs, which track budget overruns and expenditures; , which monitors resource utilization across tasks; and , which evaluates task completion and milestones. Dashboards in Microsoft Project offer quick overviews of project status through views like the , a Gantt-style chart displaying key milestones and dependencies, and the Team Planner, which visualizes resource assignments and availability. Users can customize these dashboards by adding fields for key performance indicators (KPIs), such as completion percentage or variance from , to highlight progress and potential issues. Collaboration features enhance team coordination, particularly in cloud-based editions such as (successor to the retired Project for the web as of August 2025), where co-authoring allows multiple users to edit schedules and task lists simultaneously in . Tasks support inline comments for discussions and updates, while export options to PDF or PowerPoint facilitate sharing progress reports with stakeholders. Earned value management (EVM) reporting is integrated to assess project performance, providing metrics such as the Schedule Performance Index (), calculated as SPI = / , where represents earned value (budgeted cost of work performed) and denotes planned value (budgeted cost of work scheduled). These reports include graphical variance charts to illustrate schedule and cost deviations, aiding in predictive analysis. Sharing options support broader dissemination, including syncing project data with lists for real-time status updates among team members and publishing reports to the for external access, though full requires appropriate permissions.

Integrations and Extensions

Microsoft Ecosystem Integrations

Microsoft Project integrates seamlessly with , enabling users to synchronize tasks directly with and for real-time notifications and updates. This connectivity allows project managers to assign tasks within Microsoft Project, which sends notifications via email or integrates with through Planner for updates and alerts, reducing the need to switch applications. Additionally, Power Automate within facilitates workflow automation, such as creating approval flows for task changes or budget requests, streamlining project governance processes. Project Server and Project Online provide deep integration with , serving as centralized repositories for project-related documents, risks, and issues that link directly to schedules in Microsoft Project. Users can sync project plans (.mpp files) to task lists, enabling collaborative editing and automatic updates to timelines based on shared site activities. This setup supports enterprise-level by embedding risks and issues tracking within the broader ecosystem. Connectivity to Power BI allows export of project data from Microsoft Project for the web or Project Online, creating interactive dashboards that visualize key metrics like resource utilization and task completion rates. The official Power BI template app connects to Project Web App, pulling in data for custom reports that highlight portfolio performance and bottlenecks. As of 2025, Microsoft Project integrates with in , providing AI-powered insights such as automated summaries, task suggestions, and risk analysis within Planner and Project for the web. For agile development environments, Microsoft Project links with , enabling the import of work items and sprints (via Excel) into Project timelines to align traditional with practices. Note that direct integration is deprecated since 2019; use Excel or add-ins for connectivity. This integration supports hybrid methodologies by mapping Azure Boards tasks to Gantt charts in Project, facilitating progress tracking across development and delivery phases. File storage integration with and ensures automatic backups and version history for .mpp files, allowing secure cloud access and recovery options as part of Microsoft 365. Project files saved to benefit from co-authoring capabilities and audit trails, enhancing in distributed teams.

