Joint Strike Fighter program

The Joint Strike Fighter (JSF) program is a U.S.-led multinational initiative to develop and acquire a family of fifth-generation , designated the F-35 II, intended to replace aging fleets of fighters and across the U.S. branches and allied forces. Launched in the mid-1990s as a cost-sharing effort following the merger of competing service-specific programs, it emphasized commonality across variants to reduce lifecycle expenses through . The program's development phase featured a concept demonstration competition between Lockheed Martin's X-35 and Boeing's X-32 prototypes, with Lockheed selected in 2001 to proceed into and manufacturing development. Three variants emerged: the F-35A for conventional takeoff and landing by the , the F-35B for short takeoff/vertical landing by the Marine Corps and allies like the , and the F-35C for carrier-based operations by the . International partners including the , , , , , , and contributed funding and requirements, enabling shared production and sustainment. By 2024, the F-35 achieved full-rate production approval after completing operational testing, with over 1,000 aircraft delivered and operational across multiple nations as of 2025. Despite these milestones, the JSF has faced persistent challenges, including developmental delays, software integration issues, and engine reliability problems that have deferred full combat capabilities for years. Lifetime costs, encompassing acquisition, operations, and sustainment for approximately 2,500 U.S. and allied aircraft, have ballooned to an estimated $1.7 trillion, far exceeding initial projections due to concurrency between testing and production, complexities, and upgrade requirements. Recent assessments highlight ongoing Block 4 modernization overruns exceeding $6 billion and schedule slips pushing major upgrades into the 2030s, underscoring risks from ambitious technical goals and compressed timelines. These factors have prompted congressional scrutiny and calls for restructuring to align costs with demonstrated performance.

Origins and Program Initiation

Strategic Background and Service Requirements

The Joint Strike Fighter (JSF) program originated in the early 1990s amid post-Cold War fiscal constraints and the need to modernize aging tactical aircraft fleets, following the Bottom-Up Review that highlighted the unsustainable costs of service-specific programs such as the Navy's canceled A-12 and the 's Multi-Role Fighter (MRF). The program evolved from the Joint Advanced Strike Technology (JAST) initiative, launched in to consolidate efforts across the U.S. , , and Corps, and was formally renamed JSF in 1996 after merging with DARPA's Advanced Short Take-Off/Vertical Landing (ASTOVL) program, enabling early international collaboration with the . This joint approach addressed the high acquisition and sustainment expenses of fourth-generation fighters like the F-16 (entering service in 1978) and F/A-18 (1983), which were approaching obsolescence, while responding to lessons from operations like Desert Storm that emphasized precision strike and survivability against advanced threats. The strategic rationale centered on developing a family of affordable, multi-role strike fighters to achieve , with projected savings of approximately $15 billion through avoided parallel programs and high parts commonality (targeted at 70-90 percent across variants), thereby reducing the logistical footprint and enabling a single production line. Core operational needs included features for low observability, supersonic dash capability, internal carriage of weapons like AIM-120 missiles, and integration to support joint missions in contested environments, all while prioritizing affordability with flyaway costs initially set at $28-38 million per (in FY1994 dollars). The Joint Initial Requirements Document (JIRD), approved in the mid-1990s, established top-level parameters focused on sortie generation rates, reduced ownership costs, and adaptability to evolving threats, guiding trade-offs between performance and lifecycle expenses. Service-specific requirements drove the design of three variants to meet diverse operational environments while maximizing commonality. The U.S. Air Force's conventional take-off and landing (CTOL) variant (F-35A) was intended to replace the F-16 and A-10, requiring a combat radius of 450-600 nautical miles, a 2,000-pound payload, and a unit cost of about $31 million (FY1994 dollars), with emphasis on air-to-ground multirole capabilities complementing the F-22. The Navy's carrier variant (CV, F-35C) aimed to succeed the F-14, A-6, and older F/A-18 models, demanding a 600-nautical-mile radius, 2,000-pound payload, reinforced landing gear for arrested landings, folding wings, and costs of $31-38 million, to provide survivable carrier-based strikes. For the Marine Corps, the short take-off/vertical landing (STOVL) variant (F-35B) was to replace the AV-8B Harrier and F/A-18, specifying a 450-550-nautical-mile radius, 1,000-pound payload in STOVL mode, vertical lift capacity, and costs of $30-35 million, enabling operations from amphibious ships without catapults or arresting gear. These requirements balanced branch-specific needs—such as basing flexibility for Marines—with overarching goals of interoperability and cost control.

Formation of the Joint Program Office

The Joint Program Office (JPO) for the Joint Strike Fighter program was formally established in January 1994, marking the transition from the preceding Joint Advanced Strike Technology (JAST) initiative, which had been announced by the Secretary of Defense in September 1993 and approved in October 1993 to address the need for advanced, affordable strike capabilities following cancellations of separate U.S. military service fighter programs. The JPO was structured as a joint entity under the Department of Defense's Acquisition Category 1D framework, integrating personnel and oversight from the U.S. and to manage multi-service requirements for , , and aircraft configurations. This collaborative management alternated service acquisition executive responsibilities between the and , with the office headquartered in Arlington, Virginia, to streamline acquisition, technology development, and operational input from warfighters. Early JPO efforts emphasized an model, incorporating government agencies, industry partners, and end-users to align requirements, reduce costs, and accelerate development timelines, diverging from traditional siloed service approaches. In 1995, congressional directed the merger of the Defense Advanced Research Projects Agency's Advanced Short Takeoff/Vertical Landing (ASTOVL) program into the JSF effort, expanding the JPO's scope to incorporate technologies critical for U.S. Marine Corps and allied needs, such as those of the , which formalized participation via a in December 1995. The office's formation facilitated the program's shift from technology maturation under JAST to full joint acquisition, setting the stage for the concept exploration phase that began in November 1996 with downselect to and demonstrators. The JPO's joint structure aimed to mitigate historical inter-service rivalries by centralizing , though it faced initial challenges in balancing divergent requirements—such as the Navy's carrier-based durability versus the Air Force's emphasis on speed and range—while prioritizing affordability targets of under $1,000 per flight hour in 1990s dollars. Over time, the office grew to include partners and expanded to more than 2,200 personnel worldwide, overseeing life-cycle management, though legislative mandates like the for Fiscal Year 2022 required planning for a phased transfer of functions back to individual services by October 2027. This foundational setup enabled the program's progression to system development and demonstration in 2001, underscoring the JPO's role in fostering a unified acquisition amid evolving threats.

Competitive Demonstration Phase

Design Competition Entries

In November 1996, the U.S. Department of Defense selected and to proceed into the Concept Demonstration Phase of the Joint Strike Fighter program, tasking each with building and flying demonstrator aircraft to validate key technologies for multi-role strike fighters serving conventional takeoff and landing (), short takeoff and vertical landing (), and carrier variant () requirements. received a $662 million contract to develop its entry, focusing on a delta-wing design emphasizing high commonality across variants to reduce production and sustainment costs. Boeing's X-32 demonstrators featured a distinctive large chin-mounted to accommodate the direct-lift system for operations, powered by a modified with a shaft-driven lift fan and roll-control nozzles. The X-32A variant, intended primarily for U.S. requirements, conducted its on September 18, 2000, from , accumulating 66 flights over four months to demonstrate handling qualities, supersonic performance, and carrier approach simulations. The X-32B prototype followed with its first flight on March 29, 2001, validating short takeoff, hover, and vertical landing capabilities through 78 total flights, including demonstrations of transition from conventional to flight modes. Lockheed Martin's X-35 entry adopted a more conventional blended-wing configuration with canted vertical stabilizers for enhanced and control, utilizing a engine; the STOVL version incorporated a with a separate lift fan upstream of the engine. The team constructed three prototypes to cover all variants: the X-35A first flew on October 24, 2000, completing 28 flights focused on air vehicle performance and handling before conversion for further testing. The X-35C variant achieved initial flight on December 16, 2000, logging 73 flights to validate carrier suitability, including arrested landings and low-speed approaches. The X-35B demonstrator, converted from the X-35A, flew from June 23 to August 6, 2001, in one of the program's shortest test campaigns, successfully proving STOVL transitions and hover stability.

Evaluation Criteria and Selection Process

The evaluation criteria for the Joint Strike Fighter (JSF) competition emphasized technical performance, program affordability, and risk reduction across conventional takeoff and landing (), short takeoff/vertical landing (), and carrier variant () configurations. Key requirements included (low observability), multirole combat effectiveness with advanced avionics and precision munitions, and STOVL capabilities critical for U.S. Marine Corps and operations. Cost targets were set using a Cost as an Independent Variable (CAIV) approach, aiming for unit recurring flyaway costs of $28 million for CTOL, $30-35 million for STOVL, and $31-38 million for CV in FY1994 dollars, alongside high parts commonality (targeting 70%) to achieve manufacturing economies. During the Concept Demonstration Phase (1997-2001), and built and flew prototypes—the X-32 and X-35, respectively—to demonstrate compliance with these criteria through flight tests, ground evaluations, and simulations assessing integration, systems, and systems. The Department of Defense's Joint Program Office conducted rigorous assessments, prioritizing designs that minimized technical risk while meeting operational needs, such as supersonic dash capability alongside operations without major reconfiguration. 's X-35 excelled in performance via its shaft-driven lift fan and roll-control posts, enabling seamless transitions between vertical lift and high-speed flight modes, whereas 's X-32 relied on direct-lift vectored thrust, which suffered from hot gas reingestion issues and required separate configurations for and supersonic testing, increasing perceived program risk. The selection process culminated in a winner-take-all decision to proceed to System Development and Demonstration, favoring a single contractor to reduce front-end costs and leverage over dual sourcing. On October 26, 2001, the Department of Defense announced as the winner, citing the X-35's superior technical maturity, lower projected life-cycle costs, and better alignment with joint service requirements, particularly in variant feasibility and overall design commonality. This choice reflected a balance of empirical test data and predictive modeling, though subsequent program challenges highlighted ongoing risks in scaling prototypes to production.

System Development and Demonstration

Engineering and Manufacturing Development Phase

The Engineering and Manufacturing Development (EMD) phase of the Joint Strike Fighter program, formally designated as the System Development and Demonstration (SDD) effort, began with the U.S. Department of Defense's Milestone B approval and the award of the primary contract to Lockheed Martin on October 26, 2001. The fixed-price-incentive contract was valued at $18.9 billion for the air vehicle prime contractor, with additional funding allocated to Pratt & Whitney for the F135 engine development, encompassing design maturation, systems integration, and fabrication of an initial cadre of 22 test aircraft across variants. Objectives included refining the common airframe architecture, incorporating stealth features, advanced avionics, and sensor fusion, while addressing service-specific requirements such as short takeoff/vertical landing (STOVL) capabilities for the Marine Corps F-35B. Key early milestones advanced the program's technical baseline. A Preliminary Design Review was completed in April 2003, validating initial configurations and risk reduction from the Concept Demonstration Phase. Critical Design Reviews followed in February 2006 for the conventional takeoff and landing (CTOL) F-35A and shared common elements, with subsequent reviews in February 2006 for STOVL components and June 2007 for carrier variant (CV) adaptations. Manufacturing of flight test articles commenced at Lockheed Martin's Fort Worth facility, producing structural test airframes like AA-1 and flight sciences vehicles including BF-1 through BF-4 for STOVL propulsion validation, CF-1 and CF-2 for carrier operations, and DA-1 for mission systems integration. First flights marked progress: the F-35A (AA-1) on December 15, 2006; the F-35B on June 11, 2008, demonstrating STOVL transition; and the F-35C on May 6, 2010, with arrested landings simulated. The phase encountered persistent technical and programmatic hurdles, resulting in schedule extensions and cost escalation beyond initial projections. Software development for avionics and mission systems proved particularly challenging, with integration delays stemming from the complexity of fusing data from active electronically scanned array radars, electro-optical targeting systems, and distributed aperture sensors. STOVL lift system refinements required iterative ground and flight testing to achieve reliable short takeoffs and vertical landings under combat loads. The Government Accountability Office (GAO) documented requirements growth and concurrency—overlapping development with low-rate initial production (LRIP)—as causal factors, necessitating costly retrofits on early production lots. SDD completion slipped from an original target of approximately 2007 to April 11, 2018, when the final developmental flight (CF-2 weapons delivery validation) occurred after over 17,000 test hours, 183 weapons separation tests, and 46 accuracy evaluations across sites like Edwards Air Force Base and Naval Air Station Patuxent River. Total expenditures exceeded baseline estimates, with attributing overruns to optimistic initial assumptions on technological maturity and underestimation of risks in a tri-service, multi-variant . By phase end, development costs had ballooned to support refined performance metrics, including capability on the F-35A and internal weapons bays compatible with joint direct attack munitions. Despite these issues, the effort established the production-representative configuration, paving the way for low-rate initial production lots starting in 2006 and full-rate production approval in March 2024.

