Express Rail Link


The Express Rail Link (ERL) is an airport rail link system in connecting (KLIA) to via dedicated high-speed tracks. Operated by Express Rail Link Sdn Bhd, it comprises two services: the non-stop , which covers the 57 km distance in 28 minutes at speeds up to 160 km/h, and the , which includes intermediate stops for commuter access. Launched in 2002 with KLIA Ekspres commencing operations on 14 April and KLIA Transit on 1 June, the system was extended to serve KLIA Terminal 2 (klia2) starting 21 April 2014 to accommodate low-cost carriers. The infrastructure, built under a 30-year concession awarded in 1997, provides seamless rail connectivity, reducing road congestion and enhancing airport access reliability.

History

Origins and Planning

The Express Rail Link (ERL) originated as a dedicated airport rail connection to support the newly developed (KLIA), which commenced operations on 27 June 1998 to handle increasing international traffic and replace the capacity-limited Subang International Airport. The project was conceived in the mid-1990s as part of Malaysia's broader infrastructure push under the Vision 2020 initiative, aiming to integrate with urban transport hubs for efficient passenger movement. Planning emphasized a non-stop express service to minimize travel time from the city center, addressing projected demand for seamless airport access amid rapid economic growth and air travel expansion. On 25 August 1997, the Malaysian government awarded ERL Sdn Bhd a 30-year concession to finance, design, construct, operate, and maintain the rail link, including both the premium and the stopping services. This build-operate-transfer-style agreement placed full responsibility on the operator, reflecting a model to leverage expertise and capital for . The concession covered a 57 km dedicated standard-gauge line from KL Sentral—Kuala Lumpur's integrated transport —to KLIA's main terminal, with provisions for future extensions. ERL was established as a special-purpose vehicle jointly owned by Malaysian firms: (45%), Lembaga Tabung Haji (36%), SIPP Rail Sdn Bhd (10%), and Trisilco Equity Sdn Bhd (9%), enabling pooled resources for the estimated RM2.9 billion project cost. Early planning involved coordination with (KTMB) for track alignment and integration at KL Sentral with existing rail and systems, ensuring interoperability while prioritizing dedicated airport tracks to avoid congestion. Construction commenced in May 1997, achieving completion in under five years through accelerated execution, with key decisions favoring electric multiple units capable of 160-180 km/h commercial speeds and advanced signaling for reliability.

Construction and Financing

The Express Rail Link (ERL) project encompassed the development of a 57 km dedicated non-stop express rail line from KL Sentral to (KLIA), along with a transit service featuring intermediate stops. Construction was executed under an (EPC) contract awarded on May 3, 1999, to the SYZ Consortium, comprising AG for the train systems and SPYTL (a entity) for works. The project included the erection of 30 new bridges and upgrades to KL Sentral station, completed ahead of the line's opening. Work progressed rapidly, with construction in full swing by October 2000; electric multiple units (EMUs) underwent testing in starting March 2001, followed by deliveries to from September 2001 to May 2002. The initial fleet consisted of 12 four-car EMUs capable of reaching 162 km/h, supplied by with rails sourced from , catenary masts from , and equipment from . The line opened to passengers on April 14, 2002, less than two years after the EPC contract initiation, marking the completion of built to complement KLIA's 1998 operations previously served by slower KTM shuttles. Financing for the RM2.4 billion project followed a build-operate-transfer (BOT) model, granting Express Rail Link Sdn Bhd—a between and —a 30-year concession to , construct, operate, and maintain the . Key funding included a government initially amounting to RM940 million provided in late 1998, later expanded to RM4.08 billion by 2016 amid financial pressures. Additional financing came from Bank Pembangunan Malaysia Berhad, with RM704 million disbursed in 1999 and RM1.5 billion in 2003 to support construction and operations. The BOT structure placed financial risks on the private operator, leading to challenges such as servicing strains and requests for concession extensions, though it enabled rapid private-sector-led development without direct equity beyond loans.

Launch and Initial Operations

The service, operated by Express Rail Link Sdn Bhd (ERL), officially launched on 14 April 2002, establishing a non-stop rail connection between Kuala Lumpur Sentral station and (KLIA). The 57-kilometer dedicated track allowed trains to complete the journey in approximately 28 minutes at speeds up to 160 km/h. , the complementary stopping service, commenced operations on 1 June 2002, with scheduled halts at three intermediate stations: Salak Selatan, , and & . Initial train frequencies for were every 15 minutes during peak hours, reducing to 30 minutes off-peak, while operated at similar intervals but with extended travel times of about 35 minutes due to station stops. Early operations relied on a fleet of 8 four-car Desiro ET425M electric multiple units for , designed for high-capacity transfers with features like wide doors and luggage space. Services integrated with Malaysia's network at KL Sentral, facilitating onward connections, though initial ridership figures reflected modest uptake amid competition from and buses. No significant disruptions were reported in the opening phase, with ERL holding a 50-year concession to manage and operate the line.

Ownership and Organization

Corporate Structure

Express Rail Link Sdn. Bhd. (ERL) is a private limited company incorporated in Malaysia on April 14, 1998, under the Companies Act 1965, responsible for the operation and maintenance of the dedicated airport rail link between Kuala Lumpur International Airport (KLIA) and Kuala Lumpur Sentral station. ERL's shareholding is held by four primary entities: YTL Corporation Berhad with a 45% stake, Lembaga Tabung Haji (a government-linked investment arm for Muslim pilgrims) holding 36%, SIPP Rail Sdn. Bhd. owning 10%, and the remaining 9% distributed among minority shareholders. YTL Corporation, a diversified infrastructure conglomerate founded in 1955, provides strategic oversight as the largest shareholder, while Lembaga Tabung Haji's involvement aligns with national development priorities in transportation infrastructure. The structure reflects a public-private partnership model, with ERL operating under a 30-year concession granted in 1997 and extended in January 2024 to 2059, allowing market-driven fare adjustments post-2029 without government compensation for rejected hikes. Governance is led by a chaired by Tan Sri (Dr) Mohd Nadzmi bin Mohd Salleh, appointed as Executive Chairman on April 14, 1998, who oversees strategic decisions including fleet expansion and concession negotiations. The management team, reporting to the board, includes Mohammad Yusof Azami, who joined in August 2020 with over 15 years in and , focusing on and financial strategy. ERL maintains a corporate emphasizing , operations, and divisions to support its dual-service model of non-stop express () and intermediate stop () trains. A key subsidiary is ERL Maintenance Support Sdn. Bhd. (e-MAS), established for specialized and upkeep, with its own board including representatives from parent entities to ensure alignment with ERL's operational mandates. This structure enables ERL to manage assets valued in the billions of ringgit, including track, signaling, and trainsets sourced from and , under the extended concession framework.

Subsidiaries and Partnerships

ERL Maintenance Support Sdn Bhd (E-MAS) functions as the wholly-owned operations and maintenance of Express Rail Link Sdn Bhd, specializing in the upkeep of rail infrastructure, , and related systems to ensure service reliability. Express Rail Link Sdn Bhd was formed as a entity with principal ownership stakes held by (45%), Lembaga Tabung Haji (36%), and SIPP Rail Sdn Bhd (10%). Beyond its core ownership structure, ERL has pursued operational partnerships to enhance connectivity and passenger services, including a July 2025 extension of its with Meru Sdn Bhd— of VGI Airports services—to integrate digital assets for seamless . In November 2024, ERL entered a Memorandum of with Tourism to promote rail-linked tourism initiatives. These arrangements build on ERL's recognition for air-rail integration efforts, as evidenced by awards from the Global AirRail .

