Fact-checked by Grok 2 weeks ago

Floating production storage and offloading

A Floating Production Storage and Offloading (FPSO) unit is a floating used in the and gas industry to hydrocarbons from subsea wells, them by separating , , and water, store the stabilized crude in onboard tanks, and offload it to shuttle tankers for to refineries. Typically built on a converted hull or as a purpose-built structure, an FPSO features a system that allows it to rotate freely—known as weathervaning—to align with prevailing weather and sea conditions while remaining connected to subsea infrastructure via risers and flowlines. This design enables operations in water depths ranging from shallow to ultra-deepwater, often exceeding 2,000 meters, without the need for permanent pipelines to shore. The origins of FPSOs trace back to the , when the emerged as a cost-effective alternative to fixed platforms for marginal or remote fields. The first commercial FPSO was deployed by in 1977 on the Castellón field off the coast of , marking a shift toward floating production systems that could handle the full lifecycle of extraction at sea. Over the decades, advancements in , , and have evolved FPSOs into versatile assets, with early conversions from existing tankers giving way to bespoke designs incorporating gas compression, water injection, and living quarters for crews of up to 100 personnel. FPSOs offer significant advantages in flexibility and economics, particularly for fields where building subsea pipelines would be prohibitively expensive or technically challenging, such as in deepwater environments or areas with harsh weather. They can be leased for 10–25 years, redeployed to new fields upon depletion, and support production rates from 30,000 to over 200,000 barrels of oil per day, making them ideal for smaller reservoirs or as hubs for satellite developments. However, challenges include high upfront costs—typically $1–3 billion for a newbuild—and the need for rigorous maintenance to ensure safety and environmental compliance in dynamic conditions. As of 2025, more than 270 FPSOs operate globally, with the largest concentrations in Brazil's pre-salt basins (46 units), West Africa's , and Southeast Asia's marginal fields, driving a market projected to grow due to rising deepwater exploration and energy demands. Regulatory bodies like the () provide classification and sustainability notations to support their lifecycle, from construction to decommissioning, emphasizing innovations in remote operations and reduced emissions.

Introduction and Overview

Definition and Purpose

A floating production and offloading (FPSO) unit is a floating used for the processing of produced hydrocarbons, along with associated stabilization, , and operations to an offloading or . Typically based on a converted or purpose-built hull, an FPSO receives hydrocarbons from subsea wells or nearby platforms via flexible risers and . The primary purpose of an FPSO is to enable in remote or deepwater locations where fixed platforms are impractical due to high costs, challenging conditions, or excessive depths exceeding 600 meters. It serves as a self-contained facility for crude oil and handling, providing flexibility for field development without the need for extensive subsea or onshore processing plants. This mobility allows FPSOs to be relocated to new fields after declines, optimizing capital investment in marginal or short-life reservoirs. Core functions of an FPSO include production, where onboard facilities separate , gas, and from the incoming stream, treat the products for stabilization, and manage byproducts such as reinjecting gas or discharging treated . occurs in dedicated cargo tanks within the , with capacities typically ranging up to 2 million barrels of crude to support extended operations between offloads. Offloading involves transferring stabilized to shuttle tankers using flexible hoses in tandem or side-by-side configurations, or occasionally to export pipelines, ensuring safe and efficient delivery to markets. FPSOs emerged in the 1970s as a cost-effective alternative to subsea tiebacks or fixed rigs for exploiting fields beyond the reach of conventional . This innovation addressed the growing demand for deepwater production, allowing operators to process and store hydrocarbons directly at the source.

Key Components

A Floating Production Storage and Offloading (FPSO) system consists of several interconnected major components that enable the production, processing, , and export of hydrocarbons in environments. These include the , topsides facilities, mooring system, tanks, and offloading equipment, each engineered to withstand harsh marine conditions while ensuring operational efficiency. The serves as the foundational structure of an FPSO, providing and forming the base for all other systems. It can be either a converted , which repurposes existing vessels for cost efficiency, or a purpose-built tailored to specific requirements such as water depth and environmental loads. Hulls are typically ship-shaped to facilitate transportation and are constructed from high-strength to resist and over a 20- to 30-year lifespan. Topsides facilities refer to the modular processing units mounted on the hull's deck, handling the separation, , , and initial refinement of well fluids. These modules include separators for , gas, and ; compressors for gas reinjection or ; and systems for removing impurities like sand or . Built to standards such as and ASME, topsides are prefabricated onshore for assembly , allowing customization based on characteristics. The mooring system anchors the FPSO to the , maintaining its position against winds, , and currents. Common configurations include turret mooring, which allows 360-degree rotation (weathervaning) to align the vessel with prevailing conditions, or spread mooring with multiple lines fixed to anchors. Comprising mooring lines, anchors, and connectors, these systems are designed for water depths up to 3,000 meters and incorporate quick-disconnect features for emergency relocation during . Storage tanks, integrated into the hull's holds, provide onboard for stabilized crude after . These double-hulled compartments prevent spills and are coated for resistance, with typical volumes ranging from 800,000 to 2.3 million barrels depending on size and export . For example, the FPSO Egina stores up to 2.3 million barrels, while units in Brazil's Búzios hold 1.4 to 2 million barrels. Offloading equipment enables the safe transfer of stored to shuttle tankers or pipelines. Systems include tandem offloading, where the FPSO remains connected via a line, or side-by-side configurations using fenders and hoses. Turret-integrated offloading points enhance flexibility by accommodating motion during transfers. These components integrate seamlessly to form a self-contained unit: subsea risers deliver well fluids to the topsides for processing, where separated flows to tanks via internal , and the system ensures stability throughout. Safety is prioritized through features like the turret's weathervaning capability, which reduces hydrodynamic loads, and detachable moorings that permit disconnection in extreme conditions such as hurricanes. FPSOs typically process up to 250,000 barrels of per day, with examples like the FPSO Almirante Tamandaré handling 225,000 barrels daily.

History and Development

Early Developments

The origins of floating production storage and offloading (FPSO) systems emerged in the mid-20th century amid expanding offshore exploration in areas lacking fixed pipeline infrastructure. In the and , the industry began utilizing converted tankers as basic floating storage units to accumulate crude oil from early offshore wells before transfer to transport vessels, with notable applications in regions like the where onshore processing was distant or undeveloped, marking the pre-FPSO phase focused solely on storage rather than onboard processing. Technological precursors laid the foundation for more advanced floating systems during this period. Single-point mooring trials, pioneered by companies like , began in the late 1950s with the introduction of the first commercial Catenary Anchor Leg Mooring (CALM) buoy in 1959, enabling tankers to weathervane around a single anchor point for safer offshore loading and storage in exposed locations. Concurrently, systems were tested in the early 1960s for drilling vessels, with Shell's drillship achieving the first commercial application in 1961 in the , using thrusters to maintain position without traditional anchors in deeper waters up to 1,000 feet. These innovations improved vessel stability and operational flexibility, essential for future integrated production units. The 1970s oil crises, triggered by the 1973 Arab oil embargo, intensified the drive for rapid deployment of production technologies to exploit marginal or remote fields and reduce reliance on supplies. High oil prices—quadrupling from about $3 to $12 per barrel—spurred investment in non- offshore resources, including flexible floating solutions that avoided costly subsea pipelines. This economic pressure catalyzed the transition to FPSO-like systems combining production, storage, and offloading. In 1975, the field in the UK saw the deployment of the world's first floating production system, a converted unit for initial oil output from 140 feet of water. advanced the concept further in 1977 with the Castellon field off , converting a tanker into the first true FPSO for onboard processing, 1.2 million barrels of storage, and offloading in 385 feet of water, demonstrating viability in the Mediterranean.

