Fact-checked by Grok 2 weeks ago

Dam failure

Dam failure constitutes the or structural of a , resulting in the sudden, uncontrolled of impounded and potential downstream inundation that threatens lives, , and ecosystems. This event typically arises from hydraulic overload, material degradation, or geotechnical instability, with consequences including flash floods propagating at high velocities—often exceeding 10 meters per second—and amplifying damage through and mobilization. The predominant mechanisms stem from overtopping, which erodes embankments when floodwaters surpass capacity and accounts for about 34% of historical failures; foundation defects compromising (30%); internal seepage-induced that progressively erodes materials (28%); and miscellaneous factors like cracking or inadequate upkeep (8%). These failures underscore vulnerabilities where causal chains often trace to initial flaws, construction shortcuts, or deferred rather than isolated natural extremes, as empirical analyses of forensics reveal patterns of progressive deterioration under load. In the United States, documented incidents averaged roughly 10 annually from 1848 to 2017, rising to 24 per year post-1984 amid an aging inventory of over 90,000 structures, many exceeding their life. Mitigation hinges on probabilistic risk assessments incorporating , , and material fatigue, alongside mandatory for real-time of pore pressures, settlements, and seepage—practices that have curtailed failure rates in jurisdictions enforcing stringent standards, though global dams exhibit elevated risks at 1.2% failure probability versus 0.01% for water-retaining variants due to unstable slurries. Controversies persist over underinvestment in retrofits and regulatory leniency for low-head dams, where even minor breaches can into widespread disruption, emphasizing the imperative of first-principles validation in load-path integrity over reliance on historical precedents alone.

Definition and Characteristics

Physical Mechanisms of Failure

Dam failures typically initiate through hydraulic, geotechnical, or structural processes that compromise the integrity of the dam body or foundation, leading to uncontrolled release of reservoir water. These mechanisms involve the interplay of water pressure, material strength, and erosive forces, often progressing from localized instability to full breach formation via progressive erosion or deformation. Embankment dams, constructed of compacted earth or rockfill, are particularly susceptible to erosion-driven failures, while concrete dams more commonly fail through cracking or sliding under excessive stress. Overtopping occurs when reservoir water exceeds the dam crest elevation, allowing high-velocity flows to scour the downstream face or crest armor. The of the water, governed by principles of and , entrains and removes protective materials, initiating headcut erosion that migrates upstream and widens the . For earthen dams, this process can excavate a channel through the embankment in hours, with breach depth and width determined by flow , dam height, and erodibility; empirical models estimate peak breach flows at 0.1 to 0.3 times the reservoir per unit time for such events. Internal , often termed , arises from seepage gradients that exceed the critical hydraulic gradient for , typically around 1.0 for uniform sands but lower for stratified materials. Water flow through pores or cracks dislodges fine particles via backward , forming subsurface channels that propagate under the combined forces of drag and on grains; this suffusion or concentrated leak reduces and can lead to sinkholes or progressive cavity enlargement, culminating in embankment slumping if unchecked. tests confirm initiation when seepage velocity surpasses particle velocity, with progression accelerating as channels connect to the downstream toe. Foundation defects manifest as differential settlement, sliding, or uplift, where weak or alluvial soils fail under the dam's weight and hydrostatic pressures. In gravity dams, sliding occurs along low-friction planes if resistance drops below driving forces, with safety factors calculated as the ratio of resisting to driving components often falling below 1.5 in vulnerable cases; uplift from pressures in joints reduces effective normal stress, promoting overturning or rotational . Embankment foundations may liquefy under cyclic loading, but static mechanisms involve planes forming due to inadequate , as quantified by Terzaghi's bearing capacity equation adapted for dams. Structural mechanisms in rigid dams include tensile cracking from , alkali-aggregate reaction, or overload, where strain exceeds material tensile strength (around 3-5 MPa for ), propagating fractures that allow leakage and eventual loss of monolithicity. Shear failure along construction joints or abutments follows Mohr-Coulomb criteria, with and angles dictating resistance; historical analyses show that un-grouted joints amplify risks by permitting differential movement. These processes are distinct from triggered events like , focusing instead on inherent material and geometric responses to loads.

Types of Dams and Vulnerability Differences

dams, constructed primarily from compacted , rockfill, or zoned combinations thereof, constitute the most common type worldwide due to their adaptability to varied terrains and materials. These dams are particularly susceptible to overtopping failures, where floodwaters exceed the , leading to rapid of the erodible materials, as erodes at relatively low velocities compared to . Seepage-induced internal , known as , poses another primary risk, where concentrated through the or foundation undermines stability, often exacerbated by inadequate filters or systems. defects, such as weak soils or features, further heighten vulnerability in designs, which rely on the of the underlying ground for load distribution. Concrete gravity dams, relying on their massive weight to counteract , offer greater to overtopping but are prone to structural cracking from differential , , or high uplift pressures beneath the base. These dams, typically trapezoidal in cross-section, demand ; defects like sliding or inadequate can lead to base sliding failures, particularly under seismic loading where inertial forces amplify stresses. In contrast to embankment types, gravity dams exhibit lower seepage risks due to their impervious but require rigorous for cracks that could propagate under repeated loading cycles. Arch dams, slender curved structures that transfer water loads primarily to the via , minimize material use but amplify geological sensitivities; weak or yielding can cause excessive deformation, cracking, or outright collapse, especially during earthquakes where differential movements exceed design tolerances. These dams perform well in competent rock but are less forgiving than flexible types to seismic ground motions or abutment discontinuities, with historical analyses showing higher vulnerability in high-seismicity regions unless extensively instrumented. Seepage along joints or contacts remains a concern, potentially leading to uplift if not mitigated by curtains. Buttress dams, featuring a sloped upstream face supported by triangular buttresses, combine elements of gravity and arch designs to reduce concrete volume but inherit vulnerabilities to buttress cracking or spalling under eccentric loading from wave action or earthquakes. Their deck-supported variants are more susceptible to deck uplift or sliding compared to solid gravity dams, with failure modes often tied to corrosion in reinforcement or differential settlement between buttresses. Overall, rigid concrete dams like arch and buttress types generally withstand overtopping better than embankments but demand precise construction and foundation treatment to avert brittle failures, whereas embankment dams' flexibility aids seismic resilience yet heightens erosion risks.
Dam TypePrimary VulnerabilitiesKey Differentiators from Other Types
EmbankmentOvertopping erosion, seepage/piping, slope instabilityHigh erodibility; flexible under seismic loads but poor hydrological resistance
GravityCracking, uplift pressures, foundation slidingMass-dependent stability; lower seepage but sensitive to settlement
ArchAbutment yielding, joint seepage, seismic crackingGeology-dependent; efficient but brittle in weak foundations
ButtressButtress failure, deck uplift, corrosionMaterial-efficient; hybrid risks combining gravity and support elements

Historical Development

Pre-Modern Failures and Lessons

The Sadd el-Kafara, constructed around 2600 BC in Egypt's Wadi Garawi, represents the earliest documented dam failure. This rubble-fill embankment structure, approximately 14 meters high and 110 meters wide at the base, aimed to retain but collapsed shortly after partial completion when overtopped by an extreme event, resulting in rapid erosion of its unconsolidated materials due to the absence of or freeboard provisions. The breach likely generated a destructive downstream , though exact casualties remain unknown, and the trauma prompted Egyptian engineers to abandon large dam projects for nearly eight centuries, shifting focus to canal-based irrigation. The Great of Marib in ancient , built by the Sabaean kingdom around the , endured for over a millennium as an earthen barrier 16 meters high and 580 meters long, channeling monsoon floods into reservoirs for agriculture that supported a prosperous . It breached catastrophically multiple times, with major failures in 450 AD and 542 AD repaired by the Himyarites, before a final rupture circa 570 AD unleashed floodwaters estimated at 18 billion cubic meters, devastating oases, farmlands, and displacing up to 50,000 people in tribal migrations northward. Causal factors included progressive internal erosion from seepage, silt buildup weakening abutments, and possible seismic influences, exacerbated by deferred maintenance as political power waned. Roman engineering featured the Subiaco Dams on Italy's River, erected in the AD under Emperor Nero as three sequential arch-gravity structures, the tallest reaching 50 meters—the world's highest until the . Two smaller dams failed progressively from floods and deterioration, while the main dam collapsed in 1305 AD during a severe inundation, reportedly intensified by monks extracting stones for building materials, leading to uncontrolled breach propagation. This incident highlighted vulnerabilities in thin-crested designs under prolonged exposure to debris-laden flows. Pre-modern failures collectively revealed foundational principles of dam stability: overtopping initiates erosive breach growth absent diversion capacity, as seen in Sadd el-Kafara's rubble disintegration; sustained seepage undermines foundations without vigilant reinforcement, evident in Marib's repeated repairs yielding to silt-induced stress; and human interventions or neglect amplify natural hydrological loads, per Subiaco's endgame. These events, analyzed retrospectively through geotechnical lenses, emphasized empirical calibration to local flood regimes and material limits, fostering incremental advances like gated spillways in later antiquity, though constrained by pre-scientific hydrology and resource scarcity.

19th and Early 20th Century Incidents

The Mill River Dam, an earthen structure completed in 1866 near Williamsburg, , to supply water for a manufacturing reservoir, failed catastrophically on May 16, 1874, due to progressive internal from undetected seepage cracks that had developed over years of inadequate maintenance and inspection by the dam's owner, despite warnings from engineers. The breach released approximately 600 million gallons of water, inundating downstream villages including Haydenville and Skinnerville, resulting in 139 fatalities—primarily women and children caught unaware—and the destruction of over 700 buildings. This incident highlighted vulnerabilities in privately managed earthen dams, where cost-saving deferred repairs allowed failures to propagate unchecked, leading to the first U.S. into a dam disaster and subsequent calls for stricter oversight, though no immediate regulatory changes followed. The South Fork Dam, an earthfill embankment originally built in 1852 for canal navigation in Pennsylvania but repurposed in the 1880s as a private lake for the South Fork Fishing and Hunting Club, collapsed on May 31, 1889, after extreme rainfall overwhelmed the structure's inadequate spillway capacity, exacerbated by upstream modifications that included removing the original iron discharge pipes, installing obstructive fish screens over remaining outlets, and lowering the crest elevation for a carriage road—all prioritizing recreational aesthetics over hydraulic safety. The failure unleashed 14.55 million cubic meters of water from Lake Conemaugh, which surged 23 kilometers downstream to Johnstown at speeds exceeding 64 kilometers per hour, demolishing communities and causing 2,209 confirmed deaths, with hundreds more unrecovered, marking the deadliest dam failure in U.S. history. Engineering analyses later attributed the breach to overtopping that eroded the embankment, underscoring how non-engineering alterations by affluent club members—without professional hydraulic review—amplified risks from the dam's already marginal design and deferred maintenance. In the early 20th century, the Austin Dam (also known as Bayless Dam), a pioneering gravity structure completed in 1910 near Austin, , to power a , breached on September 30, 1911, during routine reservoir drawdown rather than a flood event, owing to rushed construction on unstable gravel foundations without adequate key trenches or bonding between the massive unreinforced monoliths, which allowed differential and horizontal cracks to form under hydrostatic pressure. The failure propagated rapidly as water seeped through fissures, undermining the toe and causing the 18-meter-high dam to slide forward intact before disintegrating, releasing a 3.2-kilometer-long flood wave that killed 78 people in the valley below, including mill workers and residents, and destroyed , a nearby community. Post-failure investigations by the U.S. Geological Survey revealed foundational flaws and poor in the mix, illustrating the hazards of applying unproven dam technology without geotechnical site preparation, prompting to enact the nation's first comprehensive dam safety inspection law in 1913. These incidents, concentrated in the amid rapid industrialization and private dam proliferation for mills and recreation, exposed recurring causal patterns: inadequate design permitting overtopping, unchecked seepage in earthen structures, and instabilities in early experiments, often compounded by owner neglect or amateur modifications that disregarded hydraulic principles. Casualty figures, while devastating, reflected localized downstream populations rather than broader systemic warnings, yet they spurred incremental scrutiny without widespread regulation until later decades.

Post-World War II Era and Large-Scale Dams

Following World War II, global dam construction surged, with thousands of large dams built for hydroelectricity, water supply, and flood management, often exceeding 15 meters in height and involving massive reservoirs. This era saw engineering innovations like high arch and embankment designs but also exposed vulnerabilities in handling extreme hydrology, geology, and construction quality. Failures during this period, though fewer per dam built compared to earlier eras, were catastrophic due to scale, resulting in thousands of deaths and highlighting causal factors such as inadequate spillway capacity, foundation instability, and underestimation of rare events. In 1959, the Vega de Tera in collapsed during intense rainfall, releasing approximately 230 million cubic feet of water in under ten minutes and killing 144 people in downstream Ribadelago. The failure stemmed from overtopping exacerbated by insufficient design for the extreme , compounded by delays and geological challenges in the mountainous terrain. Later that year, France's Malpasset thin-arch dam failed abruptly, causing 421 deaths in from a sudden that flooded the area with 50 million cubic meters of water. Investigations attributed the collapse to piping erosion in the foundation, where water leakage under high pressure destabilized the structure, revealing the risks of untested in arch dams. The 1975 Banqiao Dam failure in remains the deadliest, triggered by Typhoon Nina's record rainfall—over 1 meter in 24 hours, far beyond the dam's 1-in-1,000-year design standard—leading to overtopping and breach of the earthen structure, with direct deaths estimated at 26,000 and total impacts up to 240,000 including famine. Contributing causes included engineering shortcuts during the 1950s construction rush, inadequate maintenance, and delayed flood warnings due to communication breakdowns. In the United States, the 1976 , an earthen embankment, failed during initial reservoir filling on June 5, draining 80 billion gallons in hours and causing 11 deaths with $2 billion in damages. The U.S. Bureau of Reclamation's review pinpointed internal erosion () through fractured in the foundation key trench, initiating a whirlpool that progressively eroded the core. These incidents spurred advancements in , such as probabilistic and grouting techniques, but underscored the causal primacy of site-specific and hydrological extremes over structural scale alone, with large dams amplifying propagation downstream. Empirical data from post-failure analyses revealed that many designs overlooked conservative margins, influenced by post-war developmental pressures prioritizing output over .

Primary Causes

Hydrological and Overtopping Failures

Hydrological failures in dams arise from extreme precipitation events, rapid snowmelt, or inadequate spillway design that cannot accommodate peak inflows, leading to uncontrolled rises in reservoir levels. These events often culminate in overtopping, where water surpasses the dam crest, particularly affecting embankment dams constructed from erodible materials like earth or rockfill. Overtopping initiates erosive processes on the downstream face, progressively widening a breach as turbulent flows entrain and remove embankment material, potentially leading to catastrophic collapse if not arrested. Overtopping accounts for approximately 34% of documented dam worldwide, based on analyses up to 1985, underscoring its prevalence as a mode compared to defects (30%) or internal erosion (28%). This statistic highlights the critical role of hydrologic loading in dam safety, where capacities are frequently undersized relative to probable maximum floods, exacerbated by reducing effective storage or gate malfunctions blocking outflows. In structures, the process begins with surface scour, forming headcuts that migrate upstream, undermining stability and accelerating growth rates that can exceed 10 meters per hour in cohesive soils under high-velocity flows. Historical cases illustrate these dynamics: the in failed on May 31, 1889, due to overtopping after 14 inches of rain overwhelmed its inadequate spillway, eroding the earthen embankment and unleashing a flood that killed over 2,200 people in Johnstown. Similarly, the in breached on August 8, 1975, when Typhoon Nina dumped 1.06 meters of rain in 24 hours—far exceeding the design flood of a 1-in-1,000-year event—causing overtopping that destroyed the structure and contributed to an estimated 171,000 deaths across multiple failures. The Vega de Tera Dam in overtopped on January 11, 1998, during intense regional flooding, resulting in a 50-meter-wide in its rockfill body. These incidents reveal common causal factors, including underestimation of extreme event probabilities and deferred maintenance on outlet works, emphasizing the need for probabilistic hydrologic modeling over deterministic design assumptions.