Operations

Services and Routes

The Express Rail Link (ERL) operates two distinct rail services connecting to Kuala Lumpur International Airport's Terminal 1 (KLIA T1) and Terminal 2 (KLIA T2): the , a non-stop express service optimized for airport transfers, and the , a commuter-oriented service with intermediate stops. Both services utilize a dedicated 57-kilometer electrified standard-gauge line branching from the Klang Valley's broader rail network, with operations commencing daily from approximately 5:00 AM to midnight, subject to adjustments for peak demand or events. The KLIA Ekspres provides direct connectivity, departing KL Sentral and traveling nonstop to KLIA T1 in 28 minutes, followed by a 3-minute extension to KLIA T2, bypassing intermediate stations to prioritize speed and efficiency for passengers with luggage or tight schedules. Trains operate at frequencies of every 20 minutes throughout the day under standard conditions, with reductions to 15 minutes during peak hours (typically 6:00–9:00 AM and 4:00–8:00 PM) or high-demand periods such as international summits. In contrast, the KLIA Transit serves local commuters by halting at all stations along the route, extending the total journey from KLIA T2 to KL Sentral to 39 minutes and facilitating access to suburban areas. It stops at (interchange with and lines), & (serving government and tech hubs), and (near industrial zones), in addition to the endpoints. Frequencies align closely with the Ekspres at every 20–30 minutes, increasing to 15 minutes during peaks to accommodate higher commuter volumes.
ServiceStops ServedTypical Travel Time (KL Sentral to KLIA T2)Standard Frequency
KLIA EkspresKL Sentral → → KLIA T2 (non-stop between KL Sentral and terminals)31 minutesEvery 20 minutes
KLIA TransitKL Sentral → → KLIA T1 → KLIA T239 minutesEvery 20–30 minutes
Services run in both directions, with integrated ticketing available for seamless transfers at KL Sentral to other rail networks, though ERL maintains separate fares from KTM or systems.

Stations and Infrastructure

The Express Rail Link (ERL) operates on a dedicated 57 km line, primarily consisting of elevated viaducts and at-grade sections, connecting to (KLIA). The infrastructure supports two services: the non-stop , which covers the full route to KLIA Terminal 1 in 28 minutes, and the , which serves intermediate stops en route to both terminals, with a 3-minute extension between KLIA Terminal 1 and Terminal 2 (klia2). The line includes modern signaling and systems integrated for high reliability, with maintenance facilities centered at the depot. The ERL network features six stations: KL Sentral (the city terminus and main interchange hub), Bandar Tasik Selatan, Putrajaya & Cyberjaya, , KLIA Terminal 1, and KLIA Terminal 2. KL Sentral station integrates with , ETS intercity trains, , LRT, and lines, facilitating seamless transfers for passengers. Bandar Tasik Selatan serves as a key interchange with the and KTM Seremban Line, located in a densely populated area south of central . Putrajaya & Cyberjaya station provides access to government offices in and the tech hub, with pedestrian links to local bus services. , situated in , primarily handles KLIA Transit passengers and houses the primary maintenance depot in Bandar Baru Salak Tinggi, used for train servicing, storage, and unveiling of new rolling stock such as the EMUs. The airport stations at KLIA Terminal 1 and Terminal 2 are located on Level 1 of their respective buildings, with the latter connected via a covered to the terminal's main facilities. All stations are equipped with passenger amenities including escalators, elevators for platform access, restrooms, prayer rooms (), and dedicated facilities for persons with disabilities such as ramps and tactile guidance paths. Ticketing counters, automated vending machines, and intermodal services for select airlines are available at major stations like KL Sentral and the airport terminals. The Salak Tinggi depot supports comprehensive maintenance operations, including periodic inspections and fleet overhauls, ensuring operational uptime for the ERL's electric multiple units. Infrastructure resilience is enhanced by dedicated tracks avoiding freight interference, with the entire line designed for speeds up to 160 km/h on the express service.

Timetables, Fares, and Passenger Experience

The KLIA Ekspres provides a non-stop service between KLIA (both terminals) and KL Sentral, with trains departing every 15 minutes during weekday peak hours (typically 6:00 AM to 9:00 AM and 5:00 PM to 8:00 PM) and every 20 minutes off-peak, operating from the first train at 5:00 AM to the last at 12:40 AM daily. Journey time is consistently 28 minutes, covering 57 km at speeds up to 160 km/h. The service, which includes stops at , Salak Selatan, and , runs every 30 minutes, with a total journey time of 39 minutes from KLIA Terminal 2 to KL Sentral. Schedules align closely between the two services for integrated operations, though frequencies may adjust slightly on weekends or holidays without prior notice. Fares for single journeys are RM55 for adults and RM25 for children aged 6-15 from KL Sentral to KLIA (or vice versa), with return tickets at RM85 for adults; children under 6 travel free. fares are lower at approximately RM35 for adults single journey to KL Sentral, reflecting the additional stops and shorter distances for intermediate users. Concession options include MyKad TravelCards for frequent commuters, offering bundled fares such as RM395 for 10 return trips on Transit, and periodic promotions like 50% off Transit returns during national holidays in 2025. Tickets are available via the official app, website, or stations, with no advance booking required for single trips due to ample capacity. Passengers report a generally positive experience characterized by high reliability, with Express Rail Link maintaining a 99.7% on-time performance record since operations began, minimizing delays compared to road alternatives prone to . Trains feature air-conditioned comfort, spacious seating for 362 passengers per set, wide gangways between coaches, and amenities like power outlets and luggage space, contributing to satisfaction ratings focused on and . Some users note the premium fare justifies the predictability and speed, though crowding can occur during peak travel periods without reserved seating guarantees. Overall, the service prioritizes efficiency for airport transfers, with over 90 million passengers served by 2025, underscoring its role in seamless connectivity.

Technical Specifications

Track and Electrification

The Express Rail Link (ERL) comprises a dedicated spanning approximately 57 km from Sentral to (KLIA), with an extension serving KLIA2 that extends the total operational route to 59 km. The employs a standard gauge of 1,435 mm, distinct from the metre-gauge network used by much of Malaysia's (KTM) system, enabling compatibility with international high-speed designs. The infrastructure features continuous welded rails on elevated viaducts for the majority of the alignment, designed to support maximum speeds of up to 160 km/h for express services while minimizing ground-level disruptions and land requirements. Passing loops are incorporated at intermediate stations to facilitate service operations without impeding Ekspres trains. is supplied via a 25 50 Hz AC overhead system along the entire route, providing consistent power for electric multiple units (EMUs) and supporting efficient and braking. This voltage aligns with international standards for mainline , ensuring potential and operational reliability in Malaysia's .