Milestones and Evolution

The 1980s marked a pivotal era for FPSO technology, transitioning from experimental conversions of tankers to more reliable leased systems for production. The world's first leased FPSO, a converted vessel, began operations in 1981 on the Cadlao field in the , demonstrating the viability of floating production for remote fields. This breakthrough was followed by innovations in mooring systems, including the introduction of the first disconnectable FPSO and external designs, which enhanced operational flexibility in harsh environments. By the mid-1980s, the industry saw a gradual shift toward purpose-built units over conversions, driven by the need for customized hulls to withstand prolonged exposure, although conversions remained dominant due to cost efficiencies from surplus tankers. The 1990s witnessed widespread adoption of FPSOs, particularly in emerging deepwater regions like and , where fixed platforms were impractical. Petrobras deployed its first FPSO, the P-34, in September 1997 on the field in the Campos Basin, marking a significant step in Brazil's offshore expansion and enabling production from pre-salt reservoirs. In , operators like began integrating FPSOs for fields such as Girassol (operational from 2001), leveraging the technology's mobility to access marginal fields and reduce infrastructure costs. This period also saw the debut of the first purpose-built permanently moored FPSO, Gryphon A, in the UK in 1994, which set precedents for integrated systems and long-term station-keeping. Entering the and , FPSO designs evolved to support ultra-deepwater operations, with capabilities extending to water depths of up to 10,000 feet, facilitated by advanced synthetic mooring lines and . Key advancements included enhanced gas handling systems for associated gas reinjection and , reducing flaring and improving recovery rates. By the , integration of LNG offloading capabilities emerged, as seen in projects like FLNG (2018), which combined FPSO principles with modules to monetize stranded gas reserves. Regulatory milestones bolstered this growth, with the (IMO) adopting Resolution MEPC.139(53) in 2005, providing guidelines for applying to FPSOs and floating storage units (FSUs), ensuring environmental compliance during conversions and operations. The 2009 MODU Code further standardized safety and design requirements for mobile offshore units, including FPSOs. Recent trends through 2025 reflect a push toward , with over 200 FPSO units in global operation by 2023, predominantly in , , and . FPSOs incorporating have gained traction, exemplified by the Greater Tortue Ahmeyim FPSO (first gas December 2024, full operations mid-2025), which combines gas turbines with battery storage and potential tie-ins to reduce emissions through , with first LNG cargoes achieved in February 2025. Projects like Equinor's Hywind Tampen (2022) demonstrate feasibility of offshore powering nearby floating production, paving the way for FPSO- farm hybrids in the and . These evolutions underscore FPSOs' adaptability amid energy transitions, with newbuilds emphasizing low-carbon designs.

Types and Variants

FPSO

A Floating Production Storage and Offloading (FPSO) unit is a floating vessel designed to receive hydrocarbons from subsea wells, process them onboard into stabilized crude oil and , store the products, and offload them to tankers or pipelines, distinguishing it from storage-only units like floating storage (FSO) vessels that lack capabilities. FPSOs integrate all essential functions into a single ship-shaped , enabling operations in remote or challenging environments without fixed . Key characteristics of FPSOs include onboard processing facilities such as multi-stage separation trains to separate oil, gas, and water; gas compressors for reinjection or ; and systems to handle for environmental compliance or reinjection. For , FPSOs typically employ a weathervaning turret system—either internal or external—that allows the vessel to rotate freely around a single anchor point in response to , , and currents, ensuring operational in deepwater conditions up to 3,000 meters or more. FPSOs are particularly suited for developing marginal fields with limited reserves or deepwater sites where fixed platforms are uneconomical, providing a flexible, relocatable solution that accelerates time to first . A representative example is the Girassol FPSO, deployed in 2001 off the coast of in Block 17 at a depth of 1,350 meters, where it processes up to 200,000 barrels per day of through integrated facilities and stores 2 million barrels, supporting production from subsea wells in a pioneering deepwater project. Approximately 55% of operational FPSOs worldwide are conversions of existing oil tankers, such as very large crude carriers (VLCCs), which offer significant cost savings—often 50-70% less than newbuilds—and faster deployment timelines of 18-24 months compared to 3-5 years for purpose-built units, though conversions may require extensive strengthening and fatigue assessments for long-term use. Newbuild FPSOs, comprising the remaining 45%, provide optimized designs for specific field conditions but at higher upfront costs exceeding $1 billion.

FSO and Other Variants

Floating Storage and Offloading () units are vessels designed primarily for the of crude oil or other hydrocarbons and their subsequent transfer to tankers or pipelines, without any onboard or capabilities. These units typically receive already processed fluids from nearby fixed platforms, subsea tie-backs, or floating systems, serving as dedicated solutions in remote or marginal fields. Unlike integrated systems, FSOs emphasize reliability in handling large volumes of stabilized oil, often utilizing converted tanker hulls for cost efficiency. FSO characteristics include simpler topside facilities focused on utilities, accommodation, and offloading equipment rather than complex processing modules, allowing for reduced construction and operational costs. Storage capacities can reach up to 2.2 million barrels of , enabling extended in areas without onshore . Mooring systems are typically spread or turret-based, with spread common in benign environments for stability, while turret systems permit weathervaning in harsher conditions; these are suited for water depths from shallow (under 500 meters) to moderate depths. FSOs are often paired with FPSOs or fixed platforms to supplement storage when production exceeds immediate . Other variants extend the FSO concept to specialized storage roles. A Floating Storage Unit (FSU) is a stationary offshore structure for holding oil or (LNG) without offloading provisions, relying on periodic shuttle transfers or pipeline connections for export; it lacks the or tandem offloading gear of an FSO. (FLNG) units adapt the model for gas fields, incorporating liquefaction processes alongside storage and offloading of LNG; as of 2025, FLNG units continue to expand with new projects in and , though they diverge from pure FSOs by including conversion facilities for into liquid form. A Floating Production Unit (FPU) focuses on processing and separation without integrated storage, exporting directly via risers to separate FSOs or pipelines, making it a modular complement in hybrid setups. FSOs and their variants find applications in shallow-water fields or as extensions to existing production infrastructure, particularly where rapid deployment and lower are prioritized over full integration. In , they support mature basins with limited export options; for instance, the FSO Golden Star serves the Sao Vang and Dai Nguyet gas-condensate fields off , storing for tanker offloading. Similarly, in Malaysia's Cendor field, an FSO supplements production in shallow waters, while Thailand's G1/61 concession (encompassing Erawan, Platong, , and fields) deploys an FSO to manage increased output from revitalized reservoirs. These deployments highlight FSOs' role in extending field economics in regions with water depths under 100 meters and logistical challenges.