Seepage and Internal Erosion

Seepage involves the flow of water through a dam's embankment, foundation, or abutments under hydraulic gradients, which can be benign in controlled amounts but hazardous when concentrated or unchecked. In embankment dams, where zoned earth and rockfill materials predominate, seepage exerts drag forces on soil particles, potentially initiating internal erosion if protective filters or drainage systems fail. This process erodes fine-grained soils, forming progressive voids or channels that undermine structural integrity. Internal , commonly termed , progresses through mechanisms such as backward erosion piping (BEP), where seepage gradients erode unprotected downstream faces; concentrated leak (CLE), involving high-velocity flows through cracks from , , or hydraulic fracturing; suffusion, the migration of finer particles through coarser ; and at interfaces between dam materials and . These erode cohesive or non-cohesive soils, with voids enlarging until roof collapse propagates the pipe upstream, culminating in if unchecked. dams are particularly vulnerable due to their reliance on internal for seepage control, with failures often linked to inadequate compaction, unsuitable materials, or penetrations like outlet conduits. Statistics indicate internal erosion accounts for approximately 47% of documented failures in the United States, often occurring under normal levels or exacerbated by degradation over time. Globally, analyses of incidents show internal responsible for about half of embankment failures, underscoring its prevalence over other causes like overtopping. Factors amplifying include high seepage gradients, absence of chimney drains or toe filters, and foundation discontinuities such as permeable strata or features. The failure on June 5, 1976, in exemplifies seepage-induced internal , where cracks in the volcanic foundation allowed rapid seepage through the embankment core, eroding material and forming a progressive pipe that breached the 305-foot-high structure within hours. This released about 288,000 acre-feet of water, causing 11 deaths, widespread inundation, and over $2 billion in damages (in 2016 dollars), prompting federal reviews of design standards. Similarly, the 1995 Omai Tailings Dam breach in involved internal along the embankment-foundation contact, releasing 3.7 million cubic meters of cyanide-laced and contaminating waterways, highlighting risks in tailings structures lacking robust filters.

Structural and Foundation Defects

Foundation defects, including differential and instability, contribute to approximately 30% of documented failures worldwide. These arise primarily from inadequate geotechnical investigations, such as overlooking fractured , features, or compressible soils beneath the structure, which allow uneven loading and progressive weakening. Structural defects in the body, by contrast, often stem from faulty design, substandard materials, or construction errors, manifesting as cracks, bulges, or deformations that reduce load-bearing capacity. Both categories can interact; for instance, foundation induces tensile stresses leading to embankment cracking, which shortens seepage paths and accelerates internal . The 1976 Teton Dam failure exemplifies foundation-related vulnerabilities in earthen structures. Completed in 1975 by the U.S. Bureau of Reclamation, the 305-foot-high zoned earthfill dam on the Teton River in Idaho breached on June 5, 1976, releasing 288,000 acre-feet of water and causing 11 deaths. Investigations by an independent panel identified the primary cause as seepage through highly permeable rhyolite tuff and basalt in the right abutment foundation, initiating piping erosion that progressed to breach within hours of initial leaks observed at elevation 5359 feet. Inadequate grouting and over-reliance on a key trench cutoff failed to seal pre-existing cracks and joints, allowing differential hydrostatic pressures to exploit defects. In concrete dams, foundation defects often involve uplift pressures along discontinuities, reducing frictional resistance. The Malpasset arch dam in , a 210-foot-high thin-arch structure completed in 1954, catastrophically failed on December 2, 1959, during a event, killing at least 423 people. Post-failure analysis revealed sliding along a faulted foundation plane at the left , where water infiltration increased pore pressures, causing 0.8 meters of horizontal displacement and tensile cracking at the dam-foundation contact. Geological mapping had underestimated joint orientations and permeability, leading to insufficient adits and grouting. Structural defects independent of foundation issues include overstress from poor reinforcement or material fatigue. For example, in gravity concrete dams, heel cracking from alkali-aggregate reaction or has compromised stability, as seen in non-failure cases prompting retrofits. relies on thorough pre-construction borings, geophysical surveys, and post-construction monitoring with inclinometers and piezometers to detect early or strain. Despite advances, legacy dams from the mid-20th century remain susceptible due to outdated design assumptions about foundation homogeneity.

Seismic and Geological Triggers

Seismic activity triggers dam failures primarily through intense ground accelerations that induce dynamic stresses, leading to mechanisms such as cracking in structures, in earthen , or destabilization of slopes and . dams are particularly vulnerable to earthquake-induced , where saturated soils lose and behave as viscous fluids, potentially causing lateral spreading or foundation sliding; rigid dams may develop transverse cracks or failures if motions exceed design spectra. Federal guidelines identify overtopping from waves, differential settlement, and pore pressure buildup as key seismic failure pathways in dams. A prominent historical case occurred during the December 11, 1967, in , with a surface-wave of 6.5, which severely damaged the Koyna gravity dam despite the region being previously deemed aseismically stable. The event caused horizontal cracks through several non-overflow monoliths, vertical fractures up to 1 meter wide in the dam body, and heaving, though the structure held without breaching due to its massive design; the quake killed approximately 200 people and damaged infrastructure within a 75-mile radius. This incident highlighted reservoir-induced risks, as post-construction filling likely contributed to fault activation beneath the dam. Geological triggers encompass site-specific instabilities in foundations or abutments, including differential on heterogeneous soils, slope instability from weak zones, or uplift along faults, accounting for roughly 30% of documented dam failures. These defects often stem from inadequate pre-construction investigations overlooking compressible strata, dissolution features, or anisotropic rock masses, which allow seepage, , or progressive deformation under static loads. For dams, foundation deficiencies—such as uncemented joints or scale-dependent rock strength variations—represent the leading cause of structural compromise. The 1959 Malpasset failure in exemplifies geological oversight, where unstable and undetected fractures led to abutment sliding and rapid fracturing, releasing 24 million cubic meters of water and killing 421 people; investigations revealed insufficient grouting of discontinuities. Similarly, active faults can impose differential displacements, cracking heels or promoting sliding along bedding planes, as analyzed in cases where fault orientation misaligns with axes. Comprehensive geological mapping and geophysical surveys are essential to mitigate these risks, as post-failure analyses consistently attribute such incidents to overlooked subsurface heterogeneities rather than overt design errors.

Human Error and Maintenance Neglect

Human error in dam failures often involves flawed decisions, overlooked geological risks, and operational misjudgments, while neglect encompasses insufficient inspections, deferred repairs, and ignored deterioration signals. These factors compromise structural integrity, allowing progressive issues like internal or cracking to escalate unchecked. According to analyses of historical incidents, human factors contribute to approximately 20-30% of dam failures, frequently amplifying natural vulnerabilities through preventable oversights. The 1976 Teton Dam failure exemplifies human error in design and oversight. Constructed by the U.S. Bureau of Reclamation as an earthfill structure in Idaho, the 305-foot-high dam collapsed on June 5 during initial reservoir filling due to inadequate foundation protection against piping erosion. Engineers dismissed early warnings from U.S. Geological Survey geologists about fractured abutments, diluting memos and proceeding without comprehensive grouting, which required double the estimated volume after discovering larger-than-expected voids. Despite leaks escalating to 1,000 times predicted groundwater flow, officials doubled the filling rate twice and attributed issues to faulty monitors rather than halting operations, leading to rapid breach and release of 80 billion gallons of water. The incident caused 11 human deaths, 16,000 livestock losses, and approximately $2 billion in damages, highlighting bureaucratic reluctance to alter sunk investments exceeding $100 million. Maintenance neglect featured prominently in the 2017 spillway incident in . The main spillway eroded catastrophically on February 7 after heavy storms, prompting evacuation of 188,000 downstream residents due to risks from the eroded chute and unstable emergency spillway. An forensic team attributed the event to long-term systemic failures by the California Department of Water Resources, including flawed original design, substandard construction, and inadequate upkeep that ignored visible concrete delamination and foundation weaknesses dating back decades. Regulatory oversight by federal agencies also faltered, failing to enforce repairs despite prior inspections noting issues, resulting in deferred maintenance that eroded spillway capacity over time. Repairs ultimately cost over $1 billion, underscoring how chronic underfunding and organizational inertia exacerbate vulnerabilities in aging infrastructure. Other cases, such as the 2005 Taum Sauk upper reservoir in , illustrate operational errors akin to lapses, where automated overfilling from faulty sensors—unaddressed due to inadequate —caused and environmental , though no direct fatalities occurred. Broadly, inadequate ranks as a top mode, contributing to issues like outlet blockages or embankment cracking in events such as the 1985 Val di Stava collapse in , which killed 268 due to unmaintained upstream structures. These incidents reveal causal chains where initial human decisions compound over time without vigilant intervention, emphasizing the need for rigorous, independent audits to mitigate bias toward cost-saving over safety.

Mechanisms of Breach and Flood Propagation

Progressive Failure Processes

failure processes describe the sequential enlargement of initial defects or sites in dams, culminating in , predominantly affecting embankment structures where material can be mobilized by water forces. Internal accounts for a significant portion of such , with historical data indicating it as a leading cause in U.S. embankment dam incidents. In overtopping scenarios, failure initiates when reservoir levels exceed the , eroding the downstream face and forming a headcut that advances upstream through distinct phases: initial headcut formation at the downstream side, backward erosion widening the notch, undercutting transitioning flow from broad-crested to sharp-crested , mass sloughing upon reaching the upstream , and final deepening to the foundation level. For non-cohesive dams, seepage on the downstream slope triggers particle at the , followed by headcut migration upward, slip failures, and expansion to the , driven by interfacial and seepage stresses exceeding frictional resistance. Piping, a subsurface progressive mechanism, begins with seepage gradients transporting fine particles, forming incipient voids or within the or ; these enlarge via continued and sloughing, potentially surfacing as sinkholes before accelerating into headcutting and mass caving, with flow evolving from to discharge as the grows. In cohesive materials like brittle clays, progression involves strain-softening along shear zones, where peak strength drops post-failure, propagating instability laterally or vertically; the 1984 Carsington Dam collapse exemplified this, with initial upstream slips reducing adjacent section stability to a of 1.0, leading to 1,625 feet of failure width, 43 feet lateral displacement, and 33 feet crest settlement over days. Breach development times vary by material and loading, typically ranging from 0.1 to 4 hours initiation for earthen , with full progression modeled using erodibility coefficients (e.g., 2.6–3.3 for in clay) and side slopes (e.g., 1H:1V).

Downstream Inundation Dynamics

Upon a , the sudden release of impounded water generates a high-velocity wave that propagates downstream, characterized by an initial peak often orders of magnitude greater than typical events. This wave's leading edge advances rapidly, with travel speeds typically ranging from 2 to 10 miles per hour depending on channel slope and , while the wave front exhibits steep rising limbs due to the kinematic nature of the surge. The hydrograph features a sharp crest followed by a prolonged recession, influenced by the formation time and outflow volume, which can exceed billions of cubic meters in large . As the flood wave travels downstream, it undergoes through energy dissipation via bed and bank friction, governed by Manning's roughness coefficients (typically 0.03–0.05 for natural channels), and spreading over floodplains. Channel confinement amplifies velocities and depths in narrow reaches, potentially exceeding 10–20 m/s and 10–50 m near the , but widening or meandering sections promote lateral inundation and reduced peak flows. Backwater effects from downstream constrictions or confluences can cause flow reversals in tributaries, extending inundation durations and complicating evacuation timelines. Uncertainties in initial parameters, such as width and formation duration, diminish in impact with distance, as propagation damping stabilizes predictions beyond 10–20 km downstream. Hydrodynamic modeling of these dynamics employs one- or two-dimensional to simulate flow routing, with tools like incorporating dynamic wave routing to capture non-hydrostatic effects and storage. Key inputs include topographic data (e.g., DEM resolution >5 m for accuracy), breach hydrographs derived from empirical formulas like Froehlich's for earthen , and local inflows to account for concurrent . Validation against historical events, such as the 1976 failure where modeled peaks matched observed attenuations within 20%, underscores the causal role of valley morphology in wave evolution. Inundation extent is determined by water surface elevations intersecting terrain, with hazard zones classified by velocity-depth products (e.g., >4 m²/s indicating high lethality). These simulations reveal that flood arrival times can vary from minutes near the to hours downstream, emphasizing the need for site-specific parameterization over generic assumptions.

Tailings Dam Specifics

Tailings dams impound slurried waste comprising , fine-grained particles, and processing chemicals, distinguishing them from water-retention dams by their reliance on self-depositing materials for construction and raising. The upstream method, where new layers of tailings beaches are deposited atop the dam, predominates but heightens instability risks due to uneven , poor , and potential for undrained shear failure in loose, saturated deposits. Downstream and centerline methods offer greater through engineered embankments but are less common owing to higher costs. Specific failure modes include static , a rapid loss of strength in contractive under monotonic loading, often initiating progressive breaching without precursor deformation. Seepage and internal () prevail due to the erodible, low-permeability fines that clog filters and promote hydraulic gradients exceeding critical thresholds. Foundation defects, such as weak alluvial or features, amplify risks, while overtopping from extreme rainfall interacts with seismic shaking to trigger cyclic in earthquake-prone regions. Unlike water dams, facilities exhibit elevated long-term failure probabilities from cumulative , chemical of liners, and inadequate post-closure , with active dams failing more frequently than inactive ones. Breach outflows form dense, non-Newtonian flows with sediment concentrations often surpassing 60% by weight, yielding Bingham-like rheology that resists initial dispersion but enables sustained propagation over distances exceeding 50 kilometers in confined valleys. These mudflows entrain downstream sediments, escalating volumes and velocities through basal erosion, with peak discharges moderated by high viscosity yet prolonged hydrographs extending inundation durations. Environmental toxicity from heavy metals and cyanides heightens impacts, as flows infiltrate soils and aquifers rather than dissipating rapidly like water floods. Flood modeling must account for non-homogeneous layering, with upper supernatant water surging ahead followed by tailings mobilization estimated as 20-100% of stored volumes based on beach gradients and saturation. Tailings dam incidents outpace water dam failures in modern records, with over 40 documented breaches since 1990 linked to geotechnical oversights rather than rare externalities, per engineering compilations. Risk assessments underscore biased historical reporting favoring operator narratives, necessitating independent forensic reviews to discern causal chains beyond surface attributions.

Immediate and Long-Term Consequences

Human Casualties and Evacuation Challenges

Human casualties from failures exhibit wide variation, from zero in cases with effective to thousands in unprepared scenarios, driven by downstream population at risk and dynamics. In the United States, failures between 1960 and 1998 caused more than fatalities, with under 15 meters in height responsible for 88% of these deaths despite their smaller scale. Smaller structures often fail unexpectedly, catching populations off-guard due to less rigorous oversight compared to large . Flood severity, measured by the product of water depth and (depth-velocity or ), directly correlates with lethality, as higher DV values overwhelm attempts. Empirical data from over 60 historical cases inform models like the U.S. Bureau of Reclamation's Reclamation Consequence Estimating Methodology (RCEM), which differentiates fatality rates by adequacy: little to no warning yields rates exceeding 0.01 even at moderate DV, while adequate warning has produced zero fatalities up to DV of 300 ft²/s in events like Big Bay Dam. No-warning failures, such as the 1928 breach with over 400 deaths, underscore how sudden inundation amplifies losses absent detection. Evacuation serves as the principal safeguard against casualties, yet dam breaches pose acute challenges due to the flood wave's rapid downstream , often at 2 to 10 , with initial fronts arriving faster and attenuating over distance. Limited warning time—frequently under an hour—compounds issues like nighttime occurrence delaying visual detection, urban congestion blocking routes, and variable public response to alerts influenced by prior false alarms or low perceived . guidelines apply severity-based fatality rates, ranging from 0.7% (low) to 75% (high), adjusted for evacuation feasibility, with injuries often estimated at twice fatalities; challenges persist as responders face restricted access amid high-velocity flows. procedures further account for population adjustments via GIS mapping and time-of-day effects to refine predictions and bolster .