Signaling and Control Systems

The Express Rail Link (ERL) employs the ZSL90 automatic train protection (ATP) system for signaling, which enforces speed restrictions, automatic braking, and overspeed protection to maintain safe operations at speeds up to 160 km/h. This system, originally developed for railways, integrates trackside signals with onboard equipment to prevent incidents and ensure adherence to fixed block sections along the dedicated airport line. The central control center at KL Sentral utilizes electronic interlocking to manage route setting and point operations, providing continuous supervision of train movements across the 57 km dedicated track between KLIA and the city terminus. Communications between the control center, train drivers, and ground staff rely on a Motorola-provided radio , enabling command and coordination for both non-stop services and stops. Operational disruptions have occasionally highlighted system vulnerabilities, including a signaling failure at Bandar Tasik Selatan station on April 8, 2025, which suspended all services, compounded by prior cable thefts affecting power and signaling integrity. These incidents underscore the reliance on robust ATP enforcement but also the exposure of cabling infrastructure to external interference, with ERL confirming full restoration after targeted repairs.

Rolling Stock and Fleet Details

The Express Rail Link (ERL) fleet comprises 18 four-car (EMU) trainsets, serving both the non-stop and the stopping services between Kuala Lumpur Sentral and (KLIA). The original rolling stock consists of 12 ET 425 M EMUs delivered in 2002, with eight allocated to for higher-capacity, express operations and four to . These trains operate on 25 kV 50 Hz overhead electrification with a standard gauge of 1,435 mm, achieving a commercial top speed of 160 km/h. In November 2014, ERL awarded a contract to (formerly CNR Changchun) for six additional four-car EMUs, designated the EMU, to augment capacity and enable higher service frequencies. These entered revenue service progressively from March 2017, with two sets assigned to and four to . The EMUs feature enhanced specifications, including dual air compressors (versus one on the sets), more powerful traction motors for improved acceleration, 15% greater air-conditioning capacity, and a 50% increase in overall passenger accommodation through optimized interior layouts with expanded legroom. Each set provides 192 seats and maintains the 160 km/h operational speed. One set incorporates a culturally inspired textile-patterned exterior .
ServiceManufacturerModelSetsCars/SetIntroduction Year
KLIA EkspresSiemensDesiro ET 425 M842002
CRRC ChangchunEquator EMU242017
SiemensDesiro ET 425 M442002
CRRC ChangchunEquator EMU442017
The mixed fleet allows flexible operations, with Siemens sets handling peak express demands and units supporting transit stops while reducing maintenance intervals through advanced components. No full fleet replacement has been implemented as of October 2025, despite earlier plans for upgrades by that year. All units are maintained at the depot, ensuring high availability for the dedicated airport corridor.

Performance Metrics

The Express Rail Link (ERL) experienced peak annual ridership of 11.03 million passengers in 2015, driven by strong airport traffic and prior to fare adjustments. A fare hike implemented in 2016 led to a 19 percent decline in ridership from previous levels, reflecting sensitivity to pricing amid competition from alternative transport modes. By 2018, total passengers across and services stood at 8.6 million, with operators targeting a five percent increase the following year through promotional initiatives. The COVID-19 pandemic severely disrupted usage trends starting in 2020, as international and domestic travel restrictions aligned with Kuala Lumpur International Airport (KLIA) passenger volumes plummeting over 90 percent from 2019 peaks. Ridership rebounded gradually post-2022 alongside air traffic recovery, with KLIA handling 57.08 million passengers in 2024. Cumulative ERL passengers exceeded 113 million by mid-2023, rising to over 122 million by November 2024 and 130 million by May 2025, indicating annualized figures approaching or surpassing pre-pandemic norms amid sustained demand for non-stop airport links. Ongoing trends show KLIA Transit achieving daily peaks of around 13,000 passengers in 2025, supporting expectations of further growth tied to KLIA's expansion and recovery. Usage remains concentrated on express services for time-sensitive travelers, though stops contribute to broader commuter patterns during off-peak periods.

Reliability and On-Time Performance

The Express Rail Link (ERL) has maintained a self-reported on-time performance rate of 99.7% for both and services since their launch in April 2002. This figure, consistently cited in company profiles and operator statements, reflects the reliability enabled by dedicated high-speed tracks for the non-stop service, which operates at up to 160 km/h with frequencies of every 15-20 minutes. , with intermediate stops and shared infrastructure segments, benefits from the same operational framework but experiences marginally higher variability due to its route structure. Despite this benchmark, ERL services have faced occasional disruptions from external factors, notably and technical faults. In April 2025, multiple cable theft incidents between and KLIA, combined with a signalling system failure, caused significant delays and cancellations across both lines, affecting thousands of passengers during peak travel periods. Such events underscore vulnerabilities in perimeter , though ERL has responded by enhancing and protocols to preserve overall . No comprehensive independent audits contradicting the 99.7% claim were identified in up to October 2025.

Safety Record and Incidents

The Express Rail Link (ERL), comprising the and services, has maintained a generally strong operational safety record since commencing services in April 2002, with no fatalities among passengers and minimal reported collisions or derailments involving the public. Malaysian railway systems, including dedicated lines like the ERL, benefit from advanced protocols such as automatic train protection and regular , contributing to their classification as one of the safer modes of transport in the country compared to road travel. A notable non-passenger incident occurred on March 14, 2013, when a worker was killed and another seriously injured after being struck by a KLIA-bound ERL near the tracks, highlighting risks during trackside work despite procedures. Investigations attributed the event to the workers' proximity to the active line, prompting reviews of protocols by Express Rail Link Sdn Bhd. Service disruptions due to external factors, such as cable thefts, have occasionally impacted reliability but have not resulted in injuries or accidents. For instance, on April 8, 2025, multiple cable cuts—first at kilometer marker 48.5 between Salak Tinggi and KLIA stations, and later at kilometer 43.1 between Putrajaya/Cyberjaya and Salak Tinggi—caused delays of 7 to 10 minutes across services, attributed to vandalism rather than operational failures. A subsequent signalling system failure compounded the issue, but trains were halted safely, and operations resumed by evening without harm to passengers or staff. These events underscore vulnerabilities to theft in remote sections but demonstrate effective contingency measures to prevent escalation to safety breaches.

Economic and Strategic Impact

Contributions to Airport Connectivity

The Express Rail Link (ERL) bolsters airport connectivity by delivering a dedicated, non-stop rail service via the , spanning 57 km from (KLIA) to KL Sentral in approximately 28 minutes, with trains departing every 15 minutes during peak hours and every 20 minutes off-peak. This traffic-free alternative circumvents road congestion on routes like the KLIA , offering passengers a predictable and efficient link to the city center since its launch on 14 April 2002. At KL Sentral, the ERL integrates with Malaysia's broader transport infrastructure, including (KTM) intercity services, high-speed trains, LRT, , and lines, enabling onward connections to regional destinations without reliance on taxis or buses. augments this by halting at four intermediate stations—Salak Selatan, , , and —providing access to administrative centers, tech parks, and southern suburbs, thus extending airport reach beyond central . The system further unifies KLIA's two terminals through a three-minute inter-terminal on shared tracks, ensuring seamless transfers for passengers across low-cost and main hub operations at klia2 and KLIA1. Enhancements like self-check-in kiosks and bag-drop facilities at KL Sentral, introduced in , allow passengers to complete airport formalities in the city before boarding, reducing terminal dwell time and enhancing end-to-end efficiency. These features have earned the ERL multiple "AirRail Link of the Year" awards from the Global AirRail Awards in 2012, 2014, and 2015, underscoring its role in facilitating and via reliable airport access.