Flight Testing and Milestone Achievements

Flight testing for the F-35 Joint Strike Fighter commenced during the System Development and Demonstration (SDD) phase following the program's 2001 selection of . The initial conventional takeoff and landing () variant, designated F-35A, achieved its first flight on December 15, 2006, from , marking the start of developmental flight tests aimed at validating , , and integration. The short takeoff/vertical landing () F-35B variant followed with its maiden flight on June 11, 2008, initially in mode to clear pathways for STOVL-specific funding and testing. Subsequent testing expanded to include the carrier variant (CV) F-35C, with flight envelope progression, weapons integration, and mission systems validation conducted primarily at and [Naval Air Station Patuxent River](/page/Naval Air Station Patuxent River). By 2017, the F-35 fleet had accumulated over 100,000 total flight hours, with SDD-specific efforts encompassing more than 17,000 hours across 9,200 test flights by the phase's completion. Key achievements included the completion of weapons delivery accuracy assessments in 2017 by the 461st Squadron, demonstrating precision strike capabilities. Despite these advances, encountered persistent delays, particularly in software maturation and simulator development, which impeded operational test timelines and full warfighting capability delivery. The phase culminated on , 2018, with the final developmental test flight, transitioning the program toward operational evaluation amid ongoing issues like and instabilities identified in software ground and flight tests. Milestone achievements tied to testing included declarations of Initial Operational Capability (IOC). The U.S. Marine Corps attained IOC for the F-35B in July 2015, followed by the U.S. Air Force for the F-35A in August 2016, and the U.S. Navy for the F-35C in February 2019, signifying that each service had achieved minimum mission-ready status post-testing validations.
VariantFirst Flight DateIOC Date (U.S. Service)
F-35A (USAF)December 15, 2006August 2016
F-35B (USMC)June 11, 2008July 2015
F-35C (USN)N/AFebruary 2019

Design Features and Variants

Core Airframe and Stealth Technology

The F-35 Lightning II's core airframe utilizes advanced composites for approximately 35% of its structural weight, balancing strength, weight reduction, and low-observability requirements. Primary materials include carbon-fiber reinforced polymers such as IM7/977-3 and IM7/5250-4 prepregs, chosen for their proven durability in fighter applications. The design features a trapezoidal mid-wing layout with canted twin vertical stabilizers and aligned edges to deflect radar waves away from the source, minimizing radar cross-section (RCS) across multiple aspects. Internal weapons bays preserve stealth during missions by avoiding external stores, while the fuselage integrates variant-specific elements without altering the baseline low-observable profile. Stealth integration relies on precise shaping, radar-absorbent materials () coatings, and structural alignments to achieve broadband low , though exact values remain classified. Diverterless supersonic inlets (DSI), positioned laterally with bifurcated serpentine ducts, employ compression surfaces and forward-swept cowls to obscure the engine blades from while enhancing and reducing weight by 30% relative to conventional diverter-equipped inlets. This configuration supports supersonic cruise and contributes to suppression through cooled exhaust management. The interface features a low-observable axisymmetric with serrated edges, minimized gaps, and specialized high-temperature coatings to attenuate both and signatures. Electro-hydrostatic actuation systems drive flight controls, including flaperons and rudders, ensuring precise maneuverability without hydraulic vulnerabilities that could compromise coatings. For the F-35B variant, a shaft-driven LiftFan® and three-bearing swivel module (3BSM) integrate into the core , redirecting bypass air for vertical while maintaining aligned surfaces for . The carrier-capable F-35C adapts with enlarged wings and folding canted tails, yet adheres to the program's edge and material standards for consistent performance.

Propulsion and Avionics Systems

The propulsion system for the F-35 Lightning II employs the afterburning engine across all variants, derived from the F119 engine used in the F-22 Raptor and delivering up to 43,000 lbf (191 kN) of thrust with . The powers the conventional takeoff and landing () F-35A and carrier variant (CV) F-35C, providing high thrust-to-weight ratios and capability without in certain configurations, with production engines entering service following initial in 2006. For the short takeoff and vertical landing () F-35B, the variant integrates a Rolls-Royce shaft-driven lift fan (SDLF) system, which diverts engine power for vertical lift generating approximately 40,500 lbf in vertical mode while preserving 43,000 lbf in conventional flight, enabling operations from amphibious assault ships without compromising payload. The engine incorporates advanced materials like single-crystal turbine blades and thermal management systems to handle high inlet temperatures exceeding 2,000°C, supporting sustained operations in contested environments. Ongoing upgrades, such as the Engine Core Upgrade () initiated in the early 2020s, enhance thermal capacity by over 50% to accommodate directed-energy weapons and increased electrical demands, with initial integration testing completed by 2023 and full operational capability targeted for the late 2020s. These modifications maintain the F135's design margin for adaptability without requiring a new engine core, addressing evolving threats identified in operational analyses. The avionics architecture centers on sensor fusion via a common integrated core processor, enabling real-time data integration from multiple subsystems for pilot decision-making. The primary sensor is the Northrop Grumman AN/APG-81 active electronically scanned array (AESA) radar, featuring over 1,200 transmit/receive modules for simultaneous air-to-air search, air-to-ground mapping via synthetic aperture radar (SAR), and electronic warfare jamming, with a detection range exceeding 150 nautical miles against fighter-sized targets. Complementing this, the Lockheed Martin AN/AAQ-40 Electro-Optical Targeting System (EOTS) integrates a mid-wave infrared sensor, laser spot tracker, and ranger for precision air-to-surface targeting and infrared search-and-track (IRST), mounted in the aircraft's chin pod to minimize radar cross-section impact. The AN/AAQ-37 Distributed Aperture System (DAS) comprises six electro-optical/infrared cameras providing 360-degree spherical coverage for missile warning, fire control, and , fusing data to cue the pilot's system (HMDS) for off-boresight targeting up to 90 degrees. Additional elements include the AN/ASQ-239 suite for threat detection and countermeasures, and the AN/ASQ-242 communications, navigation, and identification (CNI) system supporting and (MADL) for secure, low-probability-of-intercept networking with allied platforms. This fused environment reduces pilot workload by automating threat prioritization, with software Block 4 upgrades from 2023 onward enhancing processing power via hardware replacements for improved reliability and .

Variant Configurations

The F-35 Lightning II program produced three main variant configurations to address the divergent requirements of the U.S. Air Force (USAF), U.S. Marine Corps (USMC), and U.S. Navy (USN), while incorporating a high degree of commonality in , sensors, features, and core propulsion to reduce lifecycle costs. The F-35A employs (CTOL) capabilities suited for land-based operations from standard runways, the F-35B integrates (STOVL) for expeditionary and amphibious missions, and the F-35C adapts (CV) features for naval catapult-assisted takeoff and arrested recovery. These configurations diverge primarily in structure, landing gear, wing design, and vertical lift systems, with the STOVL and CV variants lacking the F-35A's internal in favor of an external pod. The F-35A CTOL variant features a lightweight optimized for high agility and 9g maneuverability, with conventional tricycle and an internal GAU-22/A 25 mm four-barrel integrated into the for close-range engagements. Its wings maintain a fixed without folding mechanisms, supporting operations from runways as short as 2,500 feet under loaded conditions. Intended for the USAF and numerous allied air forces including , , and the , the F-35A prioritizes internal fuel capacity of approximately 18,250 pounds and a combat radius exceeding 600 nautical miles on internal fuel. In contrast, the F-35B STOVL variant incorporates a , consisting of a swiveling lift fan forward of the , a main engine-driven lift fan shaft, and a three-bearing swivel module for the engine nozzle to enable vertical and hover. This configuration adds about 1,800 pounds to the empty weight compared to the F-35A but allows operations from amphibious assault ships or austere sites with as little as 500 feet of runway for short takeoff. The USMC and partners like the UK Royal Navy and forces employ the F-35B, which uses a pod-mounted 25 mm gun unique to its mold-line to preserve internal volume for the lift system, and features reinforced structure to handle vertical landing stresses. The F-35C CV variant emphasizes durability for carrier deck cycles, with larger wings spanning 43 feet (versus 35 feet for the F-35A and B) providing 25% more area for improved low-speed lift during launches and arrested landings, folding wingtips for storage, and heavier-duty including dual nose wheels and a tailhook. Its internal capacity reaches 19,750 pounds, extending for naval strike missions, and it shares the external gun pod design with the F-35B but tailored to its . Exclusively procured by the USN, the F-35C underwent initial carrier qualifications in 2015 aboard USS George Washington.
VariantWingspanEmpty Weight (approx.)Key Structural Adaptations
F-35A35 ft29,300 lbInternal gun bay; lightweight gear for
F-35B35 ft32,300 lbLift fan integration; swivel nozzle for
F-35C43 ft34,800 lbFolding wings; reinforced gear/tailhook for
Despite these adaptations, all variants maintain identical radar cross-sections, mission systems, and F135-PW-100/400/600 engine families (with the STOVL using a modified core for lift power), enabling 70-80% projected commonality in production lots as of 2022, though service-specific modifications have reduced effective parts interchangeability below initial goals.

Technical Capabilities

Stealth, Sensors, and Network Integration

The F-35 achieves low observability through an integrated incorporating radar-absorbent materials, aligned panel edges, and internal weapons bays to minimize cross-section (). Full-scale tests on detailed models have validated the aircraft's performance, demonstrating robustness in materials and that supports long-term maintainability. Special low-observable coatings, applied via precise processes including hand-painting over fasteners and latches, further reduce detectability while withstanding operational wear. Reduced engine signatures and sensors contribute to overall signature management across multiple spectra. The F-35's sensor suite centers on advanced systems enabling comprehensive . The () provides long-range air-to-air and air-to-ground detection in active and passive modes, with capabilities. The Distributed Aperture System (DAS) offers 360-degree coverage for missile warning, threat tracking, and infrared search-and-track (IRST) functions. Complementing these, the (EOTS) delivers precision air-to-air and air-to-surface targeting via (FLIR) and laser designation. algorithms integrate data from the APG-81, DAS, EOTS, and systems into a unified picture, prioritizing threats and cueing weapons automatically to reduce pilot workload. Network integration leverages this fused data for collaborative operations via secure datalinks. The (MADL) enables low-probability-of-intercept, high-bandwidth sharing of sensor tracks and targeting information among F-35s and compatible platforms like the B-2, preserving during transmission. provides interoperability with legacy forces, relaying tactical data though MADL-to- gateways when direct F-35 participation requires preservation. This architecture allows the F-35 to disseminate a , enhancing networked lethality by distributing sensor-derived intelligence to command nodes and allied assets without compromising the platform's low-observability profile.

Performance Metrics and Multirole Versatility

The F-35 Lightning II demonstrates key performance metrics including a maximum speed of Mach 1.6, achievable with full internal weapons loads across all variants, enabling supersonic dash capabilities in scenarios. Its service ceiling surpasses 50,000 feet, supporting high-altitude operations for and . The engine provides thrust-to-weight ratios approaching 1:1, contributing to agile maneuvering, with the F-35A variant certified for +9 g sustained turns, while the F-35B and F-35C are limited to +7 g and +7.5 g respectively to preserve structural integrity for and carrier operations. Combat radii on internal fuel vary by variant and mission profile, reflecting design trade-offs for versatility:
VariantCombat Radius (nautical miles, internal fuel)Profile/Source
F-35A>590USAF
F-35B>450USMC
F-35C>600Naval
These figures assume clean internal configurations for , with ferry ranges exceeding 1,200 nautical miles for the F-35A. The F-35's multirole versatility arises from integrated , advanced , and modular software, allowing a single to execute diverse missions including air superiority, precision ground attack, intelligence surveillance reconnaissance (), close , suppression/destruction of enemy air defenses (SEAD/DEAD), strategic attack, and without requiring variant-specific hardware changes. Internal weapons bays accommodate up to 18,000 pounds of ordnance in stealth mode, switching to external hardpoints for higher payloads in permissive environments, thus balancing with flexibility. This design enables rapid role adaptation via mission data loads and network-centric data sharing, enhancing joint operations, though operational testing has highlighted reliability challenges impacting sustained multirole employment rates.

