Fact-checked by Grok 2 weeks ago

BC Rail

BC Rail, originally the Pacific Great Eastern Railway, was a provincially owned railway incorporated in 1912 to connect coastal and interior regions of , eventually operating 2,320 kilometers of track as Canada's third-largest railway by revenue and mileage. Renamed the British Columbia Railway in 1972, it primarily hauled freight including lumber, coal, minerals, and grain to support the province's resource extraction industries, while also running passenger trains until their discontinuation in 2002. In 2004, the BC Liberal government leased its operations to for $1 billion, a structured as a that bypassed direct sale prohibitions but ignited the Railgate , where aides to Premier were convicted of bribery and influence peddling for favoring CN through leaked bid information and illicit payments. The deal preserved some infrastructure under the British Columbia Railway Company for multi-user access but shifted control to CN, reducing local operational autonomy and prompting ongoing disputes over track maintenance and service discontinuations in underutilized segments.

History

Origins and early construction (1912–1948)

The Pacific Great Eastern Railway (PGE) was incorporated on April 1, 1912, under a provincial charter to construct a line connecting Vancouver to Prince George, spanning approximately 460 miles through challenging terrain including the Coast Mountains and Cariboo Plateau, with the goal of facilitating resource extraction, settlement, and trade amid the anticipated opening of the Panama Canal. The initiative, announced by Premier Richard McBride on February 20, 1912, received a provincial bond guarantee of $35,000 per mile, later increased to $42,000 per mile in 1914 for a total authorized expenditure exceeding $20 million, reflecting optimism for economic development despite the absence of federal funding typical for transcontinental lines. Construction contracts were awarded to Foley, Welch and Stewart (FW&S), experienced contractors who prioritized rapid grading over sustainable financial management. Work commenced in October 1912 from Squamish northward, with grading advancing amid an economic downturn that reduced investment inflows; by November 1915, FW&S had completed 164 miles of track to despite exhausting bond funds, at an actual cost of about $84,000 per mile—far exceeding the planned $58,000—due to overruns in labor, materials, and subcontractor payments. operations began in 1917 on the Squamish–Clinton segment, serving and interests, while simultaneous grading from Prince George southward reached toward Quesnel, though shortages in steel, labor, and capital severely hampered progress, leaving the line fragmented and unconnected. FW&S's management drew criticism for excessive profits—yielding 38% on invested capital—stemming from loosely enforced contracts that allowed front-loading payments for incomplete work, as later detailed in legislative investigations. Faced with impending bankruptcy and provincial liability for the bonds, the government assumed ownership of the on February 22, 1918, inheriting $20.16 million in debt and operational deficits, with the takeover finalized by year's end after negotiations including a $750,000 to FW&S for assets. Post-takeover, construction extended the northern section to Quesnel by 1921, achieving 345 miles from Squamish, but halted in 1922 amid mounting interest payments of $2–2.5 million annually and low freight volumes insufficient to cover costs. The saw minimal extensions, with maintenance prioritized over expansion during the ; reports such as those by W.P. Hinton and J.G. Sullivan in 1922 affirmed the line's potential for resource haulage but underscored financial unsustainability without subsidies. Through the 1930s and 1940s, the operated as a asset with persistent operating losses averaging $7,000 annually pre-1946, reliant on provincial appropriations for upkeep amid wartime material constraints that delayed rehabilitation. A legislative recommended resuming construction to bridge the 80-mile gap between Quesnel and Prince George, citing untapped timber and agricultural potential, leading to renewed grading efforts in 1948 as post-war recovery enabled limited investment in track and equipment upgrades. By 1948, the incomplete network—primarily the Squamish–Quesnel mainline—supported regional freight but fell short of its original vision, emblematic of the era's blend of infrastructural ambition and fiscal realism in provincial rail development.

Provincial takeover and initial expansion (1949–1971)

In 1949, the provincially owned Pacific Great Eastern Railway (PGE) launched a program of substantial infrastructure development to address longstanding gaps in its network, driven by postwar economic growth in British Columbia's resource sectors. Prior to this, the line—acquired by the government in 1918 following private-sector insolvency—had stalled north of Quesnel and lacked a direct coastal connection south of Squamish, limiting its utility for freight from forestry and mining operations. The expansion prioritized northward extension from Quesnel, with 150 miles of new track laid to link with the Canadian National Railway (CNR) at Prince George. On November 1, 1952, the first train arrived in Prince George, establishing the junction and enabling through traffic to northern interior resource sites; this milestone followed decades of delays attributed to terrain challenges and funding constraints under earlier administrations. Concurrently, southern construction blasted a challenging route along Howe Sound's cliffs, completing the 38-mile segment from Squamish to on August 27, 1956. This linkage integrated the PGE into 's port facilities, facilitating bulk exports of , , and minerals, though initial operations relied on ferries for remaining coastal gaps until full rail continuity. The 1960s saw continued provincial investment in northern extensions to support emerging industrial demands, including a major push from Fort St. John toward Fort Nelson—spanning over 400 kilometers through and mountains—to access , gas, and timber reserves. By 1971, additional track connected Fort St. James to Vanderhoof on September 10, enhancing access to central zones and consolidating the 's role as a key hauler for provincial resource extraction, with annual freight volumes rising amid booming postwar commodity prices. These developments, funded through government bonds and operating revenues, transformed the PGE from a fragmented short line into a viable regional carrier, though profitability remained marginal due to high construction costs and competition from highways.