Cost-Benefit Analysis and Efficiency

The Express Rail Link (ERL) project, encompassing the and services, was constructed at a of RM2.4 billion, financed through a consortium including and supported by loans from institutions such as Bank Pembangunan Malaysia Berhad. This investment covered the 57 km dedicated track, stations, and initial , with operations commencing in 2002 to provide non-stop airport connectivity from Sentral. Early financial performance was challenged by accumulated losses totaling RM671.7 million by 2015, attributed to lower-than-expected ridership and rising operational expenses, prompting a fare adjustment for from RM35 to RM55 effective 2016 to ensure sustainability. Operational efficiency has been enhanced through fleet modernization and capacity optimizations, including the introduction of CRRC Changchun EMUs in 2020, which increased passenger capacity by approximately 20% per trainset while reducing maintenance downtime and operating expenditures. ERL reported a 40% reduction in costs via revised train scheduling and demand management post-2016, improving load factors during peak hours. Revenue streams, primarily from fares, reached RM43.35 million in FY2022, more than doubling from RM18.17 million in FY2021 amid post-pandemic recovery, though this remains modest relative to outstanding debts exceeding RM2.8 billion as of 2015. The government's extension of the concession to 2059, with provisions for market-based pricing from 2029, reflects an assessment that adjusted fares could yield positive net returns, balancing investor recovery against public access. Benefits accrue from time savings—KLIA Ekspres completes the 57 km journey in 28 minutes versus 60-90 minutes by road—quantifiable via reduced traveler opportunity costs and lower road congestion around the , supporting broader economic activity in and logistics. Pre-COVID ridership of 2.156 million passengers annually for in 2019 indicates a capture of demand, diverting traffic from highways and yielding environmental gains through lower emissions per passenger-kilometer compared to or buses. However, financial metrics suggest marginal profitability without subsidies or fare flexibility, with critics noting that initial projections underestimated competition from cheaper ground , leading to dependency on periodic adjustments for viability.
Fiscal YearRevenue (RM million)Key Factor
202118.17 restrictions
202243.35Recovery in
Overall, while direct cost-benefit ratios remain unpublished in independent audits, the system's persistence and upgrades imply that intangible gains in reliability and outweigh construction overruns for stakeholders, though sustained efficiency hinges on demand growth and cost controls.

Criticisms and Operational Challenges

The Express Rail Link (ERL) has faced significant operational disruptions due to repeated cable thefts and vandalism, particularly highlighted in April 2025 when multiple incidents severed signaling cables, halting KLIA Ekspres and KLIA Transit services for hours and causing widespread commuter delays of 7 to 10 minutes or more between stations like Salak Tinggi and KLIA Terminal 1. The first cut occurred at kilometer marker 48.5 on April 8, followed by another at kilometer 43.1 the same day, with ERL attributing the failures to malicious acts that compromised the signaling infrastructure essential for train operations. These events exposed vulnerabilities in perimeter security along the track, prompting criticisms of inadequate surveillance and response protocols by ERL's management under YTL Corporation, which has led to calls for enhanced preventive measures beyond reactive police interventions. Safety records include fatal incidents involving track workers and trespassers, such as a maintenance worker killed and another seriously injured in 2013 after being struck by a KLIA-bound at kilometer 9.2 near . A separate 2015 event saw an unidentified man decapitated by an ERL en route to Kuala Lumpur Sentral, underscoring risks from unauthorized access and insufficient barriers in operational zones. While passenger-facing accidents remain rare, these cases point to ongoing challenges in trackside safety protocols and coordination during , contributing to perceptions of systemic reliability gaps despite the system's dedicated right-of-way design. Project extensions have drawn for inefficiencies, with a National Audit Department review from 2023 identifying weaknesses in price negotiations that undermined value for money in expanding ERL services, potentially inflating costs without commensurate benefits in or . Broader operational critiques include intermittent signaling failures exacerbating , as seen in the 2025 disruptions where full service restoration lagged behind initial promises, affecting airport connectivity during peak travel periods. These issues reflect causal factors like exposed in semi-rural segments and resource constraints in , rather than inherent flaws, though they have fueled passenger complaints about dependability compared to road alternatives.

Expansions and Future Developments

Past Extensions

The Express Rail Link underwent its principal infrastructure extension in 2014 with the construction of a 2.1 spur line connecting to Terminal 2 (KLIA2), the dedicated facility. This branch diverged from the main line near the original KLIA Terminal 1, enabling seamless rail access for passengers at the new terminal. Services on the extended line commenced on May 2, 2014, coinciding with KLIA2's opening, allowing both non-stop trains and KLIA Transit trains with intermediate stops to serve the facility. The extension addressed the growing demand from budget airlines, which had previously operated from a separate (LCCT) without direct rail connectivity, requiring bus transfers. Integration of KLIA2 into the ERL network enhanced overall accessibility, with trains maintaining speeds up to 160 km/h on the upgraded . No further physical line extensions occurred prior to 2020, though operational enhancements, such as new trainsets, supported increased capacity on the existing route including the KLIA2 branch. The project represented a targeted expansion to accommodate redevelopment rather than broad network growth.

Ongoing and Proposed Projects

In January 2024, the Malaysian government signed a supplemental concession agreement with Express Rail Link Sdn Bhd (ERL), extending the operator's rights to run KLIA Ekspres and KLIA Transit services by 30 years, from the original expiry in 2029 to 2059. This agreement, negotiated since 2017, permits ERL to pursue investments in infrastructure upgrades, service enhancements, and dynamic market-based pricing starting in 2029, potentially funding ongoing maintenance and modernization efforts without specified projects detailed publicly. No major construction projects are currently underway for track extensions or new stations as of October 2025, though the extended concession supports incremental improvements such as digital check-in facilities at KL Sentral, implemented by early 2024 via partnership with , allowing baggage drop-off for flights up to 24 hours in advance. A proposed southern extension from KLIA to (approximately 45 km) and further to Melaka (additional 50 km) has been discussed since 2014, with an estimated cost of RM8 billion including , aiming to cut travel times to 50 minutes to and 80 minutes total to Melaka. The plan, contingent on a by the Land Public Transport Commission (SPAD), remains unapproved and inactive, with no updates since initial announcements.

Recognition and Comparisons

Awards and Milestones

The Express Rail Link (ERL) commenced commercial operations on April 14, 2002, linking Kuala Lumpur International Airport (KLIA) to KL Sentral in 28 minutes for the Ekspres service and providing intermediate stops via Transit. In 2014, ERL extended services to KLIA2, enabling a 3-minute connection between the two terminals and enhancing airport accessibility. By May 30, 2025, ERL marked its 23rd anniversary by surpassing 130 million passengers carried since inception. ERL has received multiple international and regional awards recognizing , , and marketing innovation. At the Global AirRail Awards (GARA), ERL was named of the Year in 2012, 2014, 2015, and 2016, with the 2014 win also earning North Star Air Rail Link of the Year and a award for community initiatives like the Frog Classroom Makeover programme. In 2019, it secured Partnership of the Year at the GARA Awards for expanding sales networks with airlines. Recent recognitions include the 2017 Malaysia Canada Business Award for Outstanding Green Air-Rail Transport, highlighting environmental sustainability efforts. ERL achieved ISO 9001:2015 and ISO 14001:2015 certifications in 2018, upgrading quality and environmental management standards. In 2025, its Sustainability Report won Gold at the Malaysia International ARC Awards, and it received the ASEAN Rail Industry Outstanding Digital Award plus triple victories at the MARKIES Awards for effective marketing campaigns, including the viral "Ekspres Lah Best" Merdeka Day initiative. Additionally, ERL earned the Best of Malaysia - Mobility award at the 2024 Klook Partner Awards for performance in travel partnerships.