Economic Damages and Infrastructure Loss

Dam failures result in direct economic losses from the destruction of property, including residential structures, commercial buildings, and agricultural lands submerged or eroded by floodwaters. reconstruction often constitutes the largest expenditure, encompassing the dam's repair or replacement, as well as restoration of downstream roads, bridges, railways, and utilities severed by inundation. In the breach on June 5, 1976, floodwaters devastated irrigation canals, farmlands, and urban areas in Idaho's Teton Valley, yielding total damages estimated at $2 billion in 1976 dollars—equivalent to roughly $9.4 billion adjusted for . Initial claims against the U.S. Bureau of Reclamation surpassed $400 million for property, livestock, and crop damages alone. Auxiliary infrastructure, such as and outlet works, frequently sustains irreparable harm, leading to prolonged operational downtime and lost revenue from or services. The 2017 Oroville Dam erosion incident required $1.1 billion for rebuilding the main and emergency , addressing scour damage and reinforcing foundations to avert total evacuation. This included debris removal and hydraulic upgrades, with federal reimbursements covering only partial costs due to pre-existing maintenance disputes. Tailings dam collapses amplify economic tolls through contamination of industrial sites and transport networks, alongside cleanup liabilities. The Brumadinho tailings dam failure on January 25, 2019, obliterated on-site facilities, a nearby , and pipeline infrastructure, prompting to allocate $7 billion in compensation for direct harms to victims and communities. Broader financial repercussions included suspended mining operations and regulatory fines, with total economic losses estimated in the billions from halted production and remediation. Indirect costs, including business disruptions and relocation expenses, can equal or exceed direct outlays, as flood debris clogs reservoirs, diminishing storage for irrigation and exacerbating future agricultural shortfalls. U.S. Bureau of Reclamation analyses underscore that such failures forfeit long-term benefits like flood mitigation, compounding annual economic burdens through elevated insurance premiums and deferred regional development.

Environmental and Ecological Effects

Dam failures trigger abrupt hydrological disruptions, inundating downstream wetlands, riparian zones, and aquatic habitats with high-velocity floodwaters that erode shorelines and bury vegetation under deposits. This scouring action alters channel morphology, reducing suitable spawning grounds for and disrupting food webs reliant on stable substrates. The released reservoir water often carries elevated suspended loads, increasing and limiting light availability for and submerged macrophytes, which cascades to diminished and oxygen levels in affected rivers. Benthic macroinvertebrates suffer acute smothering, with studies post-failure showing up to 90% reductions in sensitive taxa abundance due to sediment . In tailings dam breaches, such as the 2015 Fundão disaster in , the outflow of 43.7 million cubic meters of waste introduced heavy metals including iron, , and , elevating concentrations in the Doce River by factors of 10 to 100 times background levels and causing in aquatic organisms. Ecological repercussions extend to mass die-offs of populations from hydraulic , deoxygenation, and toxicant exposure, with the 2014 Mount Polley tailings dam failure in resulting in localized spikes that impaired function in salmonids despite overall limited persistent decline due to rapid dilution and remediation. and mammalian species in floodplains face loss and displacement, while may proliferate in disturbed areas, hindering native recovery. Long-term effects include persistent geochemical alterations, such as acid generation from exposed sulfides in residues, which can sustain low and metal for years, impeding recolonization by acid-sensitive and . Recovery trajectories vary by failure scale and reservoir contents; conventional earthen dams like Teton in 1976 primarily caused physical habitat reconfiguration with sediment redistribution fostering gradual revegetation over decades, whereas contaminated releases prolong ecological impairment through trophic magnification of pollutants. Monitoring post-Brumadinho 2019 revealed ongoing impacts on Paraopeba River biota, with elevated tissues persisting two years later, underscoring the causal link between breach-released particulates and bioaccumulative toxicity.

Notable Case Studies

Banqiao Dam (1975)

The , an earthen structure on the Ru River in Province, , collapsed on August 8, 1975, following extreme rainfall from Typhoon Nina, triggering a cascade of failures in over 60 downstream reservoirs and inundating approximately 12,000 square kilometers across 30 counties. Constructed between 1951 and 1975 primarily for flood control, , and generation, the dam stood 24.5 meters high and impounded a with a capacity of about 492 million cubic meters at normal levels, but its design incorporated a low safety margin influenced by rushed construction and alterations to original Soviet-engineered plans during China's period. Initial cracks and seepage issues emerged during building due to substandard materials and poor compaction, yet repairs were deemed sufficient without comprehensive reinforcement. Typhoon Nina, a category 1 equivalent storm, stalled over the region from to 8, delivering unprecedented : over 1,000 millimeters (about 40 inches) in the first 24 hours at some stations, including a world-record 829.8 millimeters in six hours at Daowencheng gauging station, far exceeding the dam's design criterion of 300 millimeters per day for a once-in-1,000-year event. inflow surged to 13,000 cubic meters per second by August 7, overwhelming spillways rated for 1,700 cubic meters per second after multiple upstream reservoirs overflowed and operators, lacking telemetry, delayed full discharge amid fears of downstream flooding. The core wall, a clay barrier intended to prevent seepage, eroded under prolonged overtopping, leading to progressive breaching around 1:00 a.m. on August 8; the resulting flood wave, carrying 500 million cubic meters of water at speeds up to 50 kilometers per hour, propagated downstream with a front height equivalent to a 10-story building in narrow valleys. The absence of functional early-warning systems, compounded by disrupted communications and dismissed upstream alerts, prevented timely evacuations; radio messages warning of imminent were sent but ignored or unattainable due to flooding. Direct casualties from the Banqiao and Shimantan breaches totaled at least 26,000, per official Chinese reports, though estimates, accounting for indirect deaths from , , and exposure in the ensuing weeks, range from 171,000 to 230,000, reflecting a that suppressed higher figures until the 1990s. The disaster destroyed 6.8 million homes, ruined 17.8 million acres of farmland, and caused economic losses exceeding 10 billion yuan (equivalent to billions in today's terms), with efforts hampered by political under Maoist policies that prioritized ideological campaigns over rigor. Post-event analyses highlight causal factors beyond the extreme rainfall, including undersized reservoirs relative to hydrological standards, inadequate protocols, and policy-driven overconfidence in , which ignored hydraulic modeling of ; these underscore the risks of political interference in technical design and the necessity of probabilistic risk assessments incorporating worst-case precipitation scenarios. The failure propagated rapidly due to the Ru River basin's steep gradients and chain-reaction overflows, amplifying volumes by factors of 10 or more, and demonstrated how localized overtopping can evolve into systemic basin-wide collapse without redundant capacity or .

Teton Dam (1976)

The Teton Dam was an earthen embankment structure built by the United States Bureau of Reclamation on the Teton River in southeastern Idaho, designed primarily for irrigation storage with secondary benefits for flood control and recreation. Standing 305 feet high with a crest length of 3,060 feet, construction began in 1972 and was completed in November 1975 at a cost of approximately $100 million. The reservoir began initial filling in late 1975 but reached significant levels for the first time in spring 1976, holding about 288,000 acre-feet at the time of failure. On June 5, 1976, at 11:57 a.m., the catastrophically breached during this initial filling when the elevation was 5,301.7 feet, 3.3 feet below the crest. The failure initiated with seepage observed as early as June 3, escalating to muddy flows and whirlpools at the downstream toe by 7:00 a.m. on June 5, followed by rapid erosion forming a 6-foot-diameter by 10:50 a.m. Efforts to plug leaks with bulldozers failed as the crest began to sink around 11:00 a.m., leading to complete collapse within minutes and releasing over 230,000 acre-feet of water at peak flows exceeding 1 million cubic feet per second. The primary cause was internal erosion, or , of the impervious core material deep in the right foundation key trench, facilitated by the highly permeable and fractured rhyolite in the abutments. This featured interconnected joints and fissures up to 3 inches wide, allowing unchecked seepage paths that the inadequate —plagued by incomplete sealing and high-permeability "windows"—failed to control. Compounding factors included the erodible, low-plasticity silty fill in Zone 1 of the core, which was susceptible to hydraulic fracturing under arching stresses in the narrow key trench, and insufficient geological treatment such as deeper grouting or filters despite known risks identified in pre-construction memos. The Independent Panel to Review Cause of Failure concluded that "the design of the dam did not adequately take into account the foundation conditions and the characteristics of the used," emphasizing preventable combinations of unfavorable circumstances rather than unforeseeable events. The resulting flood inundated over 300,000 acres downstream, destroying communities including Wilford, Teton, Sugar City, and parts of Rexburg, while sparing Idaho Falls due to partial attenuation. Eleven people died, primarily from drowning in vehicles during evacuation, and between 13,000 and 16,000 livestock perished. Property damages totaled about $400 million in 1976 dollars, encompassing homes, farms, businesses, and infrastructure, with over 25,000 residents evacuated after warnings issued around 10:30 a.m. effectively limited human casualties despite the rapid onset. The disaster prompted major reforms in Bureau of Reclamation practices, including enhanced foundation investigations, improved seepage controls, and the establishment of rigorous dam safety protocols that influenced national standards.

Oroville Dam Spillway Incident (2017)

The spillway incident began on , 2017, when operators at the 770-foot-high earthfill dam on California's initiated flows through the service to manage levels amid heavy rainfall from an event. Early observations revealed damage and a 30-foot-deep hole in the spillway chute, attributed to water injection through cracks and joints in the , causing uplift pressures and exposure of underlying poor-quality foundation rock to high-velocity flows. Continued operations exacerbated the , forming a 450-foot-long, 25-foot-wide, and 30-foot-deep scour hole by February 8, prompting reduced flows to assess stability. By February 11, reservoir inflows necessitated diversion to the adjacent emergency spillway for the first time in the dam's history, leading to rapid headward erosion that formed a 30-foot-deep headcut advancing toward the concrete weir crest. This progression threatened potential undermining and uncontrolled release of the full reservoir volume, estimated at over 3.5 million acre-feet, which could have inundated downstream areas along the Feather and Sacramento Rivers. On February 12, state officials issued evacuation orders for approximately 188,000 residents in Butte, Sutter, and Yuba counties, citing imminent risk of catastrophic spillway failure; no fatalities occurred, but the action disrupted communities and local economies for days. Operators then curtailed inflows by halting upstream releases and relying on natural outflows, lowering the reservoir below emergency spillway levels by February 14 and averting further erosion. An forensic investigation, commissioned by the (FERC), identified no singular root cause but a of factors: inherent flaws in the chute, including insufficient thickness, inadequate reinforcement, and poor subsurface drainage that allowed pressurized to weaken the slab; erodible materials comprising fractured, weathered metavolcanic rock; and operational decisions amid longstanding deficiencies. The highlighted systemic organizational shortcomings at the California Department of Water Resources (DWR), such as complacency toward vulnerabilities documented since the 1960s, inadequate response to prior warning signs like 2013-2015 chute cracking, and a culture prioritizing over despite regulatory oversight. These human factors amplified physical vulnerabilities, underscoring how deferred and optimistic assessments can precipitate near-failures in aging infrastructure. Repairs, completed by 2019, involved demolishing and reconstructing the service with , installing a new chute capable of handling 300,000 cubic feet per second, and modifying the with a hardened and to prevent headcut formation. Total costs exceeded $1.1 billion, including $500 million for reconstruction, $200 million for removal and armoring, and additional response expenditures; reimbursement covered a portion via FEMA, though disputes arose over eligibility for pre-existing fixes. The incident prompted enhanced protocols, including real-time instrumentation and FERC-mandated upgrades, but also exposed tensions in state- coordination and the challenges of balancing with ecological flows in a variable climate.

Brumadinho Tailings Dam (2019)

The collapse of the Dam I tailings facility at 's Córrego do Feijão mine occurred on January 25, 2019, in Brumadinho, , , releasing an estimated 12 to 13 million cubic meters of liquefied mining in a that traveled up to 9 kilometers downstream along the Paraopeba River valley. The structure, an upstream-raised earthen embankment designed to store processing waste, had been decommissioned in 2016 but retained significant volumes of saturated, fine-grained prone to . The breach generated a high-velocity that engulfed the mine's administrative and nearby areas during lunchtime, contributing to the high concentration of victims in those locations. Engineering analyses attribute the failure primarily to static within the dam's crest and upper body, where undrained shear stresses in loose, contractive layers—exacerbated by ongoing deposition and inadequate drainage—led to a sudden loss of and progressive slip surface propagation along weak, fine-particle interfaces. Independent expert panels, including those reviewing geotechnical data, confirmed that the upstream construction method amplified risks of under static loading, distinct from seismic triggers, with pre-failure detecting anomalous deformations and pore pressures that were not acted upon decisively despite the site's history of seismic activity and prior concerns raised after the 2015 Mariana dam failure at a joint Vale-BHP facility. Brazilian authorities and Vale's internal audits later identified lapses in protocols, including reliance on outdated models and insufficient post-decommissioning , though Vale contested some findings attributing full causality to inherent material brittleness rather than operational . The disaster caused 270 confirmed fatalities, including mine workers and local residents, with the mudflow's speed—reaching up to 50 km/h in initial surges—limiting escape opportunities despite the collapse occurring midday; modeling indicates that an effective could have reduced deaths by alerting personnel in the 10-15 minutes preceding the . Environmentally, the tailings plume contaminated over 300 kilometers of the Paraopeba River with such as , mercury, and , leading to die-offs, sediment deposition smothering benthic habitats, and suspension of supplies for approximately 1 million downstream, with long-term of toxins persisting in riverbed deposits. Economically, Vale incurred direct costs exceeding $7 billion USD in compensation agreements, remediation, and operational halts, including a 37.6 billion reais for social and environmental reparations, alongside a sharp decline in global market confidence and temporary mine shutdowns that disrupted Brazil's mining sector output. The event prompted stricter Brazilian regulations, such as mandatory downstream eliminations by high-risk operators, underscoring systemic vulnerabilities in profit-driven maintenance amid lax oversight following the Mariana precedent.

Prevention, Mitigation, and Engineering Responses

Design and Construction Standards

Dam design standards emphasize comprehensive site investigations, including geological assessments to evaluate foundation stability and seepage potential, as unstable foundations have contributed to failures like the 1976 collapse due to through fractured . Hydrological analyses determine inflow probabilities, requiring spillways to accommodate the Probable Maximum Flood (PMF), a hypothetical extreme event based on maximized meteorological conditions, to prevent overtopping, which caused the 1975 failure when rainfall exceeded design assumptions by a factor of five. Construction standards for embankment dams mandate zoned earth and rock-fill placement with specified compaction densities—typically 95% of maximum dry density per ASTM D698—to minimize settlement and internal , alongside impervious cores or cutoff walls to control seepage. For dams, designs incorporate uplift pressure reductions via galleries and requirements exceeding 1.5 against sliding and overturning under static loads, with for tensile stresses. Material involves testing aggregates for and for strength, ensuring compliance with specifications like those in USACE Engineer Manual EM 1110-2-2300. Seismic standards require dynamic analyses using response spectra for the Maximum Credible (MCE), incorporating pseudostatic coefficients or finite element modeling to verify , as outlined in Guidelines for . Regulatory oversight, such as FERC's pre-construction review of plans and specifications for hydroelectric projects, enforces these through independent peer reviews and risk-informed (RIDM), classifying by potential to prioritize higher standards for those posing greater downstream threats. Post- lessons, including Teton's emphasis on geologic mapping and curtains, have integrated probabilistic assessments into USACE policies under ER 1110-2-1156, blending deterministic criteria with quantitative mode evaluations.
Dam TypeKey Design FeaturesGoverning Standard Example
(Earth/Rock-fill)Zoned fills, filters for seepage control, factors >1.5USACE 1110-2-2300
Mass distribution for , to reduce upliftUSACE 1110-2-2200
ArchThin profile relying on resistance, seismic flexibilityFEMA Guidelines
These standards evolve through empirical validation from instrumentation data and failure analyses, prioritizing causal factors like inadequate freeboard or material heterogeneity over less verifiable models.