Third-Party and Customization Options

Microsoft Project supports a range of third-party add-ins available through the Microsoft AppSource marketplace, enabling users to extend functionality for specific needs such as portfolio synchronization and task bridging. For instance, PPM Express is a cloud-based add-in that integrates with Microsoft Project Desktop and Online to provide advanced portfolio management, allowing users to sync project data, track progress across multiple sources, and generate consolidated reports. Similarly, the add-in facilitates task import and export between Wrike and Microsoft Project, preserving elements like durations, dependencies, and assignees to support hybrid workflows. Customization in Microsoft Project includes support for (VBA) macros, which allow automation of repetitive tasks, data manipulation, and integration with external processes. Users can create macros to perform actions such as updating resource assignments or generating custom reports based on project data. Additionally, custom fields enable the definition of tailored data points using s; for example, a like % Complete = (Actual Work / Work) × 100 can be applied to calculate progress dynamically without manual intervention. For programmatic access, Microsoft Project Online provides REST APIs that support operations like creating, reading, updating, and deleting project elements such as tasks, resources, and assignments. These APIs use OData protocols to enable integrations with (ERP) systems, for example, pulling or pushing data to for synchronized cost and resource tracking. Developers can authenticate via and query endpoints like /Projects for retrieving project details or /Tasks for managing schedules. Third-party connectors further enhance interoperability, with tools like offering import and export capabilities for Microsoft Project files in formats such as XML or , allowing seamless transfer of tasks, timelines, and dependencies between the platforms. Oracle Primavera provides compatibility through XML-based modes, enabling users to migrate project plans while maintaining activity structures and resource allocations, though some advanced Primavera features may require manual adjustments post-import. Customization options in Microsoft Project emphasize data manipulation and extensions rather than structural changes, with no native for deep user interface (UI) modifications such as altering core navigation or visual layouts. While add-ins and VBA can influence task panes and views, extensive UI overhauls are limited to prevent compatibility issues across updates, directing users toward API-driven or connector-based enhancements instead.

Current Status and Future Developments

Support Lifecycle

Microsoft Project's support lifecycle varies by edition, with perpetual license versions following fixed or modern policies, while subscription-based versions receive continuous servicing through update channels. As of November 2025, older perpetual editions such as Project 2016 and Project 2019 have reached the end of their extended on October 14, 2025, meaning no further security updates, non-security updates, bug fixes, or are available for these versions. Newer perpetual editions adhere to different policies for longer-term maintenance. Project 2021 operates under the Modern Lifecycle Policy, providing continuous support and updates as long as users remain current with licensing requirements, with retirement scheduled for October 13, 2026. In contrast, Project 2024 LTSC follows the Fixed Lifecycle Policy, offering five years of mainstream support until October 9, 2029, after which no extended support or further updates will be provided. For subscription models integrated with Microsoft 365, Project receives ongoing updates without a fixed end date, delivered through configurable channels tailored to organizational needs. The Current Channel provides the fastest rollout of new features and previews, ideal for users seeking the latest capabilities. The Monthly Enterprise Channel balances feature updates with monthly security patches, while the Semi-Annual Enterprise Channel prioritizes stability by deferring non-security updates to twice-yearly releases. Microsoft recommends migrating from end-of-support perpetual versions like Project 2016 and 2019 to active options, including subscriptions with Project desktop and web apps or the perpetual Project 2024 LTSC for on-premises needs; for simpler , organizations may transition to , which incorporates enhanced planning tools previously in Project for the web.

Recent Updates and Transitions

In 2024 and 2025, Microsoft Project underwent significant enhancements through its integration with Premium, introducing AI-assisted task suggestions that automate the creation and assignment of tasks based on project goals and team availability. These features, building on the transition from Project for the web, enable users to generate plans using natural language prompts, such as converting high-level objectives into actionable task lists. Mobile applications for and support basic task management, including viewing schedules and updating progress on the go, aligning with broader cross-device improvements. A key transition occurred in August 2025 with the retirement of the standalone Roadmap app, which was fully integrated into Microsoft Teams Planner to streamline project visualization and . Premium plans in Planner support agile and hybrid methodologies, allowing teams to manage sprints, backlogs, and dependencies within a unified interface. Users accessing the retired apps are automatically redirected to Planner for the web, ensuring continuity in portfolio and timeline tracking. New capabilities in Project Plan 5 introduced Copilot integration for querying of data, such as prompting "Show overdue tasks" to retrieve filtered views and summaries. This AI-driven functionality extends to advanced analytics, providing insights into risks, resource allocation, and progress metrics directly within the . In parallel, Goals integrates with Planner to align goals with organizational objectives, facilitating OKR tracking. The Power Platform supports low-code extensions, enabling custom workflows and app integrations to enhance automation without deep technical expertise. At Microsoft Ignite 2025 on November 18, 2025, new Copilot features were announced for collaborative project planning in Microsoft Teams, allowing users to review and adjust plans before tasks are added to Planner. Looking ahead, enhanced ERP integrations via Dynamics 365 Project Operations are planned for 2025 release wave 1 and beyond, unifying project management with financial and operational systems.