Design and Engineering

Hull and Mooring Systems

The hull of a floating production storage and offloading (FPSO) unit serves as the foundational structure, providing , storage capacity, and integration for topsides facilities, with designs primarily categorized as converted oil tankers or purpose-built vessels. Converted hulls are typically repurposed from existing very large crude carriers (VLCCs) or similar tankers, offering rapid deployment and cost efficiency due to the utilization of proven ship designs with storage capacities up to 2.3 million barrels. These conversions often incorporate double-hull configurations to enhance safety by creating a protective void space that reduces spill risks during grounding or collision, in compliance with international regulations like for tankers built after 1993. In contrast, purpose-built hulls are engineered from the outset for specific field conditions, allowing optimized dimensions such as lengths of 600–1,100 feet and breadths of 100–200 feet, with storage up to 2.3 million barrels—as exemplified by the Egina FPSO (commissioned )—and are increasingly favored for their tailored structural integrity. Recent purpose-built designs, such as the FPSO (2025), further demonstrate advancements with 2 million barrels storage for ultra-deepwater operations. For harsh environments like the , purpose-built cylindrical hulls, such as the Sevan design, provide superior motion characteristics and stability in high waves and winds, with symmetrical forms enabling deployment in severe conditions. Mooring systems anchor the FPSO to the , ensuring positional stability against environmental loads from , currents, and , with primary types including and configurations. mooring systems, either internal (housed within the ) or external (at the bow), incorporate a rotating with bearings that permit weathervaning, allowing the to freely align with dominant environmental forces and minimize loads on risers and s. mooring, by contrast, employs multiple lines—typically chains, wires, or synthetic ropes—anchored symmetrically to piles or embeds in various directions, fixing the 's heading and providing robust in milder seas but limiting rotational . Disconnectable variants, often integrated with systems, include quick-release mechanisms and buoys that enable the FPSO to detach and relocate during extreme events like cyclones, with reconnection designed for specified environmental limits to protect the asset. Engineering considerations for FPSO hull and mooring systems emphasize stability and load resistance, with metacentric height (GM) serving as a key metric for initial transverse stability against rolling. The metacentric height is calculated as the difference between the height of the metacenter from the keel (KM) and the height of the center of gravity from the keel (KG), expressed as: GM = KM - KG where KM accounts for the vessel's buoyancy center and form factors, ensuring GM remains positive for stable equilibrium under operational drafts and partial loading. Mooring designs must withstand ultimate limit states, including intact and damaged conditions, with line tensions limited to 0.67 times minimum breaking load for survival storms. Hull construction utilizes high-strength compliant with classification society rules, such as Grade A mild with a minimum yield strength of 34 (235 ) for primary structural elements, often supplemented by higher grades like AH36 for enhanced in critical areas. is integral to ensure durability over the typical 20-25 year design life, employing methods to predict cumulative damage from cyclic wave loading, with design factors of at least 10 for air-exposed welds and 20 for corrosion-prone locations per DNV-RP-C203 guidelines. rules similarly mandate S-N curve-based assessments for hotspots, incorporating environmental reductions for to verify fatigue life without major inspections until mid-life.

Production and Processing Facilities

The production and processing facilities on a floating storage and offloading (FPSO) unit are located on the topsides and handle the initial of well fluids to separate and prepare hydrocarbons for or . Well fluids, consisting of a of , gas, and , are received from subsea via risers and manifolds, then directed to primary separation such as three-phase separators that divide the stream into gas, , and phases. Following separation, the undergoes stabilization through heaters and treaters to remove dissolved gases and achieve specifications, while the gas is routed to compression trains for and potential reinjection or . The separated is treated for disposal or reinjection, ensuring compliance with environmental standards. Key equipment in these facilities includes multiphase pumps for boosting well fluids from risers, gas compression trains capable of handling up to 100 million standard cubic feet per day (MMscfd) to support gas lift, reinjection, or export, and water injection systems that maintain reservoir pressure by pumping treated back into the formation. Electrostatic treaters and heat exchangers further process the to reduce water content and stabilize it, while hydrocyclones and flotation units polish for reinjection or discharge. These components are often designed in compact configurations to minimize topsides weight and footprint, with inline separators achieving high separation efficiency by integrating freewater knockout, deliquidization, and in a single unit weighing up to 40% less than traditional vessels. Integration with subsea tiebacks allows FPSOs to receive fluids from remote wells up to 30 kilometers away, using flexible risers and umbilicals to connect fields without additional platforms, thereby optimizing development costs. Chemical injection systems are incorporated for flow assurance, dosing inhibitors such as or glycol into well streams or pipelines to prevent formation and maintain fluid mobility in deepwater conditions. These systems are typically automated and tied to the FPSO's control infrastructure for precise dosing based on real-time monitoring. FPSO facilities are engineered for capacities ranging from 100,000 to 300,000 barrels per day (bpd) of oil production, with designs prioritizing modularity to accommodate varying field conditions and ensure separation efficiencies that meet export quality standards, often exceeding 95% for oil-water separation in compact units. The topsides weight, supported by the underlying hull structure, influences equipment selection to balance processing capability with vessel stability.

Storage and Offloading Mechanisms

Floating production storage and offloading (FPSO) vessels feature multiple segregated cargo tanks, typically numbering 12 to 16, designed to hold processed hydrocarbons such as crude after separation from and gas. These tanks are divided by bulkheads to prevent cross-contamination and ensure , with capacities varying based on vessel size but often exceeding 1 million barrels in total. To mitigate explosion risks, an system blankets the tank headspaces with a low-oxygen atmosphere (less than 8% oxygen by volume), generated from or , which displaces flammable vapors during loading and storage. Additionally, crude occurs naturally in these tanks, allowing and sediments to separate from the oil over time, facilitating removal through stripping systems before offloading. Offloading mechanisms transfer stored hydrocarbons to shuttle tankers via established methods, including side-by-side configurations using (SBM) with flexible loading connected between vessels, offloading where the tanker aligns stern-to-stern with the FPSO, or via a separate catenary anchor leg (CALM) for indirect transfer. offloading is the most prevalent, employed by approximately 100 FPSOs as of 2022, due to its efficiency in deepwater environments. Transfer rates typically reach 30,000 to 50,000 barrels per hour, enabling a full offload of a large tanker in 24-48 hours, depending on and weather conditions. These systems handle processed fluids from onboard facilities, ensuring export-quality crude meets or market . Safety protocols during storage and offloading prioritize containment and precise vessel alignment to prevent spills and collisions. containment booms are deployed around the transfer area to encircle potential leaks, forming a barrier that confines floating hydrocarbons for skimming or recovery. systems, utilizing thrusters and GPS-guided controls, maintain relative positions between the FPSO and tanker within meters, compensating for waves and currents during hose connections. All operations follow simultaneous operations (SIMOPS) plans, including real-time monitoring of hose integrity and emergency shutdown valves to isolate flows instantly if anomalies occur. Storage capacity is approximated using the vessel's deadweight tonnage (DWAT), which represents the maximum load including cargo, divided by the crude oil density (typically 0.85-0.95 tonnes per cubic meter): storage volume ≈ DWAT / density. For instance, an FPSO with 200,000 tonnes DWAT and oil density of 0.89 tonnes/m³ yields approximately 225,000 m³ of storage, equivalent to about 1.4 million barrels, though actual usable volume is slightly less due to allocations for fuel and slops. This calculation ensures vessels are sized for field production rates, balancing storage duration against offloading frequency.

Operations and Deployment

Installation and Commissioning

Site preparation for an FPSO deployment begins well before the vessel's arrival at the field site, focusing on the installation of subsea to ensure seamless integration. This includes deploying subsea trees, manifolds, jumpers, flowlines, risers, and umbilicals, often using heavy-lift vessels and remotely operated vehicles (ROVs) to position and connect these components on the . Pre-commissioning activities, such as pressure testing and integrity verification of the subsea systems, are conducted to confirm functionality and prevent delays during later hook-up. These preparatory steps typically occur months in advance, allowing the seafloor to be ready for to the arriving FPSO. Following site preparation, the FPSO undergoes tow-out from the or yard to the location, a managed by specialized tug fleets to ensure safe across potentially long distances. Upon arrival, positioning involves the vessel to pre-installed anchors or suction piles, often using a or spread system for stability in deepwater environments. then commences, connecting the FPSO's and topsides to the subsea risers and umbilicals through pull-in operations via winches and ROV assistance; this phase can last several months, integrating , power, and control systems. Commissioning proceeds in structured phases to verify operational readiness. The planning phase starts during front-end engineering and design (FEED), defining milestones like temporary certificate of inspection (TCOI) and outlining system tests in reverse from first oil production. Onshore execution, initiated after 60-80% topsides completion, involves dry testing of essential systems such as power generation, safety shutdowns, and utilities without hydrocarbons. Offshore execution follows tow-out, encompassing wet commissioning with live fluids, riser hook-up, and performance trials to achieve for startup. The overall timeline for FPSO installation and commissioning in deepwater projects typically spans 12-24 months, from subsea preparation through to first oil, with hook-up and integration often requiring 6-10 months. Costs for these phases can exceed $450 million in deepwater settings, driven by vessel mobilization, subsea connections, and testing, though overruns of 38% or more are common due to integration complexities.