Inspection, Monitoring, and Maintenance Protocols

Inspection protocols for dams typically encompass routine visual examinations conducted by dam owners or operators, supplemented by periodic professional assessments to detect deterioration, erosion, or structural anomalies that could precipitate . In the United States, the (FERC) mandates under Part 12 of its regulations that licensed projects undergo periodic inspections (PIs) every five years by qualified engineers, focusing on embankment , spillway , and performance, with comprehensive assessments (CAs) alternating to evaluate potential modes. Similarly, the U.S. Corps of Engineers (USACE) requires annual reviews and quinquennial detailed inspections for its inventory of approximately 740 dams, incorporating risk-informed evaluations to prioritize high-hazard structures. Internationally, the International Commission on Large Dams (ICOLD) advocates for systematic visual surveillance integrated with geotechnical surveys to identify early signs of distress, such as cracking or , emphasizing owner responsibility for daily checks during operations. Monitoring systems rely on embedded instrumentation to provide real-time or periodic data on key parameters, enabling early detection of anomalous behavior that might indicate internal erosion or hydraulic inadequacy—common precursors to dam breaches. Essential instruments include piezometers for measuring pore water pressure, inclinometers for tracking lateral movement, and joint meters for foundation deformation, with data automated via supervisory control and data acquisition (SCADA) systems for continuous oversight. FERC guidelines specify surveillance and monitoring plans that integrate these tools with seepage observation wells and survey benchmarks, requiring thresholds for alerting operators to exceedances, such as sudden rises in uplift pressure. USACE protocols extend this to seismic monitoring and reservoir level gauges, with risk management frameworks mandating periodic calibration and data validation to ensure instrument reliability, as unmonitored seepage has contributed to failures like the 1976 Teton Dam incident. Maintenance protocols prioritize corrective actions derived from and findings, including clearance to prevent root-induced cracking, removal from reservoirs to maintain capacity, and repairs to outlet works or embankments to mitigate seepage paths. of State Dam Safety Officials (ASDSO) outlines owner guidance emphasizing scheduled upkeep, such as grouting cracks or reinforcing slopes, integrated into a broader program that logs deficiencies and timelines for remediation to avert progressive deterioration. FERC requires independent consultant reports post- to recommend , with if conditions warrant, while USACE employs a tiered approach categorizing by urgency—routine for issues like sealing, and urgent for stability threats—supported by federal funding allocations exceeding $100 million annually for high-risk dams as of 2021. ICOLD best practices stress lifecycle , including post-construction audits, to address aging effects, noting that deferred upkeep correlates with over 30% of historical failures globally. Effective protocols demand integration across these elements, with protocols updated via risk assessments; for instance, FERC's 2021 revisions incorporated potential failure mode analyses to refine inspection frequencies based on site-specific hazards like seismic zones or climate-induced shifts. Owners must maintain records of all activities, training personnel in recognition of warning signs such as sinkholes or cloudy seepage, which empirical reviews attribute to failures in cases like the 2019 Brumadinho dam collapse. Non-compliance risks regulatory enforcement, underscoring the causal link between rigorous adherence and reduced failure probability, as evidenced by post-audit reductions in deficiency rates across monitored U.S. inventories.

Emergency Action Plans and Warning Systems

Emergency Action Plans (EAPs) for consist of formal documents prepared by owners that outline procedures for detecting, evaluating, and responding to potential emergency conditions, such as structural instability or overtopping, to minimize and . These plans classify emergencies into levels—typically including conditions requiring increased monitoring, potential failure, and imminent failure—and specify responsibilities for dam operators, emergency personnel, and downstream communities. In the United States, the (FEMA) provides guidelines under FEMA P-64 (updated from the 2004 version), emphasizing consistent planning to facilitate timely notifications and evacuations. The U.S. Army Corps of Engineers mandates EAPs for all its operated or maintained and levees, as detailed in Engineer Circular EC 1110-2-6075 issued in October 2020, which requires inundation mapping and annual reviews. Key components of EAPs include detection mechanisms like instrumentation monitoring (e.g., piezometers for pore pressure and seepage sensors), evaluation protocols to assess failure risks, and notification flowcharts that detail communication chains from dam operators to local authorities and the public. Inundation maps delineate probable extents for various scenarios, enabling pre-planned evacuation routes and shelter designations. Plans must be coordinated with local agencies, with regular exercises—often annual for high-hazard dams—to test procedures and identify gaps. State regulations, such as California's Government Code section 8589.5, require approval of EAPs by oversight bodies to ensure downstream populations receive at least 1-4 hours of for evacuation in rapid-failure scenarios. Dam warning systems integrate with EAPs to disseminate alerts rapidly, comprising , , and notification elements. relies on sensors for levels, structural deformations, and seismic activity, feeding data into automated early systems (EWS) that trigger alerts upon threshold breaches. methods include sirens audible up to 5-10 miles downstream, automated phone calls, text messages, and the Integrated Alert and System (IPAWS), which supports (WEA) for cell broadcasts without subscriber data. Visual aids such as standardized —outlined in FEMA's P-2188 best practices—use symbols like the to mark zones and instruct on response actions. Effectiveness of these systems hinges on factors like , system reliability, and public response; studies indicate EWS can reduce fatalities by providing at least four hours of warning in high-population areas, as modeled for dam- floods where timely evacuation averts direct submersion deaths. For instance, U.S. Corps of Engineers protocols emphasize tiered alerts (e.g., Threat Level I for imminent ) integrated with WEAs to reach 90%+ of at-risk populations within minutes, though empirical data from exercises reveal challenges like signal propagation delays in rural areas or complacency from false alarms. Maintenance of and annual testing are critical, as unmonitored sensors fail to detect precursors like internal , underscoring that warnings alone do not substitute for proactive structural integrity assessments. International guidelines from bodies like the International Commission on Large Dams similarly advocate for EWS but note variability in adoption, with proven higher in jurisdictions enforcing regular drills.

Regulatory and Policy Frameworks

Government Oversight and Liability

Government oversight of dam safety encompasses regulatory frameworks enforced by national and subnational agencies responsible for design approval, periodic inspections, risk assessments, and enforcement of maintenance standards. In the United States, the (FERC) administers the nation's largest dam safety program, licensing over 2,500 projects and conducting comprehensive reviews of plans, specifications, and ongoing to mitigate risks. The U.S. Corps of Engineers (USACE) oversees approximately 740 federally owned , applying a risk-informed process that prioritizes high- structures for remediation, with actions triggered by potential probabilities exceeding 10^{-4} annually for unacceptable risk. State-level programs, numbering 50 active across the U.S. as of , regulate non-federal through based on downstream hazard potential, mandatory permitting, and biennial inspections, though program maturity varies, with only 17 states achieving full funding for oversight by 2021. Internationally, oversight structures reflect national priorities and infrastructure scales; China's Ministry of Water Resources (MWR) regulates over 98,000 large dams via a hierarchical system of safety evaluations, monsoonal monitoring, and compulsory retrofitting, supported by laws enacted post-1975 Banqiao failure to address centralized planning deficiencies. In , agencies like Germany's Federal Waterways Engineering and Research Institute or France's national dam registry enforce EU-aligned directives emphasizing probabilistic risk analysis and transboundary notifications, with 22 countries studied in 2016 showing common reliance on owner-submitted evaluations audited by regulators. Federal guidelines, such as those updated by FEMA in 2023, bind U.S. agencies to uniform practices including emergency preparedness and consequence modeling, aiming to standardize risk reduction across owners. Liability for dam failures typically rests with owners under principles prevalent in many jurisdictions, imposing accountability for downstream from uncontrolled reservoir releases without proving , as evidenced by U.S. rejecting defenses like in failures causing over $1 billion in aggregate losses historically. entities owning , such as USACE or the Bureau of Reclamation, face direct fiscal and operational responsibility, with post-failure congressional reviews often mandating compensatory actions; for instance, after the 1976 collapse attributed to failures under Bureau oversight, internal audits led to enhanced seepage controls without formal payouts due to caps under the . Regulatory agencies may incur -based for oversight lapses, as in the 2020 Edenville and Sanford Dam failures in , where a court ruled in 2021 that the Department of Environment, Great Lakes, and Energy's failure to enforce inspections enabled the , allowing flood victims to pursue claims exceeding $100 million in . Criminal penalties, including fines up to $250,000 per violation under U.S. , apply for willful neglect contributing to fatalities, underscoring causal links between inadequate and outcomes. Empirical analyses reveal that frameworks incentivize proactive , yet challenges persist from jurisdictional fragmentation and resource constraints; for example, underfunded state programs correlate with higher uninspected counts, amplifying potential government exposure in litigation-heavy environments. In non-U.S. contexts, such as Brazil's 2019 Brumadinho tailings collapse, government regulators faced scrutiny for lax permitting, resulting in executive indictments but limited civil payouts due to corporate veils, highlighting variances in enforcement rigor across systems. Overall, effective assignment hinges on verifiable causation, with post-event often determining whether failures stem from design flaws, deferred maintenance, or regulatory blind spots.

International Standards and Cross-Border Issues

The International Commission on Large Dams (ICOLD), established in 1928, serves as the primary global body for advancing dam engineering practices, maintaining a World Register of Dams and issuing bulletins on safety, design, and failure prevention, with over 100 national committees contributing data on incidents by dam type, age, and causation to inform risk-aware standards. emphasizes risk-informed management, advocating for comprehensive assessments of unforeseen factors like foundation instability or overtopping, and supports national adoption of its guidelines to minimize failures, as evidenced by its classification of large dams (height over 15 meters or volume exceeding specified thresholds). The provides operational guidelines under Operational Policy 4.37 (updated 2014), requiring borrower-submitted dam safety evaluations for projects involving new or existing dams, including independent reviews for high-hazard structures and risk mitigation plans addressing potential downstream impacts. Its 2021 Good Practice Note on Dam Safety promotes a lifecycle approach—encompassing , , operation, and decommissioning—with emphasis on probabilistic risk analysis for failure modes like or seismic events, applicable to financed in developing nations. These frameworks prioritize empirical data from post-failure analyses over prescriptive rules, acknowledging that uniform standards may overlook site-specific causal factors such as material degradation or extreme . Cross-border dam issues arise primarily in shared basins, where failures can propagate floods or shortages downstream, affecting multiple ; over 126 such basins host dams vulnerable to cascade failures, exacerbated by upstream construction without coordinated oversight. The 1997 UN on the Law of the Non-Navigational Uses of International Watercourses, entering force in 2014, mandates equitable and reasonable utilization while prohibiting significant harm, requiring prior notification and consultation for dam projects on transboundary s, though ratification remains limited (39 parties as of 2023), hindering enforcement. Complementing this, the 1992 UNECE on the Protection and Use of Transboundary Watercourses and International Lakes obliges parties to prevent, control, and reduce transboundary impacts, including from dam-induced floods, through joint monitoring and emergency protocols, with amendments extending to non-ECE states since 2016. Implementation gaps persist, as only 20% of transboundary basins have adopted joint strategies, and 14% address climate-amplified threats like intensified ing, often due to asymmetric power dynamics where upstream developers prioritize national benefits over downstream safety. UNECE guidelines on transboundary risk recommend real-time data sharing and joint early warning systems to mitigate dam failure propagation, including ice jams or overtopping, but causal realism reveals that political non-cooperation frequently overrides technical standards, as seen in basins like the where upstream dams have heightened downstream inundation risks without binding failure protocols. In conflict scenarios, Additional to the (1977) designates dams as installations containing dangerous forces, prohibiting attacks unless they provide military advantage outweighing civilian harm, with international signage required for protection.

Economic Incentives and Private Sector Roles

Private dam owners, who control approximately 70% of the roughly 92,000 dams in the United States, bear primary responsibility for , operation, maintenance, and rehabilitation to prevent failures, often engaging firms and contractors for these tasks. These entities, including companies, utilities, and agricultural operations, invest in inspections and upgrades driven by direct financial stakes, as evidenced by the 's role in maintaining facilities under programs like the U.S. Department of Energy's Section 247 incentives for efficiency enhancements that indirectly support structural integrity. Economic incentives for safety stem from doctrines, which hold owners accountable for downstream irrespective of , compelling proactive to avert catastrophic losses. For instance, is essential for private owners to cover potential third-party claims from failures, with premiums reflecting hazard assessments and maintenance records, thereby aligning insurer oversight with prevention efforts. Cost-benefit analyses further underscore these incentives: rehabilitating non-federal high-hazard dams is estimated at $34.1 billion nationwide, far less than the economic fallout from breaches, which can exceed billions in direct , lost productivity, and legal settlements. The 2019 Brumadinho tailings dam collapse in illustrates the private sector's exposure, where mining firm Vale S.A. agreed to $7 billion in for 270 deaths and widespread environmental harm, alongside operational shutdowns and stock value erosion, reinforcing global incentives for rigorous tailings management and third-party audits. Such events drive industry adoption of advanced monitoring technologies and contingency planning, as private firms weigh failure risks—often quantified in extended benefit-cost models incorporating probabilistic breach scenarios—against upfront investments that preserve asset value and regulatory compliance. While government grants occasionally supplement private efforts for , core motivations remain market-based, with reputational and financial penalties ensuring accountability absent public subsidies.

Future Risks and Predictions

Aging Vulnerabilities

A significant proportion of global dam has exceeded its original design life, increasing susceptibility to . In the United States, approximately 90,000 exist with an average age of 57 years, and over 8,000 are more than 90 years old, heightening risks from deferred and environmental stresses. Worldwide, many large dams constructed between 1930 and 1970—typically designed for 50 to 100 years—now surpass an "alert" age threshold of 50 years, with averages exceeding 100 years in countries like and the . Material degradation constitutes a primary in aging dams. Concrete structures experience , cracking, and surface deterioration from cycles of freezing and thawing, reducing cross-sectional integrity and permitting seepage that erodes over time. Embankment dams, comprising earth and rockfill, undergo time-dependent changes such as settlement, slope instability, and internal due to —where water flows erode core materials—often undetected until catastrophic occurs. Corrosion of embedded steel reinforcement and outlet conduits further compromises hydraulic controls, as deteriorating pipes can lead to backward exposing embankment cores to reservoir flows. These processes, rooted in physicochemical alterations rather than acute events, accumulate insidiously, with failure rates for embankments estimated at 2.31 times higher than for other types when aged. Historical incidents underscore these risks, particularly when aging intersects with extreme hydrology. The 2020 failures of the Edenville and Sanford dams in , both over 90 years old and poorly maintained, released 4.3 billion gallons of water after heavy rainfall overwhelmed degraded structures, displacing 10,000 residents and causing $100 million in damages. Similarly, smaller aging dams in the U.S., built decades ago for low-risk rural areas now urbanized, exhibit heightened overtopping potential from intensified storms, with six high-hazard sites in , , and identified as critically vulnerable as of 2025. Compounding these inherent weaknesses, aging infrastructure faces amplified threats from non-structural factors like , which reduces capacity by up to 39% in long-lived systems such as Japan's, and compound rainfall events projected to elevate U.S. failure probabilities. Without proactive —such as advanced or —over 90,000 U.S. remain in service amid these dynamics, necessitating risk assessments that prioritize empirical material testing over assumptive safety margins.

Climate Variability Influences

Climate variability, manifested through shifts in precipitation patterns and intensified hydrological extremes, heightens the risk of dam overtopping, which accounts for approximately one-third of historical dam failures in the United States. Warmer atmospheric conditions enable greater moisture retention, resulting in more frequent and severe rainfall events that exceed historical design capacities for many constructed decades ago. For instance, compound rainfall clusters—sequential heavy storms with limited inter-event recovery time—have been shown to amplify inflows, increasing overtopping probabilities by up to 50% in vulnerable U.S. regions under projected scenarios. These dynamics are empirically linked to observed trends, where historical data indicate rising overtopping risks for nationwide, driven by intensification rather than isolated anomalies. Regional analyses underscore variability in impacts; while some dams may experience moderated peak outflows due to altered patterns, the predominant effect across mid-latitude reservoirs is elevated magnitudes from . A quantitative study of 18 found that projected increases in rainfall depth under climate scenarios directly elevate overtopping risks, with magnitudes varying by basin but consistently worsening without adaptive resizing. rates can also fluctuate with erratic wet-dry cycles, reducing storage capacity and exacerbating vulnerability to subsequent deluges, as evidenced in reviews of global dam portfolios. Peer-reviewed assessments emphasize that these risks are not uniform, with older structures facing compounded threats from during intensified storm velocities. Projections for the coming decades, derived from coupled hydrological models, anticipate a 20-100% rise in design exceedance probabilities for high-hazard dams in precipitation-sensitive areas, necessitating reevaluation of capacities based on updated probable maximum estimates. Empirical validation from post-event analyses, such as those following recent U.S. clusters, confirms that intensifying extremes correlate with near-miss overtopping incidents, underscoring causal pathways from thermodynamic enhancements in systems to structural overload. While some models project localized mitigations through reduced in certain climates, the net global trajectory points to heightened failure probabilities absent engineering interventions.