Armament and Payload Options

The F-35 incorporates two internal weapons bays to maintain its low-observable characteristics during ordnance carriage, with each bay featuring dual ejector racks for flexible configurations. Standard internal loadouts support up to four AIM-120 Advanced Medium-Range Air-to-Air Missiles (AMRAAM) for air superiority missions, or combinations such as two AIM-120s paired with two GBU-31 Joint Direct Attack Munitions (JDAM) 2,000-pound bombs for mixed air-to-ground roles. Ongoing upgrades, including the adapter, enable carriage of six AIM-120s internally on F-35A and F-35C variants by adding tandem mounting at select stations. For non-stealth operations, external pylons on the wings and expand capacity to 18,000 pounds (8,160 kilograms) across up to 10 stations, allowing integration of larger or additional munitions such as the Joint Air-to-Surface Standoff Missile (JASSM) or Long Range Anti-Ship Missile (LRASM). This "beast mode" configuration sacrifices radar cross-section for increased volume, supporting missions with up to eight AIM-120s externally alongside air-to-ground stores. The F-35A conventional takeoff and landing variant uniquely features an internal GAU-22/A 25 mm four-barrel with 181 rounds for and . F-35B and F-35C models rely on podded systems when required, with the F-35B's bays slightly reduced in volume due to the integrated lift fan, limiting compatibility with certain oversized weapons compared to the A and C variants, though all share core munitions interoperability. Additional compatible stores across variants include AIM-9X Sidewinder short-range missiles, GBU-12 Paveway laser-guided bombs, and allied nation-specific armaments certified through joint testing.

Production and Procurement

Manufacturing Processes and Facilities

The primary final assembly and checkout (FACO) facility for the F-35 Lightning II is Lockheed Martin's production plant in , spanning over a mile in length and employing thousands of workers operating around the clock to integrate more than 300,000 distinct components into each aircraft. This site handles the production of all forward fuselages and over 120 wing sets annually, utilizing more than 3,000 touch laborers for precision tasks including automated riveting and alignment systems across five parallel assembly lines. Manufacturing processes emphasize and to achieve tight tolerances for features, such as aligned edges and composite skins milled by flexible overhead systems that ensure radar-absorbent surface precision. Subassemblies arrive from a global , including center sections produced via Northrop Grumman's Integrated Assembly Line, which employs advanced robotic drilling and fastening for high-speed, repeatable accuracy in composite and metallic structures. Rear fuselages, horizontal and vertical tails, and aft doors are manufactured at ' facilities in , , incorporating automated composite and curing processes to meet low-observable requirements. International partner nations operate supplementary FACO sites for local production and sustainment, including in for European variants since 2014, and facilities in and for regional assembly of licensed kits shipped from Fort Worth. These processes support a target annual production rate of 156 as of 2025, with ongoing integration of additive for non-structural components to reduce lead times and waste. Despite these advancements, a 2020 assessment identified variability in over 7,000 of the program's key processes, prompting to refine automation standards for consistent quality.

Contracts, Deliveries, and Production Lots

The F-35 production program is structured around sequential lots, beginning with Low Rate Initial Production (LRIP) contracts awarded to Lockheed Martin starting in 2007, followed by a transition to Full Rate Production (FRP) approved in March 2024 after technical maturation delays. LRIP lots 1 through 14 encompassed approximately 968 aircraft, with early lots focusing on testing and initial operational capability aircraft for U.S. services and partner nations; for instance, LRIP 4 included 31 aircraft under a $3.5 billion full-funding contract modification. Unit costs declined progressively during LRIP, reaching $77.9 million per F-35A in Lot 14. These contracts incorporated concurrency risks, where aircraft were produced alongside ongoing development, leading to retrofits for later software and hardware upgrades. FRP commenced with Lot 15, enabling higher-volume production rates of up to 156 aircraft annually, though deliveries have been constrained by issues such as Tech Refresh 3 (TR-3) hardware and software integration delays, which halted shipments for several months in 2024 before resuming. In September 2025, the U.S. Department of Defense and finalized a $24.3 billion contract for Lots 18 and 19, covering 296 aircraft (148 per lot), including allocations for the U.S. (F-35A), Corps (F-35B), (F-35C), and international partners; initial deliveries from these lots are scheduled for 2026. This agreement follows earlier FRP awards, such as an $11.8 billion modification for 145 Lot 18 aircraft. Engine contracts, supplied by , have faced separate delays, with new agreements slipping to 2026, potentially impacting timelines.
Production LotTypeApproximate QuantityKey Contract DetailsNotes
LRIP 1-5LRIP~200Initial awards 2007-2010, focused on prototypes and early test jetsIncluded international partner shares; concurrency enabled rapid scaling but required upgrades.
LRIP 6-14LRIP~768Cumulative contracts through 2021; Lot 14 at $77.9M/unit for F-35ACost reductions averaged 5-10% per lot; total LRIP value exceeded $50 billion.
15-17~300+Awards post-2024 Milestone C; steady rate productionSupported IOC for all variants; TR-3 issues deferred some handovers.
18-19296$24.3B finalized Sep 2025; 148 aircraft/lotU.S. services: ~100 jets; partners/exports: remainder; deliveries from 2026.
As of early 2025, had delivered over 1,100 F-35s globally since production began in 2006, with 110 aircraft handed over in 2024 despite a mid-year pause for TR-3 fixes. In 2025, the company projected 175-190 deliveries, including 46 in the third quarter alone, bringing the cumulative total to approximately 1,250 by ; these include variants distributed to U.S. military branches (e.g., over 600 to the ) and allies such as the (40+ F-35B), (72 completed in 2024), and . International deliveries occur via and partner agreements, with production lots allocating slots for nations like and , which completed its full order of 52 F-35As by April 2025. Delivery rates are managed through the F-35 Joint Program Office to balance U.S. and export demands, with ongoing sustainment tied to performance-based logistics contracts.

Operational Deployment

U.S. Military Integration and IOC

The U.S. Marine Corps achieved the first Initial Operational Capability (IOC) declaration among the services for the F-35B short takeoff/vertical landing variant on July 31, 2015, with at , , certified as combat-ready after training and qualifying over 50 pilots and maintainers. This milestone followed successful shipboard operational testing aboard USS Wasp (LHD-1) in May 2015, validating the variant's integration into Marine expeditionary units for distributed operations from amphibious assault ships. VMFA-121's IOC emphasized the F-35B's role in enhancing Marine Corps and strike capabilities, with subsequent squadrons like achieving IOC by 2017 and forward deployments to integrating the aircraft into 7th Fleet exercises. The U.S. declared F-35A IOC on August 2, 2016, for the at , , under , marking the conventional takeoff and landing variant's readiness for multirole missions replacing F-16s and A-10s in active-duty units. Integration involved pilot and maintenance training at Eglin Air Force Base's 33rd Fighter Wing, the joint formal training unit, with the Hill squadron achieving operational proficiency through exercises demonstrating internal weapons employment and despite Block 3F software limitations at the time. By IOC, the had integrated the F-35A into combat-coded squadrons, prioritizing basing at locations like Eglin, Luke, and Hill for sustainment via the Autonomic Logistics Information System (ALIS), though early fielding focused on a minimum sustainment threshold of 12 aircraft per squadron. The U.S. Navy attained F-35C IOC on February 28, 2019, with Strike Fighter Squadron 147 (VFA-147) at , , confirming the carrier variant's suitability for catapult-assisted takeoff and arrested recovery operations after completing qualifications aboard (CVN-70). This declaration required the squadron to be fully manned, equipped with safe-for-flight certifications, and capable of deployed carrier strikes, integrating the F-35C into carrier air wings for networked warfare alongside legacy F/A-18s. Navy integration emphasized carrier deck trials and testing, with VFA-147's IOC enabling initial deployments in 2, though full operational capability awaited further Block 3F upgrades and joint precision approach enhancements. Across services, F-35 integration leverages shared infrastructure like the Eglin training pipeline and the program's Joint Program Office for , with IOC thresholds met independently per variant despite common challenges in software maturity and data availability. By 2024, over 400 F-35As operate in units, with and squadrons expanding to multiple bases, reflecting phased replacement of fourth-generation fighters amid ongoing sustainment refinements.

International Operator Experiences

Israel achieved initial operational capability with its F-35I Adir variant in December 2017, becoming the first country to employ the aircraft in during strikes in that year. By June 2025, maintained a 90% mission-ready rate across 35 of its 39 F-35I aircraft, even amid intensive operations, surpassing U.S. benchmarks in sortie generation and reliability. The has logged the most extensive hours of any F-35 operator, including long-range strikes against Iranian targets in October 2024, where F-35Is evaded defenses over 1,000 miles without losses, and subsequent operations against Houthi and Iranian assets. In March 2025, F-35s pioneered "beast mode" employment in , utilizing external loads for high-volume strikes while retaining advantages. These experiences underscore the platform's effectiveness in contested environments, with modifications enhancing integration of indigenous weapons and systems, though daily feedback has informed global software updates despite initial technical hurdles overcome by 2018. The Royal Australian Air Force declared initial operational capability for its F-35A fleet in December 2020, following delivery of the first aircraft in 2018 and operationalization of No. 3 Squadron in 2021. Since then, Australian F-35As have participated in multinational exercises such as , demonstrating multirole versatility in simulated high-threat scenarios, with air combat group commanders noting superior over legacy platforms like the F/A-18. Full operational capability remains delayed due to software integration challenges as of August 2024, impacting full weapon envelope clearance, though the fleet supports regional deterrence amid tensions. The United Kingdom's and achieved initial operational capability for F-35B s by 2020, with deployments validating carrier integration aboard during exercises like Operation Fortis in 2021. In 2025, UK F-35Bs supported Operation Highmast in the , proving island-hopping but encountering maintenance issues, including a grounded in for weeks due to mechanical faults requiring specialized repairs. Full operational capability assessments face scrutiny over sustainment shortfalls, with reports highlighting limited flight hours, restricted access to certain UK missiles, and dependency on U.S. , constraining operations. The Royal Netherlands Air Force declared full operational capability for its F-35A fleet in September 2024, assuming NATO nuclear deterrence roles previously held by F-16s. Dutch F-35s have emphasized interoperability in exercises like Flag 2025, where they integrated with U.S. forces for sharing in anti-access/area-denial simulations, and rapid deployment drills from bases in and . These operations highlight enhanced readiness, with the fleet's sensor network enabling superior threat detection over legacy aircraft, though early deliveries began in 2019 with ongoing emphasis on maintenance proficiency in forward environments.

Combat and Exercise Deployments

The Israeli Air Force achieved the first combat use of the F-35 on May 22, 2018, when F-35I Adir variants conducted airstrikes against Iranian targets in Syria, marking the initial operational deployment of the aircraft in active hostilities. Subsequent Israeli operations expanded F-35 employment, including strikes in Gaza, Lebanon, Iraq, Yemen, and against Iranian assets, with confirmed use of external ordnance in "beast mode" configurations during missions as recent as March 2025. For the United States, F-35 variants achieved combat debuts across the Middle East, with the F-35B conducting operations in Yemen by early 2025, completing the operational introduction of all four variants (A, B, C, and international F-35I) in regional conflicts including Iraq, Syria, and support against Houthi threats. U.S. deployments, such as the U.S. Marine Corps' VMFA-314 squadron's five-month rotation to the Central Command area in 2025, logged over 5,000 flight hours without major incidents, emphasizing sustained combat presence amid escalating tensions with Iran-backed groups. In exercise deployments, U.S. F-35A squadrons from participated in 24-1 in January 2024, integrating with joint forces to simulate high-threat environments and enhance readiness for peer competition. Earlier iterations, such as 17-1 in 2017, demonstrated F-35A superiority with a kill ratio exceeding 20:1 in air-to-air engagements against simulated adversaries. International operators followed suit; F-35As joined for the first time in 2021 with four aircraft focusing on tactical , while Italian F-35As operated in full during 24-1 in May 2024. F-35Is deployed to a multinational exercise in in June 2021 alongside U.S., British, and Italian forces, testing beyond-visual-range tactics and data-sharing in a simulated scenario. These exercises underscored the platform's network-centric advantages, with 24-2 in March 2024 prioritizing seamless refueling, repair, and rearming across allied F-35 fleets regardless of national origin.