Modernization efforts and operational challenges (1972–1989)

In 1972, the Pacific Great Eastern Railway was renamed the British Columbia Railway, marking a shift toward provincial modernization initiatives aimed at enhancing freight capacity amid growing resource exports. Efforts included fleet upgrades, with the acquisition of new locomotives such as MLW M-630 units in the mid-1970s to replace aging steam-era equipment, improving hauling efficiency on mountainous routes. Financially, the railway recovered from a $21 million operating loss in 1976 through cost controls and rising commodity traffic, achieving an operating profit of $4.46 million in 1979 despite railcar shortages that hampered operations. A of modernization was the –1983 construction of the 130 km , extending from Chetwynd to new mines in northeastern to tap into export markets. This $500 million (1983 CAD) project, part of a broader $2.5 billion , featured Canada's first freight at 50 kV AC, designed to reduce dependency and handle heavy unit trains more economically than diesel traction alone. The line opened on November 2, 1983, with seven GF6C electric locomotives (built 1983–1984) deployed for operations, each capable of 6,000 hp and optimized for the electrified subdivision. Operational challenges persisted, including severe freight car shortages in the late that delayed shipments and eroded profits, as well as the 1977 halt of the proposed Dease Lake extension amid cost overruns and environmental scrutiny, prompting a provincial into railway expansion viability. Safety incidents, such as the October 30, 1987, of 16 cars spilling 200 tons of into the Cheakamus River, highlighted vulnerabilities in handling bulk commodities over rugged terrain. By 1980, mishap costs had fallen 53% from 1979 levels through improved , contributing to an operating profit of $7.5 million, yet the to modern equipment strained capital resources amid fluctuating demand. In 1984, the entity rebranded as BC Rail, reflecting these infrastructural advances.

Financial restructuring and pre-lease developments (1990–2003)

In the early 1990s, the government reduced subsidies to the British Columbia Railway Company (BC Rail), exacerbating financial strains from money-losing passenger services and uneconomic branch lines that the railway was mandated to maintain. Long-term debt, which had declined annually to $79.4 million by 1991, began rising sharply thereafter under the (NDP) administration, driven by operating losses and capital investments outpacing revenues. By 2001, had increased more than sixfold from 1991 levels, reaching approximately $500 million amid sustained deficits and demands, including expansions tied to resource exports. In 1993, BC Rail transitioned to a commercial , eliminating ongoing provincial subsidies and requiring self-sustainability through market-oriented operations. This shift intensified pressure to finance capital projects—such as track upgrades and equipment acquisitions—primarily through debt, as earnings failed to cover expenditures. A significant setback occurred in 1999 with a $600 million write-down on northeast coal line assets, reflecting overinvestment in underutilized infrastructure from earlier expansions dating to the . Efforts to diversify traffic bases, including intermodal and marine services, yielded mixed results, with persistent losses from subsidized obligations hindering profitability. The 2001 election of the Liberal government prompted accelerated restructuring to address the mounting debt, which stood at a debt-to-equity ratio of over 1.76 by late 2002. BC Rail recorded a net loss of $106.9 million in 2001, improving slightly to $84.2 million in 2002 after cost-cutting measures, though discontinued operations contributed to the latter figure. Key actions included divesting non-core assets, such as the February sale of Casco Terminals and Canadian Stevedoring operations for $105 million (yielding a $36 million gain), which reduced debt to $592 million by year-end 2002 and was projected to lower it further to $502 million post-transaction. Passenger rail services, Finlay Navigation, and uneconomic intermodal operations were discontinued, alongside consolidation of terminals in North Vancouver, Squamish, and Prince George, narrowing focus to core industrial freight hauling. Operating income from continuing operations rose 103% to $71.3 million in 2002, with the operating ratio improving to 78% from 92% the prior year, signaling nascent viability but underscoring the need for strategic partnerships to stabilize finances. These steps, including surplus land sales and BCR Properties retention for revenue, aimed to target a of 1.03 by 2005, setting the stage for external operational arrangements.

Negotiation and execution of CN lease (2003–2004)

In May 2003, the government, under Premier , initiated a competitive process to solicit expressions of interest from qualified bidders for a to operate BC Rail's freight services, amid ongoing financial losses reported by the . The request for proposals sought to revitalize operations, with the retaining ownership of the rail right-of-way, railbed, and track infrastructure. Bidders included and OmniTRAX, but () emerged as the preferred partner after submitting the highest-value proposal. On November 25, 2003, the province announced 's selection, with agreeing to acquire all issued and outstanding shares of BC Rail Ltd. and partnership units of the BC Rail Partnership for $1 billion in cash, plus $5 million in assumed debt repayable in 90 years, totaling $1.005 billion. Under the parallel Revitalization Agreement, the province leased the track infrastructure to for an initial 60-year term, with a 30-year renewal option and provisions for further extensions potentially extending operations up to 990 years. committed to investing in infrastructure upgrades, maintaining freight operations, and allocating funds from the proceeds—including $135 million to a Northern Development Initiative Trust and $15 million to a Benefits Trust—to support regional economic growth and community interests. The transaction faced scrutiny over the negotiation process, including allegations of bid information leaks to lobbyists connected to , prompting an RCMP investigation into influence peddling that raided the on December 28, 2003. Despite claims from opposition and investigative outlets of political favoritism—given CN executives' ties to the —the probe cleared government officials of wrongdoing, attributing issues to junior aides convicted in 2010. The deal required approval from Canada's , which consented in July 2004 after CN agreed to share operational efficiencies with shippers to mitigate concerns on certain routes. Execution proceeded with closing on July 14, 2004, transferring operational control to CN while the province maintained asset ownership and oversight rights under the lease. The structure preserved nominal public control over infrastructure but effectively privatized day-to-day freight management, yielding immediate fiscal relief equivalent to about one-third of the province's 2003-04 deficit. CN integrated BC Rail's operations gradually over three years, focusing on network synergies with its mainline system.