Geopolitical and Deliberate Threats

Dams have served as strategic targets in warfare throughout history, with deliberate breaches used to unleash floods against adversaries. During the in the 13th century, invaders destroyed irrigation dams near the city of Gurjang in , flooding the area to punish resistance and demonstrate power. In , the British Royal Air Force's on May 16-17, 1943, employed bouncing bombs to breach the Möhne and Eder dams in Germany's Valley, releasing approximately 300 million cubic meters of water, disrupting industrial production, and causing around 1,300 deaths, primarily civilians. Such tactics, also seen in the (1568-1648) where Dutch forces inundated lands by destroying dikes to repel Spanish advances, highlight dams' dual role as weapons when weaponized, though often yielding indiscriminate civilian harm exceeding military gains. In contemporary geopolitical conflicts, state actors continue to exploit dams for tactical advantage. The Dam on the Dnipro River was destroyed by an explosion on June 6, 2023, amid Russia's invasion of , with officials and Western intelligence attributing the act to Russian forces under their control since February 2022, purportedly to flood positions and impede counteroffensives; Russia countered by blaming artillery strikes on the overpressured structure. The breach released vast waters, submerging 620 square kilometers across four oblasts, displacing tens of thousands, contaminating water supplies, and inflicting an estimated US$14 billion in damages, underscoring how contested territories amplify risks in interstate disputes. Conflicting attributions reflect broader , with independent verification hampered by active combat zones, though and seismic data supported explosion theories over gradual failure. Emerging cyber capabilities enable remote deliberate threats, often tied to geopolitical rivalries. In 2021, hackers linked to Iran's Revolutionary Guard targeted the in , attempting to manipulate controls as part of a wider probe into U.S. , highlighting state-sponsored potential against hardened physical assets. Similarly, in April 2025, pro-Russian hackers infiltrated the control system of the Risevatnet Dam in , exploiting weak passwords to fully open valves, discharging 500 liters per second for four hours undetected and risking downstream flooding; Norwegian intelligence attributed this to Russian actors amid NATO tensions over support. These incidents reveal vulnerabilities in supervisory control and systems, where geopolitical grudges drive low-cost, deniable operations that could escalate to catastrophic releases if scaled to larger reservoirs. Non-state remains a latent concern, with U.S. assessments identifying like dams as high-impact targets for domestic violent extremists or foreign plots, though executed attacks remain rare due to robust .

Controversies and Debates

Over-Regulation vs. Practical Safety Trade-Offs

Regulatory frameworks for dam safety, while essential for mitigating failure risks, impose compliance costs and procedural delays that can inadvertently compromise practical safety measures. Owners of aging often face elevated expenses to meet evolving standards, such as seismic or reinforcements, with national needs estimated at over $8 billion for high-hazard dams alone as of 2019. These costs strain small private operators and local governments, who may defer non-mandatory maintenance to prioritize regulatory filings, thereby extending vulnerability periods. Environmental permitting requirements under laws like the (NEPA) frequently exacerbate delays in urgent repairs, as multi-agency reviews and mitigation demands can span years for projects involving habitat disruption or sediment management. For instance, large-scale rehabilitations commonly encounter permitting hurdles that postpone work, heightening interim risks to downstream populations despite identified deficiencies. Critics, including state dam safety officials, contend that dueling federal, state, and local mandates—such as concurrent Section 404 approvals—slow rehabilitation, leaving deficient structures exposed longer than necessary. In , water utilities have reported permit delays impeding dam repairs, underscoring how procedural rigor can prioritize ecological concerns over immediate structural integrity. Risk-based versus prescriptive regulatory approaches highlight further trade-offs, where overly uniform standards may compel costly upgrades on low-consequence dams, diverting resources from higher-priority sites. U.S. Army Corps of Engineers analyses note that excessively stringent criteria risk excluding resource-limited states from federal assistance programs, potentially undermining broader safety gains. (FERC) oversight, mandating comprehensive Owner's Dam Safety Programs and quinquennial inspections, enhances accountability but burdens operators with administrative loads that correlate with project economics deterring proactive investments. Empirical data from attributions, however, indicate that non-compliance or inadequate enforcement—rather than regulatory excess—predominates in incidents like the 2020 breach, suggesting balanced deregulation for minor structures could alleviate burdens without sacrificing core protections. Proponents of reform advocate tailored, consequence-proportional standards to optimize safety investments, avoiding scenarios where compliance fatigue leads to systemic neglect.

Environmental Opposition to Dams

Environmental opposition to dams centers on their disruption of natural riverine ecosystems, arguing that the ecological costs outweigh benefits such as generation and . Critics, including organizations like International Rivers and American Rivers, contend that dams fragment rivers, blocking migratory species and altering flow regimes that sustain . For instance, river fragmentation from dams has contributed to an 81% decline in migratory fish populations since 1970, as reported by the World Wildlife Fund's . Large dams inundate upstream habitats, leading to habitat loss and species displacement, while downstream effects include sediment deprivation that erodes riverbeds and reduces formation. Studies indicate that dam construction alters and causes riparian degradation, with tropical projects linked to avian extinctions in the , where the induced local bird species loss. In the Basin, proposed dams threaten 17% of riverine habitats for marine-associated fishes if built. Fish passage structures often fail to mitigate these impacts, as evidenced by persistent declines in populations on the U.S. due to altered water temperatures and predator-prey dynamics. Reservoir impoundments also generate significant , primarily from decomposition under conditions, challenging claims of dams as low-carbon energy sources. Global reservoir emissions are estimated at 0.8 Pg CO2-equivalents annually, with some tropical reservoirs emitting at rates comparable to plants. Recent assessments show emissions 29% higher per reservoir area than previously estimated, exacerbated by climate-driven increases in organic inputs. Opponents argue these emissions, combined with vulnerability to droughts reducing output, render dams unreliable for climate mitigation, advocating alternatives like and .

Attribution of Failures to Systemic vs. Isolated Causes

Analyses of dam failures frequently categorize proximate causes into mechanisms like overtopping, defects, and seepage, and structural issues, with overtopping accounting for approximately 34% of documented cases as of 1985, defects for 30%, and for 28%. These are often initially attributed to isolated events, such as extreme floods exceeding design assumptions or localized geological weaknesses, but post-mortems reveal that many such incidents arise from systemic deficiencies, including underdesigned spillways reflecting historical trade-offs between margins and economic constraints, inadequate pre-construction geotechnical investigations, and deferred maintenance allowing progressive deterioration. Systemic factors predominate in global failure patterns, particularly for aging structures where diminishes storage, elevating overtopping risks, and where operational protocols fail due to insufficient training or . For example, internal via , a leading cause, often traces to unaddressed seepage paths from poor compaction or grouting, emblematic of broader lapses in during construction phases influenced by cost pressures or regulatory leniency. In contrast, purely isolated attributions—such as failures from novel material fatigue unforeseen by era-specific testing or freak seismic anomalies—are infrequent, comprising less than 10% of cases, and even these typically involve overlooked precursors like cracking detectable through routine . This distinction informs debates, where overemphasizing isolated triggers can obscure preventable institutional shortcomings, such as fragmented oversight in jurisdictions with high private dam ownership or inconsistent enforcement of inspection regimes. Evidence from 21st-century incidents underscores that compounded human elements—design conservatism, land-use alterations amplifying upstream runoff, and delayed responses—elevate isolated mechanisms into systemic vulnerabilities, with failures rarely decoupling from upstream causal chains in and practice.