Daily Operations and Maintenance

Daily operations of floating production storage and offloading (FPSO) units involve continuous processing of hydrocarbons from subsea wells, with 24/7 monitoring facilitated by systems to ensure real-time oversight of production parameters, equipment performance, and safety protocols. These systems integrate sensors across the vessel's topsides, hull, and mooring infrastructure to detect anomalies, optimize flow rates, and maintain operational stability, often supported by digital twins for . Offloading of stored crude to shuttle tankers typically occurs every 7-14 days, depending on production volumes and storage capacity, using side-by-side or tandem configurations to transfer up to 1 million barrels per operation while adhering to safety margins for relative motion and weather conditions. Maintenance strategies for FPSOs emphasize preventive and condition-based approaches to minimize , including planned shutdowns every 4-5 years for comprehensive topsides overhauls that involve refurbishment, upgrades, and assessments. These shutdowns, lasting 20-30 days, align with production forecasts to balance repair scopes with revenue impacts, often incorporating simultaneous operations (SIMOPS) planning to mitigate risks during execution. Routine upkeep of subsea elements, such as mooring lines and risers, relies on remotely operated vehicles (ROVs) for visual and non-destructive testing inspections, typically conducted annually or biennially to evaluate , , and marine growth without requiring full vessel disconnection. Onboard crews for FPSOs generally range from 80 to 120 personnel, comprising operations, , , and staff operating on rotational schedules to manage the vessel's complex systems. plays a pivotal role in reducing manpower demands, with integrated control systems handling routine tasks like valve operations and alarm management, while remote operations centers onshore provide analysis and decision to enhance efficiency and response times. Throughout their lifecycle, FPSOs incorporate turndown capabilities—typically down to 50% of design capacity—to accommodate declining field production rates, allowing sustained operations as pressures drop without major retrofits. Decommissioning occurs after 20-30 years of , involving off-station relocation, topsides removal, and in compliance with international standards, often enabling partial redeployment of components to extend asset value.

Advantages and Challenges

Economic and Operational Benefits

Floating production storage and offloading (FPSO) systems provide significant economic advantages over traditional fixed platforms, particularly in deepwater environments where fixed structures are either impractical or substantially more costly to install. These advantages stem from reduced requirements for extensive subsea and the ability to utilize converted tanker hulls rather than custom-built . The leasing model further enhances these savings by shifting substantial (capex) from operators to specialized contractors, allowing operators to avoid upfront ownership risks and maintenance burdens. A key operational benefit of FPSOs is their relocatability, enabling redeployment to new fields after the initial reservoir's productive life ends, which extends asset utilization and improves (ROI) by accessing otherwise stranded reserves. Deployment timelines for FPSOs are notably shorter, often 2-3 years for conversions or newbuilds, compared to 5 years or longer for fixed platforms or other floating systems, facilitating quicker market entry and revenue generation. This flexibility is particularly valuable for marginal fields, where FPSOs' allows economic viability without committing to permanent infrastructure. Onboard storage capacities, typically ranging from 800,000 to 2.3 million barrels, enable and offloading via shuttle tankers, eliminating dependency on costly and time-intensive pipelines, especially in remote or harsh locations. This operational autonomy supports steady output from smaller or short-life reservoirs, enhancing overall project economics. In 2023, the global FPSO fleet demonstrated high utilization, with average uptime exceeding 98% for major operators, underscoring the reliability and ROI potential through prolonged access to extended reserves.

Environmental and Technical Challenges

Floating production storage and offloading (FPSO) units pose significant environmental risks, particularly during offloading operations where spills can occur due to hose failures, collisions with tankers, or adverse conditions. These incidents often result in small-volume releases, but the potential for larger spills threatens ecosystems, with historical data indicating that most FPSO-related spills are minor yet collectively contribute to in sensitive areas. Additionally, flaring of associated gas releases CO2 and unburnt hydrocarbons, exacerbating and air quality degradation. Technical challenges in FPSO operations include mooring system , especially in harsh environments where dynamic loads from and currents accelerate wear on chains and lines, potentially leading to failures that compromise vessel positioning. In deepwater deployments, these systems must withstand extreme tensions, with life reduced by factors like low-frequency drift motions induced by wind. in storage tanks is another persistent issue, driven by exposure to , crude oil residues, and contaminants, necessitating robust protective measures to prevent structural degradation and leaks. Mitigation strategies have evolved to address these risks, including the adoption of double-hull designs mandated by international regulations such as MARPOL amendments in the early , which enhance containment and reduce spill probabilities from hull breaches. Zero-discharge policies, pioneered in regions like the , prohibit harmful effluents to sea, relying on advanced treatment and reinjection to minimize environmental releases. For emissions control, hybrid power systems integrating batteries, waste heat recovery, and renewables offer potential reductions in CO2 intensity by supplementing traditional gas turbines. As of 2025, FPSOs face heightened challenges in adapting to ultra-deep waters exceeding 12,000 feet, where increased hydrostatic pressures and complex conditions demand advanced and riser technologies to maintain and prevent failures. The global FPSO fleet has grown to 208 units as of 2025, with increasing integration of renewables such as offshore wind or for presenting opportunities for decarbonization but requiring overcoming logistical hurdles like intermittent supply and existing vessels. Operational plays a key role in controlling these risks through regular inspections.

Notable Examples

Record-Breaking Vessels

The FPSO , deployed by in Brazil's Santos Basin in 2025, has one of the largest storage capacities among operational FPSOs, with a crude oil storage of 2 million barrels. This vessel, built by and measuring 64 meters in width, achieved first oil on October 15, 2025, at the Bacalhau field, enabling efficient handling of high-volume production in remote deepwater environments. Its scale underscores advancements in hull design and tank configuration for ultra-large floating units. In terms of water depth deployment, the FPSO set the benchmark in 2016 for Shell's Stones field in the US , operating at a record 2,896 meters (9,500 feet). This SBM Offshore-leased unit, with a disconnectable turret system, supports production from reservoirs up to 8,077 meters below , demonstrating the feasibility of FPSO technology in extreme ultra-deepwater conditions exceeding 2,000 meters. The deployment highlighted innovations in integrity and subsea tiebacks for such depths. For production capacity, the FPSO Almirante Tamandaré, operated by at the Búzios field offshore , achieved the highest single-unit oil output record of 270,000 barrels per day on October 25, 2025, surpassing its nominal rating of 225,000 bpd. Chartered from and commissioned earlier that year, the vessel's performance, averaging over 250,000 bpd in October, reflects optimized processing facilities for pre-salt reservoirs. Regarding conversion efficiency, the FPSO Liza Destiny, converted by from a VLCC for ExxonMobil's Liza field off , completed its transformation in a record 20 months from contract award to sail-away in 2018, enabling rapid deployment with a production capacity of 120,000 . This timeline, faster than typical 24-30 month conversions, involved streamlined engineering of the 230-meter hull for turret mooring and storage of 1.6 million barrels, setting a precedent for accelerated VLCC-to-FPSO projects in emerging basins.