CN operational era and recent discontinuation plans (2004–present)

In 2004, (CN) acquired operational rights to BC Rail's freight network through a lease agreement with the Province of , finalized on July 14 for a total value of $1.005 billion, allowing CN to manage trains, equipment, and track maintenance while the province retained ownership of the right-of-way. This transition integrated BC Rail's 1,494 km of track—primarily serving resource-heavy northern and interior regions—into CN's transcontinental system, shifting focus from provincial passenger services (discontinued in 2002) to freight haulage of commodities like , , , and . CN assumed responsibility for all rail traffic, eliminating BC Rail's standalone operations and absorbing its locomotive fleet, including diesel-electric units renumbered into CN's series. CN's oversight emphasized network efficiency, with upgrades to signaling, bridges, and sidings on key segments like the Squamish subdivision to handle increased intermodal and bulk freight volumes amid British Columbia's export growth. Annual traffic peaked in the mid-2010s, supported by resource booms, but declined post-2020 due to factors including wildfires, disruptions, and from trucking on parallel highways. Maintenance demands escalated on the single-track, mountainous mainline, where steep grades and risks required ongoing investments exceeding operational revenues on underutilized stretches. By 2025, initiated discontinuation proceedings for the Squamish-to-Exeter () segment—approximately 400 km of the former BC Rail main—under its Three-Year Rail Network Plan updated July 11, citing insufficient traffic density and maintenance costs averaging millions annually per subdivision. The plan proposes ending lease-based operations by 2026, triggering regulatory review by the Canadian Transportation Agency, including consultations and potential subsidies to retain service; discontinuation would isolate northern lines beyond Chasm, rerouting freight via 's Yellowhead mainline. Provincial officials and local stakeholders, including the for —Sunshine Coast—Sea to Sky Country, have advocated repurposing the corridor for commuter or tourist rail, arguing 's exit revives opportunities dormant since BC Rail's passenger halt. This move follows 's broader network rationalization, prioritizing high-volume corridors amid stagnant regional volumes.

Ownership and Governance

Crown corporation structure

The British Columbia Railway Company (BCRC) is established as a provincial under the British Columbia Railway Act (RSBC 1996, c. 36), which incorporates the company and subjects it to specific statutory provisions distinct from general . As an agent of in right of , BCRC holds a hybrid status: structured like a private corporation for operational flexibility but fully accountable to the provincial government as its sole shareholder, with all issued shares owned by the Minister of Finance on behalf of . This ownership ensures direct provincial control over strategic decisions, including asset management and leasing arrangements, while exempting from certain liabilities unless explicitly assumed. Operated as a self-supporting commercial entity, BCRC generates revenue primarily through leases of its infrastructure and related properties, aiming for without reliance on annual appropriations from general provincial revenues. The corporation's mandate, as outlined in its enabling and annual reporting, focuses on preserving rail corridor assets, facilitating on adjacent lands, and deriving income from non-operational activities post-2004, when freight and passenger services were outsourced via long-term lease to . Governance adheres to the Crown Corporations Reporting Act, requiring annual financial disclosures, performance audits, and alignment with provincial fiscal policies, though operational autonomy is preserved to mimic market-driven efficiency. The , appointed by the Lieutenant Governor in Council, provides strategic oversight, sets within guidelines tied to performance metrics, and ensures compliance with legislative mandates; as of fiscal 2023-2024, the board supported a lean executive structure comprising a and alongside limited senior roles. This framework balances governmental accountability—through mandated reporting to the responsible for corporations—with commercial incentives, such as targets from asset utilization, reflecting the corporation's evolution from active operator to passive holder.

Board oversight and executive compensation

The Board of Directors of the British Columbia Railway Company (BCRC), a provincial , is appointed by the Lieutenant Governor in and typically comprises seven members responsible for strategic oversight, , and ensuring to the —the . The board reports to the Minister of Transportation and , operating under the British Columbia Railway Act, British Columbia Railway Finance Act, Financial Administration Act, and Budget Transparency and Accountability Act, which mandate preparation of service plans and annual reporting without reliance on government subsidies. Oversight includes quarterly meetings to review business conduct and delegation of day-to-day operations to the president and , with emphasis on commercial viability and risk management. Specialized committees support board functions, including the , and Committee for financial integrity; the and Committee for ; and the , and Nominating Committee for executive evaluation and . These mechanisms align with broader practices in , where boards set direction amid government-appointed membership, though historical audits have noted inconsistencies in role clarity and evaluation processes. Post-2004 lease of operations to , the board continues to manage residual assets, such as and limited track, valued at approximately $500 million, ensuring lease terms and provincial interests are upheld. Executive compensation adheres to public sector disclosure requirements, with total remuneration for designated executives reported annually. In the 2023/2024 fiscal year, BCRC's two executives received a combined $501,, comprising base salary, benefits, and performance incentives, despite operational scale limited to asset holding under the CN lease. Board directors receive fees for service; for instance, in the early 2000s, a four-member board for the post-lease entity collected $1.4 million annually from government appointees, reflecting oversight of restructuring. By 2009, the board discontinued non-essential perks such as discretionary allowances, lunch club memberships, and golf policies to align with fiscal restraint. Individual directors have continued earning fees post-asset transfer, with one receiving tens of thousands annually into the 2010s amid ongoing governance of residual holdings.