Benchmarking Against Regional Systems

The Express Rail Link (ERL) service covers 57 km from to KL Sentral in 28 minutes at a commercial operating speed of 160 km/h, achieving an effective average speed of approximately 122 km/h excluding stops. This non-stop configuration prioritizes speed and reliability for airport transfers, with passenger satisfaction surveys indicating 94% approval rates, particularly for punctuality. In contrast, the variant, which includes intermediate stops, extends the journey to 39 minutes, serving local commuters but reducing overall efficiency for direct airport access. Compared to other Southeast Asian airport rail systems, the ERL demonstrates superior speed and time efficiency on a per-kilometer basis. Bangkok's Suvarnabhumi Airport (ARL) spans 28 km to in 26-30 minutes, implying a lower average speed due to its elevated urban routing and multiple stops, with operational data highlighting challenges in peak-hour and disruptions. Jakarta's Soekarno-Hatta Airport Rail Link requires 56 minutes for 37 km to Manggarai station, burdened by low occupancy rates (often below 20% in early years) and integration issues with the broader network, leading to underutilization despite its role in reducing road congestion. Singapore's connectivity relies on the system rather than a dedicated express, with journeys from the airport to city center (via Tanah Merah interchange) taking 30-40 minutes at maximum line speeds of 80 km/h, emphasizing frequency (every 5-7 minutes) over high-velocity point-to-point service.
SystemCountryDistance to City CenterTravel TimeMax SpeedFrequency (Peak)
ERL KLIA Ekspres57 km28 min160 km/hEvery 15-20 min
ARL28 km26-30 min~120 km/hEvery 10-15 min
Soekarno-Hatta Rail Link37 km56 min~100 km/hEvery 15-30 min
Changi Airport ~20 km (to Tanah Merah) + city extension30-40 min total80 km/hEvery 5-7 min
The ERL's dedicated non-stop model outperforms regional peers in velocity and reliability metrics, as evidenced by its higher commercial speeds and lower incidence of delays compared to Bangkok's ARL, which has faced criticism for and aging . However, integration with urban transit remains a shared challenge; while ERL connects seamlessly to KL Sentral's intermodal , systems like Jakarta's suffer from mismatched schedules and station accessibility, contributing to occupancy shortfalls. For broader regional context, Hong Kong's achieves 24 minutes over a shorter at 135 km/h with 10-minute headways, setting a benchmark for premium service but at higher fares, underscoring ERL's competitive positioning in cost-effective high-speed airport linkage. Overall, the ERL's design reflects causal advantages in dedicated , enabling faster modal shifts from road transport amid growing air traffic demands in .