References

  1. [1]
    Dam Failures and Incidents - Association of State Dam Safety Officials
    Dam failures cause immense damage and deaths. Common causes include overtopping, foundation defects, cracking, inadequate maintenance, and piping.Dam Failures And Incidents · The Causes Of Dam Failure · Asdso Dam Safety Incident...
  2. [2]
    Causes and Types of Dam Failures - Hydrologic Engineering Center
    Costa (1985) reports that of all dam failures as of 1985, 34% were caused by overtopping, 30% due to foundation defects, 28% from piping and seepage, and 8% ...
  3. [3]
    [PDF] Technical Note 1: Dam Break Inundation Analysis and Downstream ...
    CAUSES OF DAM FAILURE ... In this usage, the dam break inundation analysis is used to assess the potential consequences of dam failure on life.
  4. [4]
    Dam Failures - Missouri State Emergency Management Agency
    While dam failures are not common, nationally, the most common reasons for dam failures are: Piping: Internal erosion caused by embankment leakage ...
  5. [5]
    Causes and Consequences of Dam Failures—Case Study
    Piping is one of the most important causes of dam failure. Concentrated leak erosion, which occurs in cracks or a system of interconnecting voids, accounts for ...
  6. [6]
    [PDF] to the climate induced failure of aging dams in the us - ResearchGate
    There have been on average 10 dam failures per year in the U.S. from 1848 to 2017, but since 1984 the average failure rate has increased to 24 per year, mostly ...
  7. [7]
    A Review of Tailings Dam Safety Monitoring Guidelines and Systems
    The failure rate of tailings dams worldwide (i.e., the percentage of failed dams out of total) is estimated at 1.2%, compared to the 0.01% rate for ...
  8. [8]
  9. [9]
    I-GUIDE Team Examines the Vulnerability of Dams across the ...
    Dec 6, 2023 · Dams are vulnerable due to climate change, especially aged ones. Combined one and 30-day rainfall events increase failure risk. Socioeconomic ...
  10. [10]
    [PDF] the dam break causes, development and consequences - NHESS
    The. causes for the dam failure may be the faults during the design and construction stages, ageing of the structures and climate. change resulting in altering ...
  11. [11]
    [PDF] Investigation of the Failure Modes of Concrete Dams
    Final collapse is a push through of sections of the dam downstream and is controlled by the joints both with the pattern of the failure and with the ...
  12. [12]
    Mechanisms of the Non‐Uniform Breach Morphology Evolution of ...
    Sep 21, 2022 · The landslide dam failure process is complex, involving flow dynamics (Powledge et al., 1989), hydraulic jumps (Walder et al., 2015), rapid bed ...
  13. [13]
    [PDF] Internal Erosion
    Failure results when mechanism repeats itself until the core is breached or downstream slope is over-steepened to the point of instability.
  14. [14]
    A Comprehensive Discussion of Piping and Internal Erosion Failure ...
    An embankment dam can fail or experience serious distress if water flows without adequate controls through the embankment itself or through the foundation soil ...
  15. [15]
    [PDF] The mechanics of internal erosion and piping of embankment dams ...
    Internal erosion and piping is the main cause of failure and incidents in embankment dams and their foundations. The failure process is best considered in ...
  16. [16]
    [PDF] Typical Failure Modes of Embankment Dams - NH.gov
    Failures of earthen embankment dams or dikes can generally be grouped into three classifications: hydraulic, seepage and structural. Hydraulic failures from ...
  17. [17]
    Concrete Gravity Dam Failures | Association of State Dam Safety
    Gravity dam failures can be grouped into three general categories: sliding failures, overturning failures, and structural failures.Concrete Gravity Dam... · Gravity Dam Failure Modes · Sliding Gravity Dam Failure
  18. [18]
    [PDF] Concrete Dam Foundation Risks
    Foundation deficiencies are the number one cause of concrete dam failures. • The location, orientation, and strength (including scale effects) of.
  19. [19]
    Dam Failure - kipda
    Dam failure can cause loss of life and property damage. Causes include improper maintenance, design, and hydraulic/seepage failures. Signs include seepage and ...Description · Location + Extent · VulnerabilityMissing: consequences | Show results with:consequences
  20. [20]
    Dam Safety Education - Dam Failures
    Aug 12, 2025 · Seepage and piping can cause internal erosion within the dam that can erode embankment or foundation materials and lead to dam failure. Evidence ...Missing: most | Show results with:most
  21. [21]
    [PDF] criteria for the selection of dam types in areas of high seismicity
    The main hazards are: ground shaking; active or potentially active faults, discontinuities in the footprint of dams, which can be activated during strong nearby ...
  22. [22]
    Safety Aspects of Sustainable Storage Dams and Earthquake Safety ...
    Conservatively designed earth core rockfill dams can cope with such movements, whereas arch dams will be very vulnerable to them. Therefore, if there is doubt ...
  23. [23]
    (PDF) Dam Safety Problems Related to Seepage - ResearchGate
    Jun 20, 2020 · In dam's foundation grout curtains or other type of cutoffs can reduce the hydraulic head and hence uplift under the dam and hinder seepage.<|control11|><|separator|>
  24. [24]
    [PDF] Chapter R5 | FERC Engineering Guidelines Risk-Informed Decision ...
    Concrete Dam Analysis - Arch, Gravity and Buttress Dams. R5.6.2 Failure Modes ... An arch dam can bear on a thrust block, which will be governed by gravity type ...
  25. [25]
    Comparing vulnerabilities of CFRDs and ECRDs
    Sep 15, 2023 · CFRDs are vulnerable to overtopping like all types of embankment dams. There are several reasons for overtopping of dams such as inadequate ...
  26. [26]
    Cracking Dams: embankment history, i
    The ruins of the Sadd-el-Kafara embankment dam were discovered over 100 years ago in the Garawi ravine in Egypt. The dam was built around 2600 BC and was 14 m ...
  27. [27]
    A Dam at Marib - Saudi Aramco World
    The collapse of the dam marked the end of an ancient civilization of South Arabia - a civilization centered on the fortified city called Marib and on its dam.
  28. [28]
    Key Developments in the History of Embankment Dams
    The consequences of the dam's failure must have been so grave that the Egyptian engineers refrained from further dam construction for about eight centuries.
  29. [29]
    Cracking Dams: gravity history, i
    Moreover, the Subiaco dam and two smaller dams nearby are the only Roman dams in Italy. Although the dam was to thin, it remained intact until it failed in 1305 ...
  30. [30]
    [PDF] Concrete Dams Case Histories of Failures and Nonfailures with ...
    This compilation of case history summaries is intended to assist risk analysis teams in estimating probabilities related to concrete dams.Missing: examples | Show results with:examples<|separator|>
  31. [31]
    [PDF] The Mill River Flood of 1874 - Westfield State University
    Twenty-seven of the 139 people killed were from Haydenville. . . . [Assistant coroner Charles] Delano must have thought that [Joel]. Hayden Jr. would hold back.
  32. [32]
    Dam-Breach hydrology of the Johnstown flood of 1889–challenging ...
    But the 1862 failure set the stage for the dam breach disaster in 1889 because when the dam was rebuilt by the SFFHC significant changes were made to the ...
  33. [33]
    [PDF] South Fork Dam Breach MDB 1 - ASDSO Lessons Learned
    The South Fork Dam breach and Johnstown Flood of May 31st, 1889, remains the USA's deadliest dam disaster. A torrential storm the night before had drenched ...
  34. [34]
    Frequently Asked Questions - Johnstown Flood National Memorial ...
    Aug 8, 2025 · The three remembered most happened on May 31, 1889, when at least 2,209 people died, the St. Patrick's Day flood of 1936, in which almost two ...
  35. [35]
    Dam Failure Case Study: Austin (Bayless) Dam (Pennsylvania, 1911)
    The dam stood for less than two years, during which numerous partial failures made it a constant problem and safety concern. The dam completely breached on ...
  36. [36]
    [PDF] THE INFLUENCE OF DAM FAILURES ON DAM SAFETY LAWS IN ...
    “Austin Dam Failure, Austin, Pennsylvania.” When Technology Fails: Significant Technological Disasters, Accidents, and Failures of the Twentieth Century. N ...
  37. [37]
    [PDF] Dam Failures in the U.S.
    The earliest recorded fatalities due to a dam failure occurred in 1850 as a result of Ashburnham Reservoir Dam fail- ure in Massachusetts in which two lives ...Missing: modern 1800
  38. [38]
    [PDF] The History of Large Federal Dams: Planning - Bureau of Reclamation
    At the same time, the history also addresses some of the negative environmental consequences of dam-building, a series of problems that today both Reclamation.
  39. [39]
    spain: ribadelago repairing village after dam disaster. (1959)
    The Government, which control the hydro-electric station of the Vega de Tera ... NORTHERN ITALY: ITALIAN DAM DISASTER: RELIEF OPERATIONS & SCENES ABOVE DAM.
  40. [40]
    lake connectivity during extreme floods in mountain areas: The 1959 ...
    Feb 15, 2021 · Here, we present a geomorphological and hydraulic analysis of the 1959 Vega de Tera (NW Spain) dam-break flood, a worldwide notable dam-failure ...
  41. [41]
    The traps behind the failure of Malpasset arch dam, France, in 1959
    This unsuspected property, high sensitivity to stress, was then supposed to be the main cause of failure, as the load applied by the dam on the foundation rock ...
  42. [42]
    Typhoon Nina–Banqiao dam failure - Britannica
    Oct 10, 2025 · Typhoon Nina–Banqiao dam failure, catastrophic dam failure in August 1975 in western Henan province, China, caused by a typhoon (tropical ...
  43. [43]
    [PDF] The World's Most Catastrophic - Dam Failures
    At the most urgent moment after the collapse of the two dams, there was a blackout that caused tremendous chaos. Fourth, there was a failure to establish clear ...
  44. [44]
    [PDF] Failure of Teton Dam by Independent Panel to Review Cause of ...
    Dec 31, 1976 · These pages present a summary and conclusions. Teton Dam failed on June 5, 1976, when the reservoir was at El. 5301.7, 3.3_ ft below the ...
  45. [45]
    Failure of Teton Dam, Report to U.S. Department of the Interior and ...
    In briefest summary, the Panel concludes (1) that the dam failed by internal erosion (piping) of the core of the dam deep in the right foundation key trench ...
  46. [46]
    Teton Dam History - Bureau of Reclamation
    Teton Dam failed on June 5, 1976, during its first filling, releasing a massive flood. The reservoir drained in less than six hours, causing 11 deaths and ...
  47. [47]
    [PDF] D3_Flood Overtopping Failure of Dams and Levees
    Jul 1, 2019 · reasons including failure of the hoist mechanism, failure of the wire ropes or chains that lift the gates, binding of the gates due to pier ...
  48. [48]
    (PDF) Dam Safety and Οvertopping - ResearchGate
    Failure in most cases occurs when the inflow exceeds the spillway design capacity, but to a lesser extent from the buildup of very high wave setup and runs up.<|separator|>
  49. [49]
    dam failure Archives - Tata & Howard
    Dam failure is most frequently caused by overtopping, accounting for 34% of all dam failures. Causes of overtopping include inadequate spillway design, blocked ...Dam Safety Awareness... · The Johnstown Flood Of 1889 · The High Cost Of High-Hazard...<|control11|><|separator|>
  50. [50]
    Dam Failures: the 5 Worst Examples and Their Lessons - Asterra
    Jun 28, 2023 · In Eqypt in 2,600 BCE, while still under construction, a 14 m tall dam was destroyed by one of the floods it was being built to control. In the ...Missing: modern 1800
  51. [51]
    [PDF] Internal Erosion Risks for Embankments and Foundations
    Internal erosion can occur through the embankment, foundation, or into structures, with 47% of failures due to it. Mechanisms include BEP, CLE, and internal ...
  52. [52]
    [PDF] Lessons on internal erosion in embankment dams from failures and ...
    Three different mechanisms of fail- ure may occur: (1) general instability without hydraulic fracturing, (2) hydraulic fracturing (with or without suffusion) ...
  53. [53]
    [PDF] D6 Internal Erosion Risks for Embankments and Foundations with ...
    Jul 1, 2019 · One of the leading causes of dam and levee failures in the United States is from internal erosion of embankments (or their foundations).
  54. [54]
    [PDF] DSO-04 -03 - Bureau of Reclamation
    About 50% of large dam failures are due to internal erosion. This document studies case histories of these failures, including Picketberg Dam, Omai Tailings  ...<|separator|>
  55. [55]
    [PDF] Fedearl Guidelines for Inundation Mapping of Flood Risks ... - FEMA
    1976 Failure of Teton Dam in Idaho due to internal erosion caused $1 billion in losses and 14 deaths. This failure led to widespread review by Federal agencies ...
  56. [56]
    Incidents & failures - Washington State Department of Ecology
    Why dams fail · Differential settlement · Sliding and slope instability · High uplift pressures · Uncontrolled foundation seepage.Missing: types | Show results with:types<|separator|>
  57. [57]
    [PDF] Teton Dam Failure Case Study
    A thorough investigation identified the causes of the failure and suggested improvements for the design and construction of earthen dams.Missing: defects | Show results with:defects
  58. [58]
    three sciences behind the Malpasset dam failure (France, 2 ...
    Built from 1952 to 1954 for water supply and irrigation, filling of the reservoir was delayed 5 years and the failure occurred following a flash flood of the ...
  59. [59]
    [PDF] 3 sciences behind the Malpasset dam failure (France, Dec. 2, 1959)
    Sep 4, 2019 · The cause of the dam failure was for them directly related to the water pressure under the left bank of the dam. Uplift was known about ...
  60. [60]
    [PDF] Chapter 3: Hazards, Risks, Failures
    The complexity of the hazard is such that structural design and causes of dam failure are significant areas of research in engineering.
  61. [61]
    [PDF] Case Histories of Earthen Dam Failures - Scholars' Mine
    May 2, 2013 · The purpose of this paper is to highlight the most promising causes of the earthen dam failures and present the case histories of the dams ...Missing: statistics | Show results with:statistics<|separator|>
  62. [62]
    [PDF] for Dam Safety Federal Guidelines - Earthquake Analyses ... - FEMA
    Several earthquake-induced conditions that can cause failure of an embankment dam are described below. a. Overtopping of the Embankment. The evaluation of ...
  63. [63]
    Earthquakes and Dams | IntechOpen
    May 20, 2015 · It is a well-known phenomenon that earthquakes can result damages and failures for dams and their appurtenant structures. There is another fact ...
  64. [64]
    The Koyna earthquake and the damage to Koyna Dam
    Mar 3, 2017 · The Koyna earthquake (surface-wave magnitude 6.5) occurred on December 11, 1967 near Koyna Dam in a region of India which was considered to be stable and ...
  65. [65]
    [PDF] The Koyna, India, Earthquakes - IIT Kanpur
    On December 11, 1967, an earthquake occurred at Koyna that was among ... Earthquake damage to the dam included a horizontal crack through some of the ...
  66. [66]
    The 10 Worst Dam Disasters In History: Causes & Impact
    The failure was attributed to subpar construction practices and inadequate geological assessments. Malpasset Dam Failure (1959) – France. The Malpasset Dam ...
  67. [67]
    Dam design - the effects of active faults - International Water Power
    Aug 19, 2008 · Fault movements will cause cracks in almost all concrete dams, whereas differential foundation movements resulting, for example, from the ...<|separator|>
  68. [68]
    [PDF] Two Case Studies in Human Factors and Dam Failure
    Nov 8, 2014 · Human choices, behaviors, and errors (collectively “Human Factors”) have been a critical contributing factor in historic dam failures.
  69. [69]
    [PDF] Dams and Public Safety - Bureau of Reclamation
    Some of the most frightening have involved the collapse of dams. History reveals that for each 1,000 dams existing today, approximately ten others have failed.
  70. [70]
    Big Dams & Bad Choices: Two Case Studies in Human Factors and ...
    Human choices, behaviors, and errors (collectively “Human Factors”) have been a critical contributing factor in historic dam failures.Missing: neglect | Show results with:neglect
  71. [71]
    [PDF] INDEPENDENT FORENSIC TEAM REPORT OROVILLE DAM ...
    Jan 5, 2018 · The incident was caused by a complex interaction of physical factors like design vulnerabilities and poor foundation, and human, organizational ...Missing: neglect | Show results with:neglect
  72. [72]
    Oroville Dam: Report places blame on decades of neglect, human ...
    Jan 5, 2018 · ... dam's problems: “The Oroville Dam spillway incident was caused by a long-term systemic failure of the California Department of Water ...Missing: maintenance | Show results with:maintenance
  73. [73]
    Estimating Breach Parameters - Hydrologic Engineering Center
    The failure mode is the mechanism for starting and growing the breach. Overtopping failures start at the top of the dam and grow to maximum extents, while a ...
  74. [74]
    Mechanism of the progressive failure of non-cohesive natural dam ...
    Aug 15, 2020 · The progressive failure is initiated by head cutting, which arises at the toe of the downstream face of the dam and progressively migrates ...
  75. [75]
    The Carsington Dam Failure | Geo-Institute
    Jun 27, 2025 · The disaster made clear the importance of recognizing the brittle nature of some clays, considering progressive failure in dam design, and, as a ...
  76. [76]
  77. [77]
    [PDF] the development and testing of a dam-break flood ... - NOAA Atlas 14
    A distinguishing characteristic of dam-break flood waves is the great magnitude of the peak discharge when compared to runoff-type floods which have ...
  78. [78]
    [PDF] Silver Spring, Maryland - NOAA Atlas 14
    Such a technique is referred to as dynamic routing. Since this technique is used for routing the dam-break flood wave through the domstream valley, the ...
  79. [79]
    [PDF] Prediction of Dam Breach Parameters - Literature Review
    Warning time is the sum of the breach initiation time (defined below), breach formation time, and flood wave travel time from the dam to a population center.
  80. [80]
    [PDF] Evaluation of Selected Dam-Break Flood-Wave Models by Using ...
    Four dam-break flood-wave models have been evaluated by using three field data sets and selected criteria of desirable features.
  81. [81]
    Dimensionless attenuation of dam-breach flood wave propagating ...
    The dam-breach wave propagation is studied through a dimensionless formulation. The dimensionless hydrographs shape depends mainly on the reservoir morphology.Missing: inundation dynamics
  82. [82]
    [PDF] CHAPTER 2 SELECTING AND ACCOMMODATING INFLOW ...
    Aug 1, 2015 · When routing a dam break flood through the downstream reaches, appropriate local inflows should be considered in the computations.
  83. [83]
    Dam Breach Modeling and Downstream Flood Inundation Mapping ...
    Nov 10, 2023 · This section provides a detailed discussion of the dam breach analysis model, which involves predicting the dam breach hydrograph and routing it ...
  84. [84]
    OHD/HL/HSMB - Hydraulics: Dam Break
    Oct 24, 2011 · Dam failures can be sudden events and the resulting flood waves travel rapidly downstream; therefore, forecasters need pre-calculated scenarios ...