Transition to leased operations

In 2004, the Province of restructured its ownership of the British Columbia Railway Company (BCRC) to separate infrastructure assets from operational responsibilities, culminating in a long-term of rail operations to (). Under the BC Rail Partnership Revitalization Agreement formalized via Ministerial Order M5/2004, BCRC retained title to the railway right-of-way, track , and associated lands, while granting operational control through a 60-year renewable for an initial additional 30-year term. The arrangement provided with exclusive rights to freight and passenger services on the mainline network, excluding the provincially managed Port Subdivision in . The transaction closed on July 14, , with CN acquiring the shares of BC Rail Ltd., the operating , for approximately C$1 billion, including upfront payments and commitments to investments. This shift preserved provincial ownership of core assets—valued at over C$500 million in track and —but transferred daily governance of rail services to CN's , reducing BCRC's role to lessor oversight, lease enforcement, and . As a result, BCRC's board and executives transitioned from managing operations to monitoring CN's adherence to terms such as maintenance standards, rate protections for shippers, and options for competitive access by other carriers via interchanges. The lease included provisions for to integrate BC Rail's , employees, and contracts, with implementing agreements reached in December 2004 for labor transitions under the Council of Trade Unions on 's Pacific Region. implications extended to fiscal , as the deal generated immediate for the —estimated at C$150 million in initial payments—while offloading operational risks and deficits that had plagued BC Rail, which reported losses exceeding C$100 million annually prior to the lease. However, the process drew scrutiny amid the "Railgate" inquiry, which investigated bidding irregularities and undisclosed advisor roles but affirmed the lease's legal structure without invalidating the transfer of operational authority.

Infrastructure and Routes

Mainline network and key segments

The mainline network of BC Rail, originally developed from the Pacific Great Eastern Railway, primarily comprised a north-south trunk line extending 497 miles from its interchange yard at North Vancouver to Prince George, traversing coastal fjords, steep mountain passes, and interior plateaus. This core route facilitated freight transport of , minerals, and agricultural products, with standards upgraded over time to handle heavy loads despite challenging grades up to 2.2% and curves requiring speeds as low as 25 in sections. Beyond Prince George, the network extended northward via the Peace River Subdivision approximately 250 miles to Fort St. John and , serving oil, gas, and grain industries in the region. Key segments included the Squamish Subdivision, spanning roughly 37 miles from North Vancouver through the to Squamish, characterized by single-track operations amid Howe Sound's rugged terrain and avalanche-prone slopes, with historical bottlenecks eased by siding extensions in the 1980s. Northward, the progression to Pemberton (mile 65), (mile 130), and marked the transition to the drier Cariboo Plateau, where the line crossed the Fraser and systems via bridges like the 1,100-foot span at Seton Lake, supporting and traffic. The northern Cariboo from Williams Lake (mile 320) to Quesnel and Prince George emphasized bulk commodity hauls, with interchanges to at Prince George enabling connections to markets. Branch lines integral to the network included the 82-mile Subdivision diverging from the mainline at Wakely (mile 537 north of North Vancouver), developed in 1981 for coal exports from Quintette and Bullmoose s, peaking at 10-12 million tons annually before closures in the reduced volumes. The Fort Nelson Subdivision extended 400 miles from Fort St. John to Fort Nelson, primarily for but largely dormant since the due to low traffic density. These segments collectively totaled over 1,400 miles of owned trackage by the , with maintenance focused on curvature realignments and bridge reinforcements to sustain 286,000-pound car loads.

Track ownership versus operational control

The Province of , through its BC Rail Ltd., retains ownership of the railway right-of-way, railbed, and track infrastructure formerly comprising the BC Rail network. In the transaction, acquired operational rights via a long-term rather than outright purchase of the physical assets, preserving provincial to the approximately 1,400 miles of track extending from North Vancouver to Prince George and associated branches. This lease structure, formalized on July 14, 2004, grants exclusive operational control, including the authority to run freight trains, maintain day-to-day dispatching, and implement service decisions on the owned tracks. The initial term spans 60 years (through 2064), with renewal options extending potential control up to 90 years, during which assumes all operational risks and revenues from traffic but pays no ongoing lease fees beyond the initial $1 billion transaction payment that included acquisition of and freight operations. Under the agreement, BC Rail holds veto rights over major alterations, such as abandonment or significant upgrades requiring public funding, ensuring provincial oversight despite ceded day-to-day control. The distinction has implications for regulatory and abandonment processes: CN may discontinue operations on leased segments without divesting ownership, as demonstrated by its 2025 notice to end service on the 214-mile Squamish-to-100 Mile House portion, after which control would revert to the province for $1 or potential repurposing, without needing federal approval under the Canada Transportation Act for lease termination. This setup contrasts with CN's full ownership of adjacent lines, limiting provincial flexibility for alternative uses like passenger reactivation until operational rights lapse or are renegotiated.

Maintenance and upgrades under provincial and CN management

Under provincial ownership, the British Columbia Railway Company (BC Rail) managed routine of its extensive , which included tracks, bridges, and signals across rugged prone to landslides and . and mechanical expenditures declined by $4.9 million in 2003 compared to 2002, reflecting operational adjustments amid financial ahead of the lease arrangement. Specific upgrades during this era were primarily reactive, such as historical repairs involving the placement of 800,000 cubic yards of material and 90 feet of new trestle following damage events, though comprehensive capital programs were constrained by the corporation's debt burden exceeding $2 billion by 2003. The 2004 Revitalization Agreement transferred operational responsibility to () while retaining provincial ownership of the track and infrastructure; leased the assets for 60 years, renewable for 30 more, with obligations to maintain them in good repair. Section 10.1 requires to perform adequate maintenance on all leased property, including preventing deterioration beyond normal , while Section 11.2 prohibits actions that could impair the infrastructure's condition. Upon lease termination or discontinuation, must return the rail bed and related assets to the province in a functional state, subject to . CN implemented targeted upgrades post-lease to enhance capacity and efficiency, such as extending sidings and achieving double-stack clearances on the B.C. North line to facilitate traffic from Prince Rupert port. Annual investments have escalated in response to the lines' demanding geography; in 2024, CN allocated approximately $554 million CAD to track maintenance and infrastructure projects across , followed by a planned $615 million in 2025 for similar efforts, including bridge reinforcements and capacity expansions to support resource commodities like critical minerals. These initiatives have improved reliability for freight volumes exceeding 10 million tons annually on key segments, though persistent high costs—attributed to frequent repairs in avalanche-prone areas—have prompted CN's 2025 three-year plan to discontinue operations on underutilized portions, such as the Squamish to segment.