Program Economics

Development and Unit Cost Evolution

The Joint Strike Fighter (JSF) program originated in the mid-1990s as a consolidation of U.S. Department of Defense efforts to replace aging tactical fleets with a family of affordable, stealthy multirole fighters. Following a concept exploration phase launched in 1996, the program advanced to a competitive demonstration phase in 1997, pitting Boeing's X-32 against Martin's X-35 prototypes. Both designs achieved first flights in 2000, with evaluations focusing on performance, cost, and commonality across conventional takeoff/landing (), short takeoff/vertical landing (), and carrier variants (). On October 26, 2001, Martin's X-35 design was selected, leading to a $19 billion System Development and Demonstration (SDD) contract that initiated detailed design, prototyping, and testing. The phase encountered significant technical hurdles, including software integration delays, propulsion challenges, and issues, resulting in schedule slippages and cost growth. The first production-representative F-35A flew on December 15, 2006, marking the transition toward low-rate (LRIP) lots starting in 2007. Program restructuring in 2010 addressed concurrency risks between and , adding approximately $5 billion to costs but aiming to stabilize milestones. Full operational capability declarations followed initial combat-ready statuses: U.S. Marine Corps in July 2015, U.S. Air Force in August 2016, and U.S. Navy in February 2019. By December 2023, the program's total acquisition cost had escalated to $428 billion for 2,456 aircraft, reflecting overruns from the 2001 baseline of $233 billion driven by extended timelines and inflation adjustments. Unit recurring flyaway costs, excluding engines and government-furnished , evolved downward as scaled and efficiencies accrued. Early LRIP lots (1-5, 2007-2011) saw F-35A costs exceeding $140 million per in then-year dollars due to low volumes and developmental fixes. Through manufacturing process improvements, supplier negotiations, and larger lot sizes, costs declined progressively; by Lot 14 (2020), the F-35A reached $77.9 million, fulfilling a 2014 Department of Defense target of $80 million to match legacy fourth-generation fighters. Subsequent lots 15-17 (2021-2023) averaged $82.5 million for the F-35A amid , with Lots 18-19 (2025 onward) maintaining similar levels around $80-85 million despite pressures. This reduction, averaging over 50% from initial lots, stemmed from learning curve effects and fixed-cost amortization over planned procurements exceeding 2,400 units, though GAO assessments note persistent risks from software upgrades and sustainment tying back to early decisions.
VariantEarly LRIP (Lots 1-5) Approx. CostRecent Lots (15-17) Avg. Cost
F-35A>$140 million$82.5 million
F-35B>$200 million$109 million
F-35C>$180 million$102.1 million
Costs cited in then-year dollars; reductions attributed to per reports.

Sustainment and Lifecycle Expenses

The F-35 program's lifecycle costs, spanning , acquisition, operations, and sustainment over a 94-year period from 1994 to 2088, total an estimated $2.1 trillion according to the Department of Defense's 2023 Modernized Selected Acquisition Report. Of this amount, operating and support (O&S) costs—primarily sustainment-related—account for the majority, exceeding $1.7 trillion, while , , test, and evaluation plus constitute about $428 billion. These projections reflect cumulative adjustments for , fleet size growth to 2,456 , and extended , though they assume steady-state operations post-full-rate production. Sustainment costs have risen steadily due to persistent challenges in , , and achieving target aircraft availability rates. The (GAO) reported in 2024 that Department of Defense projections for F-35 O&S costs increased from $1.1 trillion in 2018 to $1.58 trillion, driven by higher-than-expected depot-level repairs, engine overhauls, and software updates. Spare parts shortages, exacerbated by global supply disruptions and production delays, have further inflated expenses; in April 2024, GAO noted these issues reduced mission-capable rates and increased reliance on expedited , adding millions to annual sustainment outlays. By 2023, O&S expenditures for the U.S. Air Force's F-35A variant alone approached $3.2 billion, with costs per flight hour remaining above affordability targets at approximately $30,000–$35,000 despite efforts to reduce them through public-private partnerships. Lifecycle expense growth stems from the aircraft's advanced stealth features, sensor fusion, and distributed aperture systems, which demand specialized tools, trained personnel, and frequent inspections not scalable like legacy platforms. GAO's September 2025 assessment highlighted that total program costs have ballooned beyond $2 trillion when factoring recent sustainment overruns and Block 4 modernization delays, attributing this to inadequate risk mitigation in early sustainment planning and contractor incentives misaligned with long-term affordability. The Congressional Budget Office corroborated low availability—averaging 48–55 percent mission-capable across variants in recent years—correlating with elevated per-aircraft sustainment costs averaging $6–$8 million annually. International partners, operating over 200 F-35s collectively, report similar escalations, with sustainment contracts consuming 40–50 percent of their program budgets amid shared logistics pools that have yet to fully mature. Efforts to curb expenses include the Joint Simulation Environment for training reductions and autonomous logistics initiatives, but GAO recommends enhanced oversight of contractor performance fees, which totaled billions in 2024 despite delivery shortfalls averaging 238 days per aircraft. Without addressing root causes like corrosion-prone stealth coatings and engine reliability—linked to 20–30 percent of unscheduled maintenance—projections indicate O&S costs could exceed current estimates by 10–20 percent over the next decade.

Challenges and Criticisms

Cost Overruns and Management Shortcomings

The Joint Strike Fighter (JSF) program, now known as the F-35 Lightning II, has experienced substantial cost growth since its inception in the , with total program costs escalating from initial projections of approximately $233 billion for the first two decades to over $400 billion by 2012, reflecting a $163 billion increase driven by immature technologies and optimistic baseline assumptions. By 2023, the estimated the program's lifetime acquisition and sustainment costs at nearly $1.7 trillion, encompassing , of about 2,470 , and operations through 2088, though recent analyses project up to $2 trillion when accounting for extended service life and inflation. Sustainment expenses alone have risen 44 percent since 2018, from $1.1 trillion to $1.58 trillion, attributed to higher-than-expected maintenance demands and parts shortages. A primary management shortcoming was the program's heavy reliance on concurrency—simultaneously developing and producing aircraft to expedite delivery—which exposed the fleet to design deficiencies identified post-production, necessitating expensive retrofits estimated at $1.4 billion as of recent assessments. (GAO) reviews have consistently criticized and for advancing to low-rate initial production without sufficient technical maturity, leading to repeated cost and schedule slippages; for instance, the program exceeded original expectations by $165 billion and eight years as early as 2021. This approach prioritized speed over risk reduction, resulting in a "ghost fleet" of grounded or limited-capability jets awaiting upgrades, compounded by inadequate early testing and fragmented oversight. Ongoing issues include Block 4 modernization, which has ballooned to $16.5 billion in costs and a 2029 completion date, $6 billion over initial estimates and five years delayed due to software integration challenges and scope reductions to manage affordability. Production deliveries have deteriorated, with all 110 F-35s delivered in 2024 arriving an average of 238 days late, up from 61 days in 2023, stemming from technical release delays and contractor performance shortfalls. attributes these to persistent program office weaknesses in enforcing accountability, forecasting sustainment realistically, and aligning contractor incentives with cost control, despite repeated recommendations for better knowledge-based acquisition strategies.

Technical Reliability and Software Issues

The F-35 program has encountered ongoing challenges with software maturity, particularly in the Block 4 modernization effort, which aims to integrate enhanced weapons, sensors, and computing but has been hampered by immature and deficient mission systems software. Developmental testing has revealed instability and delays in software releases, with updates originally planned annually now taking up to 18 months, contributing to postponed full operational capability timelines projected into the 2030s. Technology Refresh 3 (TR-3), a critical hardware and software upgrade prerequisite for Block 4, has faced persistent glitches in processing power and integration, delaying deliveries such as Lot 15 jets and exacerbating overall program risks. The transition from the Autonomic Logistics (ALIS), plagued by prediction errors, vulnerabilities, and excessive downtime requirements, to the cloud-based Operational Data Integrated Network () has also lagged, with full fielding deferred until 2025 despite promises of reduced processing times and improved . Reliability metrics underscore these software-linked deficiencies, with U.S. F-35A mission capable rates—measuring aircraft able to perform at least one assigned —dropping to 51.5% in 2024, far below the program's 80% threshold and legacy fighters like the F-16's historical 80-90% averages. Full capable rates, requiring all primary , remain even lower, often under 10% for newer F-35B and F-35C variants, attributed to unresolved faults and sustainment complexities. The engine, powering all variants, has compounded reliability concerns through overheating from under-specced cooling demands amid increased electrical loads, vibration-induced failures, and supply chain bottlenecks resulting in all 123 engines delivered in 2024 arriving late. These issues have elevated lifecycle burdens and prompted interim fixes, though experts warn of worsening degradation without fundamental upgrades, as the engine's strains under the aircraft's and requirements.

Espionage and Security Incidents

In 2007, hackers infiltrated the networks of a subcontractor involved in the Joint Strike Fighter (JSF) program, exfiltrating sensitive technical documents related to the F-35's development, including design schematics and performance data. This breach, conducted via vulnerabilities rather than direct attacks on prime contractors, compromised unclassified but proprietary information that could inform and features. By April 2009, further intrusions into JSF program defenses allowed hackers—widely attributed to state actors—to steal additional on the aircraft's and electronic systems, prompting U.S. officials to acknowledge repeated penetrations. A 2013 Pentagon assessment confirmed that such thefts of F-35 had eroded U.S. technological edges, potentially accelerating adversaries' countermeasures against capabilities. The most documented case involved Su Bin, a Chinese national and aviation executive, who from 2008 to 2014 conspired with hackers to target U.S. defense firms, directing the theft of over 630,000 files on multiple programs, including tens of thousands specific to the F-35 and F-22 stealth fighters. Su, operating from and , provided target lists to his co-conspirators, who exploited email phishing and network intrusions to access data on weapons systems, radar evasion, and engine technologies before transmitting it to him for relay to Chinese military entities. Indicted in 2014 by a federal on charges including conspiracy to commit wire fraud and , Su surrendered in , pleaded guilty in the U.S. in March 2016, and received a 46-month sentence in July 2016. In May 2011, Lockheed Martin detected and mitigated a significant cyber intrusion into its networks, which involved malware exploiting a vendor's remote access credentials, though officials stated no classified F-35 data was compromised in that specific event. These incidents, predominantly linked to Chinese advanced persistent threats, have fueled concerns over program vulnerabilities, with U.S. intelligence assessments indicating the stolen data likely informed foreign stealth aircraft development, though direct causation remains unproven absent declassified forensic linkages. Despite enhanced cybersecurity measures post-breaches, such as isolated development networks, the JSF program's scale and international partnerships continue to present espionage risks.

Strategic Value and Future Developments

Geopolitical and Deterrence Rationale

The Joint Strike Fighter (JSF) program was established in the to develop a family of affordable, fifth-generation multirole fighters capable of replacing diverse legacy aircraft across U.S. services—including the F-16, F/A-18, A-10, and AV-8B—while incorporating , advanced sensors, and internal weapons bays to penetrate defended airspace. This design emphasized joint operations among the , , and Corps, with variants tailored for conventional takeoff/landing, short takeoff/vertical landing, and carrier operations, aiming to achieve through high production volumes and reduced lifecycle costs via commonality in , , and engines. Geopolitically, the program's structure as a multinational —with Level 1 partners (), Level 2 (Italy, ), and Level 3 (, , Denmark, Norway, ) contributing funding for technology access and co-production—serves to align allied defense industrial bases and standardize capabilities, thereby enhancing coalition in exercises and potential conflicts. By enabling real-time data sharing through systems like the Autonomic Logistics Information System (now Operational Data Integrated Network), the F-35 facilitates networked warfare among operators, as demonstrated in integrations where it has become the de facto standard for over 20 nations, including recent additions like (2024) and (November 2024). This shared platform reinforces transatlantic and alliances by mitigating capability gaps and fostering joint sustainment, though it introduces dependencies on U.S.-controlled software updates and supply chains. In terms of deterrence, the F-35's low-observability and provide U.S. and allied forces with a qualitative edge over peer adversaries' air defenses, enabling (SEAD) and precision strikes in anti-access/area-denial environments characteristic of systems in or deployments in the Western Pacific. The 2022 National Defense Strategy highlights its role in dual-capable aircraft missions for nuclear deterrence, with variants certified for B61-12 gravity bombs to sustain credible extended deterrence against aggression. U.S. Congressional leaders have cited the program as essential for countering and , with Pacific Deterrence Initiative allocations supporting F-35 deployments projected to exceed 300 aircraft in the region by 2035, distributed across land bases, carriers, and amphibious ships to raise aggression costs through integrated, survivable strike networks.