Significant Projects

One of the pivotal deployments in the evolution of FPSO technology occurred in Brazil's Basin, where initiated pre-salt production with the FPSO Cidade de in 2010. This unit, connected to the Tupi field in water depths exceeding 2,200 meters, achieved first oil ahead of schedule and enabled the extraction of high-pressure, high-temperature reservoirs previously inaccessible with conventional platforms. By processing up to 150,000 barrels of oil per day () and incorporating advanced subsea systems, it set benchmarks for ultra-deepwater operations and accelerated ' dominance in pre-salt developments, influencing regional exploration strategies across the . Shell's , a variant of FPSO , which arrived on location in 2017 off the coast of in the Browse Basin and began production in 2018, exemplified scalable floating production for gas resources. Measuring 488 meters in length, the facility processes 3.6 million tonnes of annually alongside and , demonstrating the feasibility of without extensive onshore . This project shaped industry practices by integrating modular construction and remote monitoring systems, paving the way for floating units in remote fields and reducing timelines for marginal gas reserves. In , Total's Kaombo project offshore introduced twin FPSO units—Kaombo Norte and Kaombo Sul—starting with the first in 2018 to develop Block 32's ultra-deepwater fields at depths up to 2,000 meters. The pair, each with a processing capacity of around 115,000 for a combined 225,000 , utilized converted very large crude carriers and an extensive 300-kilometer subsea network tying back 59 wells, marking one of the largest such systems globally. This deployment advanced in FPSO conversions to cut capital costs by up to 30% and enhanced local content through Angolan fabrication, influencing deepwater strategies in by prioritizing phased startups for risk mitigation. A more recent example is ExxonMobil's Payara development in Guyana's Stabroek Block, where the FPSO commenced production in late 2023 at water depths of approximately 1,800 meters. Capable of 220,000 , the unit supports the third major phase of the block's expansion, integrating 41 subsea wells across 10 drill centers and emphasizing rapid deployment through pre-fabricated modules. Innovations like Aize's contextual software enable real-time data integration for and operational optimization, reducing downtime and informing scalable models for Guyana's emerging offshore sector. These projects collectively underscore key lessons in FPSO innovation, such as the adoption of digital twins in for enhanced and the cost efficiencies from Kaombo's twin-unit , which have been applied to subsequent deployments to improve reliability in challenging environments.