Freight Operations

Primary commodities and traffic patterns

BC Rail's freight operations historically centered on bulk resource commodities, with forest products forming the dominant category. , wood pulp, and related outputs accounted for the majority of traffic, reflecting British Columbia's resource-based economy. Prior to the operational lease to (CN), these commodities generated over 80% of freight revenue when combined with energy products and agricultural goods. shipments, primarily from the area via the subdivision, represented a key revenue stream until mine closures led to their cessation around , reducing overall dependency on this sector. Traffic patterns emphasized north-south flows along the mainline from the BC interior to coastal terminals at North Vancouver and, via connections, to export ports like Prince Rupert. Forestry commodities originated from mills and harvest sites in the , Cariboo, and northern regions, moving southward for processing or export. Agricultural products, including grain and potash, supplemented these hauls, particularly on branches serving the district, while intermodal containers grew as a secondary traffic type post-lease under CN management. Annual freight volumes peaked in the early 2000s at over 10 million tonnes, but declined sharply after coal traffic ended and amid forestry sector challenges. Under 's operations since , efficiency improvements facilitated higher throughput of remaining forest products, though overall traffic contracted due to reduced bulk origins and competition from trucking. By 2020, CN suspended freight services on segments between Squamish and Williams Lake, citing low volumes primarily tied to diminishing hauls. Remaining patterns involve sporadic unit trains of and to Vancouver-area interchanges, with southbound returns often comprising empty cars or imported .

Interchanges, partnerships, and reporting marks

BC Rail interchanged freight cars primarily with at North Vancouver, facilitating access to Vancouver port terminals and CN's broader network, and at Prince George, enabling connections to via CN's main lines. The Prince George interchange was established following BC Rail's line extension completed in 1952. Limited interchange occurred with other carriers, such as indirect links through Vancouver Wharves to Union Pacific for export traffic, though volumes were minor compared to CN handlings. Operational partnerships were constrained by BC Rail's regional scope, with reliance on CN for most outbound commodity flows like , , and grain to national markets. Coordination with CN and Canadian Pacific Railway (CP) supported north shore freight movements to ports, including efficiency protocols for car handoffs, though these were rather than formal alliances. No major joint ventures or shared trackage agreements with competitors preceded the 2004 lease to CN. Equipment operated under the primary reporting mark BCOL, assigned to BC Rail Ltd. for locomotives and freight cars; BCIT designated international service units. Predecessor Pacific Great Eastern used PGE, phased out after the 1972 rebranding to Railway.

Efficiency gains and service disruptions post-lease

Following the completion of the lease agreement on July 9, 2004, (CN) integrated BC Rail's freight operations, yielding operational through and labor cost reductions. BC Rail had operated at 15-18% higher costs than major Canadian railways, largely due to restrictive agreements that limited scheduling flexibility and crew productivity. CN eliminated approximately 430 positions, representing 31% of BC Rail's workforce of about 1,380, enabling streamlined operations and alignment with CN's lower-cost model. These changes, combined with network integration, allowed CN to commit to sharing merger efficiencies with shippers via a consent agreement with Canada's . Shippers benefited from enhanced and improvements, including an average 7% reduction for interline and 30% faster transit times through optimized routing to markets. CN added 600 new rail cars to the fleet and introduced scheduled express forest products trains from Prince George, reducing reliance on ad-hoc operations and improving reliability for commodity shippers. These enhancements positioned northern shippers for greater competitiveness by linking them to CN's broader transcontinental network, though actual long-term realization depended on sustained volumes. However, the transition period saw notable service disruptions, particularly from safety incidents on the aging . In 2005, recorded 11 main-track on former BC Rail lines, nearly double the prior five-year average of six, prompting calls for provincial into operational readiness. A 2009 Transportation Safety Board report attributed a fatal near Boston Bar to 's decision to discontinue —a routinely used by BC Rail—exacerbating runaways on steep grades due to inadequate management. These events highlighted initial challenges in adapting 's standardized procedures to BC Rail's unique terrain and equipment, temporarily disrupting freight flows for , , and commodities. Despite subsequent investments, such as upgrades, early disruptions underscored the risks of rapid integration without full synchronization.

Passenger and Excursion Services

Historical commuter and regional passenger rail

The Pacific Great Eastern Railway (), predecessor to BC Rail, initiated regional passenger services in the early , with initial segments from North Vancouver to Squamish intended partly for commuter access to -area employment and resources. Construction began in 1914 on the North Vancouver to Squamish line, which opened progressively and supported local passenger traffic by the , though service remained sporadic due to incomplete track and financial constraints under provincial ownership from 1918. By the mid-1950s, modernized its passenger operations with the acquisition of three Budd RDC-1 self-propelled rail diesel cars, each seating 80 passengers in a configuration including compartments for mail and baggage. These units debuted in 1956 on the renamed (also called Cariboo Dayliner), a regional service running daily from North Vancouver to —approximately 200 km through mountainous terrain—and extending to Prince George (over 800 km total) on a thrice-weekly basis, stopping at communities like , , Williams Lake, and Quesnel. The trains facilitated transport for residents in isolated interior regions, carrying freight manifests alongside passengers, with fares structured for day trips or overnight connections. While the Squamish-North Vancouver segment saw some daily commuter use by workers in logging and construction until highway expansions in the 1960s reduced demand, BC Rail's overall passenger focus shifted to regional connectivity rather than high-frequency urban commuting, competing with growing automobile and bus options. Ridership peaked in the 1970s amid tourism promotion but declined thereafter due to subsidized road improvements and aviation alternatives, leading to subsidy burdens on the provincially owned operator. The RDC fleet operated until retirement in 2002, when BC Rail terminated all regular passenger services amid financial restructuring and privatization pressures.