Upgrades, Block Enhancements, and Export Growth

The F-35 program incorporates phased block upgrades to incrementally enhance capabilities, addressing evolving threats through and software modifications. Technical Refresh 3 (TR-3), a critical , equips the F-35 with upgraded integrated processors, expanded systems, and new displays, serving as the foundation for subsequent mission systems improvements. Initial TR-3 integrations began rolling out in early 2025, enabling early Block 4 features like enhanced processing for and weapons integration. Block 4 represents the most extensive modernization to date, encompassing over 75 major upgrades applicable to all three variants (F-35A, B, and C), including the AN/APG-85 radar for superior target detection, expanded internal weapons bays to carry additional munitions such as the , advanced suites, and improved coatings. These enhancements aim to boost lethality against peer adversaries by increasing data processing speeds, sensor resolution, and integration, with demonstrations of key capabilities completed by mid-2025. However, the $16.5 billion Block 4 development, initiated in 2018, has encountered significant delays due to technical integration challenges and issues, pushing full operational deployment to at least 2031—five years beyond the original 2026 target—as reported by the U.S. in September 2025. Export participation has expanded steadily, with the F-35 selected by 19 partner nations as of 2025, reflecting confidence in its multirole versatility despite program hurdles. Over 900 aircraft have been delivered globally, with more than 1,700 on order, including recent Foreign Military Sales such as Romania's agreement for 32 F-35A jets in 2025 and Norway's completion of its 52-aircraft fleet in 2025. Key customers include , , the , , , , , the Netherlands, , and the , among others, with production lots incorporating Block 4 precursors to sustain interoperability. This growth counters isolated hesitations in nations like and amid geopolitical shifts, underscoring the platform's role in allied deterrence strategies.

Long-Term Program Viability

The F-35 program's long-term viability hinges on its entrenched role as the backbone of U.S. and forces, with commitments for over 2,470 U.S. aircraft and more than 1,700 additional jets on order from 19 partner nations as of early 2025, rendering large-scale cancellation improbable due to sunk costs exceeding $400 billion and dependencies among participants. International partners, including Level 1 collaborators like the and , have integrated the platform into national defense strategies, with production lots securing firm orders through the 2030s and sustainment contracts extending fleet life to 2088. assessments, while critiquing persistent delays and cost growth, affirm the program's continuation absent viable alternatives for fifth-generation multirole capabilities, as non-stealthy legacy fighters like the F-16 lack the and low-observability required against peer adversaries. Sustainment expenses represent the primary fiscal risk, with Department of Defense projections estimating $1.7 trillion in operating and support costs through the fleet's 77-year , driven by factors including engine reliability issues and complexities for . Recent analysis indicates annual per-aircraft costs averaging $6.6–$6.8 million for F-35As, higher than legacy platforms due to coatings and software-intensive maintenance, though availability rates have improved to 55–65% in operational units as of mid-2025, bolstered by depot expansions. These elevations stem from causal factors like the platform's distributed aperture system and ALIS/ logistics software, which demand specialized parts and training, yet empirical data from deployments—such as F-35 operations against defenses—demonstrate mission-capable rates supporting deterrence value that offsets per-unit premiums. Technological adaptability underpins extended relevance, with Block 4 modernization—encompassing over 75 upgrades including the APG-85 radar, enhanced weapons capacity, and engine improvements for 50% more thrust—slated for initial rollout by 2031 despite a five-year delay and $6 billion overrun, as restructured to prioritize core capabilities amid software integration hurdles. Lockheed Martin has proposed "fifth-generation plus" enhancements, leveraging Next Generation Air Dominance (NGAD) technologies like advanced propulsion and AI-driven autonomy, to serve as a cost-effective bridge extending F-35 utility into the 2040s before full NGAD/F-47 transition, potentially achieving 80% of sixth-generation performance at lower acquisition costs. This path addresses obsolescence risks from evolving threats, such as hypersonic missiles and electronic warfare proliferation, by enabling modular retrofits without fleet replacement, as validated by DOD modeling showing sustained combat effectiveness through 2050. Geopolitical commitments further solidify viability, with export growth to nations like (147 ordered) and (60+) fostering industrial offsets and joint sustainment hubs that distribute costs and mitigate U.S. budget pressures, even amid isolated export hesitations unrelated to core platform performance. While GAO recommends enhanced oversight to curb growth in the $2.1 trillion total lifecycle estimate, the absence of peer alternatives—coupled with demonstrated operational integration in exercises like —positions the F-35 as irreplaceable for networked warfare, ensuring program persistence despite inefficiencies.