References

  1. [1]
    What is an FPSO? - Bluewater Energy Services
    A Floating Production Storage and Offloading (FPSO) installation is a floating facility, usually based on a (converted) oil tanker hull.
  2. [2]
    Floating Production Storage and Offloading (FPSOs)
    Floating Production, Storage and Offloading (FPSO) units are essential to offshore energy production, enabling efficient extraction, storage and transfer of ...
  3. [3]
    Guide to Floating Production Storage & Offloading - Oil & Gas IQ
    At its core, an FPSO facilitates the processing and storage of oil and gas at sea. It stands for floating production storage and offloading (FPSO).
  4. [4]
    Floating Production Storage and Offloading (FPSO) Overview
    FPSO refers to a floating vessel located near an offshore oil field, where oil is processed and stored until it can be transferred to a tanker for transporting ...
  5. [5]
    Floating Production Storage and Offloading - ScienceDirect.com
    Floating production storage and offloading (FPSO) refers to an offshore vessel used in the oil and gas industry for processing, storing, and offloading ...<|control11|><|separator|>
  6. [6]
    What is FPSO (Floating Production Storage and Offloading) System?
    Jan 16, 2011 · The FPSO, as its name suggests, is a floating contraption that allows oil rigs the freedom not just to store oil but also to produce or refine it before ...
  7. [7]
    A Guide to FPSOs: Floating Production Storage and Offloading
    Apr 23, 2024 · The history of FPSOs dates back to the 1970s when the first prototypes emerged in response to the need for cost-effective solutions in offshore ...
  8. [8]
    EMA - Guide to Floating Production Systems
    FPSOs produce and store hydrocarbons offshore in varying water depths. These units receive the complete wellstream, separate the oil, water and gas, store the ...
  9. [9]
    Components of an FPSO - Special Piping Materials
    Mooring systems comprise of mooring lines, anchors, and connectors. ▶️ Topside. The topside of an FPSO is the and gas processing unit at the top of the vessel.
  10. [10]
    Floating, Production, Storage & Offloading (FPSO) Essentials
    Sep 2, 2025 · It comprises of mooring lines, anchors, and connectors. Topside: It is the gas processing unit for the FPSO at the top of the vessel, and it is ...Missing: key | Show results with:key
  11. [11]
    FPSO/FSO | Floating Production Systems | FPSO Business - MODEC
    An FPSO is a floating production system that receives fluids (crude oil, water and a host of other things) from a subsea reservoir through risers.Missing: key | Show results with:key<|separator|>
  12. [12]
    Top 12 Biggest FPSOs in the World - Maritime Education
    FPSO Egina – Nigeria. Operator: TotalEnergies | Processing Capacity: 200,000 bpd | Storage: 2.3 million barrels. The Egina FPSO is one of the largest ...
  13. [13]
    Búzios Field, Santos Basin, Brazil - Offshore Technology
    Aug 30, 2022 · Its water injection capacity will be 240,000 barrels a day, while the storage capacity will be 1.4 million barrels of oil. To be deployed at a ...
  14. [14]
    Offshore Oil & Gas History
    By 1950, the Gulf's new offshore petroleum industry had discovered 11 oil and natural gas fields. Launched in 1954, the converted barge Mr. Charlie was the ...Missing: storage | Show results with:storage<|separator|>
  15. [15]
    [PDF] History of the Gulf of Mexico Offshore Oil and Gas Industry during the ...
    The capabilities of floating drilling in ever- deeper waters had evolved steadily since Shell Oil's pioneering work in the early 1960s with Bluewater 1, the ...
  16. [16]
    Our Heritage - SBM Offshore
    SBM's introduction of the CALM Buoy in 1959 was the beginning of a technological revolution in the offshore oil and gas industry. Single Point Mooring (SPM) ...Missing: 1950s | Show results with:1950s
  17. [17]
    History of DP - Dynamic Positioning Committee
    It was an exciting time in the early 1960s. Floating vessel drilling had been shown feasible with anchor moored vessels. Walter Munk of Scripps Oceanographic ...Missing: single- point trials
  18. [18]
    The 1973 Oil Crisis: Three Crises in One—and the Lessons for Today
    Oct 16, 2023 · The 1973 oil embargo shook the global energy market. It also reset geopolitics, reordered the global economy, and introduced the modern energy era.
  19. [19]
    The FPSO Development Timeline: Fpsos Through The Ages - Scribd
    Major developments in the 1970s-1980s included the world's first leased FPSO in 1981 and the first disconnectable and external turret FPSOs. ... As a look back at ...
  20. [20]
    (PDF) The FPSO Development Timeline - Academia.edu
    The paper outlines the historical development and milestones of Floating Production Storage and Offloading (FPSO) units from their inception to recent ...<|control11|><|separator|>
  21. [21]
    Petrobras XXXIV
    Water Depth: 835m (2,739ft) ; Tanker Size: 50,000 dwt ; First Oil: September 1997 ; Storage Capacity: 340,000 bbls ; Fabrication: Lower Turret Module - Texas USA.
  22. [22]
    Gryphon A: The First Purpose-Built Permanently Moored Fpso In ...
    May 2, 1994 · The Gryphon 'A' Floating Production Storage and Offloading (FPSO) unit is the first purpose built permanently moored FPSO in the North Sea.
  23. [23]
    [PDF] Deepwater Development: - Bureau of Ocean Energy Management
    Deepwater development includes subsea wells, fixed platforms, compliant towers, spars, tension leg platforms, and floating production, storage and offloading ...
  24. [24]
    Latest Developments In Floating LNG Liquefaction Technologies
    LNG FPSO solutions offer an economic and environmentally sound solution to exploiting the attractive stranded offshore gas fields and commercialising oil ...
  25. [25]
    Optimal liquefaction process cycle considering simplicity and ...
    This study focused on the optimal liquefaction cycle to realize LNG FPSO in future projects. It is expected to contribute tremendously to actual offshore ...
  26. [26]
    [PDF] RESOLUTION MEPC.139(53) Adopted on 22 July 2005 ...
    Jul 22, 2005 · (FSUs) used for the offshore storage of produced oil, approved the Guidelines for application of. MARPOL Annex I requirements to FPSOs and FSUs.
  27. [27]
    [PDF] 2009 MODU Code (2020 Edition) - dco.uscg.mil
    Jan 17, 2011 · This copy of the 2009 MODU Code, as amended, has been developed from official IMO documents with the expressed written permission of the ...
  28. [28]
  29. [29]
    BP's Greater Tortue Ahmeyim FPSO: A Case Study - PlantFCE
    Mar 13, 2025 · One of the most significant innovations in the Greater Tortue Ahmeyim FPSO is the adoption of a hybrid power system combining gas turbines with ...
  30. [30]
    Harnessing cutting-edge technologies to shape next-generation ...
    Jan 2, 2025 · FPSOs running on floating offshore wind power ... One example of such use of renewable energy is encapsulated in Equinor's Hywind Tampen project, ...
  31. [31]
    The FPSO Industry: Characteristics, Challenges, and Future Prospects
    Jan 13, 2025 · The FPSO market is set to grow from USD 4.8 billion in 2022 to USD 5.4 billion by 2023, growing at a CAGR of 12.5% during the forecast period.
  32. [32]
    FPSO & Operations - SBM Offshore
    Large conversion FPSOs, with oil production capacities of up to 150,000 barrels per day, representing our traditional FPSO market. Oil tankers, also known ...
  33. [33]
    Albacora Leste Field Development-FPSO P-50 Systems and Facilities
    May 1, 2006 · The FPSO arrangement is modularized asshown at Figure 2, with separated modules for Gas Compression, Gas Treatment (De-hydration and CO2 ...
  34. [34]
    How does an FPSO vessel work in offshore oil production? - Rigzone
    Sep 17, 2025 · 3.1 Mooring & turret system: Internal/external turret with bearings and a swivel stack allows the FPSO to weathervane. · 3.2 Risers & umbilicals: ...Missing: characteristics | Show results with:characteristics
  35. [35]
    The FPSO Solution to Marginal Field Development
    Jan 15, 2018 · Traditionally, the development of marginal oil fields has been restricted by the fundamental difficulties of extracting oil from deepwater and ...
  36. [36]
    Girassol FPSO, Luanda, Angola - Offshore Technology
    Mar 27, 2023 · The field came on-stream in December 2001. The average production from Girassol is approximately 240,000 barrels per day (bpd). The subsea ...
  37. [37]
    [PDF] Conversion of an Oil Tanker into FPSO. Strength Analysis using ABS ...
    Jan 26, 2017 · ❖ August 2016 →169 FPSOs on operation worldwide →70% conversions / 30% purpose built FPSOs. FPSO is a type of floating tank system ...<|control11|><|separator|>
  38. [38]
    FPSO Conversion vs. New Build: Key Decision Factors Explained
    Oct 16, 2024 · Choosing between an FPSO conversion and a new construction is determined by various criteria, including cost, schedule, flexibility, and long-term operational ...
  39. [39]
  40. [40]
    OTC-29327-MS Application of an Enhanced Lazy Wave Flexible ...
    This paper presents the design challenges encountered in a flexible riser application with an external turret moored FSO in a shallow water depth around 55m, ...
  41. [41]
    Floating Storage and Offloading Unit (FSO) Market Size, Share ...
    Shallow water FSOs operate in depths of much less than 500 meters, providing cost-powerful garage and offloading solutions. They are extensively used in mature ...Missing: examples | Show results with:examples