Development and decline of excursion tourism

BC Rail initiated excursion tourism services in 1974 with the acquisition of Canadian Pacific Royal Hudson steam locomotive No. 2860 by the Province of specifically for tourist operations. This marked the start of regular steam-powered excursions from North to Squamish, leveraging the scenic coastal route along to attract visitors seeking historic experiences amid dramatic fjord landscapes and forested terrain. The service operated seasonally from May through October, typically on weekdays, and quickly established itself as a signature offering, drawing on the locomotive's royal heritage—originally designated for King V's 1939 tour—to promote 's . To expand beyond short-haul steam trips, BC Rail introduced diesel-hauled and luxury variants in the and early 2000s, including dinner trains and specialized tourist consists like the Starlight Dinner Train. A notable escalation occurred in 2001 with the launch of the Whistler Northwind, a high-end train featuring dome cars, luxury accommodations, and gourmet dining, running from North Vancouver to Prince George over two seasons. This initiative targeted affluent travelers and tour groups, integrating with motor coach connections at Whistler to capitalize on growing regional , such as emerging resorts and activities. These developments reflected efforts to diversify revenue amid freight dominance, though excursions remained subsidized operations under provincial ownership. The excursion sector began declining in the late due to escalating maintenance costs for aging equipment, prompting a shift to power for route in its final 2001 season. Broader services, including excursions, faced mounting financial pressures from low occupancy relative to operational expenses, exacerbated by the post-September 11, 2001, slump in and a sluggish . BC Rail discontinued all and operations effective October 31, 2002, citing insufficient ridership and lack of government subsidies for upkeep. The Whistler Northwind ceased after its 2002 schedule, unable to sustain viability without ongoing provincial support, while equipment transitioned to static display at the Railway Museum of . This termination aligned with BC Rail's pivot toward freight efficiency ahead of its 2004 operational lease to Canadian National, which prioritized commercial cargo over tourist services.

Discontinuation and legacy impacts

BC Rail terminated its regular passenger services, including the Cariboo Prospector route from North Vancouver to Prince George, on October 31, 2002, alongside excursion offerings such as the Whistler Northwind and Coastal Dinner Train. The decision stemmed from chronic operating losses—totaling $4.8 million in 2001 despite carrying 81,000 one-way passengers—and the avoidance of nearly $19 million in required capital investments for fleet upgrades. These services, reliant on aging Rail Diesel Cars (RDCs), faced declining ridership amid competition from expanded highways, automobiles, and bus alternatives. Excursion tourism, exemplified by the Royal Hudson steam-powered trips from North Vancouver to Squamish, ended earlier in 2001 when locomotive No. 2860 required extensive, unaffordable repairs. BC Rail's 2002 annual report noted the exit from these "unprofitable, tourism-focused" operations, with subsequent sales of equipment yielding financial gains. The cessation severed rail links to remote interior communities like Lillooet, exacerbating isolation and shifting dependence to road-based transport, which proved vulnerable to later disruptions such as Greyhound's provincial withdrawal. Economically, it curtailed scenic rail tourism that had drawn visitors to British Columbia's coastal and mountainous routes, contributing to a broader decline in provincially operated passenger rail viability without subsidies. Preservation efforts preserved select artifacts, including RDCs and the Royal Hudson locomotive, at sites like the Railway Museum of British Columbia, sustaining historical awareness. Recent Canadian National proposals to discontinue freight operations north of Squamish on former BC Rail tracks have revived discussions of potential passenger revival in the Sea-to-Sky corridor, underscoring enduring infrastructure value amid freight prioritization.

Rolling Stock

Locomotive fleet evolution

The locomotive fleet of BC Rail, originally the , transitioned from to power in the early . The first units acquired were two locomotives numbered 559-560 in 1950, followed by additional MLW-built RS-3s numbered 561-578 between 1951 and 1955, with some later converted to slugs for yard service. This shift supported expanding freight operations amid growing resource extraction in British Columbia's interior. In the late 1950s and 1960s, the fleet expanded with MLW RS-10 units 579-586 acquired in 1956 and RS-18s numbered 601-630 from 1957 to 1965, the latter upgraded to RS-18C configuration with Caterpillar engines for improved reliability. Heavier road power arrived in the 1970s, including MLW C630M units 701-704 in 1969, M630s 705-730 from 1970-1973 (some with safety cabs), and M420 variants 640-647 in 1973 and 681-688 in 1975, though several M420s were retired following wrecks. Alco C420s 631-632, acquired in 1966 and derated, were sold off by the decade's end. The 1980s marked a diversification with EMD acquisitions: seven ex-Kansas City units 736-742 in 1978, 17 new GMD-built 751-762 in 1980, five more GMD s 763-767 in 1985, and eight second-hand units 743-750 from Oneida & Western in 1987. A single GE B39-8E unit 1700 was added in 1987. Older MLW locomotives, such as most RS-3s, RS-10s, and M630s, were progressively retired during this period to streamline maintenance. Modernization accelerated in the 1990s with Dash 8-40CM units: 22 locomotives numbered 4601-4622 delivered in 1990 to replace aging Alco/MLW power. Further acquisitions included four C44-9WL units 4641-4644 in 1995 with Pacesetter technology, 15 second-hand B36-7s from Atchison, Topeka and in 1996 (some later sold), six rebuilt C36-7M ex-Conrail units 3621-3626 in 1999, and ten additional C44-9WLs 4645-4654 in 2000. By the 2004 lease to , retained units including upgraded RS-18s and SD40-2s were transferred, while pre-1980s MLW heavies like C630Ms had been retired.
EraKey Models AcquiredUnitsBuilderNotes
1950s-1960sRS-3, RS-10, RS-18559-630MLW/AlcoRoad switchers; some slug conversions and upgrades
M630, M420, C630M640-730MLWHeavy road power; some safety cab variants
1980sSD40-2736-767/GMDMix of new and second-hand; core freight haulers
1990s-2000s 8-40CM, C44-9WL4601-4654+Modern high-horsepower units for efficiency