  85. [85]
    A new look at the statistics of tailings dam failures - ScienceDirect
    Jun 20, 2022 · ICOLD (2001) classified the causes of tailings dam failures in nine categories: static failure (SI), seepage and internal erosion (SE), ...
  86. [86]
    [PDF] Assessing Risk of Mine Tailing Dam Failures - Columbia Water Center
    (1) Active dams are more likely to fail than inactive dams (ICOLD, 2001). (2) The leading modes or mechanisms of failures identified from reported incidents in ...
  87. [87]
    Long-term Risk of Tailings Dam Failure (U.S. National Park Service)
    Jun 15, 2015 · Previous research indicates that most tailings dam failures occur at operating mines and 39 percent of such failures worldwide occur in the ...
  88. [88]
    A Comprehensive Review on Reasons for Tailings Dam Failures ...
    Jun 20, 2019 · This paper discusses reasons including seepage, foundation failure, overtopping, and earthquake for tailings dam failures and explores failure mechanisms.<|separator|>
  89. [89]
    Tailings Dam Failures: Factors and Causes - saalg geomechanics
    May 30, 2024 · Poorly understood or managed geotechnical conditions can lead to slope instability and potential collapse. Inadequate drainage can cause ...
  90. [90]
    Tailings Dam Breach Outflow Modelling: A Review
    Dec 6, 2024 · Tailings flows are generally highly sediment-laden flows and are non-homogeneous and non-Newtonian flood events.
  91. [91]
    Floods from tailings dam failures - ScienceDirect.com
    Jun 15, 2008 · The purpose of these models has been to predict the flood characteristics (flood hydrograph, peak discharge, flood wave propagation time, etc.), ...
  92. [92]
    Probabilistic Analysis of Floods from Tailings Dam Failures - MDPI
    Aug 8, 2023 · This article explores the sensibility of tailings dam breach flood mapping to rheological parameters in Bingham and Herschel-Bulkley (HB) models.
  93. [93]
    Tailings Mobilization Estimates for Dam Breach Studies
    Tailings mobilization can be estimated as a function of the stored water volume and the physical characteristics of the tailings deposit.
  94. [94]
    [PDF] Appendix 23-A Tailings Dam Breach Analysis - Canada.ca
    Jun 16, 2017 · The flood wave would propagate downstream causing erosion and inundating the downstream receiving environment, with consequences potentially ...
  95. [95]
    Differences between water-retention dams and tailing dams
    Water dams have been known to fail with catastrophic consequences but in the last 40 years, failures have become very rare, whereas tailings dams have ...
  96. [96]
    [PDF] A Procedure for Estimating Loss of Life Caused by Dam Failure DSO ...
    About. 2,000 people died as a result of this event, with about. 1,269 of these occurring in Longarone where the fatality rate was about 94%. At Belluno, about ...
  97. [97]
    [PDF] RCEM – Reclamation Consequence Estimating Methodology
    The failure of Reclamation's Teton Dam in 1976 and other dam failures in the 1970s brought about within the United States a renewed awareness of risks posed ...
  98. [98]
    [PDF] Assessing the Consequences of a Dam Failure, FEMA, 2012
    Federal Guidelines for Inundation Mapping of Flood Risks Associated with Dam. Incidents and Failures: Guidance for State Regulators. Washington, DC. FEMA ...
  99. [99]
    Teton Dam Rexburg, Idaho | Salt Lake City
    The primary cause of the Teton Dam collapse can be traced back to poor geological assessment and engineering design flaws. The dam was constructed on porous ...Missing: error | Show results with:error<|separator|>
  100. [100]
    Dam Collapse - Idaho Office of Emergency Management
    May 20, 2019 · The Teton Dam collapsed at 11:57 a.m. on June 5, 1976, after seeps and a rapid leak, due to fractured rock and cracking sediment.
  101. [101]
    Oroville Spillways Construction and Cost Estimate Update
    Sep 5, 2018 · The current estimate for emergency response and reconstruction of the main and emergency spillways is $1.1 billion.
  102. [102]
    Feds reimburse California for Oroville Dam repairs, but expensive ...
    Feb 24, 2020 · The federal government has reversed itself and agreed to reimburse California for most of the $1.1 billion it cost to repair Oroville Dam after its spillways ...Missing: incident | Show results with:incident
  103. [103]
    Vale dam disaster: $7bn compensation for disaster victims - BBC
    Feb 4, 2021 · Communities hit by a dam disaster in Brazil two years ago which killed 270 people will get a $7bn (£5bn) payout. The Brumadinho dam contained ...
  104. [104]
    Economic and financial consequences of process accidents in Brazil
    The accident had a significant impact on the environment and economy throughout the Doce River Basin, resulting in a loss of US$5.28 billion. The Brumadinho ...
  105. [105]
    [PDF] Economic Consequences Methodology for Dam Failure Scenarios
    According to the P&Gs, the loss of any future benefits is actually a cost of the dam failure.
  106. [106]
    [PDF] Teton Basin Project History - Bureau of Reclamation
    Eleven lives were attributed to the tragedy.2 The dam failure cost millions of dollars in damages, and led to increased attention placed on dam safety by.Missing: infrastructure | Show results with:infrastructure
  107. [107]
    None
    ### Summary of Content on Human Life Loss, Evacuation Modeling, and Challenges in Evacuation During Dam Incidents
  108. [108]
    Sediments | US EPA
    Feb 7, 2025 · Furthermore, dam failures and intentional releases of water from dams can release sediments and suspended, fine organic particles such as ...
  109. [109]
    Impacts of sedimentation and dam failure on the macroinvertebrate ...
    This article assessed the effects of sedimentation and dam failure on the aquatic macroinvertebrate community in a tropical streamMissing: habitat | Show results with:habitat
  110. [110]
    The environmental impacts of one of the largest tailing dam failures ...
    Sep 6, 2017 · Heavy rain episodes will likely cause enhanced erosion, remobilization, and transport of contaminated particles, sustaining high inputs of SPM ...
  111. [111]
    Water quality impacts and river system recovery following the 2014 ...
    Water quality impacts were low, with Cu and V as the main concerns. Swift removal of tailings limited chemical impacts, but Cu mobilization still occurred.
  112. [112]
    Environmental impact assessment of dam-break floods considering ...
    Sep 1, 2022 · This study summarized the complex impacts of dam-break floods on the environment from four aspects and proposed a method to quantify the overall impact.
  113. [113]
    Lessons from Catastrophic Dam Failures in August 1975 in ...
    Jun 20, 2012 · The causes and mechanisms of the principal failures are discussed, as well as the influence of an upstream dam failure on the downstream dams.
  114. [114]
    Lessons from Catastrophic Dam Failures in August 1975 in ...
    The breaching of these dams caused an inundated area of 12,000 km², a death toll of over 26,000, and economic loss of more than RMB10 billion. This paper ...
  115. [115]
    The Banqiao Dam Disaster's Fatal Engineering Flaws
    Aug 15, 2022 · The Fatal Engineering Flaws Behind the Deadliest Dam Failure in History ... The disaster was covered up by government officials for decades, ...
  116. [116]
    1975- Super Typhoon Nina - Hurricanes: Science and Society
    When the dams were first constructed, cracks and separations appeared. · The Banqiao Dam was built to resist a 1000-year flood, estimated to be 300 mm (11.8 in) ...Missing: flaws | Show results with:flaws
  117. [117]
    [PDF] Typhoon Nina and the August 1975 Flood over Central China
    The devastating consequences of the August 1975 flood are closely linked to the cascading failures of dams, including two large dams, Banqiao and Shimantan, and ...
  118. [118]
    The Hidden Risks Behind the World's Water and Waste Reservoirs
    Aug 5, 2025 · From Libya to Brazil, and Ukraine to the US, dam failures – due to poor maintenance, extreme weather or conflict – have caused catastrophic loss ...
  119. [119]
    Banqiao Dam Failure: Series of Events - courses.bowdoin.edu
    The typhoon continued its course into mainland China, where it stalled over the province of Henan on August 5th after hitting a cold front (Si, Dam Failure).
  120. [120]
    The 'Iron Dam' that became China's deadliest secret
    Jul 6, 2025 · The Banqiao Dam collapse, caused by heavy rain, was a preventable disaster that killed up to 230,000 people, and was the deadliest structural  ...Missing: credible | Show results with:credible
  121. [121]
    [PDF] A NEW METHOD FOR DAM FAILURE POTENTIAL EVALUATION ...
    After that, 61 dams downstream continued to fail. The flood inundated 17.8 million acres of farmland in 30 cities, resulting in the collapse of 6.8 million ...
  122. [122]
    [PDF] fta analysis of banqiao dam failure - AWS
    Aug 29, 2023 · The Banqiao Dam failure (1975, province of Henan, China) is considered one of the deadliest and most catastrophic dam failures in history [1].<|separator|>
  123. [123]
    [PDF] Teton Dam History and Facts - Bureau of Reclamation
    Jun 5, 1976 · Teton Dam failed June 5, 1976, releasing over 230,000 acre-feet of water. • Eleven deaths resulted from the disaster and about $400 million in ...
  124. [124]
    [PDF] INDEPENDENT FORENSIC TEAM REPORT OROVILLE DAM ...
    Jan 5, 2018 · The particularly. The Oroville Dam spillway incident was caused by a long-term systemic failure of the. California Department of Water Resources ...Missing: neglect | Show results with:neglect
  125. [125]
    [PDF] 2017 FEBRUARY OROVILLE SPILLWAY INCIDENT After Action ...
    Feb 7, 2017 · On February 11, 2017, with flows on the flood control spillway reduced to mitigate further damage to the spillway, water began to flow over the.Missing: "forensic | Show results with:"forensic
  126. [126]
    Researchers Identify Factor Behind 2017 Oroville Dam Spillways ...
    Jul 22, 2020 · In a February 2017 incident, failures in the spillways of Oroville Dam forced the evacuation of 188,000 people and caused $1 billion in damage ...
  127. [127]
    [PDF] Forensic Review Team for Oroville Dam Spillway
    Mar 20, 2017 · Preparing and submitting the forensic analysis report. The analysis should discuss the root cause of the spillway incident, as well as any other.Missing: "forensic | Show results with:"forensic
  128. [128]
    Oroville Dam repair cost over $1 billion, California says
    Sep 5, 2018 · So far Mellon said FEMA agreed to pay 75 percent of the $116 million in costs submitted by the state. That figure hasn't changed since January.Missing: consequences | Show results with:consequences
  129. [129]
    Oroville Dam Service Spillway
    Following the Oroville Dam spillway incident of February 2017 ... January 10, 2018 – Letter from FERC regarding Forensic Report and Plan of Action for Oroville ...Missing: timeline | Show results with:timeline
  130. [130]
    Modelling the Brumadinho tailings dam failure, the subsequent loss ...
    Jan 7, 2021 · The Brumadinho dam failure released a mudflow, killing 270-320 people. Modeling suggests fatalities could have been reduced with a warning.
  131. [131]
    BRUMADINHO ENGINEERING HISTORY
    Jan 25, 2019 · The expert panel report released December 12, 2019 confirms that static liquefaction occurred at the crest and was the cause of failure of the ...Dam 1 Design A Major Cause... · Static Liquefaction Likely... · 2010 And 2013 Consideration...
  132. [132]
    The slip surface mechanism of delayed failure of the Brumadinho ...
    Jan 16, 2024 · Here we propose a basic physical mechanism of a delayed slip surface growth along weak layers of fine tailings within the dam body.
  133. [133]
    Brumadinho dam collapse: The danger emerged after ... - ETH Zürich
    Jan 15, 2024 · In 2019, the tailings dam at a Brazilian iron ore mine failed. The mudslide caused a catastrophe for people and the environment.
  134. [134]
    The 2019 Brumadinho tailings dam collapse: Possible cause and ...
    The death toll stood at 259 and 11 people remained missing as of January 2020. This tragedy occurred three years after Mariana's tailings dam rupture – the most ...Missing: damage | Show results with:damage
  135. [135]
    Brumadinho - Vale
    The dam collapse resulted in 270 fatalities, including two pregnant women, with two victims still missing. We continue to engage with the families and support ...
  136. [136]
    [PDF] General Design and Construction Considerations for Earth and ...
    Jul 30, 2004 · Purpose. This manual presents fundamental principles underlying the design and construction of earth and rock-fill dams.
  137. [137]
    [PDF] Gravity Dam Design - USACE Publications
    Jun 30, 1995 · The purpose of this manual is to provide technical criteria and guidance for the planning and design of concrete gravity dams for civil works ...
  138. [138]
    [PDF] Federal Guidelines for Dam Safety, Earthquake Analyses and ...
    The guidelines encourage strict safety standards for federal dam management, and cover earthquake analysis and design, including concepts like MCE, MDE, and ...
  139. [139]
    Dam Safety and Inspections | Federal Energy Regulatory Commission
    Before projects are constructed, the Commission staff reviews and approves the designs, plans, and specifications of dams, powerhouses, and other structures.Sanford, Secord and... · Dam Safety Performance... · Meetings, Workshops and...
  140. [140]
    [PDF] RIDM Guidelines Chapter 4 Risk Management Ver 4.1
    Mar 1, 2016 · The five classes depict the range of dams from those critically near failure to those considered to have very low risk and meet all. FERC ...
  141. [141]
    [PDF] ER 1110-2-1156 Safety of Dams - Policy and Procedures
    Jan 29, 2020 · This document outlines the policy and procedures for the safety of dams, including the Dam Safety Program, risk framework, and risk management.
  142. [142]
    USACE Dam Safety Program - Army Corps of Engineers
    Dec 13, 2021 · Risk analysis and risk assessment, like many modern dam safety practices, began with the failure of Teton Dam in June of 1976. The resulting ...
  143. [143]
    icold cigb
    The world's best databasis on dams, established upon the national inventories sent by the member countries of ICOLD. The Register is continuously updated.World Register of Dams · Publications · Icold · Definition
  144. [144]
    [PDF] CHAPTER IX INSTRUMENTATION AND MONITORING
    Chapter IX covers instrumentation and monitoring, including an introduction, philosophy, and types of instrumentation such as water level and pressure.
  145. [145]
    [PDF] CHAPTER 14 DAM SAFETY PERFORMANCE MONITORING ...
    • Procedures to integrate inspection findings into maintenance schedules or initiate responses or actions if a moderate or serious condition is found ...
  146. [146]
    [PDF] Dam Safety: An Owner's Guidance Manual pdf
    INSPECTION GUIDELINES. An effective inspection program is essential to identify problems and to provide for safe maintenance of a dam. The inspection program ...Missing: protocols | Show results with:protocols
  147. [147]
    FERC Finalizes Dam Safety Regulations
    Dec 16, 2021 · FERC today finalized updates to its hydropower project safety regulations. These updates promote continued safe operation, maintenance and repair of projects.
  148. [148]
    [PDF] GENERAL PRINCIPLES AND FRAMEWORK FOR DAM SAFETY
    Feb 14, 2020 · This bulletin summarizes dam safety concepts, principles, and activities, providing a framework for all phases of a dam's life, including ...
  149. [149]
    Emergency Action Planning - Association of State Dam Safety Officials
    An Emergency Action Plan (EAP) is a written document that identifies incidents that can lead to potential emergency conditions at a dam.
  150. [150]
    Emergency Action Plan (EAP) Program | Federal Energy Regulatory ...
    The EAP program provides guidelines for preparing emergency action plans, with revisions to include notification flowcharts and inundation maps.
  151. [151]
    Dam Safety Federal Guidelines | FEMA.gov
    Aug 6, 2025 · Guidelines for implementing risk-informed decision making in a dam safety program (2015). Emergency Action Planning for Dam Owners (FEMA P-64)
  152. [152]
    [PDF] DEPARTMENT OF THE ARMY *EC 1110-2-6075 U.S. Army Corps of E
    Oct 1, 2020 · 11. Emergency Action Plan Requirements. EAPs are required to be developed by USACE for all USACE operated or maintained dams and levees, ...
  153. [153]
    [PDF] fema-64.pdf - Federal Energy Regulatory Commission
    The general purpose of these guidelines is to encourage thorough and consistent emergency action planning to help save lives and reduce property damage in areas ...
  154. [154]
    [PDF] GUIDANCE FOR EMERGENCY ACTION PLANS, INCIDENT ...
    Jan 31, 2018 · U.S. Army Corps of Engineers Emergency Action Plan Map Repository When EAP maps are produced locally, districts must provide a copy of ...
  155. [155]
    [PDF] Emergency Action Plans for Dam Owners
    An EAP is a formal document identifying emergency conditions at a dam, specifying actions to minimize loss of life and property damage, including actions,  ...
  156. [156]
    Dam Safety Planning | California Governor's Office of Emergency ...
    The Dam Safety Planning Unit reviews and approves dam owners' Emergency Action Plans (EAPs), required by Government Code section 8589.5.
  157. [157]
    How Dam Warning Systems Help to Protect Human Lives
    Aug 5, 2020 · First, such systems for water reservoirs must be comprised of three components: monitoring, warning, and notification. The most essential ...
  158. [158]
    Dam Failure Lesson Learned: Early Warning Systems can provide ...
    Early Warning Systems (EWS) allow owners and emergency response teams to provide advanced warning prior to flooding or to identify incidents that are ...
  159. [159]
    [PDF] EP 1110-2-17, A Guide to Public Alerts and Warnings for Dam and ...
    Jun 20, 2019 · Chapter 8: Having an Effective Alert/Warning System ......A-30. EP ... Emergency Alert (WEA) message for a dam breach at Threat Level I.
  160. [160]
    [PDF] Dam Safety Warning Signs Best Practices - AWS
    The Federal Emergency Management Agency's (FEMA) Dam Safety Warning Signs Best Practices is a compilation of existing leading practices from industry ...
  161. [161]
    Effectiveness of a Dam-Breach Flood Alert in Mitigating Life Losses
    Early warning systems have great potential for risk mitigation, with a minimum of four hours before the event being desirable, especially with high population ...
  162. [162]
    Analysis of flood warning and evacuation efficiency by ... - NHESS
    Sep 25, 2023 · This work evaluates the use of flood damage and life-loss models in floods caused by tailings dams through the application of these models in the real case of ...
  163. [163]
    [PDF] EMG 02-01, Emergency Action Planning for Water Impoundment ...
    Feb 19, 2024 · EMG 02-01 aims to enhance emergency management for water impoundment structures, reduce flood risks, and ensure preparedness and response ...<|separator|>
  164. [164]
    [PDF] EMERGENCY WARNING SYSTEM
    This paper presents the Emergency warning system focused on alerting inhabitants at downstream valley of the dam in case of rapid floods during dam failure or ...
  165. [165]
    Dam Safety Program | Federal Energy Regulatory Commission
    The Commission has the largest dam safety program in the United States. The Commission cooperates with a large number of federal and state agencies to ensure ...
  166. [166]
    Roadmap to Reducing Dam Safety Risks
    Aug 7, 2025 · State dam safety programs oversee the classification, permitting, and inspection of dams, provide enforcement, oversee remediation of deficient ...