References

  1. [1]
    Microsoft Project service description - Microsoft Learn
    Sep 4, 2023 · Microsoft Project offers the following applications to help meet your organization's needs for project and work management.Microsoft Project Online... · Project for the web · Project Online desktop clientMissing: overview | Show results with:overview
  2. [2]
    Buy Project Professional 2024 | Microsoft Store - Microsoft
    Manage your projects more efficiently with the right timelines, budgets, and resources. Reduce inefficiencies and training time with automated scheduling tools.
  3. [3]
    Microsoft Introduces the Next Generation of Project Management
    Microsoft Project was first launched in 1984, so it's one of the longest running products at Microsoft. The first version was an MS-DOS version and focused on ...
  4. [4]
    History of project management - Microsoft Support
    It is tempting to think of project management as a modern discipline, but its major concepts have their roots in the late nineteenth century.
  5. [5]
    Project Management Software for Teams - Microsoft
    Use a powerful, yet simple project management tool to plan, manage, and deliver work effortlessly—from one-time projects to large initiatives. · Work flexibly.
  6. [6]
    Task and Project Management Software | Microsoft Planner
    Use Microsoft Planner task management software to manage tasks, improve team collaboration, and streamline projects with an easy digital planner.Planner and Project Plan 3 · Planner Plan 1 · See plans and pricing
  7. [7]
    What is Microsoft Project? A Quick History. - Workzone
    Jun 2, 2025 · Microsoft Project was first made publicly available in 1984. It was initially used as an internal tool within Microsoft to streamline and track ...
  8. [8]
    Microsoft Project 1.0 for DOS - WinWorld
    Notable features of Microsoft Project 1.0 included its ability to use the Microsoft Mouse, and built in help. This version competed with VisiSchedule, Harvard ...
  9. [9]
    Microsoft Project 1.0 - WinWorld
    Product type: Application Planning ; Vendor: Microsoft ; Release date: Sun Apr 29 1990 ; Minimum CPU: 8088 ; User interface: GUI ...
  10. [10]
    [PDF] Unifying the User and Kernel Environments - Microsoft
    Mar 12, 1997 · With version 4.0, Microsoft moved the GUI subsystem into the kernel address space to improve performance. The differences between the two ...Missing: features | Show results with:features
  11. [11]
    [PDF] Microsoft OLE DB Provider for DB2 - Microsoft Download Center
    Jan 31, 2012 · What's New in Version 4.0. The Microsoft OLE DB Provider for DB2 version 4.0 offers the following improvements: • Simplified installation ...
  12. [12]
    Microsoft Announces Microsoft Project 98 - Source
    Sep 29, 1997 · Microsoft Project 98 is scheduled to be available in October 1997 at an estimated price of $499 for new users, and $199 for users of any ...
  13. [13]
    Microsoft Project 2000 and Microsoft Project Central Now Generally ...
    Apr 18, 2000 · Microsoft Project 2000 and Microsoft Project Central provide users with greater flexibility in data analysis and delivery and greater ...
  14. [14]
    [PDF] Managing With Microsoft Project 2000
    Aug 1, 1988 · Like other Microsoft Office applications, Access is supported by Visual Basic for Applications (VBA), an object-based programming language ...
  15. [15]
    Microsoft® Office Project 2003 Inside Out
    Not only can you integrate Excel information into your project plan, but you can also feed information from Project 2003 to an Excel workbook. Such capabilities ...
  16. [16]
    [PDF] Office Project 2007 Step by Step - Microsoft
    . Project inserts a deadline indicator in the chart portion of the Gantt Chart view. You can now see at a glance how close the pre-production phase has come ...