References

  1. [1]
    About Us - KLIA Ekspres
    Cruising at a top speed of 160 km/h, the non-stop 57-km journey on KLIA Ekspres between KL Sentral and KLIA T1 takes only 28 minutes.
  2. [2]
    Kuala Lumpur Airport Express - Railway Technology
    Jan 7, 2001 · A new 57km (35-mile) express rail link between the centre of the Malaysian capital Kuala Lumpur and the principal international airport opened in April 2002.Missing: facts | Show results with:facts
  3. [3]
    Ensuring reliable express train service in Malaysia - Hitachi Energy
    The KLIA Ekspres is a daily high-speed, non-stop rail service from Malaysia's capital, Kuala Lumpur, to Kuala Lumpur International Airport.
  4. [4]
    Express Rail Link Sdn Bhd (ERL) | Organisations - Railway Gazette
    ERL has a 30-year concession awarded in 1997 to build and operate a dedicated airport express railway from Kuala Lumpur Sentral Station to the internationalMissing: facts | Show results with:facts
  5. [5]
    Current Rail Services - Ministry of Transport Malaysia
    1997. 25 August 1997: Malaysian government presented Express Rail Link Sdn Bhd (ERLSB) with a 30 year concession to finance, build, maintain and control the ...
  6. [6]
    About Us | KLIA Ekspres
    ### Summary of Express Rail Link Sdn Bhd and KLIA Ekspres/KLIA Transit
  7. [7]
    Express Rail Link - UrbanTransit Wiki - Fandom
    Express Rail Link SDN BHD is a bullet train company in Kuala Lumpur Malaysia that shuttles people from KL Sentral to KLIA (Kuala Lumpur International Airport).Missing: facts | Show results with:facts
  8. [8]
    Express Rail Link construction in full swing | News - Railway Gazette
    Oct 1, 2000 · The first units are due to start test running in Germany in March 2001, with deliveries to Malaysia between September 8 and May 4 2002. Delivery ...
  9. [9]
    Express Rail Link facing financial woes - The Edge Malaysia
    Feb 1, 2017 · The charge was originally lodged in late 1998 as a soft loan provided by the government to help ERL finance a portion of the RM2.4 billion cost ...
  10. [10]
    Express Rail Link Sdn Bhd - Bank Pembangunan
    Shariah-compliant Money Markets or Fixed Deposit options to grow your funds today. ... ERL Train. Financing. RM704 million (1999) & RM1.5 billion (2003). Back ...<|separator|>
  11. [11]
    [PDF] COMPANY PROFILE - ERL
    The KLIA Ekspres commenced operations on 14th April 2002 and KLIA Transit service on. 1st June 2002. Services from KLIA to KLIA 2 commenced on 21st April 2014.
  12. [12]
    Kuala Lumpur's airport in the city opens for business - Railway Gazette
    May 1, 2002 · The 57 km standard gauge rail link serving Kuala Lumpur International Airport and Malaysia's new administrative capital opened last month.
  13. [13]
  14. [14]
    Putrajaya, ERL ink supplementary concession agreement with new ...
    Jan 23, 2024 · ERL is 45%-owned by YTL Corp Bhd, followed by Lembaga Tabung Haji's 36% stake, SIPP Rail Sdn Bhd's 10% shareholding, and the remaining 9% ...
  15. [15]
    ERL gets 30-year concession extension till 2059, free to set 'market ...
    Jan 26, 2024 · ERL's majority owner is YTL Corp with a 45% stake. Lembaga Tabung Haji owns 36% of the company, SIPP Rail 10% and the remaining 9% interest is ...
  16. [16]
    No more compensation to ERL from 2029 if govt rejects fare hikes
    Feb 27, 2024 · ERL is 45%-owned by YTL Corp Bhd, followed by Lembaga Tabung Haji's 36% stake, SIPP Rail Sdn Bhd's 10% shareholding, and the remaining 9% ...
  17. [17]
  18. [18]
    [PDF] erl maintenance support sdn bhd (e-mas) organisation chart
    Board of Directors. YBhg Tan Sri Dato' Sri Dr. Mohd Nadzmi bin Mohd Salleh. Puan Noormah binti Mohd Noor. Mr. Thomas Georg Baake. ERL Maintenance Support Sdn ...Missing: Berhad shareholders
  19. [19]
    ERL Maintenance Support Sdn Bhd (E-MAS) | O&M Subsidiary
    E-MAS or ERL Maintenance Support Sdn Bhd is ERL's wholly-owned operations and maintenance (O&M) subsidiary. It was first established on a foundation of ...
  20. [20]
    Express Rail Link Sdn Bhd (375839-H) - DXMYnet
    Jul 5, 2023 · ERL Malaysia was established in 1992 as a joint venture between YTL Corporation Berhad, Lembaga Tabung Haji, and Trisilco Equity Sdn Bhd. The ...
  21. [21]
    Express Rail Link, Meru Utama extend partnership to boost ...
    Express Rail Link Sdn Bhd (ERL) and Meru Utama Sdn Bhd, operating under the VGI Airports brand, today signed an ...
  22. [22]
    Express Rail Link signs collaborative agreement with Tourism ...
    Nov 27, 2024 · Express Rail Link Sdn Bhd (ERL) and Tourism Malaysia signed a Memorandum of Collaboration (MOC) in Putrajaya last 20th November.
  23. [23]
    YTL's Express Rail Link receives international recognition for its ...
    Express Rail Link (ERL) is the operator of KLIA Ekspres and KLIA Transit services that connect Kuala Lumpur International Airport (KLIA & KLIA2) and the city.
  24. [24]
    Train Service Between KLIA (T1 & T2) and Kuala Lumpur
    The journey time between KL Sentral and KLIA T1 is 28 minutes, and 3 minutes between KLIA T1 and KLIA T2. First Train, Last Train. From KL Sentral to KLIA (T1 & ...
  25. [25]
    Train Timetable & Ticket Fares, TravelCards, Concession Fares
    Our stations include KLIA T1, KLIA T2, Salak Tinggi, Putrajaya & Cyberjaya, Bandar Tasik Selatan, and KL Sentral. BUY KLIA TRANSIT. From.Schedule · KLIA Ekspres & KLIA Transit... · KLIA Transit MyKad TravelCard
  26. [26]
    KLIA Ekspres train frequency raised to every 20 minutes starting Aug 1
    Jul 26, 2023 · KUALA LUMPUR (July 26): Come Aug 1, KLIA Ekspres trains that connect KL Sentral to KLIA Terminal 1 and 2 will run every 20 minutes every day, ...<|control11|><|separator|>
  27. [27]
    Increased Frequencies For KLIA Ekspres & KLIA Transit Services
    With the new schedule, trains will run every 15 minutes during the morning peak hours starting from 6:00am to 9:00am and the evening peak hours from 4:00pm to ...
  28. [28]
    7 Route: Schedules, Stops & Maps - KLIA & KLIA2 (Updated) - Moovit
    The 7 train (KLIA & KLIA2) has 6 stations departing from KL Sentral and ending at KLIA T2. Choose any of the 7 train stations below to find updated real-time ...
  29. [29]
    KLIA Ekspres - The Fastest Way to KLIA
    Travel hassle-free from Kuala Lumpur city to KL International Airport with KLIA Ekspres. Book your tickets now for a convenient and comfortable journey.Schedule · KLIA Ekspres · Offers · Help Centre
  30. [30]
    [PDF] Malaysia Express Rail Link - Motorola Solutions
    km KLIA Express line, two airport terminals and 3 intermediate stations such as Bandar Tasik Selatan, Putrajaya /Cyberjaya and as well as the operation ...
  31. [31]
    Train & Station - ERL Maintainance Support Sdn. Bhd.
    We have six station consisting of KL Sentral, Bandar Tasik Selatan, Putrajaya, Salak Tinggi, KLIA and KLIA2. Facilities available at the station includes ...
  32. [32]
    KLIA Ekspres - The Fastest Way to KLIA
    No readable text found in the HTML.<|separator|>
  33. [33]
    YTL's ERL Unveils Its New KLIA Transit Train
    YTL's Express Rail Link Sdn Bhd (ERL) unveiled its new KLIA Transit train today at its depot in Salak Tinggi. The new train, manufactured by CRRC Changchun ...
  34. [34]
    Salak Tinggi ERL Station in Salak Tinggi town - klia2.info
    Sep 29, 2023 · Salak Tinggi ERL station is one of the Express Rail Link (ERL) stations for the KLIA Transit. It is located in the town of Salak Tinggi in Sepang, Selangor.Missing: depot | Show results with:depot
  35. [35]
    About Us - ERL Maintainance Support Sdn. Bhd.
    We are located in Kompleks Rel Udara at Bandar Baru Salak Tinggi, Sepang, Selangor Darul Ehsan. KLIA Express and KLIA Transit have been operated and maintained ...Missing: depot | Show results with:depot
  36. [36]
    Projects | KLIA Express Rail Link, Kuala Lumpur, Malaysia - Aurecon
    The railway line was introduced to create a fast and seamless connectivity between the airport and the city centre.Missing: facts | Show results with:facts
  37. [37]
    KLIA Ekspres & KLIA Transit Schedules | Check Train Times
    **Summary of KLIA Ekspres & KLIA Transit Schedules:**
  38. [38]
    KLIA Express Schedule
    KL Sentral to KLIA Express Train Timetable ; 06:20. 06:48. 06:53 ; 06:40. 07:08. 07:13 ; 07:00. 07:28. 07:33 ; 07:20. 07:48. 07:53 ; 07:40. 08:08. 08:13.