References

  1. [1]
    F-35 Lightning II | Lockheed Martin
    The F-35 is more than a fighter jet, it's a powerful force multiplier with advanced sensors and communications suites operating close to the battlefield.
  2. [2]
    F-35 Program Achieves Milestone C and Full Rate Production
    Mar 12, 2024 · The F-35 offers multi-mission capability, including strategic attack, suppression/destruction of enemy air defenses (SEAD/DEAD), offensive/ ...Missing: Fighter | Show results with:Fighter
  3. [3]
    F-35: From Design to Delivery
    The F-35 began in Skunk Works® as a 5th Generation concept and developed into a “joint” strike fighter – one platform with three variants.
  4. [4]
    Lockheed Martin Team Wins Joint Strike Fighter Competition ...
    The Joint Strike Fighter is designed to replace the A-10, the AV-8 Harrier, F-16 and the F/A-18. "We are most pleased and appreciative that the governments of ...
  5. [5]
    F-35A Lightning II > Air Force > Fact Sheet Display - AF.mil
    With nine countries involved in its development (United States, United Kingdom, Italy, Netherlands, Turkey, Canada, Denmark, Norway and Australia), the F-35 ...
  6. [6]
    F-35 Deal for Lots 18 and 19 Covers 296 Fighters at $24.3 Billion
    Sep 29, 2025 · Lockheed Martin and the F-35 Joint Program Office have finalized a $24 billion deal on nearly 300 jets in Lots 18 and 19.
  7. [7]
    F-35 Joint Strike Fighter: Program Continues to Encounter ...
    May 16, 2024 · In May 2023, GAO made seven recommendations aimed at improving Block 4 cost reporting and the program's modernization efforts (GAO-23-106047).
  8. [8]
    F-35 Joint Strike Fighter: More Actions Needed to Explain Cost ...
    May 30, 2023 · DOD estimates it will cost nearly $1.7 trillion to buy, operate, and sustain the aircraft and systems over its lifetime. DOD is also assessing ...
  9. [9]
    [PDF] GAO-25-107632, F-35 JOINT STRIKE FIGHTER
    Sep 3, 2025 · The program has not recently reported updated cost estimates, but the most recent data reflect higher than expected costs. According to the.
  10. [10]
    Pentagon cuts back F-35 upgrades to slow schedule slips: Auditors
    Sep 3, 2025 · A 2024 Defense Department review found the program was not on pace to start delivering the bulk of Block 4 upgrades until the mid-2030s, partly ...
  11. [11]
    [PDF] Joint Strike Fighter (JSF) Program - DTIC
    Jan 11, 2002 · The JAST/JSF program evolved in response to the high cost of tactical aviation, the need to deploy fewer types of aircraft to reduce acquisition ...
  12. [12]
    [PDF] The Joint Strike Fighter Program - Johns Hopkins APL
    This joint program was chartered to bring the Navy, Air Force, and Marine Corps together to work jointly at reducing costs of future strike warfare concepts by ...<|separator|>
  13. [13]
  14. [14]
    F-35 Joint Strike Fighter (JSF) Program - EveryCRSReport.com
    2 Office of the Secretary of Defense, F-35 Lightning II Joint Strike Fighter (JSF) Program (F-35), December, 2019. 3 “Fifth-generation” aircraft incorporate the ...
  15. [15]
    Joint Strike Fighter
    In November 1996, designs from two contractors - Lockheed Martin and Boeing - were selected to compete in the JSF Concept Demonstration Phase. This phase will ...
  16. [16]
    Boeing Joint Strike Fighter Program Completes Successful Initial ...
    Sep 10, 1997 · The Boeing Joint Strike Fighter (JSF) program has successfully passed its Concept Demonstrator Aircraft Initial Design Review (IDR), ...Missing: specifications | Show results with:specifications<|control11|><|separator|>
  17. [17]
    Boeing X-32A - Air Force Museum
    The Boeing X-32 was a Concept Demonstrator Aircraft (CDA) built as a multi-purpose jet fighter in the Joint Strike Fighter (JSF) contest which started in 1996.Missing: design | Show results with:design
  18. [18]
    X-32 - aircraft museum - Aerospaceweb.org
    DESCRIPTION: When the concept demonstrator phase of the Joint Strike Fighter competition was announced in 1996, Boeing was awarded a contract to construct ...
  19. [19]
    [PDF] About Boeing X-32 - Science Publications
    Mar 16, 2019 · The Boeing X-32 (Fig. 1) is a demonstration jet designed for the Joint Strike Fighter contest. He lost the Lockheed Martin X-35 demonstrator,.
  20. [20]
    Lockheed-Martin X-35A first flight - AF.mil
    The Lockheed-Martin X-35A concept demonstrator completed its first flight on Oct. 24, 2000. Along with the short-takeoff and vertical landing X-35B and the ...Missing: date | Show results with:date
  21. [21]
    Lockheed Martin Joint Strike Fighter Takes Flight - Oct 24, 2000
    Oct 24, 2000 · Today the Lockheed Martin Joint Strike Fighter (JSF) X-35A took off at 9:06 a.m. Pacific Daylight Time on its historic and successful first ...Missing: date | Show results with:date<|separator|>
  22. [22]
    X-35C Test Program First Flight Revisited With Test Engineer, Crew ...
    Dec 16, 2022 · The X-35C concept demonstrator aircraft made its first flight Dec. 16, 2000. Glen Harbison was the lead flight test engineer (FTE) on the X-35C ...
  23. [23]
    Lockheed Martin's Navy JSF Completes Historic Flight-Test Program
    Mar 12, 2001 · The X-35C carrier variant (CV), designed to demonstrate carrier-suitable flying qualities for the United States Navy, first flew on Dec. 16, ...Missing: date | Show results with:date<|separator|>
  24. [24]
    Lockheed Martin X-35B STOVL | National Air and Space Museum
    The X-35B flight test program was one of the shortest, most effective in history, lasting from June 23, 2001 to August 6, 2001. The lift-fan propulsion system ...Missing: specifications | Show results with:specifications
  25. [25]
    Aircraft Archives: X-35B First Flight | Military.com
    Nov 10, 2011 · First Flight of the X-35B - 23 June 2001 -- The Lockheed Martin X-35 was an experimental aircraft developed by Lockheed Martin for the Joint ...Missing: date | Show results with:date
  26. [26]
    [PDF] Assessing Competitive Strategies for the Joint Strike Fighter - DTIC
    Boeing's X-32A and. Lockheed's X-35A both first flew in the second half of 2000. These aircraft are intended to demonstrate basic design characteristics in ...
  27. [27]
    X-32's Test Pilot On Why It Lost To What Became The F-35
    Feb 4, 2022 · The Boeing X-32 is most remembered for its goofy looks, but its lead test pilot reveals why appearances can be deceiving.Missing: criteria | Show results with:criteria
  28. [28]
    Lockheed Martin Team Wins Joint Strike Fighter Competition ...
    Oct 26, 2001 · An international team led by Lockheed Martin has won the competition to build the Joint Strike Fighter (JSF), a stealthy, supersonic, multirole fighter.Missing: criteria | Show results with:criteria
  29. [29]
    [PDF] F-35 LIGHTNING II JOINT STRIKE FIGHTER (JSF) PROGRAM (F-35)
    Dec 31, 2022 · The F-35 Joint Program Office (JPO) identified a breach of the APB O&S cost threshold based on the. JPO's 2022 Annual Cost Estimate (ACE) and ...
  30. [30]
    Lockheed Martin Begins Next Phase for JSF - Nov 1, 2001
    Nov 1, 2001 · On Friday, October 26, Lockheed Martin received a $18.9 billion contract for the Joint Strike Fighter to move the program into the next phase, ...
  31. [31]
    [PDF] F-35 Joint Strike Fighter (JSF) Program - Congress.gov
    Jan 3, 2022 · F-35 program would need an extra 30 months to complete the SDD phase. In ... A May 2004 GAO report found that the F-35 program could.
  32. [32]
    F-35 Completes Most Comprehensive Flight Test ... - Lockheed Martin
    Apr 12, 2018 · The final SDD flight occurred April 11 at Naval Air Station Patuxent River, Maryland., when Navy test aircraft CF-2 completed a mission to ...Missing: milestones timeline
  33. [33]
    F-35 Lightning II: Background and Issues for Congress
    Dec 11, 2024 · Summary. The F-35 Lightning II is a strike fighter aircraft and the Department of Defense's (DOD's) largest procurement program.The F-35 in Brief · Three Service Versions · Program History · Modernization Issues
  34. [34]
    Lockheed Martin F-35 Lightning II Stealth Fighter Completes First ...
    Dec 15, 2006 · Lockheed Martin F-35 Lightning II Stealth Fighter Completes First Flight - Dec 15, 2006.
  35. [35]
    F-35 Lightning II program update and fast facts
    Mar 24, 2013 · F-35B first flight successfully completed on June 11, 2008 · USAF Lt. Col. James Kromberg becomes first military pilot to fly F-35 on Jan. 30, ...
  36. [36]
    Lockheed Martin F-35s Surpass 100000 Flight Hours, System ...
    Jul 24, 2017 · Lockheed Martin F-35s Surpass 100,000 Flight Hours, System Development and Demonstration Completion On Track - Jul 24, 2017.
  37. [37]
    The F-35 Hits A Key Developmental Milestone, But With Watered ...
    Apr 12, 2018 · One of the U.S. Navy's operational test F-35C, known as CF-2, completed the last SDD flight test on April 11, 2018. The objective of that ...Missing: timeline | Show results with:timeline
  38. [38]
    F-35 testers wrap up Weapons Delivery Accuracy tests
    Dec 20, 2017 · Testers from the 461st Flight Test Squadron and F-35 Integrated Test Force completed a major test milestone bringing the F-35 Lightning II's ...
  39. [39]
    F-35 Joint Strike Fighter: Cost Growth and Schedule Delays Continue
    Apr 27, 2022 · Operational testing of the F-35 continues to be delayed—primarily by holdups in developing an aircraft simulator—even as DOD goes forward ...Missing: flight | Show results with:flight
  40. [40]
    [PDF] GAO-14-322 Highlights, F-35 JOINT STRIKE FIGHTER
    Delays in developmental flight testing of the F-35's critical software may hinder delivery of the warfighting capabilities the military services expect. F-35.
  41. [41]
    F-35 Completes Comprehensive Flight Test Program - Navy.mil
    Apr 12, 2018 · The F-35 program has accomplished the final developmental test flight of the System Development and Demonstration (SDD) phase of the program.
  42. [42]
    U.S. Air Force Declares Initial Operational Capability on F-35A
    Aug 2, 2016 · The Marine Corps declared IOC on its F-35B last July after putting its first operational squadron, Marine Fighter Attack Squadron (VMFA) 121, ...
  43. [43]
    F-35C achieves Initial Operational Capability - U.S. Pacific Fleet
    Feb 28, 2019 · The aircraft carrier variant of the Joint Strike Fighter, the F-35C Lightning II, has met all requirements and achieved Initial Operational Capability (IOC).<|separator|>
  44. [44]
    Practical Use of Composite Materials Used in Military Aircraft - PMC
    Another design solution using composite materials is the Lockheed Martin F-35 ... composite materials take up 35% of the weight of the airframe. In the ...
  45. [45]
    [PDF] F-35 Aircraft Structural Integrity Program Overview
    Nov 28, 2006 · Structural Materials Selection. • F-35 Selected Mature Materials For Structural Applications. – Composite Materials IM7/977-3 and IM7/5250-4.
  46. [46]
    Lockheed Martin F-35 Lightning II - program supplier guide - Airframer
    Airframe is 35% composite and designed to enhance stealth with trapezoidal mid-wing configuration, twin tailfins and internal weapons bay. All-electric flying ...
  47. [47]
    [PDF] F-35_Air_Vehicle_Technology_Overview.pdf - Lockheed Martin
    Jun 29, 2018 · The F-35 aircraft features many technological enhancements in air vehicle and propulsion subsystems derived from predecessor programs.
  48. [48]
    Diverterless Inlet - jsf.mil
    The F-35's diverterless inlet lightens the overall weight of the aircraft. Traditional aircraft inlets were comprised of many moving parts and are much ...
  49. [49]
    History of the F135 Engine - Pratt & Whitney
    The first F135 engine was delivered in 2009, powering the F-35. An upgrade (ECU) was developed to meet future demands, using learnings from other programs.
  50. [50]
    About the F-35
    F135-PW-100 40,000 lb Max 25,000 lb Mil Vertical N/A. Speed (Full Internal ... F135-PW-600 40,000 lb Max 25,000 lb Mil 40,500 lb Vertical. * Propulsion ...5th Gen Capabilities · Global Enterprise · Economic Impact · Media KitMissing: Joint | Show results with:Joint
  51. [51]
    F135 Engine - Pratt & Whitney
    The F135 engine is powerful, innovative, dependable, with 40,000+ lbs thrust, 5th gen capabilities, and the most advanced control system, and is the most ...Engine Core Upgrade · History · Français · US Economic Impact
  52. [52]
    [PDF] pratt & whitney f135 engine fast facts
    Designed with the knowledge that operational environments evolve and threats advance, the F135 has ample design margin for agile, low-cost upgrades – known as.
  53. [53]
    [PDF] F-35_Mission_Systems_Design_Development_and_Verification.pdf
    Jun 25, 2018 · The F-35 sensor suite includes the AN/APG-81 AESA radar, AN/ASQ-239 EW/CM system, AN/AAQ-40 EOTS,. AN/AAQ-37 EO DAS, and AN/ASQ-242 CNI system.
  54. [54]
    AN/APG-81 Active Electronically Scanned Array (AESA)
    The AN/APG-81 epitomizes the F-35's multirole mission requirement showcasing the robust electronic warfare (EW) capabilities and can operate as an EW aperture ...
  55. [55]
    F-35 Electro Optical Targeting System (EOTS) - Lockheed Martin
    An affordable, high-performance, lightweight, multi-function system that provides precision air-to-air and air-to-surface targeting capability.
  56. [56]
    [PDF] F-35 Lightning II - Lockheed Martin
    all single-seat jets. The F-35A conventional takeoff and landing variant, the F-35B short takeoff/vertical landing ...
  57. [57]
    The ABCs of F-35
    Jun 5, 2024 · F-35A – conventional takeoff and landing; F-35B – short takeoff/vertical landing; F-35C – carrier variant. F-35A. Designed to operate ...
  58. [58]
    F-35 Lightning II - Northrop Grumman
    Primed with six decades of composite manufacturing experience, Northrop Grumman provides core technologies key to the F-35's advanced airframe. Our team ...
  59. [59]
    F-35B And F-35C Use Different 25mm Gun Pods Unique To Each ...
    Dec 20, 2024 · “Differences in the outer mold-line fairing mount make the gun pods unique to each variant (i.e. an F-35B gun pod cannot be mounted on an F-35C ...
  60. [60]
    Did you know….One key difference between the F-35C ... - Facebook
    Nov 23, 2024 · One key difference between the F-35C and the F-35A & B is the dual, smaller diameter nose wheels. This allows for the launch bar that attaches to the catapult ...
  61. [61]