  17. [17]
    Learn the Project 2010 Ribbon - Microsoft Support
    This document provides a broad overview of what you can find in each tab of the Ribbon, followed by a short example of how to use the Ribbon to perform a basic ...
  18. [18]
    [PDF] Microsoft Project 2010 Step by Step - Pearsoncmg.com
    Sep 27, 2013 · This new interface organizes all the com- mands that most people use in a new way, making them quickly accessible from tabs at the top of the ...
  19. [19]
    Microsoft Project 2010 | Microsoft Office
    Get new features, capabilities, and security updates available only for Project Online. ... Features include the Team Planner view, Ribbon interface, and more.<|separator|>
  20. [20]
    [PDF] Hitchhiker's Guide to Demand Management 2013
    This document contains the information necessary to get started on implementing a full Demand. Management solution with Microsoft Project Server 2013. It ...
  21. [21]
    Portfolio analysis in the Microsoft Project Web Application
    Apr 27, 2023 · Learn what a project portfolio analysis is and how to get started doing portfolio analyses in Project Web App.
  22. [22]
    Microsoft Project 2016 Brings New Agile Features
    Jan 18, 2018 · Ability to see the progress for the Backlog Items on the Sprint Planning Board (Scrum Project) and Kanban/Backlog Board (Kanban Project). Don't ...Missing: stakeholder | Show results with:stakeholder
  23. [23]
    Top seven new features of Microsoft Project 2016 - Advaiya
    Project 2016 is a host of features to help them plan projects and collaborate with project stakeholders from virtually anywhere.
  24. [24]
    What's new in Project 2019 - Microsoft Support
    Timeline bars can now be labeled, and task progress is shown right on the tasks themselves, making it simple to quickly illustrate your plan and the work in ...Missing: planner | Show results with:planner
  25. [25]
    View your team's work with Team Planner - Microsoft Support
    Welcome to the Team Planner, a feature that gives project managers greater visibility into, and control over, their team's work.
  26. [26]
    The new Microsoft Project rolls out to customers worldwide
    Oct 29, 2019 · Teams can quickly add new members and set up tasks, and then easily switch between grids, boards, or timeline (Gantt) charts to track progress.
  27. [27]
    Microsoft Project for the web service description
    Jul 7, 2025 · Project for the web is available through three subscriptions: Planner Plan 1, Planner and Project Plan 3, and Planner and Project Plan 5.
  28. [28]
    Compare All Planner Options and Prices | Microsoft Planner
    Plan, execute, and control multiple related projects or initiatives within the projects to achieve strategic goals or business objectives.Microsoft Project Server · Partners · Work management
  29. [29]
    Overview of Office LTSC 2024 - Microsoft Learn
    Apr 2, 2025 · Office LTSC 2024, including Project and Visio, receive five years of Mainstream Support. After this period, there will be no Extended Support ...Deploy Office LTSC 2024 · Update Office LTSC 2024 · Overview of Office 2019Missing: stability | Show results with:stability
  30. [30]
    Why Microsoft 365 Project Management is a Popular Choice for ...
    Nov 20, 2023 · While all editions require a subscription, the accessibility of pricing ensures that users can choose a plan that aligns with their requirements ...
  31. [31]
    Buy Microsoft Planner and Project Plan 3 - Microsoft 365
    Discover Microsoft Planner and Project Plan 3, project management software for task tracking, resource management, and team collaboration within Microsoft ...
  32. [32]
    Transitioning to Microsoft Planner and retiring Microsoft Project for ...
    May 2, 2025 · In August 2025, we will retire Project for the web, as well as the Project and Roadmap apps in Microsoft Teams. Users will be redirected to Planner for the web ...
  33. [33]
    Buy Microsoft Project Standard 2024 - Requirements & Pricing
    $$679.99 In stock Free deliveryProject Professional is a perpetual license, and once activated, it will not expire. Project Plan 3 requires an active subscription. Processor. 1.6 gigahertz ...