  39. [39]
  40. [40]
    Everything You Need to Know - KLIA Express Ticket
    Whether you're heading to KLIA Terminal 1, KLIA Terminal 2, or KL Sentral, this Electric Multiple Unit (EMU) train ensures a non-stop, 28-minute journey. My ...
  41. [41]
    Getting Around - 2025 Global Investigative Journalism Conference
    KLIA Ekspres Return Ticket: MYR85.00 per passenger. Purchase via: Website or Mobile App. ERL – KLIA Express. The ERL – KLIA Express Line transports passengers ...Missing: Link | Show results with:Link
  42. [42]
    Enjoy 50% off your KLIA Transit return tickets this Merdeka! - Facebook
    Aug 24, 2025 · KLIA Transit Merdeka deal is here! Enjoy a seamless ride to celebrate Merdeka in Putrajaya at a special discount, only for a limited time.<|separator|>
  43. [43]
    On the right track - SKF Evolution
    The KLIA Ekspres is a premium airport rail transport that takes passengers ... With a 99.7 percent on-time performance record, our passengers can be ...
  44. [44]
    [PDF] CUSTOMERS' SATISFACTION TOWARDS KLIA EKSPRES ...
    The first question is on on-board cleanliness'. 46% of them are saying it is in good performance and 1% of them it is poor performance.
  45. [45]
    Review: KLIA Ekspres between KL Sentral and KLIA | Wandernom
    Oct 23, 2024 · I've had the pleasure of riding the KLIA Ekspres train several times and I've always found it to be clean, modern, and well-maintained. The ...
  46. [46]
    KLIA Express from KLIA to city centre is stupid (RM55 1-way vs ...
    Jul 13, 2022 · Yes, but train is less prone to traffic and delays. It's almost guaranteed that you will arrive at KLIA at the promised time. Also better and ...
  47. [47]
    2025 Malaysia: KLIA Ekspres Airport Train Ticket (Kuala Lumpur)
    Rating 4.2 (5) Trains run every 15 minutes during peak hours. Our commuter service offers quick, efficient travel with stops at Salak Tinggi, Putrajaya & Cyberjaya, and Bandar ...
  48. [48]
    [PDF] Rail Transportation in Kuala Lumpur
    The 57-km long ERL runs over double tracks electrified to 25 kVac along the entire alignment. There are passing tracks at intermediate stations to allow. KLIA ...
  49. [49]
    [PDF] GUIDELINES FOR AUTHORS - Jurnal Mekanikal
    Dec 1, 2023 · ... KLIA Ekspres (ERL),. LRT, MRT, and KTM Komuter. These systems employ ... KTM ETS, KTM Komuter, and ERL run on a 25 kV 50 Hz electrification system.
  50. [50]
    KLIA Ekspres, KLIA Transit rail services hit by cable thefts and ...
    Apr 9, 2025 · Train services on the KLIA Ekspres and KLIA Transit lines saw significant disruptions following a series of cable thefts and a signalling system failure.
  51. [51]
    ERL Confirms KLIA Ekspres, KLIA Transit Services Disrupted By ...
    Apr 9, 2025 · Another incident involving disruption to the signalling system at Bandar Tasik Selatan station resulting in all train services being suspended ...Missing: signaling | Show results with:signaling
  52. [52]
    E-MAS: Two Decades of Excellence in Railway Operations and ...
    Sep 4, 2025 · As the operations and maintenance (O&M) arm of Express Rail Link ... Within just two years of launch, E-MAS achieved a 99.7% on-time ...
  53. [53]
    Siemens, Desiro ET 425 M - Locomotive & Train Specs
    Operating on 25 kV AC 50 Hz electric systems and utilizing a standard 1435 mm gauge, the Desiro ET 425 M ensures broad compatibility across railway networks.Missing: specifications | Show results with:specifications
  54. [54]
    CRRC delivers new trains for KL airport rail link
    Oct 21, 2016 · ERL signed a contract with CNR Changchun (now part of CRRC) in November 2014 for six four-car trains to supplement the fleet of six Siemens ...
  55. [55]
  56. [56]
  57. [57]
    New Kuala Lumpur airport express trains enter service
    Mar 21, 2018 · The CRRC trains have two compressors, compared to one on the Siemens trains, and more powerful traction motors. ERL also anticipates a 30% ...Missing: composition | Show results with:composition
  58. [58]
    [PDF] 6 New trains to boost ERL passenger capacity by 50 pc SEPANG
    The company is targeting a five per cent increase in daily ridership this year from 23,900 last year. “Since the fare hike in 2016, ridership has fallen by 19 ...Missing: statistics trends
  59. [59]
    ERL targets to increase five pct ridership this year, leveraging on API ...
    Apr 1, 2019 · ERL carried 8.6 million passengers last year, boosting its total to date to over 95 million passengers. "We are in the nine million range ( ...
  60. [60]
    Kuala Lumpur International Airport handles 5.2m pax in Dec-2024 ...
    Jan 21, 2025 · Kuala Lumpur International Airport handled 5.2 million passengers in Dec-2024, with 1.3 million domestic and 3.9 million international, and 57. ...
  61. [61]
    ERL RENAMES ITS KLIA STATIONS FOLLOWING REBRANDING ...
    Jun 1, 2023 · ERL launched its train services in April 2002 and has been recognised locally and internationally for consistently providing high standards of ...<|separator|>
  62. [62]
    ERL COLLABORATES WITH TOURISM MALAYSIA TO SUPPORT ...
    Nov 20, 2024 · PUTRAJAYA, 20 November 2024 – Express Rail Link Sdn Bhd (ERL) ... To date, ERL has carried over 122 million passengers onboard its trains.
  63. [63]
    KLIA Ekspres hits 130 million passengers on 23rd anniversary
    May 30, 2025 · ERL Acting Chief Executive Officer Yeow Wei Wen said the achievement of reaching the 130 millionth passenger reflects the trust and loyalty of ...
  64. [64]
    Express Rail Link Sdn Bhd's Post - LinkedIn
    May 29, 2025 · ... KLIA Transit from Bandar Tasik Selatan Station (especially during her semester breaks), as our 13,000th KLIA Transit passenger of the day.Missing: numbers annual
  65. [65]
    Vandalism, signalling issues cripple KLIA Ekspres, Transit services
    Apr 9, 2025 · ERL said the first cable cut incident took place yesterday at Km48.5 between the Salak Tinggi station and KLIA Terminal 1 at around 6.20am. “ ...
  66. [66]
    [PDF] Railway - Technology Depository Agency
    Jun 14, 2024 · The Malaysian government has placed a strong emphasis on developing the railway industry in recent years. This has led to significant investment ...
  67. [67]
    Maintenance worker dead, one injured after being hit by ERL train ...
    KUALA LUMPUR: A maintenance worker was killed while another suffered serious injuries after being hit by a KLIA bound Express Rail Link Sdn Bhd (ERL) train ...
  68. [68]
    ERL confirms cable thefts and signalling issues behind major ...
    Apr 8, 2025 · The rail operator said the first incident occurred at 6.20am on April 8 at Km48.5 between Salak Tinggi and KLIA Terminal 1, prompting ERL to ...
  69. [69]
    The Fastest Airport Transport System in Malaysia
    Jan 4, 2020 · The train time table is flexible that you can get the train every 15 minutes during peak hours every 20 minutes during off-peak hours. You can ...
  70. [70]
    Transportation - Malaysia Airlines
    Express Rail Link Sdn Bhd (ERL), the operator of KLIA Ekspres, is the sole provider of all train services and/or goods. The ticketing is subject to all ...
  71. [71]
    KL Sentral Station to benefit from self-check-in and bag ... - SITA
    Oct 9, 2023 · This will enable passengers to check in and drop their bags at the city center train station prior to taking the KLIA Ekspres train to the airport.
  72. [72]
    KLIA Ekspres named “AirRail Link of the Year”
    May 21, 2025 · ERL is the operator of KLIA Ekspres and KLIA Transit train services that connect Kuala Lumpur International Airport (KLIA & KLIA2) and the Kuala ...
  73. [73]
    ERL's fare revision necessary to sustain good service - KLIA Ekspres
    Dec 2, 2015 · The ERL project was implemented at the cost of RM2.4 billion, and the company hasbeen suffering losses over the years accumulatingto RM671.7 ...
  74. [74]
    Malaysia Transportation: An Overview of KLIA Ekspres Train ...
    Apr 11, 2021 · The KLIA Ekspres, which was designed with the air travelers' needs in mind, is a high-speed, non-stop air-rail connection between Kuala Lumpur International ...
  75. [75]
    [PDF] The Impact of the COVID-19 Pandemic on Trade, Transport,E ... - ERIA
    In 2019, the income of e-commerce rose 22.8% to RM675.4 billion from 2017. In 2020, the annual rate was 32.7%, marking an income of RM896.4 billion (Department ...