  42. [42]
    FSO, FPSO, and FLNG: Key Differences Explained - Gowin Valves
    Jul 9, 2024 · Definition. FSO stands for floating storage and offloading, these are vessels that store raw oil that it collects from other factories at sea.
  43. [43]
    OTC-31869-MS Unattended Floating Production Unit FPU and ...
    The paper presents a normally unattended Floating Production Unit (FPU) and an attended Floating Storage Offloading vessel (FSO) as an alternative to an ...
  44. [44]
    Chinese yard delivers FSO for Southeast Asia operations | Upstream
    Jan 14, 2025 · The PTTEP-operated G1/61 project encompasses the producing Erawan, Platong, Satun and Funan fields. The FSO is integral to PTTEP's strategy ...
  45. [45]
    Commencement of Production from Cendor Field, Malaysia - Petrofac
    Sep 25, 2006 · Production from Cendor also establishes south east Asia as a new core area for Petrofac and we look forward to the field's further development ...
  46. [46]
    Construction Requirements for Oil Tankers - Double Hulls
    In 1992 MARPOL was amended to make it mandatory for tankers of 5,000 dwt and more ordered after 6 July 1993 to be fitted with double hulls, ...
  47. [47]
    WATCH: Hull works are a wrap on Asia's first cylindrical FPSO ...
    Aug 18, 2023 · ... harsh environments. The vessel's main deck area is equivalent to 13 standard basketball courts. This FPSO has a maximum displacement of ...Missing: purpose- | Show results with:purpose-
  48. [48]
    [PDF] Requirements for Position Mooring Systems
    Jul 1, 2022 · A mooring system can be of several types, such as single point mooring or spread mooring, and can be used for different operations, such as ...
  49. [49]
    Mooring System | FPSO | Business - MODEC
    Disconnectable turrets are sometimes used so that FPSOs can be detached from their mooring systems and evacuated to a safe location in the event of an ...
  50. [50]
    Offshore Mooring Systems - Turrets, Spreads & Yokes - SOFEC
    SOFEC offers external and internal (disconnectable and permanent) turrets, spread mooring, and tower yoke systems for offshore mooring.
  51. [51]
    [PDF] dynamic analysis of multiple-body floating platforms - OAKTrust
    KG m. 13.32. Transverse metacentric height. MGt m. 5.78. Longitudinal metacentric height. MGl m. 403.83. Roll raius of gyration in air. Rxx m. 14.77. Pitch ...
  52. [52]
    Hull Steel - an overview | ScienceDirect Topics
    ABS mild steel (Grade A) is specified at 34 ksi yield and the corresponding gravity load allowable is 20.36 ksi. dnv mild steel is nominally 240 kN/mm2 yield, ...Missing: lifespan | Show results with:lifespan
  53. [53]
    [PDF] A Study for the US Department of the Interior
    Dec 1, 2009 · FPSOs have a high re-use and may be used to produce 3-4-5 fields in a production life of. 20-25 years. They are usually self propelled and ...
  54. [54]
    DNV-RP-C203 Fatigue design of offshore steel structures
    The objective of this recommended practice (RP) is to provide methods for fatigue assessment of offshore steel structures and structural components.
  55. [55]
    [PDF] Guide for Fatigue Assessment Of Offshore Structures 2020
    Jun 1, 2020 · This guide supplements ABS rules for fatigue assessment of offshore structures, including updated SN curves and FEA stress extrapolation. It is ...
  56. [56]
    [PDF] FLOATING PRODUCTION STORAGE AND OFFLOADING UNITS ...
    This article describes the process equipment in the topside modules of a typical FPSO along with the utility systems, presents, and includes information for the ...<|separator|>
  57. [57]
    Design of FPSO systems for re-use, decommissioning | Offshore
    The FPSO vessel is categorized by storage capacity. Vessel categories follow classical groups for categorizing trading tankers. The small vessel category ...
  58. [58]
    [PDF] Petrobras - Semantic Scholar
    Three 2,000,000 SCMD compression trains installed in a 180,000 bpd FPSO (in operation since April 2006). Three stage compressor trains, consisted of a back- to ...
  59. [59]
    Topside Processing Plants Go Compact on FPSOs - JPT/SPE
    Nov 28, 2013 · The development of compact topside processing plants for floating, production, storage and offloading (FPSO) vessels is a growing industry trend.
  60. [60]
    Prysmian's 'first-of-its-kind' FPSO subsea tie-back system in Brazil ...
    Sep 23, 2024 · A groundbreaking system envisioned to connect fields 30 kilometers (km) away to a floating production, storage, and offloading (FPSO) unit, enabling fast- ...
  61. [61]
    [PDF] Enhancing Safety on FPSOs: Operations and Maintenance
    Implementing a double hull for FPSO vessels could provide greater ease in cleaning the cargo tanks. Adopting a double hull would decrease the number of ...
  62. [62]
    [PDF] Cargo Guidelines for F(P)SOs versus ISGOTT - ocimf
    An F(P)SO continually loads crude oil to the storage tanks resulting in the inert gas blanket within the tanks being compressed. • Vent capacity. • Vent ...
  63. [63]
    The Problem of Inert-Gas Venting on FPSOs and a Straightforward ...
    May 21, 2025 · As an FPSO continually loads stabilised crude oil to the cargo tanks, the inert gas (IG) blanket within the tanks is compressed.Missing: segregated | Show results with:segregated
  64. [64]
    [PDF] 2022 WORLDWIDE SURVEY OF FLOATING PRODUCTION ...
    Dec 31, 2022 · FPSO Conversion projects are significantly faster to first oil than when the FPSO is a new build. SEE GRAPH 8. Projects where contractors own ...
  65. [65]
    [PDF] FPSO Mooring and Offloading System Alternatives for Deepwater ...
    Specifically for West Africa, side-by-side offloading is not an acceptable method due to long swells from the south and uncorrelated wind and current events ...
  66. [66]
    [PDF] FPSOs and Shuttle Tankers What Dynamic Positioning Means to ...
    tanks is displaced to the storage vessel as the crude oil is transferred. The discharge rate will be in the range of 30-40,000 barrels/hour. A safety system ...
  67. [67]
    [PDF] Oil Spills from Floating Production & Storage Craft - ITOPF
    Nevertheless, these systems often have to endure harsh weather and sea conditions and manoeuvring shuttle tankers pose a risk during offloading operations.
  68. [68]
    Process Safety and HSE Measures on an FPSO - PlantFCE
    Jan 30, 2025 · Dynamic Positioning (DP) Systems maintain stability to prevent operational accidents. · Tandem Offloading Safety Procedures ensure safe transfer ...Missing: protocols | Show results with:protocols
  69. [69]
    The Defining Series: Subsea Infrastructure - SLB
    May 20, 2016 · These subsystems can be divided into subsea trees, production controls, manifolds, jumpers, flow-lines, risers, umbilicals and processing ...
  70. [70]
    [PDF] Subsea Infrastructure Installation and Pre-commissioning Activity ...
    Once the key infrastructure is installed, pre-commissioning activities will be carried out to verify the integrity and connections of the infrastructure.Missing: tow- timeline<|control11|><|separator|>
  71. [71]
    [PDF] Site-Specific Environmental Assessment for an FPSO Facility
    Installation activities associated with FPSO commissioning would produce slight increases in the number of vessel transits, resulting in minor incremental ...
  72. [72]
    Making the Connection Between Construction and Operations
    Sep 21, 2014 · An FPS goes through a five-stage process: front-end engineering and design (FEED), detailed design, construction, installation and commissioning, and ...
  73. [73]
    [PDF] The Gulf of Mexico Oil & Gas Project Lifecycle
    Table 1: Deepwater Project Activity Timeline, Average Spending, and ... Hook-up &. Commissioning. Detailed. Activities. Integration. Flushing &. Drying.
  74. [74]
    [PDF] a critical assessment of contracting strategies and cycle times of post ...
    The deck offers a flat area that facilitates installation, hook-up and pre-commissioning topsides modules. The deck and topsides are fabricated and.
  75. [75]
    FPSO industry must re-think supply chain - Offshore Magazine
    Feb 5, 2014 · The goal here is to quantify these delays and cost overruns, and examine the reasons behind the ailing FPSO supply chain. The role of the oil ...Missing: hook- timeline
  76. [76]
    A SCADA-Integrated Framework for Real-Time Production ...
    Aug 8, 2025 · This study introduces a SCADA-integrated framework specifically designed to enhance real-time production monitoring and operational intelligence ...Missing: daily | Show results with:daily
  77. [77]
    [PDF] Survey of SCADA System Technology and Reliability in the Offshore ...
    Nov 15, 2000 · A comprehensive survey of SCADA systems in the oil and gas industry was prepared in order to assess the current state of SCADA technology ...
  78. [78]
    White Paper - MBC on-reel FPSO applications
    Aug 2, 2018 · Depending on the field and subsea production system, FPSOs will offload cargo every week ... FPSO. The loading of the tanker is a complex ...
  79. [79]
    What Are Shutdowns and Turnarounds? - Oil & Gas IQ
    These turnarounds can be due to a need for maintaining, renovating, or refitting facilities – usually every four years or so. Turnaround activities require well ...Missing: frequency | Show results with:frequency
  80. [80]
    Full year 2023 operations update and 2024 guidance - EnQuest