  34. [34]
    Microsoft Project FAQs | Questions About Project
    Find answers to commonly asked questions about Microsoft Project, including the new Microsoft Planner, Project for the web, Project Online, Project Online ...
  35. [35]
    Create and share a resource pool in Project desktop
    A resource pool helps with assiging available people across multiple projects when you need to share your resources.Missing: features | Show results with:features
  36. [36]
    Pick the right report in Project - Microsoft Support
    To do this, click Report > Visual Reports, select an Excel or Visio report for your project data, and click View. Excel builds a local Online Analytical ...
  37. [37]
    Project Professional, "Office 365 Version of MPP", Project Server, etc...
    Feb 6, 2024 · This is a standalone version of Microsoft Project designed for a single user.It doesn't include collaboration features that support multiple ...Missing: history | Show results with:history<|separator|>
  38. [38]
    Install Project - Microsoft Support
    Project Standard or Project Professional: If you have one of these non-subscription versions you should have a received a product key with your purchase. Before ...Missing: features | Show results with:features
  39. [39]
    MS Project Online and Desktop Version Differences - Microsoft Q&A
    Nov 23, 2020 · If you purchase Microsoft Project 2019, you can choose either the Standard version or the Professional version. There are a few more features ...
  40. [40]
    Microsoft Project Online service description - Microsoft Learn
    Apr 25, 2023 · Any interaction on a Project Online site requires a Project Plan 3 or Project Plan 5 subscription. 5 Active Directory requires a separate ...Missing: 2020 | Show results with:2020
  41. [41]
    Microsoft Project Online is retiring: What you need to know
    September 30, 2026: Official retirement date – Project Online will no longer be available. Project desktop remains available and is not impacted by this change.
  42. [42]
    Basic tasks in Project - Microsoft Support
    Get started managing a new project. Add, outline, and link tasks, switch to different views, and print your project.Outline Tasks · Link Tasks · Change Your View
  43. [43]
    How Project schedules tasks: Behind the scenes - Microsoft Support
    This article discusses the technical side of how Project schedules the tasks in your Project. People are sometimes confused when Project automatically moves ...Some Examples · Manually Scheduled Tasks · How Do Calendars Affect The...
  44. [44]
    Change the task type for more accurate scheduling - Microsoft Support
    Project uses a scheduling formula that relates the three values of work, duration, and assignment units: Work = Duration x Units.
  45. [45]
    Overview of Project views - Microsoft Support
    Project provides different types of views that present project information by using different formats and components, such as tables, filters, groups, and ...
  46. [46]
    Work with the Gantt Chart view - Microsoft Support
    By default, Project displays two units of time. You can adjust these time units to display up to three units of time, and you can change it so that different ...
  47. [47]
    Create a Network Diagram in Project desktop - Microsoft Support
    A Network Diagram is a graphical way to view tasks, dependencies, and the critical path of your project. Boxes (or nodes) represent tasks, and dependencies ...Missing: Calendar | Show results with:Calendar
  48. [48]
    Create or update a baseline or an interim plan in Project desktop
    In the Task Views group, click Gantt Chart, and then click Tracking Gantt. The Variance table shows start and finish dates for both scheduled information and ...Set A Baseline · Update A Baseline Or An... · Analyze Baseline And Interim...
  49. [49]
    Finish Variance fields - Microsoft Support
    You set a baseline in the Set Baseline dialog box. This copies the current value for the scheduled Finish field into the corresponding Baseline Finish field.
  50. [50]
    Definition of Microsoft Project constraints - Microsoft 365 Apps
    Jun 25, 2025 · The following are definitions of Microsoft Project constraints. As Late As Possible: Schedules the task as late as it can without delaying ...
  51. [51]
    Set a task start or finish date (constraint) for a task - Microsoft Support
    To set a task start/finish date, select the task, go to Task > Information > Advanced, choose a constraint type, and add a date if needed.