  76. [76]
    Commuter chaos as KLIA Ekspres, Transit face back-to-back cable ...
    Apr 9, 2025 · Train services on both the KLIA Ekspres and KLIA Transit lines were severely disrupted following multiple incidents of cable theft and a signalling system ...
  77. [77]
    ERL's security lapses put YTL in unwanted spotlight - Scoop.my
    Apr 10, 2025 · The government has been subsidising ERL through the Airport Passenger Service Charges (PSC), a fee collected from outbound airline passengers at ...Missing: metrics | Show results with:metrics
  78. [78]
    ERL commends police for swift action in cable theft case
    Apr 14, 2025 · ERL has commended the Royal Malaysia Police (PDRM) for their swift and effective response in apprehending the suspects involved in a recent cable theft.Missing: accidents | Show results with:accidents
  79. [79]
    Maintenance worker dead, one injured after being hit by ERL train
    KUALA LUMPUR: A maintenance worker was killed while another suffered serious injuries after being hit by a KLIA bound Express Rail Link Sdn Bhd (ERL) train ...
  80. [80]
    Man decapitated by ERL - NST Online
    KUALA LUMPURL: An identified was killed after he was run over by the Express Rail Link (ERL) as it was heading to the Kuala Lumpur Central Station yesterday ...Missing: safety accidents
  81. [81]
    ERL extension project not best value for money due to weaknesses
    In its audit done from January to April last year, the National Audit Department (NAD) found that one weakness of the project was that price negotiations were ...
  82. [82]
    Highly unreluable frequent breakdown - Review of KLIA Ekspres ...
    Rating 1.0 · Review by Bimal KIf you travel good chances are that you can miss your fl8ght as this train setvice is not reliable. Date of experience: January 2019.Missing: problems | Show results with:problems
  83. [83]
    2002: The Launch of an Express Rail Line Serving Malaysia's ...
    Apr 14, 2022 · The KLIA Ekspres was established to run passenger trains between the airport and Kuala Lumpur Sentral Station (KL Sentral), Kuala Lumpur's main railway station.<|separator|>
  84. [84]
    ERL - Line Extension | SkyscraperCity Forum
    Dec 24, 2008 · The Express Rail Link (ERL), the airport express rail network linking the city centre and the KL International Airport (KLIA), will be extended to the Low Cost ...Missing: history | Show results with:history<|separator|>
  85. [85]
    ERL Unveils KLIA Ekspres and KLIA Transit New Train Livery Design
    Feb 12, 2015 · ERL Unveils KLIA Ekspres and KLIA Transit New Train Livery Design · adding additional train capacity or travel frequencies; · improving safety ...Missing: timeline | Show results with:timeline<|separator|>
  86. [86]
    The Malaysian Government and ERL Signed a Supplemental ...
    Jan 23, 2024 · ERL was granted a 30-year extension from 2029 to 2059 which allows ERL to plan and implement investments to improve facilities and services. The ...
  87. [87]
    Putrajaya extends ERL concession period by 30 years after seven ...
    Jan 23, 2024 · The government has extended the concession period with Express Rail Link Sdn Bhd by another 30 years to 2059, after seven years of negotiations since 2017.
  88. [88]
    ERL granted 30-year concession extension - Free Malaysia Today
    Jan 23, 2024 · Express Rail Link Sdn Bhd's (ERL) concession agreement for train services to KLIA has been extended by another 30 years to 2059.
  89. [89]
    Train transfers get a SITA upgrade - TTR Weekly
    Oct 11, 2023 · The new facilities should be installed and operational by Q2 2024. It will enable passengers to check in and drop their bags at the city centre ...Missing: ongoing | Show results with:ongoing
  90. [90]
    Malaysia mulls KL airport express extension
    May 29, 2014 · The projected cost of the extension is around Ringgits 8bn ($US 2.49bn) ... KLIA Ekspress trains run non-stop between KL Sentral and KLIA ...
  91. [91]
    ERL line extension to Seremban, Malacca from KLIA, KLIA2
    May 25, 2014 · "With the ERL, travel time from Kuala Lumpur to Seremban should be about 50 minutes, and an additional 30 minutes to Malacca," she told Business ...
  92. [92]
  93. [93]
    Express Rail Link Receives International Recognition as Air Rail ...
    Despite facing a number of humbling challenges, KLIA Ekspres managed to achieve a double-digit ridership growth in 2015, the highest in ERL's 13-year history.
  94. [94]
    Awards and Accolades - YTL Corporation Berhad
    Express Rail Link Sdn Bhd (ERL) won the “Partnership of the Year” award at the Global AirRail Alliance (GARA) Awards 2019 for its efforts in expanding its sales ...
  95. [95]
    Award & Recognition - ERL Maintainance Support Sdn. Bhd.
    2018 – Successful upgrade to ISO 9001:2015 and ISO 14001:2015. · 2017 – Malaysia Canada Business Award for Outstanding Green Air-Rail Transport · 2016 – The ...
  96. [96]
    ERL Wins Gold at International ARC Awards 2025 - KLIA Ekspres
    We are proud to share that our Sustainability Report has won the GOLD Award at the Malaysia International ARC Awards 2025.Missing: achievements | Show results with:achievements
  97. [97]
    ERL is proud to have received the prestigious 2025 ASEAN Rail ...
    Jan 10, 2025 · ERL is proud to have received the prestigious 2025 ASEAN Rail Industry Outstanding Digital Award at the ASEAN Rail Awards 2025.
  98. [98]
    Triple Victory for ERL at the MARKIES Awards 2025 - KLIA Ekspres
    The “Most Effective Use” awards specifically recognise campaigns that have applied marketing strategies in ways that are both innovative and results-driven.
  99. [99]
    Mobility' award at the Klook Partner Awards. This recognition reflects ...
    Jan 21, 2025 · We are thrilled to have been recognized as one of Klook's top performers for 2024, proudly receiving the prestigious 'Best of Malaysia - ...
  100. [100]
    Bangkok Airport Train Guide - Suvarnabhumi Airport Rail Link
    Journey time is approximately 26 minutes. This makes taking the train the quickest and most convenient way to travel in and out of central Bangkok. The trains ...Missing: frequency | Show results with:frequency
  101. [101]
    Operational Challenges of the Bangkok Airport Rail Link
    Jan 25, 2020 · About 80,000 passengers now use the ARL daily, with around 5500 trips per direction during the morning peak hours. The ARL now serves as a ...Missing: ridership | Show results with:ridership
  102. [102]
    Addressing the occupancy problem of Soekarno-Hatta Airport rail ...
    Soekarno-Hatta airport rail link's operation in 2018-2022 has been marked by low occupancy. This study aims to assess the realisations of several critical ...Missing: performance | Show results with:performance
  103. [103]
    Things I learnt about the Singapore MRT (and a comparison with ...
    Jun 10, 2016 · The East-West line covers 49km and 35 stations in 70 minutes (eg average speed 42 Km/h), with a maximum speed of 80 Km/h. It probably helps that ...
  104. [104]
    Fastest Way to Singapore Changi Airprot - Airport Online
    MRT, or Mass Rapid Transit · Travel took thirty to thirty-five minutes. · Service spans five thirty AM till almost midnight. · Every five to seven minutes.
  105. [105]
    Airport Rail Link Bangkok Timetable, Map & Ticket Price - THAIest
    Oct 13, 2025 · On weekends and public holidays, trains depart every 12 minutes. Train departures before 07:00 in the morning and after 21:00 in the evening ...Missing: ridership | Show results with:ridership
  106. [106]
    Airport Express Service Guide - Hong Kong - MTR
    There is a train every 10 minutes, ready to whisk you between the airport and Hong Kong Station in the heart of the shopping and commercial district in about 24 ...Missing: key stats
  107. [107]
    Hong Kong Airport
    Feb 13, 2001 · The Airport Express train running between Chep Lap Kok Airport and Hong Kong. ... Train speed, at a maximum of 135km/h (80mph), is ...Missing: key stats
  108. [108]
    Airport-Rail Inter-modality in Southeast Asia: Opportunities
    Southeast Asia has few airport-rail connections, with less than 1% of passengers connecting. Improved connections would reduce road congestion and provide ...Missing: efficiency reliability