    Feb 15, 2024 · The planned annual maintenance shutdown was completed in 20 days, versus the original planned duration of 24 days, with all major scopes ...
  81. [81]
    ROVs for Inspecting Floating Production Storage and Offloading Units
    Battery-powered ROVs are smaller than their counterparts, making them effective tools for visual and NDT inspecting FPSOs and other offshore oil and gas ...
  82. [82]
  83. [83]
    [XLS] Summary - Offshore Norge
    Base crew size approx. 35, 42-43 typical core crew levels (inc catering). 8, Accommodation/POB, 76 beds available, and run 54 on days and 22 nights. Some issues ...Missing: personnel | Show results with:personnel
  84. [84]
    Unlocking the True Potential of FPSO Operations with a Contextual ...
    Aug 12, 2025 · This is not just about convenience. In offshore operations, time saved equals downtime avoided, better planning accuracy, and safer execution.Missing: centers | Show results with:centers
  85. [85]
    Real-time data transforms offshore operations
    Mar 19, 2025 · The system continuously captures real-time data to generate a live operational feed within FourPhase's control centre while simultaneously ...
  86. [86]
    Well and Production Systems | Reservoir Surveillance - OnePetro
    The basic design of a production facility depends on the system pressure, fluid characteristics, fluid rates, injection, and field-processing requirements.
  87. [87]
    Decommissioning and Redeployment Costs of FPSOs - PlantFCE
    Jan 11, 2025 · FPSOs are designed to operate in offshore fields for 15 to 30 years, depending on their build quality, maintenance, and field requirements. Once ...
  88. [88]
    [PDF] Foinaven FPSO Offstation Decommissioning Programmes | BP
    Jan 10, 2022 · The FPSO has to be taken off-station as it has reached end of its 25-year service life, operating in a harsh environment. The FPSO is owned by ...
  89. [89]
    OTC-27972-MS Best Practices for Decommissioning of ... - OnePetro
    Oct 26, 2017 · A typical FPSO life cycle is generally 36 months for EPC phase, 240 months for operations and after that the operator needs to take the decision ...
  90. [90]
    SSP offers cost-savings, deepwater production options | Offshore
    The satellite services platform (SSP) combines many typical characteristics of production solutions into an inexpensive, easily installable unit for deepwater.Missing: benefits fixed
  91. [91]
    Floating Production Storage and Offloading (FPSO) Market Size ...
    primarily converted units — to maximize output from deepwater fields. ... FPSOs for smaller or marginal fields. Cost ...<|separator|>
  92. [92]
    FPSOs: Overcoming challenges to unlock potential | White & Case LLP
    Aug 16, 2021 · Of the remaining two options, there has recently been a gradual shift towards new-build FPSOs as compared to conversions, on account of growing ...Redeployment · Causes Of Disputes · Conversion DisputesMissing: 1980s | Show results with:1980s
  93. [93]
    10 reasons why FPSOs are the future of oil and gas - FPSO Network
    Fast roll out = quicker profits. The average semi-submersible oil rig takes 3-4 years to kit out and build, and a jack-up rig 2-3 years. · FPSOs can evade harsh ...Missing: capex $1-2 billion $5
  94. [94]
    [PDF] Full Year Results 2023 - SBM Offshore
    Feb 29, 2024 · SBM Offshore's 2023 results include US$1,319 million EBITDA, US$30.3 billion backlog, 98.2% fleet uptime, and US$220 million cash return. Net ...
  95. [95]
    FPSO in the Offshore Industry: Advantages and Challenges - Inspenet
    Apr 25, 2025 · They can be relocated to different oil fields once the initial reservoir is depleted. · They allow the economic exploitation of marginal or small ...
  96. [96]
  97. [97]
    Analysis of Flaring Activity at Liquefied Natural Gas (LNG) Export ...
    Sep 20, 2025 · Volume of gas flared by capacity was 0.75% (0.47%) for onshore and 2.0% (0.56%) for offshore facilities. Differences in flaring days and volume ...
  98. [98]
    Flaring Accountability - Clean Air Task Force
    Nov 12, 2024 · Globally, over 4% of natural gas production is flared;v in addition to being a large source of pollution, this practice is a huge waste of ...
  99. [99]
    [PDF] Understanding Fatigue for Deepwater Mooring Systems - Sofec
    In deepwater systems, flowlines exert large horizontal pulls on FPSOs, which are governed by fatigue. Increasing anchor to vessel distance increases fatigue ...
  100. [100]
    [PDF] Spectral-Based Fatigue Analysis for Floating Production, Storage ...
    FPSO Areas for Fatigue Assessment ... Wind produces low-frequency drift motions, which can produce low-frequency fatigue effects in mooring lines and risers.
  101. [101]
    Corrosion Protection of Floating Production and Storage Vessels
    Apr 30, 2007 · Coatings are the main corrosion protection of the low alloy steel of the hull on an FPSO (floating production and storage units). For submerged ...
  102. [102]
    [PDF] Zero discharges - Offshore Norge
    "Zero environmentally harmful discharges" means that the discharges shall not inflict harm on the environment. Such an approach requires methodology and tools ...Missing: FPSO | Show results with:FPSO
  103. [103]
    What is the future of FPSO technology in offshore drilling? - Rigzone
    Sep 17, 2025 · 6.1 Subsea boosting/compression to reduce topsides power per barrel and mitigate flow assurance risks over longer tiebacks. VI. Implications for ...<|separator|>
  104. [104]
    Offshore Tech Evolves for Deeper Waters, Deeper Reservoirs
    Sep 1, 2024 · Driven by seismic, drilling, and development breakthroughs, the industry has pushed into deeper waters, high-pressure reservoirs, and new frontiers like Guyana.
  105. [105]
    MODEC celebrates First Oil milestone of FPSO Bacalhau | News 2025
    Oct 16, 2025 · It also boasts a minimum crude oil storage capacity of 2,000,000 barrels. The FPSO is also designed with gas turbine combined cycle (GTCC) ...
  106. [106]
    World's Largest FPSO Achieves First Oil at Brazil's Bacalhau Field
    Oct 19, 2025 · At a width of 64 meters, it also boasts a minimum crude oil storage capacity of two million barrels, making it one of the largest FPSOs ever ...
  107. [107]
    World's deepest FPSO en route to Gulf of Mexico (Gallery)
    Nov 16, 2015 · The FPSO will be used to develop the oil field in a water depth of 2,896 meters (9,500 feet) – this is more than six Empire State Buildings ( ...
  108. [108]
    Turritella FPSO - Design and Fabrication of the World's Deepest ...
    May 1, 2017 · ... deep water (9,500 ft. water depth). To address the step wise development of the Stones field, Shell selected a floating production, storage ...
  109. [109]
    Petrobras Achieves Record Production with FPSO Almirante ...
    Oct 28, 2025 · Petrobras' FPSO Almirante Tamandaré set a record production flow of 270,000 bpd on October 25. The Búzios 7 Project, including the Almirante ...
  110. [110]
    Petrobras Achieves Record Production with FPSO Almirante ...
    Oct 29, 2025 · This surpasses its nominal capacity of 225,000 bpd, with an average production exceeding 250,000 bpd throughout October. This milestone is part ...Missing: rate | Show results with:rate
  111. [111]
    Liza Destiny was completed in record 20+ months – SBM Offshore
    Jul 22, 2019 · The voyage to Guyana will take less than two months. The FPSO is designed to produce up to 120,000 barrels of oil per day. It will have ...
  112. [112]
    Pre-salt production gets under way - Offshore Magazine
    Nov 1, 2010 · On Sept. 22, theFPSO Cidade Angra dos Reis arrived on location in the Tupi area of Santos basin. Soon Petrobras expects to begin production at ...
  113. [113]
    Shell's Prelude FLNG Project, Browse Basin - Offshore Technology
    Jan 24, 2019 · The FLNG facility is located in the Browse basin, Western Australia. The Prelude FLNG project marks the launch of Shell's FLNG technology.
  114. [114]
    The Shell Prelude facility has sailed away to Australia - TechnipFMC
    Jun 29, 2017 · At 488-metre-long and weighing 600,000 tonnes, Prelude FLNG was towed from the SHI shipyard in Geoje for the next phase of the project: hook up ...
  115. [115]
    Kaombo Project:biggest subsea well system in Angola - NS Energy
    Jul 25, 2019 · The offshore development involved the tying-back of these oil fields with two turret-moored FPSO units through 300km of subsea pipelines. The ...
  116. [116]
    Kaombo: An Innovative Ultra-Deep-Water Offshore Project in Angola
    Oct 27, 2025 · The depth of the waters explored, which reaches 1,950 meters. At such depths, extreme temperature and pressure conditions require the deployment ...
  117. [117]
    Total fires up second Kaombo FPSO offshore Angola
    Apr 2, 2019 · The project comprises a large subsea system including 59 wells (with over 60% of them already drilled), and two FPSO units which were converted ...
  118. [118]
    Payara: Offshore Oil Development in Guyana | ExxonMobil
    Nov 14, 2023 · Company's third FPSO, Prosperity, starts up ahead of schedule and will add 220,000 barrels of oil per day · Nearly 6,000 Guyanese support ...Missing: twins | Show results with:twins
  119. [119]
    Aize signs agreement with ExxonMobil Guyana and SBM Offshore to ...
    Aize, ExxonMobil Guyana and SBM Offshore have agreed to deploy Aize digital twin software on the Floating, Production, Storage and Offloading (FPSO) vessels.Missing: Payara | Show results with:Payara