  52. [52]
    Deadline (task field) - Microsoft Support
    The Deadline field shows the date you enter as a deadline for the task. A deadline is a target date indicating when you want a task to be completed.
  53. [53]
    Add resources to your project - Microsoft Support
    On the View tab, in the Resource Views group, choose Resource Sheet. · In the Resource Name field, type a job title, material, or generic resource name. · If you ...
  54. [54]
    Material Label (resource field) - Microsoft Support
    The Material Label field contains the unit of measurement you enter for a material resource, for example, tons, boxes, or cubic yards.Missing: work | Show results with:work
  55. [55]
    Standard Rate (resource field) - Microsoft Support
    Whenever a resource reports actual work, the costs for the work are calculated by multiplying the actual work by the value in the Standard Rate field.Missing: material | Show results with:material
  56. [56]
    Learn more about resource units - Microsoft Support
    Units indicate the percentage of a work resource's time that is assigned to a task. There are two types of units in Project: maximum units and assignment units.Missing: driven | Show results with:driven
  57. [57]
    Actual Cost fields - Microsoft Support
    The Actual Cost fields show costs incurred for work already performed by resources on their tasks, along with any other recorded costs associated with the task.Missing: material | Show results with:material
  58. [58]
    Distribute project work evenly (level resource assignments)
    You can resolve resource conflicts or overallocations by leveling the assignments automatically by going to Resource > Level All.Missing: x units
  59. [59]
    Resource Leveling dialog box - Microsoft Support
    Choose from 0 to 1000, with 0 being the lowest priority, and 1000 being the highest priority (having the effect of not leveling). The default priority is 500.
  60. [60]
    Priority fields - Microsoft Support
    Because of these priority settings, the resource is leveled so that the "Coordinate trade show" task is scheduled first, the "Write proposal" task is scheduled ...
  61. [61]
    Enter costs for resources - Microsoft Support
    Project calculates the costs for resources based on pay rates, per-use fees, fixed costs, or totals for cost resources (such as airfare or dining) that are ...Enter Cost Rates For A Work... · Enter A Fixed Cost For A... · Enter Costs For A Cost...Missing: documentation | Show results with:documentation
  62. [62]
    Cost fields - Microsoft Support
    Cost is calculated based on the Standard Rate, Overtime Rate, Per Use Cost, and Cost accrual settings for the resource and the amount of work assigned to all ...Missing: material | Show results with:material
  63. [63]
    CPI fields - Microsoft Support
    The CPI (cost performance index) fields show the ratio of budgeted (or baseline) costs of work performed to actual costs of work performed.
  64. [64]
    Budget (resource field) - Microsoft Support
    The Budget field is used to view or change whether a work, material, or cost resource is a budget resource.
  65. [65]
    Create a Project report - Microsoft Support
    With Project, you can create and customize striking graphical reports of whatever project data you want, without having to rely on any other software.
  66. [66]
    What can you do with Project for the web? - Microsoft Support
    Microsoft provides a pre-built set of Power BI reports for Project for the web.Users can customize these reports or build additional reports using Power BI.
  67. [67]
    Live Cooperation in Project - Microsoft Q&A
    Dec 3, 2024 · Syncing MS Project with SharePoint can significantly enhance collaboration within your team. To set this up, start by opening your project file ...
  68. [68]
    Available fields reference - Microsoft Support
    The Priority field indicates the level of importance given to a task, which in turn indicates how readily a task or assignment can be delayed or split during ...
  69. [69]
    MSDN Magazine: Test Run - Measuring Test Effort Progress with EVM
    The difference between what you had planned to accomplish (your PV) and what you actually accomplished is your earned value (EV). ... SPI is cumulative EV divided ...Missing: reporting | Show results with:reporting
  70. [70]
    Share a project in Project for the web - Microsoft Support
    Project for the web uses Office 365 groups for sharing. You can either share your project to an existing group that you own, or create a new one.