    None
    ### Timeline of Significant Developments for F-35 SDD and EMD Phases
  62. [62]
    Lockheed Martin JSF Shows Robustness of Stealth Materials and ...
    Oct 2, 2000 · The Lockheed Martin Joint Strike Fighter (JSF) team recently completed radar cross-section (RCS) tests of a full-scale highly detailed JSF ...Missing: 35 | Show results with:35
  63. [63]
    Hand-painting and high-tech stealth for F-35A - 419th Fighter Wing
    Jan 6, 2022 · “The panels undergo a very in-depth process of different coatings just to remove the latches and cover the fasteners. In the end, there has to ...
  64. [64]
    Outsight In: F-35 Sensor Fusion in Focus
    Mar 14, 2024 · The F-35's advanced AN/APG-81 AESA radar is the most capable in the world. Long-range active and passive air-to-air and air-to-ground modes ...
  65. [65]
    The F-35's tactical edge in SEAD/DEAD missions - Key Aero
    Sep 15, 2025 · The key feature of F-35 is sensor/ information fusion, with data from different subsystems (radar, radar warning systems, EOTS, DAS and datalink) ...
  66. [66]
    [PDF] F-35 INFORMATION FUSION
    Fusion is a 'smart' networking capability that collects information, prioritizes targets, and shares it with other weapons systems.
  67. [67]
    F-35 Data Fusion: How the Smartest Fighter Shares What it Sees
    Sep 4, 2018 · To that end, the F-35 has to primary channels through which to share data: the multi-function advanced datalink (MADL) network and Link 16. “For ...Missing: integration | Show results with:integration
  68. [68]
    The F-35 and Data Fusion: A Perspective from the International ...
    Nov 26, 2018 · The role of data fusion is to provide situational awareness as a service to the pilot and the MADL linked combat force.
  69. [69]
    F35-C Lightning II :: Aviation Warfare - Naval Academy
    Jul 1, 2025 · Combat radius (internal fuel): >600 n.mi / 1,100 km. Range (internal fuel): >1,200 n.mi / 2,200 km. Internal fuel capacity: 19,200 lb / 8,708 kg
  70. [70]
    [PDF] DOT&E FY2024 Annual Report - DoD - F-35 JSF
    The report provides an independent assessment of the overall mission capability of the F-35 in the Block 3F configuration, in terms of its operational ...Missing: Department | Show results with:Department
  71. [71]
    [PDF] F-35 Joint Strike Fighter (JSF) - DOT&E
    The test team completed all weapons safe-separation events of GBU-31, JDAM, and AIM-120 weapons for the Block 2B envelope by the end of August. These tests ...
  72. [72]
    F-35 Closer To Carrying Six AIM-120 Missiles Internally
    Mar 24, 2023 · Known as Sidekick, the upgrade will give F-35As and Cs the ability to go from four to six AIM-120 missiles in their internal bays.
  73. [73]
    External pylon training increases F-35A weapons payload capability
    Jul 12, 2017 · The jet is designed to carry up to 18,000 pounds of munitions on 11 internal and external weapons stations depending on mission requirements.Missing: II armament
  74. [74]
    These are the 3 different aircraft we call the F-35 - Sandboxx
    Jun 7, 2023 · The F-35B has the same basic wingspan as the F-35A, but less internal storage capacity due to a lifting fan positioned just behind the cockpit ...
  75. [75]
    F-35 Production Facilities Near Completion at Lockheed Martin
    The new production equipment includes a flexible overhead gantry (FOG) that will mill the inside surface of the F-35's composite skin to ensure that the ...
  76. [76]
    Inside the Mile-Long Factory Where F-35 Stealth Fighters Are Made
    Feb 19, 2025 · In a sprawling factory in Texas, thousands of people work around the clock to assemble the US military's most advanced multirole fighter jet.
  77. [77]
    F35 Assembly Lockheed Martin
    Over 300,000 distinct elements entirely come together to produce the F-35 Lightning II at the Lockheed Martin's mile+-long manufacturing plant within Fort Worth ...
  78. [78]
    Building The F-35 – One Of The Most Advanced Machines Ever Made
    Aug 1, 2024 · The use of additive manufacturing. Constant analysis of production standards is a key element of building the F-35. The aircraft's internal ...
  79. [79]
    Lockheed Martin F-35 JSF Final Assembly
    The F-35 JSF project was the first at Lockheed Martin's Fort Worth facility to employ this type of automated system. ... Total of 5 assembly lines ...<|separator|>
  80. [80]
    Using Automation and Robotics in Advanced Aircraft Production
    Northrop Grumman's Integrated Assembly Line uses automation to produce precision F-35 subassemblies at unprecedented levels of speed, ...Missing: techniques | Show results with:techniques
  81. [81]
    F-35 Partners
    The rear fuselage of every F-35 is built in BAE Systems' advanced manufacturing and assembly facilities in England, with the horizontal and vertical tails and ...
  82. [82]
    Additive Manufacturing Expansion Helps Meet Demand for ...
    Nov 19, 2024 · We've also implemented AM technology on many new and legacy programs such as printing F-35 simulator cockpits and components on GMLRS. By ...Missing: techniques | Show results with:techniques
  83. [83]
    F-35 Joint Strike Fighter: Actions Needed to Address Manufacturing ...
    May 12, 2020 · Specifically, only about 3,000 of the over 10,000 airframe contractor's manufacturing key processes meet predefined design standards for ...
  84. [84]
    $$3.5 Billion Full-funding Contract Awarded for Fourth Lot of ...
    Lockheed Martin (NYSE: LMT) has received a $3.5 billion contract modification from the US Department of Defense to manufacture 31 F-35 Lightning II stealth ...
  85. [85]
    Pentagon finally approves F-35 for full rate production after 5-year ...
    Mar 12, 2024 · The years of delays did little to impact F-35 sales and production, as Lockheed has been producing upwards of 100 F-35s per year since 2019, ...Missing: quantities | Show results with:quantities
  86. [86]
    Lockheed, Pentagon finalize deal for 296 F-35s - Breaking Defense
    Sep 30, 2025 · The $24.3 billion deal covers 148 aircraft each in production lots 18 and 19, closing out negotiations that have stretched since 2023.
  87. [87]
    Statement: F-35 2024 Deliveries - Lockheed Martin
    Jan 8, 2025 · We delivered 110 F-35s in 2024, growing the global fleet to 1,100+ aircraft. Lockheed Martin is fully committed to advancing and delivering ...
  88. [88]
  89. [89]
    U.S. Marines Corps declares the F-35B operational
    Jul 31, 2015 · Achieving IOC has truly been a team effort,” concluded Dunford. The U.S. Marine Corps has trained and qualified more than 50 Marine F-35B ...
  90. [90]
    Marine Corps proves F-35B's capability at sea, looks over horizon to ...
    Jun 5, 2015 · The Marine Corps F-35B operational test (OT-1) successfully concluded aboard a US Navy amphibious ship, USS Wasp (LHD-1), on May 29, 2015.
  91. [91]
    Marine Corps F-35Bs Relocate to Japan - 7th Fleet - Navy.mil
    The exercise is a combined-arms live-fire exercise which integrates capabilities of air and ground combat elements to complete a wide range of military ...
  92. [92]
    ACC: F-35 on track for IOC > Air Force > Article Display - AF.mil
    Jun 22, 2016 · IOC is the first step Air Combat Command will take in bringing the F-35 online as the latest fifth-generation multirole fighter. In IOC ...
  93. [93]
    United States - F-35 Lightning II
    The U.S. Marine Corps currently flies the F-35B short takeoff/vertical landing (STOVL) variant and plans to purchase 353 F-35Bs and 67 F-35C carrier variant ...
  94. [94]
    Navy Declares Initial Operational Capability for F-35C Joint Strike ...
    Feb 28, 2019 · Achieving IOC means the F-35C is available to be used in deployed environments as requested by combatant commanders. US Navy photo. “We're very ...
  95. [95]
    Navy Declares Lockheed Martin F-35C Has Achieved IOC - AIAA
    Mar 1, 2019 · The Navy's first F-35C squadron “completed aircraft carrier qualifications aboard USS Carl Vinson and received a Safe-For-Flight Operations ...
  96. [96]
    US Navy and USMC F-35B/C Squadrons: A Complete Guide
    Feb 21, 2023 · The US Marine Corps and US Navy are sister services that had different degrees of urgency for introducing the Lockheed Martin F-35B/C Lightning II.
  97. [97]
    F-35 highlights Israel as a unique force multiplier for America - JNS.org
    Jul 16, 2025 · Israel was the first country to use the F-35 in combat in 2018, overcoming critical technical and mechanical problems. The daily feedback ...
  98. [98]
    A Tale of Two Air Forces: Why Israel's F-35 Fleet Outperforms the US ...
    Jun 14, 2025 · Israel maintains 35 of its 39 F-35I “Adir” aircraft in mission-ready status—an impressive 90% readiness rate that has been sustained even during ...
  99. [99]
  100. [100]
    Israel's F-35I "Adir": A Strategic Game-Changer in Middle East Air ...
    Jun 13, 2025 · Israeli F-35I aircraft have conducted the most extensive combat operations of any F-35 variant worldwide, accumulating verified combat ...
  101. [101]
    Israeli F-35s First To Use 'Beast Mode' In Combat - The War Zone
    Mar 17, 2025 · Israel has confirmed that its F-35 stealth fighters have flown airstrikes using external ordnance. The F-35's so-called 'beast mode,' featuring heavier loads ...
  102. [102]
    The Israeli F-35s | Air & Space Forces Magazine
    Compared to legacy fighters, F-35s will be able to safely enter threat arenas guarded by more advanced defenses and weapons. Moti said, “We need the advantage,” ...
  103. [103]
    Initial Operational Capability Declared for Australia's RAAF F-35A
    Dec 28, 2020 · The F-35 program creates more than 2,400 high-tech manufacturing jobs for Australian industry. With more than 600 aircraft operating from 26 ...Missing: experiences | Show results with:experiences
  104. [104]
    We Asked The Australian Air Force How The F-35 Lightning II Is ...
    Apr 30, 2024 · The first F-35A aircraft was accepted into Australian service in 2018. The first F-35A squadron, No. 3 Squadron, became operational in 2021.".
  105. [105]
    What does Australia think of the F-35? One Air Force commander ...
    Feb 28, 2019 · The commander of the Royal Australian Air Force's Air Combat Group has provided insight into his experience with the Lockheed Martin F-35A Joint Strike Fighter.
  106. [106]
    Everything you need to know about Australia's F-35s - Key Aero
    Jul 18, 2023 · Since achieving IOC in December 2020, RAAF F-35s have participated in major exercises in Australia and overseas, including the Red Flag series ...
  107. [107]
    F-35A software delays push back Australian full operational capability
    Aug 15, 2024 · Australia declared initial operational capability (IOC) for the F-35A in December 2020 following the standing up of a frontline fighter ...
  108. [108]
    [PDF] The UK's F-35 capability - National Audit Office
    Jul 11, 2025 · This capability, and the interoperability of UK and allied F-35s, was demonstrated in the 2021 Operation Fortis deployment to the Indo-Pacific.
  109. [109]
    UK F-35 Full Operational Capability Path Faces Scrutiny
    Oct 2, 2025 · The deployment has so far been hailed as a success, supporting major regional exercises, proving an island-hopping capability and demonstrating ...
  110. [110]
    What will become of the UK F-35 fighter stranded in India?
    Jul 9, 2025 · A carrier-based UK F-35B stealth fighter has been stuck in Kerala since mid-June after it was forced to land due to mechanical issues.
  111. [111]
    British F-35Bs experience problems during Operation Highmast
    Aug 28, 2025 · This episode highlighted some of the problems of maintaining frontline fifth-generation combat aircraft. The repaired F-35B eventually took off ...
  112. [112]
    UK F-35 fleet poorly supported, can't use vital weapons - Reddit
    Jul 15, 2025 · UK F-35 fleet poorly supported, can't use vital weapons - Stealth jets can't fight, can't fly much, and can't shoot UK missiles, says UK's ...
  113. [113]
    Exciting news The Royal Netherlands Air Force has declared Full ...
    Sep 26, 2024 · Exciting news The Royal Netherlands Air Force has declared Full Operational Capability (FOC) with their F-35 fleet.
  114. [114]
    Royal Netherlands Air Force and Lockheed Martin Skunk Works ...
    Apr 14, 2025 · In this real-time live fly exercise, Dutch F-35s operating in an Anti-Access Area Denial environment, successfully detected, identified, ...
  115. [115]
    Royal Netherlands Air Force Showcases Advanced F-35 Operations ...
    Aug 31, 2025 · The fleet also reached Full Operational Capability, assuming NATO nuclear deterrence duties previously held by the F-16. Lockheed Martin F-35A ...
  116. [116]
    U.S., Netherlands air forces enhance fifth-generation interoperability ...
    Apr 7, 2025 · The US Air Force and Royal Netherlands Air Force demonstrated advanced fifth-generation interoperability among NATO Allies during an F-35 Lightning II training.
  117. [117]
    Netherlands - F-35 Lightning II
    2019: Netherlands's First Operational F-35, known as AN-3, is delivered from the Fort Worth, Texas, factory. 2019: First aircraft arrival at Leeuwarden Air Base ...
  118. [118]
    F-35 stealth fighter sees first combat, in Israeli operation - BBC
    May 22, 2018 · The US-made F-35 stealth fighter has seen its first ever combat action, flying in an operation for the Israeli air force. The air force chief ...
  119. [119]
    After Yemen, All 4 F-35 Variants Have Made Combat Debut ... - Forbes
    May 13, 2025 · All four variants of America's premier stealth strike fighter first saw combat in various operations across the greater Middle East.<|separator|>
  120. [120]
  121. [121]
    Hill AFB Airmen bring F-35A's vital capabilities to Red Flag's modern ...
    Jan 30, 2024 · Red Flag delivers distinctive training for the F-35A, focusing on enhancing airman readiness for high-end warfighting and strategic competition.
  122. [122]
    F-35 Scores Impressive 15:1 Kill Ratio at Red Flag War Games.
    Feb 19, 2017 · 15:1 was actually the score 2/3 through; by the end they improved their performance, bringing the ratio to a bit over 20:1 (145:7).
  123. [123]
    For the First Time, Norwegian F-35s Used in 'Red Flag'
    Mar 27, 2021 · Four Norwegian F-35 aircraft, Norwegian pilots and associated Norwegian technicians participate in one of the world's largest air exercises.
  124. [124]