  167. [167]
    [PDF] Dam Safety and Hydro Asset Management: Capacity building in Asia
    Nevertheless, the Ministry of Water. Resources (MWR) is responsible for the safety of most of the dams in China. Dam safety is supported by a comprehensive ...Missing: US | Show results with:US<|separator|>
  168. [168]
    Regulatory frameworks for dam safety : a comparative study (English)
    This study is a comparative assessment of the regulatory frameworks applicable to dam safety in 22 countries. It is divided into three parts.Missing: agencies | Show results with:agencies
  169. [169]
    [PDF] Federal Guidelines for Dam Safety - ASDSO Lessons Learned
    Dam Safety is a shared responsibility. Many entities have a role to play in creating a future where all dams are safer – including dam owners, engineers, ...
  170. [170]
    Ownership Responsibility and Liability
    The concept of strict liability imposes liability on a dam owner for damages that occur regardless of the cause of failure.
  171. [171]
    [PDF] LEGAL LIABILITY FOR DAM FAILURES
    Governmental bodies may suffer direct losses, as well as relief and recovery obligations. Environmental damage may be severe. Clean-up and recovery efforts ...
  172. [172]
    Dam Safety Overview and the Federal Role | Congress.gov
    Apr 13, 2023 · Although some dams were built before 1900s (e.g., ~2,300 of the dams ... Between 2000 and 2020, states reported 270 failures and 581 non-failure ...
  173. [173]
    [PDF] Governmental and Private Liability for Flooding
    Nov 10, 2011 · In an action brought under the Federal Tort Claims Act, the district court held the United States liable for flood damage during Hurricane ...
  174. [174]
    Edenville and Sanford Dam Failure Litigation - Cohen Milstein
    Flood victims can press forward with litigation against Michigan over the collapse of a hydroelectric dam, a claims court judge ruled Monday, finding that ...Missing: examples | Show results with:examples
  175. [175]
    [PDF] Dam Awareness | FEMA
    Neglected maintenance and deterioration can leave a dam vulnerable to several failure modes: • Missing riprap can leave areas of an embankment unprotected and ...
  176. [176]
    In an Era of Extreme Weather, Concerns Grow Over Dam Safety
    Jul 9, 2019 · The Oroville incident forced the evacuation of nearly 190,000 people and cost the state $1.1 billion in repairs. It took its place as a seminal ...
  177. [177]
    [PDF] Chapter 10: Reducing the Consequences of Dam Failure
    Liabilities that arise following a dam failure strongly affect both organizations and people, governments and dam owners. Determination of liability is the ...
  178. [178]
    Legal Liability for Dam Failure or Accidents: An In-Depth Examination
    Jul 14, 2024 · Liability can be grounded in negligence, where responsible parties failed to exercise reasonable care in dam design, maintenance, or operation.
  179. [179]
    [PDF] Dam Safety and Dams Hazards - DiVA portal
    Jun 18, 2020 · Table 1: ICOLD large dams classification criteria for dams >10 m in height [3]. Criterion. Requirement. Length of crest. > 500 m. Volume of ...
  180. [180]
    [PDF] Operational Manual - OP 4.37 - Safety of Dams - The World Bank
    Mar 5, 2014 · The Bank may accept previous assessments of dam safety or recommendations of improvements needed in the existing dam or DUC if the borrower ...
  181. [181]
    Good Practice Note on Dam Safety: New Guidance on Managing ...
    Apr 27, 2021 · The World Bank's Environmental and Social Framework (ESF) contains specific provisions on dam safety, which are intended to address safety and ...
  182. [182]
    dam safety risk assessment for transboundary river basins
    Oct 6, 2024 · Currently, more than 126 of these shared river basins have dams that have some potential for cascade failure. Water use and its governance has ...
  183. [183]
    [PDF] Everything you need to know about the UN Watercourses Convention
    In 1997, more than one hundred nations joined together to adopt the United. Nations Convention on the Law of the Non-Navigational Uses of International.
  184. [184]
    [PDF] convention on the protection and use - UNECE
    For the purposes of this Convention,. 1. "Transboundary waters" means any surface or ground waters which mark, cross or are located on boundaries between two ...
  185. [185]
    Convention on the Protection and Use of Transboundary - UNTC
    The Convention was opened for signature at Helsinki from 17 to 18 March 1992 and was open for signature at United Nations Headquarters in New York until 18 ...
  186. [186]
    Water cooperation lags, weakening resilience to floods and droughts
    Oct 1, 2024 · However, today only 14% have adopted a concrete strategy to face this challenge, and just 20% have adopted a joint strategy for disaster risk ...Missing: failure | Show results with:failure
  187. [187]
    [PDF] Transboundary flood risk management - UNECE
    Risks originating from floods, dam failures and ice hazards may be reduced by: • Free and unrestricted provision and transfer of meteorological and ...
  188. [188]
    What do international conventions, rules and laws say about dams?
    States are required under Article 5 to use international watercourses in a way that respects other states' rights. One could argue that this commitment has been ...
  189. [189]
    Dam Safety Resources for Dam Owners
    Liability Insurance - Dam owners need liability insurance to protect themselves from financial loss in the even of a dam failure.
  190. [190]
    Section 247: Maintaining and Enhancing Hydroelectricity Incentives ...
    Sep 5, 2024 · The President's Bipartisan Infrastructure Law invests $553.6 million to maintain and enhance existing hydroelectric facilities to ensure ...
  191. [191]
    America's Aging Dams and Other Infrastructure is an Urgent ...
    Feb 12, 2025 · Of course, harms arising from dam failures extend beyond the Southeast and can result in substantial liabilities and insurance claims. In Hawaii ...
  192. [192]
    [PDF] The Cost of Rehabilitating Dams in the U.S. - AWS
    Based on the study detailed in this report, ASDSO estimates the cost to rehabilitate the nation's non-federal dams at $157.5 billion with $34.1 billion of that ...
  193. [193]
    Vale Mining Company to Pay $7 Billion in Compensation for Brazil ...
    Feb 4, 2021 · Vale Mining Company to Pay $7 Billion in Compensation for Brazil Dam Collapse. The disaster in the city of Brumadinho killed 270 people, and 11 ...Missing: economic | Show results with:economic
  194. [194]
    (PDF) Risk of dam failure in benefit-cost analysis - ResearchGate
    Aug 6, 2025 · A procedure is presented for calculating the costs of failure of a dam and for incorporating these risk costs into the evaluation process.
  195. [195]
    Comprehensive decision-making approach for managing time ...
    Existing initiatives in the field of dam safety management can however benefit from a comprehensive and quantitative approach based on Cost-Benefit Analysis.
  196. [196]
    Dam Rehabilitation Funding - Association of State Dam Safety Officials
    Some States offer assistance funding (loans or grants) to dam owners. Click on the US Map to find contact information for your state's dam safety office.
  197. [197]
    Climate change is increasing stress on thousands of aging dams ...
    Jul 13, 2023 · The average dam age is 57 years, and more than 8,000 dams are over 90 years old.
  198. [198]
    Ageing Dams Pose Growing Threat | United Nations University
    Jan 22, 2021 · By the numbers ; General · 50 to 100 years: design life of dams constructed between 1930 and 1970 (when most existing large dams were built).
  199. [199]
  200. [200]
    [PDF] Technical Problems of Ageing Concrete Dams - DiVA portal
    May 30, 2020 · Surface deterioration and loss of material may be caused by freezing and thawing (F/T) of concrete which leads to a reduced cross section of ...
  201. [201]
    [PDF] The Aging of Embankment Dams
    The aging of dams, constructed of earth and rockfill material, as defined herein is due to time-related changes in the properties of the materials of which the ...
  202. [202]
    [PDF] Effects of Concrete Deterioration on Safety of Dams
    This could expose the embankment materials to outlet flow, leading to undetected erosion that could progress to the reservoir and fail the dam. Backward.
  203. [203]
    [PDF] Technical Manual: Conduits through Embankment Dams
    Deteriorating conduits pose an increasingly greater risk for developing defects that can lead to embankment dam failure with each passing year. In an effort to ...Missing: progressive | Show results with:progressive
  204. [204]
    Age, climate and economic disparities drive the current state of ...
    Mar 7, 2025 · This study revisits dam failures worldwide since 1900, analysing key factors driving the failure risk, profiling current dam safety and providing an outlook to ...
  205. [205]
    Problems of Aging Dams: Global Challenges & Solutions
    Aging dams commonly face structural integrity issues such as concrete fatigue, deterioration, steel corrosion, seepage, and internal erosion.
  206. [206]
    Aging Smaller Dams Could Pose Problems for America's Communities
    Jul 24, 2025 · When watershed dams were built, the risk of failure was considered low because any damage would mostly affect unpopulated or undeveloped areas.
  207. [207]
    Dangerous dams: Where are the six most at risk of failing in the U.S.?
    Jul 21, 2025 · Of the 33 dams studied, 31 were classified “high hazard” by the Federal Emergency Management Agency (FEMA), meaning their failure could result ...
  208. [208]
    The World's Dams Are Filling Up — But Not With Water - The Revelator
    Mar 15, 2023 · The Problem. One of the most significant problems from sedimentation, as the study points out, is the loss of storage capacity for water supply ...
  209. [209]
    Increasing dam failure risk in the USA due to compound rainfall ...
    Oct 10, 2024 · With over 90,000 aging dams still in service, the increasing likelihood of intense rainfall sequences raises concerns about future dam failures.
  210. [210]
    Review article: Climate change impacts on dam safety - NHESS
    This article presents a comprehensive and multidisciplinary review of the impacts of climate change that could affect dam safety.
  211. [211]
    (PDF) Increasing risk of dam failures in the United States due to ...
    Feb 12, 2024 · A changing climate, with intensifying precipitation may contribute to increasing failures of dams by overtopping. We present the first analysis ...
  212. [212]
    Historical changes in overtopping probability of dams in the United ...
    Jul 21, 2025 · We analyzed 33 dams across the United States to investigate temporal trends in dam overtopping probabilities of annual maximum dam water levels.
  213. [213]
    Full article: Climate change and hydrological dam safety
    Climate change will likely increase the frequency and magnitude of extreme precipitation events and floods, increasing design peak flows that could lead to ...
  214. [214]
    The impact of climate change on dam overtopping flood risk
    Jan 9, 2025 · We found that increases in rainfall depth had the largest impact on increasing dam overtopping flood risk for all 18 dams under climate change.
  215. [215]
    Full article: 'Literature review on the analysis of climate change risks ...
    An increase in water flow due to climate change can increase sedimentation and erosion, threatening the dam lifespan and amplifying flood risk and dam breaches ...
  216. [216]
    Climate-resilience of dams and levees in Canada: a review
    Mar 28, 2024 · Extreme water levels and velocities are just a few of the potential threats that could trigger failure of these structures.<|separator|>
  217. [217]
    Quantification of climate change impact on dam failure risk ... - NHESS
    This article presents a comprehensive quantitative assessment of the impacts of climate change on the safety of a Spanish dam under hydrological scenarios.
  218. [218]
    Assessment of the Impact of Climate Change on Dam Hydrological ...
    The results show that the peak outflows at the Eugui Dam will be lower in the future. Therefore, maximum reservoir water levels will not increase in the future.
  219. [219]
    Dam Warfare. Floods as weapons, from ancient times… | War Is Boring
    Jul 9, 2014 · The Mongols destroyed the medieval city of Gurjang in Central Asia by breaching a nearby dam—making an example of those who dared resist their ...
  220. [220]
    The Incredible Story Of The Dambusters Raid - Imperial War Museums
    Dambusters Raid 16-17 May 1943. An audacious bombing raid to destroy three dams in the Ruhr valley. The mission was codenamed Operation 'Chastise'
  221. [221]
    Five Military Takeaways from the Kakhovka Dam's Destruction
    Jun 8, 2023 · Turning land into water through intentional destruction of dikes was a tactic used several times during the Eighty Years' War in the Netherlands ...Missing: deliberate examples
  222. [222]
    The Kakhovka Dam Disaster: Responsibility and Consequences
    Jun 14, 2023 · In the early morning hours of June 6, an explosion destroyed the dam of the Kakhovka hydroelectric power station on the Dnipro river.
  223. [223]
    Kakhovka Dam destruction inflicted US$14 billion damage and loss ...
    Oct 17, 2023 · The Kakhovka dam breach caused massive damage, submerging 620 square kilometres of territory in four oblasts—Kherson, Mykolaiv, Dnipropetrovsk, ...
  224. [224]
    Key insights into the Nova Kakhovka dam destruction
    Jun 12, 2023 · While the Ukrainian government blamed Russia for blowing up the dam, Russia announced that Ukrainian shelling had damaged the dam to an extent ...Missing: attributions | Show results with:attributions
  225. [225]
    Throwback Attack: How The Bowman Avenue Dam Became The ...
    Aug 12, 2021 · The modest Bowman Avenue Dam in Rye Brook was targeted by seven Iranian hackers on behalf of the country's Revolutionary Guard Corps in a far-reaching ...
  226. [226]
    Russian hackers seized control of Norwegian dam, spy chief says
    Aug 15, 2025 · Russian hackers took control of a Norwegian dam this year, opening a floodgate and allowing water to flow unnoticed for four hours, Norway's ...
  227. [227]
    Norway spy chief blames Russian hackers for dam sabotage in April
    Aug 13, 2025 · Last September, Britain's spy chief accused Russia of waging a "staggeringly reckless campaign" of sabotage in Europe, partly to scare European ...
  228. [228]
    Lake Risevatnet dam hack exposes industrial cyber gaps as weak ...
    Jul 1, 2025 · “Attackers compromised a weak password and were able to manipulate valves at the Lake Risevatnet dam, opening them all the way, causing an ...
  229. [229]
    [PDF] Homeland Threat Assessment 2025
    (For more information on threats to the 2024 US election cycle, see page 10.) Page 10. 2. Homeland Threat Assessment 2025. Terrorism.
  230. [230]
  231. [231]
    [PDF] AN ACT ENHANCING ENVIRONMENTAL PERMITTING ...
    Mar 14, 2025 · Gara testified that water utilities frequently experience permit delays, hindering progress on dam repairs and development. These delays ...
  232. [232]
    [PDF] Lessons Learned - Experience with National Dam Safety Program to ...
    If requirements are minimal, they are less effective; if requirements are too stringent, they could exclude the states that need the most help.
  233. [233]
    Owners Dam Safety Program (ODSP)
    The Owners Dam Safety Program (ODSP) is the most important factor in maintaining safe dams and preventing dam failures.
  234. [234]
    The surge in hydroelectric dams is driving massive biodiversity loss
    May 24, 2024 · River fragmentation is a key reason migratory fish populations have declined by 81% since 1970, according to a new report by the Living Planet Index.
  235. [235]
    10 reasons why hydropower dams are a false climate solution
    Apr 6, 2022 · Dams are costly to build, difficult to maintain, and aren't climate-resilient or competitive against proven clean energy alternatives like solar ...
  236. [236]
    Dams are problem creators, not problem solvers - American Rivers
    Hydropower dams flood large areas, force people to relocate, threaten freshwater biodiversity, disrupt subsistence fisheries, and leave rivers dry – ...<|separator|>
  237. [237]
    Effects of dam construction on biodiversity: A review - ScienceDirect
    Recent studies have revealed that dam construction alters species distribution patterns and biodiversity and leads to severe degradation of riparian ...
  238. [238]
    Avian extinctions induced by the oldest Amazonian hydropower ...
    Aug 18, 2021 · The hydropower sector is one of the key drivers of human-induced biodiversity loss in Amazonia, damming rivers, transforming landscapes and ...
  239. [239]
    Habitat loss due to dam development may affect the distribution of ...
    Feb 5, 2020 · If all 38 dams are constructed, marine-associated fishes will lose approximately 17% of riverine habitats (7400 km) including 7% of the best ...<|separator|>
  240. [240]
    How Dams Affect Water and Habitat on the West Coast
    Oct 29, 2024 · Changing a habitat from a river to a lake can have many negative effects on fish. The presence of the dam may also change the way predators and prey interact.
  241. [241]
    Greenhouse Gas Emissions from Reservoir Water Surfaces: A New ...
    We estimate that GHG emissions from reservoir water surfaces account for 0.8 (0.5–1.2) Pg CO2 equivalents per year, with the majority of this forcing due to CH4 ...
  242. [242]
    Dam Accounting: Taking Stock of Methane Emissions From Reservoirs
    Apr 25, 2022 · “Hydroelectric reservoirs are a source of biogenic greenhouse gasses and in individual cases can reach the same emission rates as thermal power ...
  243. [243]
    Greenhouse gas emissions from reservoirs higher than previously ...
    Jun 1, 2021 · Greenhouse gas emissions from the world's water reservoirs are around 29% higher, per area, than suggested by previous studies, ...
  244. [244]
    Methane emissions from reservoirs are increasing | WSU Insider
    Sep 19, 2022 · The water collected behind dams will release greater amounts of methane, a greenhouse gas with even worse effects than carbon dioxide, according to a recent ...
  245. [245]
    Why dams fail: a systems perspective and case study - ResearchGate
    Sep 30, 2025 · Sedimentation, poor operational management especially delayed release of water, aging infrastructure and may be climate change have all combined ...
  246. [246]
    What Factors Contribute to Dam Failure? → Question
    May 2, 2025 · Dam failures stem from design flaws, material degradation, geological instability, extreme weather, and human management errors compounding ...
  247. [247]
    Statistical Analysis of Global Dam Accidents in the 21st Century
    Jun 11, 2025 · This study provides a comprehensive global analysis of dam failures in the 21st century, examining the characteristics, causes, and impacts of these incidents.Missing: casualties | Show results with:casualties
  248. [248]
    4 Hidden Causes of Dam Failures - National Geographic
    Oct 7, 2015 · 4 Hidden Causes of Dam Failures · 1. Changes in Land Use · 2. Changes in Weather Patterns · 3. Outdated Designs · 4. Lack of Maintenance and Funding.1. Changes In Land Use · 2. Changes In Weather... · 3. Outdated DesignsMissing: poor | Show results with:poor
  249. [249]
    On-Demand Webinar: Human Factors in Dam Failure and Safety
    These drivers of failure in turn result in various types of human errors (e.g., mistakes, slips, and lapses) and inadequate risk management (e.g., risk ...Missing: debate | Show results with:debate