  71. [71]
    MS Project desktop and Sharepoint integration - Microsoft Q&A
    Nov 10, 2020 · In Project, click File > Save As> Sync with SharePoint> after Verify Site click Save. For reference: Sync with a SharePoint tasks list. I ...
  72. [72]
    Integration of MS Project with To Do / Outlook - Microsoft Learn
    Jan 28, 2024 · With this integration, will all tasks, whether assigned through MS Project Web or originating from marked emails in Outlook, be consolidated in a single ...
  73. [73]
    Project Online - Connectors - Microsoft Learn
    To use this integration, you will need access to an account with access to a Project Online site. To make a connection, select Sign In. You will be prompted to ...
  74. [74]
    Sync with SharePoint tasks list from Project Professional
    Jun 25, 2025 · Describes a Project Professional feature that lets you sync .mpp files to a new or existing SharePoint site. Updated for Project 2016.
  75. [75]
    Sync with a SharePoint tasks list - Microsoft Support
    In Project, choose File > Save. · Select Sync with SharePoint, and in the Sync with list, select New SharePoint Site. · In the Project name box, type a name. · In ...
  76. [76]
    Use Power BI Desktop to connect with your Project data
    You can use the Microsoft Power BI template to import data into Power BI from Project for the web and Project Online.
  77. [77]
    Connect to Project Web App with Power BI - Microsoft Learn
    Learn how to connect to Microsoft Project Web App using the Power BI template app. Unlock insights for project portfolio management. Get started now.
  78. [78]
    Resolve Azure DevOps and Office integration issues - Microsoft Learn
    Sep 19, 2025 · Azure DevOps integrates with Microsoft Office applications, primarily Excel and Project, to enable bulk editing and management of work items.<|control11|><|separator|>
  79. [79]
    Link MSProject Tasks to Azure Devops WorkITems - Stack Overflow
    Sep 29, 2019 · Here is a document states how to integrate Microsoft Project with Azure devops. If you want to first import a list or tree of work items you've already defined ...Is it possible to import a whole project from Azure Devops into MS ...Does Project for the web supports integration with Azure Devops ...More results from stackoverflow.com
  80. [80]
    Introduction to SharePoint and OneDrive in Microsoft 365 for ...
    Apr 17, 2025 · SharePoint and OneDrive in Microsoft 365 are cloud-based services that help organizations share and manage content, knowledge, and applications.Intro to file collaboration in... · Plan for SharePoint and... · Migration planning<|control11|><|separator|>
  81. [81]
    OneDrive and MS Project - Microsoft Q&A
    Jun 6, 2016 · After saving an MS Project file to OneDrive, the user cannot send a share invitation, though they can share Word and Excel files.
  82. [82]
    PPM Express - Microsoft AppSource
    Rating 4.4 (8) A cloud-based platform for Intelligent Project Portfolio Management. We work with Project Management Offices, Project Directors, and CIOs.
  83. [83]
    Microsoft Project | Project Management | Time Tracking - Wrike
    Wrike allows importing MS Project tasks (.MPP, .MPX, .XML) for collaboration, carrying over durations, dependencies, and responsible parties.
  84. [84]
    Project Visual Basic for Applications (VBA) reference - Microsoft Learn
    This reference contains conceptual overviews, programming tasks, samples, and references to guide you in developing solutions based on Project.Missing: fields | Show results with:fields
  85. [85]
    Project functions for custom fields in Project desktop
    Formulas enable you to work with fields to create these new values. The following examples illustrate how you can use formulas with custom fields.
  86. [86]
    Project REST Basic Operations - Code Samples - Microsoft Learn
    Nov 28, 2022 · This sample runs REST API methods that create, read, update, or delete data. When running commands that delete or edit data, the sample creates sample data.
  87. [87]
    Import Microsoft Project Data into Oracle Primavera Cloud
    Sep 15, 2025 · To import data from a Microsoft Project XML file: In the object selector, select Project, and then select View Projects List.