    Italian Air Force F-35s Flew In Full "Stealth Mode" During Red Flag ...
    May 10, 2024 · After over two weeks of intense flight operations, the Italian Air Force successfully completed its participation to the Red Flag Alaska 24-1 ...
  125. [125]
    Israeli F-35s Taking Part in Joint Exercise with US, Italy, Britain
    Jun 6, 2021 · Israeli F-35 stealth fighter jets are taking part in a large-scale drill in Italy, marking the first time that the fifth generation plane has been deployed ...
  126. [126]
    Red Flag 24-2: Advancing F-35 interoperability at Nellis
    Mar 12, 2024 · The objective is for any F-35, regardless of the owning nation, to land at any F-35 base to refuel, repair, rearm and return to the fight. Red ...
  127. [127]
    Pentagon and Lockheed Martin Reach Agreement Reducing F-35A ...
    Oct 29, 2019 · This agreement achieves an average 12.7 percent cost reduction across all three variants and gets us below $80 million for a USAF F-35A by Lot ...Missing: timeline | Show results with:timeline
  128. [128]
    Economic Impact - F-35 Lightning II
    A. For Production Lots 15 through 17, the average flyaway cost of an F-35A was $82.5 million; $109 million for an F-35B, and $102.1 million per F-35C. The F-35 ...
  129. [129]
    Clarification on the F-35 Program Cost Estimate: Providing Facts ...
    Aug 4, 2025 · The DOD's 2023 Modernized Selected Acquisition Report (MSAR) estimates the program's total cost at $2.1 trillion over its 94-year lifecycle, from 1994 through ...
  130. [130]
    F-35 Joint Strike Fighter: More Actions Needed to Explain Cost ...
    Dec 12, 2023 · In May 2023, GAO made seven recommendations to DOD aimed at improving Block 4 cost reporting and engine and thermal management modernization ...
  131. [131]
    F-35 Sustainment: Costs Continue to Rise While Planned Use and ...
    Apr 15, 2024 · What GAO Found · Sustainment cost estimates have increased 44 percent, from $1.1 trillion in 2018 to $1.58 trillion in 2023. · DOD's planned use ...
  132. [132]
    GAO-25-107632, F-35 JOINT STRIKE FIGHTER: Actions Needed to ...
    Sep 3, 2025 · The F-35 program continues to experience late deliveries and quality issues. Specifically, the contractors delivered all engines and aircraft ...
  133. [133]
    Availability, Use, and Operating and Support Costs of F-35 Fighter ...
    Jun 12, 2025 · In this report, the Congressional Budget Office analyzes the recent availability, use, and operating and support costs of stealthy F-35 fighter aircraft.<|separator|>
  134. [134]
    F-35 Joint Strike Fighter: Actions Needed to Address Late Deliveries ...
    This report assesses, among other things, (1) DOD's progress in Block 4 modernization efforts; (2) the extent to which contractors delivered F- ...
  135. [135]
    Lockheed Martin's $1.7 trillion F-35 fighter jet is 10 years late and 80 ...
    Aug 2, 2023 · By 2021, the cost of the F-35 had nearly doubled—overall outlays for the project, originally estimated at $233 billion for the first 20 years, ...Missing: current | Show results with:current
  136. [136]
    F-35s to cost $2 trillion as Pentagon plans longer use, says watchdog
    Apr 15, 2024 · The F-35 Joint Strike Fighter's total cost is expected to top $2 trillion over its entire life span given the US military plans to fly it longer.
  137. [137]
    Defects, Delays, and Indecision Plague the F-35 Program
    The United States-led F-35 fighter jet initiative serves as a useful case study illustrating the adverse impact of design defects on major projects.
  138. [138]
    F-35 Joint Strike Fighter: Cost and Schedule Risks in Modernization ...
    Jul 13, 2021 · Currently, the program is more than 8 years delayed and $165 billion over original cost expectations. As the program progresses toward ...Missing: flight | Show results with:flight
  139. [139]
    GAO: F-35 Modernization Costs and Delays Escalate Sharply
    The F-35 faces $38B extra costs and a growing “ghost fleet” of jets unfit for combat.
  140. [140]
    GAO flags major delays and cost risks in F-35 program - AeroTime
    Sep 5, 2025 · A GAO report finds all of 2024's F-35 deliveries were late, with TR-3 delays and Block 4 modernization over $6 billion and 5 years behind ...Missing: SDD EMD
  141. [141]
    F-35 Program Plagued by Cost, Delivery Overruns, GAO Says
    Sep 3, 2025 · The Defense Department's F-35 Joint Strike Fighter program has continued to over promise and under deliver in recent years, plagued by ...Missing: controversies | Show results with:controversies
  142. [142]
    [PDF] DOT&E FY2023 Annual Report: DoD: F-35 JSF
    The DOT&E assessment shows a relatively flat trend for the 12 months of data in FY23. Availability tracks aircraft capable of performing at least one ...
  143. [143]
    Pentagon Report: F-35 Test Progress Slow, Readiness Below Par
    Feb 3, 2025 · Testing and reliability of the F-35 remain below par, but the Director of Operational Test and Evaluation says progress is being made.
  144. [144]
    The F-35 program's software development isn't getting any better ...
    Feb 4, 2025 · Development issues have plagued Technology Refresh-3, a software and hardware upgrade vital for Block 4 improvements. Originally slated to ...
  145. [145]
    [PDF] GAO-24-106909, F-35 JOINT STRIKE FIGHTER: Program Continues ...
    May 16, 2024 · Specifically, we found that the military services had not fully defined the power and cooling requirements. Additionally, we found that the ...
  146. [146]
    Start of F-35 ODIN Software Fielding to Squadrons Delayed Until 2025
    Apr 21, 2023 · The F-35 program wants to field ODIN–a cloud-based, government-owned logistics software system--to replace the more than two decade-old ...
  147. [147]
    [PDF] GAO-25-108104, MILITARY READINESS
    Mar 12, 2025 · Figure 9: F-35 Mission Capable Rates by Military Service/Variant, Fiscal Years 2019 through 2024. Note: The mission capable rate assesses ...<|separator|>
  148. [148]
    F-35 Engine Running Too Hot Due To 'Under-Speccing,' Upgrade ...
    Mar 30, 2023 · The F-35's engine is having to work harder to cool and power the aircraft's systems, leading to a logistical mess.
  149. [149]
    F-35 Engine Production Contract Slips to Spring 2026
    Oct 2, 2025 · The GAO said every one of the 123 F135 engines delivered in 2024 were late, which Pratt said was due to supply chain and production problems.
  150. [150]
    Expert: F-35 Fighter Engine Issues Will Get Worse Over Time
    Mar 23, 2025 · F-35 F135 Engine Hits 1 Million Hours, but Challenges Loom Large. On March 3, U.S. aircraft engine manufacturer Pratt & Whitney announced that ...
  151. [151]
    Throwback Attack: Chinese hackers steal plans for the F-35 fighter in ...
    Jul 8, 2021 · Look no further than the 2007 theft of sensitive technical documents related to the development of the F-35 Lightning II strike fighter jet by the Chinese.
  152. [152]
    CMMC: Stopping Cyber Espionage Like Chinese Theft of F-35 Data
    Feb 12, 2021 · The breach occurred in 2007, and came through a subcontractor to Lockheed Martin, the principal maker of the F-35. While it's impossible to ...
  153. [153]
    Hackers breach defences of joint strike fighter jet programme
    Apr 21, 2009 · Computer hackers have breached the cyber defences of an advanced US fighter jet programme, stealing data on the plane's design and electronics systems.
  154. [154]
    Theft of F-35 design data is helping U.S. adversaries -Pentagon
    Jun 19, 2013 · The theft of sensitive design data by hackers targeting programs like the F-35 Joint Strike Fighter takes away a big U.S. advantage by ...
  155. [155]
    Chinese National Pleads Guilty to Conspiring to Hack into U.S. ...
    Mar 23, 2016 · A Chinese national pleaded guilty today to participating in a years-long conspiracy to hack into the computer networks of major US defense contractors.
  156. [156]
    Cyber espionage for the Chinese government
    Sep 17, 2020 · The group also targeted data related to the F-22 and F-35 fighter aircraft. Su Bin instructed the hackers on which individuals, companies ...
  157. [157]
    Los Angeles Grand Jury Indicts Chinese National in Computer ... - FBI
    Aug 15, 2014 · LOS ANGELESA federal grand jury has indicted a Chinese national on five felony offenses stemming from a computer hacking scheme that ...
  158. [158]
    Chinese Businessman Sentenced After Aiding Hackers Access US ...
    Jul 14, 2016 · A Chinese businessman was sentenced to nearly four years in prison Wednesday for helping military officers in China hack into the computer networks of United ...
  159. [159]
    US defence firm Lockheed Martin hit by cyber-attack - BBC News
    May 30, 2011 · US defence firm Lockheed Martin says it has come under a significant cyber-attack, which took place last week.
  160. [160]
    The man who stole America's stealth fighter secrets for China
    Feb 16, 2024 · Over at least six years, Su and his hackers would gain access to tens of thousands of files associated with these stealth fighter programs.
  161. [161]
    Chinese Businessman Pleads Guilty of Spying on F-35 and F-22
    Mar 24, 2016 · ... hacking activities. Data on "dozens of U.S. military projects," including the F-35 and F-22 stealth fighters, also was stolen in intrusions ...
  162. [162]
    [PDF] F-35 Joint Strike Fighter (JSF) Program - Congress.gov
    Jan 3, 2022 · The largest procurement program in the Department of Defense (DOD), the F-35 Lightning II is a strike fighter aircraft being procured in ...
  163. [163]
    [PDF] THE GLOBAL POLITICS OF THE F-35 JOINT STRIKE FIGTHER
    The rationale is simultaneously strategic and economic: co-production deals cement alliance ties, while also helping to offset development costs and increase ...
  164. [164]
    F-35, The Backbone of Next Generation NATO Operations
    The intent of the program was to leverage recent major investments by the U.S. in technology, introduce true service interoperability and achieve economies of ...
  165. [165]
    Romania Becomes the 20th Member of the F-35 Global Alliance
    Nov 21, 2024 · "The F-35's growing presence across Europe demonstrates alliance-based deterrence and is setting the foundation for NATO and allied nations' ...Missing: building | Show results with:building
  166. [166]
    The F-35′s interoperability tech strengthens US alliances
    Dec 16, 2020 · The F-35′s fifth-generation interoperability helps create connective tissue that reinforces relationships with allies, partners and friends who ...Missing: value | Show results with:value
  167. [167]
    Joint Strike Fighter Caucus Announces Strong Bipartisan Support of ...
    May 5, 2021 · "The F-35 is a key military capability to deter conflict with China and Russia, and our commitment to this program maintains critical support ...Missing: reports | Show results with:reports
  168. [168]
    [PDF] 2022 National Defense Strategy, Nuclear Posture Review ... - DoD
    Oct 27, 2022 · ... Joint Strike Fighter. The United States will work with Allies concerned to ensure that the transition to modern DCA and the B61-12 bomb is ...
  169. [169]
  170. [170]
    The F-35 as the foundation of allied deterrence in the Indo-Pacific
    Sep 30, 2021 · By 2035 there will be over 300 F-35s operating in the Indo-Pacific from land bases, carriers and amphibious assault ships – an interoperable ...Missing: rationale | Show results with:rationale
  171. [171]
    [PDF] PACIFIC DETERRENCE INITIATIVE
    May 25, 2021 · F-35B/C Continuous Capability Development & Delivery (C2D2) ($399.5 million): Funding for the F-35 Joint Strike Fighter (JSF). Program ...
  172. [172]
    First F-35 Block 4 Updates Start to Roll Out, Block 5 List Taking Shape
    Mar 10, 2025 · It includes a powerful new processor, expanded memory, and new displays for the F-35, among other enhancements, which will allow the F-35 to ...
  173. [173]
  174. [174]
    F-35 Block 4 Will Be 'Most Aggressive Upgrade'
    Jun 16, 2025 · In terms of timeline for the Block 4 upgrades, while demonstrations have occurred and the capabilities are available, the Joint Strike Fighter ...
  175. [175]
    F-35 Block 4 upgrade delayed until at least 2031: GAO
    Sep 3, 2025 · F-35 Block 4 upgrade delayed until at least 2031: GAO. The long awaited F-35 modernization effort is delayed at least another two years since ...<|control11|><|separator|>
  176. [176]
    These Are The Countries That Purchase US Fighter Jets
    Aug 10, 2025 · As of early 2025, over 900 F-35s are in service with 19 partner nations, and more than 1,700 additional jets remain on order, a testament to its ...Missing: growth | Show results with:growth
  177. [177]
    [PDF] FIGHTER AIRCRAFT: 2025 GLOBAL MARKET REPORT - IQPC
    Aug 3, 2025 · Foreign Military Sale for 32 F-35A aircraft, including engines and related equipment. This was followed by an official agreement by Romania ...
  178. [178]
    Tariffs, Trust, and the F-35: Can Global Volatility Upend the JSF?
    Apr 18, 2025 · On April 1, 2025, Lockheed Martin confirmed delivery of the 51st and 52nd F-35A jets to the Royal Norwegian Air Force, finalizing Norway's ...Missing: growth | Show results with:growth
  179. [179]
    Trump's anti-NATO turn could sink F-35 sales - Defense One
    Mar 13, 2025 · No country that currently flies F-35s is likely to abandon the airframe immediately, but Germany and Canada might alter their recent orders, ...Missing: growth | Show results with:growth
  180. [180]
    F-35 in Action - F-35 Lightning II
    Since the first F-35 Lightning II rolled out of the Lockheed Martin factory in Fort Worth, Texas in 2006, the program's reach has exponentially expanded ...
  181. [181]
    F-35 Price Tag - Economy Insights
    Aug 2, 2025 · F-35A (Air Force CTOL version) – roughly $80–83 million per jet in the latest production lots. This is the cheapest variant. F-35B (Marine Corps ...
  182. [182]
    Lockheed won't protest NGAD loss, instead pitches new, 'fifth-gen ...
    Apr 22, 2025 · Lockheed Martin's chief executive has laid out a mandate to its aeronautics division: Create a “fifth-generation plus” version of the F-35 that can offer 80 ...
  183. [183]
    Lockheed CEO Pitches F-35 Upgrade as 'Bridge' to F-47
    Jul 22, 2025 · Lockheed can apply the technologies it developed for NGAD to the F-35, he said, and it could be the “best value option” for the U.S. government.