Acquisition, retirement, and CN integration

In July 2004, (CN) completed its acquisition of Ltd. from the government for CAD $1 billion, gaining ownership of the company's fleet and other as part of the transaction. The deal, announced in November 2003, transferred approximately 100-120 diesel , primarily older MLW and GE models, along with a small number of specialized units, into CN's operational control, while the track infrastructure remained under a 60-year renewable operating . Prior to the acquisition, BC Rail had begun retiring older and less efficient locomotives in the late and early 2000s, including its fleet of six GF6C electric locomotives (nos. 6001-6006), which were withdrawn from service in 2000 after the termination of a long-term export contract with Japanese steel mills that had justified their use on the electrified line. Several MLW C630M units, such as no. 701, were also retired before the CN takeover due to high maintenance costs and obsolescence relative to newer GE Dash 8-series locomotives acquired in the . These retirements reflected BC Rail's shift toward more reliable, higher-horsepower s amid declining freight volumes in certain sectors, with scrapped or donated units including no. 6002, dismantled in 2004. Following integration, CN systematically retired or disposed of many legacy BC Rail locomotives over the subsequent years, prioritizing the retention of modern units like the 8-40CM (nos. 4600s) and C44-9W (nos. 4650s) for continued service on former BC Rail routes. Older models, including surviving MLW and early diesels, were largely scrapped or sold, with the integration process spanning three years to minimize disruptions; by 2012, only the 8 and 9 series remained active in original BC Rail under CN operation, gradually repainted and renumbered into CN's national fleet standards. This selective preservation enhanced fleet efficiency, as CN's model favored high-utilization, low-emission locomotives over BC Rail's aging patchwork.

Notable equipment types and specifications

BC Rail's locomotive fleet featured several notable diesel-electric models tailored for British Columbia's rugged terrain and resource-heavy freight, including (MLW) M420 units with a 2,000 horsepower and MLW ZWT trucks for enhanced traction on steep grades. These six-axle road switchers, acquired primarily between 1973 and 1977, numbered over 100 across variants like M420W and M420R, serving in mixed freight and passenger duties until the early 2000s. Heavy-haul operations relied on MLW M630 and C630M locomotives, each producing 3,000 horsepower from a 16-cylinder engine, with six powered axles and a top speed around 65 mph, enabling efficient pulling of long trains over mountainous routes. BC Rail rostered approximately 20 such units in the 1970s, including wide-cab M630W variants for improved crew visibility and comfort during extended hauls of lumber and minerals. Modernization in the 1990s introduced General Electric Dash 8-40CM (C40-8M) models, rated at 4,000 horsepower with a 7FDL16 engine, six axles, and a maximum speed of 70 mph, optimized for high-volume freight corridors. BC Rail purchased these in 1990 to replace aging ALCOs, deploying about a dozen for interchanges with larger carriers. The final major acquisition before the 2004 CN lease comprised locomotives (series 4650-4654), delivering 4,400 horsepower via a 7FDL16T engine, wide cabs for safety, and advanced controls for fuel efficiency on trains exceeding 10,000 tons.
ModelBuilderHorsepowerAxle ConfigurationKey Features
M420MLW2,000C-CALCO 251C3 engine, ZWT trucks
M630MLW3,000C-C16-cylinder ALCO, wide-cab option
Dash 8-40CM4,000C-C controls, 70 mph top speed
C44-9W4,400C-CWide long hood, heavy service
BC Rail also operated four GMD GF6C electric locomotives (numbers 601-604), built in the 1980s with thyristor technology for 6,000 horsepower equivalent drawbar pull on electrified segments, eliminating needs but limited by to specific routes like the tumbler subdivision.

Economic Impact and Performance

Contributions to British Columbia's resource economy

BC Rail facilitated the transport of essential resource commodities from British Columbia's interior regions to coastal export terminals, underpinning the province's , , and sectors by providing dedicated for bulk freight. Its 2,315 km , including the mainline from North Vancouver to Fort Nelson, connected remote camps, pulp mills, and mines to North American gateways, enabling efficient movement of that would otherwise rely on costlier trucking over rugged terrain. In 2003, BC Rail reported 12.9 million revenue tons and 151,063 carloadings, with over 80% of its $299 million freight revenue derived from resource commodities such as forest products, energy minerals, and agricultural goods. Forest products dominated, generating $185 million, including $58.1 million from , $40.6 million from wood pulp, $34.7 million from , and $17.9 million from logs and poles, reflecting the railway's central role in serving mills in areas like Prince George and the central interior. The railway also supported coal extraction in the Peace River region through its Tumbler Ridge Subdivision, constructed as part of the Northeast Coal Development Project in the early and electrified to handle high-volume unit trains. This line was designed to deliver up to 33,000 tons of daily via three unit trains, facilitating exports from mines like Teck and Quintette to international markets via coastal ports, though volumes declined post-2000 due to market shifts, with contributing $3.3 million in revenue by 2003. Bulk minerals such as sulphur, a , added $26.3 million, underscoring BC Rail's niche in hauling industrial outputs critical to resource processing and export. By prioritizing long-haul shipments, BC Rail reduced transportation costs for producers, fostering economic viability in export-dependent industries that comprised a significant portion of British Columbia's GDP during its operational peak from the to early .