  88. [88]
    Task pane add-ins for Project - Microsoft Learn
    Sep 18, 2025 · Project task pane add-ins are context-sensitive, meaning they can respond to your currently selected task, resource, view, or Gantt chart data.
  89. [89]
    Customization Best Practices and Limitations for Project for the web
    Nov 1, 2024 · Customize Project for the web through managed solution layers using at least two environments. Use Teams Groups security roles, and avoid ...
  90. [90]
    Project 2016 - Microsoft Lifecycle
    Support dates are shown in the Pacific Time Zone (PT) - Redmond, WA, USA. Support Dates. Expand table. Listing, Start Date, Mainstream End Date, Extended End ...
  91. [91]
    Project 2019 - Microsoft Lifecycle
    Download Microsoft Edge More info about Internet Explorer and Microsoft Edge ... Start Date, Mainstream End Date, Extended End Date. Project 2019, Sep 24, 2018 ...
  92. [92]
    End of support for Office 2016 and Office 2019 - Microsoft Support
    Support for Office 2016 and Office 2019 ended on October 14, 2025 and there will be no extension and no extended security updates. All of your Office 2016 ...
  93. [93]
    Project 2021 - Microsoft Lifecycle
    Project 2021 follows the Modern Lifecycle Policy. This applies to the following editions: Professional, Standard. Support dates are shown in the Pacific Time ...
  94. [94]
    Project 2024 (LTSC) - Microsoft Lifecycle
    Project 2024 (LTSC) follows the Fixed Lifecycle Policy. This applies to the following editions: Professional, Standard. Support dates are shown in the Pacific ...
  95. [95]
    Overview of update channels for Microsoft 365 Apps
    May 30, 2025 · There are three primary update channels: Choose Current Channel to give your users the newest features as soon as they're ready.Comparison of the update... · Current Channel overview
  96. [96]
    Office 2016/2019 have reached end of support – here's what to do now
    Oct 14, 2025 · Recommended upgrade path: The best option is to upgrade to Planner and Project Plan 3 to get full-feature web and desktop apps with advanced ...
  97. [97]
    What's new in Microsoft Planner – August 2025
    Aug 28, 2025 · Our team has released a range of updates in Microsoft Planner's Project Manager agent including improved suggestions, and seamless access ...
  98. [98]
    Microsoft Project BECOMES Planner : BIG Changes by Sept 2025
    Jun 12, 2025 · In 2024, Microsoft primarily introduced branding and licensing updates. ... Mobile App, Available for iOS and Android (basic task management) ...
  99. [99]
    Advanced capabilities with premium plans in Planner
    Premium Planner features include Goals, People view, Sprints, Copilot, Task conversations, Task history, Advanced dependencies, Timeline view, and more.
  100. [100]
    Retirement of Project for the web, Project apps in Teams and the ...
    May 3, 2025 · Starting August 2025, Microsoft will retire Project for the web, the Roadmap app in Teams, and Roadmap on the web.
  101. [101]
    Copilot for project overview | Microsoft Learn
    Nov 15, 2024 · Enable or disable the Copilot for project feature · In Project Operations, go to Settings > Parameters > Feature Control > Enable Copilot.Task plan generation · Risk assessments
  102. [102]
    Integrate with Viva Goals - Microsoft Support
    Viva Goals support integration with industry-leading tools and platforms you use every day, so your OKR implementation process is as simple, effective, ...
  103. [103]
    8 Ways to Integrate Microsoft Power Platform and Viva Products
    Feb 14, 2023 · In this blog, we'll explore 8 ways to integrate Microsoft Power Platform and Viva products to create a comprehensive employee experience solutions.
  104. [104]
    How AI Opens Microsoft Project for Everyone: Less Effort, Better ...
    Sep 18, 2025 · Artificial intelligence is redefining project planning with Microsoft Project—setting new benchmarks for efficiency and user experience.
  105. [105]
    What's new and planned for Dynamics 365 Project Operations
    This topic lists features that are planned to release from April 2025 through September 2025. Because this topic lists features that may not have released ...