Fiscal performance under government ownership

Under government ownership, BC Rail generated operating revenues that occasionally exceeded direct costs, as evidenced by $447.2 million in revenues against $418.6 million in operating expenses for the 2001 , yielding a modest surplus before , , and other non-operating items. However, persistent net losses arose from substantial debt servicing—on long-term obligations exceeding $600 million—and mandated uneconomic services, such as subsidized and routes, which eroded profitability. For instance, the company recorded a $107 million net deficit in 2001/02, contributing to an accumulated debt burden that strained provincial finances. Provincial subsidies were integral to sustaining operations, totaling approximately $1 billion over decades to support goals like in central and northern , rather than purely commercial freight. While operating income improved to $71 million in 2002 from $35 million in 2001, reflecting cost controls and freight volume growth, these gains were insufficient to offset interest expenses and maintenance demands without ongoing government backing. reductions in the early prompted service rationalizations, including curtailment of money-losing passenger lines, but did not eliminate the structural reliance on funds. Critics from taxpayer advocacy groups highlighted the fiscal drag, arguing that policy-driven obligations diverted resources from core freight efficiency, while defenders noted episodic operating profits like $71.9 million in , during which debt slightly declined by $4 million. Nonetheless, the pattern of net shortfalls and dependence underscored the challenges of operating a regionally focused railway under mandates, culminating in the 2004 lease to to alleviate provincial liabilities.

Post-lease financial outcomes and cost savings

The BC Rail transaction with (), finalized on July 14, 2004, delivered an upfront payment of $1.005 billion to the government, comprising $693 million for the shares of BC Rail Ltd. (the freight operating entity) and $312 million in prepaid rent for a 60-year lease of the railway right-of-way, renewable for an additional 30 years. This capital influx allowed the province to fully retire BC Rail's accumulated of approximately $500 million, while directing surplus proceeds toward broader transportation infrastructure investments, thereby averting further public borrowing or fiscal strain from the railway's legacy liabilities. Post-lease, the Railway Company—retained as the track lessor—accounts for the CN arrangement as a , derecognizing rail assets from its and amortizing the prepaid lease revenue over the term, which generates steady, predictable income streams for the province without absorbing operational risks or maintenance expenses previously borne by taxpayers. By the late , this structure yielded an estimated $10 million in annual to provincial coffers, a marked improvement over pre-lease years when freight operations often recorded deficits amid subsidy reductions and rising from the early onward. The lease eliminated recurring government subsidies for freight services, which had totaled millions annually in prior decades to cover shortfalls, shifting BC Rail from a net drain on public resources to a revenue-neutral or positive asset through CN's commercial management and infrastructure upgrades. CN's assumption of day-to-day costs, including track maintenance and capital improvements, further enhanced savings, as the avoided expenditures estimated in the tens of millions yearly under prior ownership models plagued by underinvestment and competitive pressures. Overall, the arrangement realized immediate fiscal relief via debt elimination and long-term efficiencies by privatizing operations while retaining ownership of the underlying corridor.

Controversies and Criticisms

BC Rail lease scandal and political investigations

In November 2003, the government under Premier announced a transaction with (), involving the sale of all outstanding shares of BC Rail Ltd. for $1 billion in cash, alongside a 60-year of the railway's right-of-way and , renewable for an additional 30 years. The deal, structured as a public-private , aimed to revitalize the provincially owned railway amid ongoing financial losses, with assuming operational control while BC Rail retained ownership of certain assets. The agreement quickly sparked controversy when, on December 28, 2003, the Royal Canadian Mounted Police (RCMP) raided the Legislature and offices of ministerial aides, seizing documents related to the bidding process. The investigation, dubbed "Railgate," focused on allegations that confidential information about rival bids—particularly from Omnitrax and other competitors—was leaked to lobbyists and insiders, potentially influencing the outcome in favor of . Key figures included David Basi, policy adviser to Finance Gary Collins, and Virk, aide to Transportation Judith , who were accused of breaching trust by disclosing non-public details of the sale process in exchange for benefits such as cash, luxury trips, and other inducements. The probe expanded to include businessman Erik Bornmann, who testified that Basi and Virk had provided him with insider information on bids, enabling him to pass it to lobbyist Erik Anderson, who represented interests aligned with . After years of pretrial delays, Basi and Virk pleaded guilty in October 2010 to one count each of breach of trust and accepting a benefit, just before the trial's resumption; they were sentenced to two years less a day of , , and 150 hours of , avoiding jail time. Bornmann, granted immunity for his testimony, avoided charges. The province covered approximately $6 million in legal fees for Basi and Virk, later waiving repayment despite their convictions, a decision criticized for shielding potential higher-level involvement. Political investigations yielded no charges against cabinet ministers or Premier Campbell, with special prosecutor William Smart concluding in 2011 that evidence did not substantiate wrongdoing by elected officials, attributing issues to aides acting independently. Opposition and others, including MLA Paul Nettleton who defected from the Liberals in 2003 over privatization concerns, called for a into the process, alleging systemic deception and failure to disclose full bid details, but none was convened. The contributed to public distrust in the Campbell government's handling of sales, though it did not derail the lease, which proceeded under CN operation.

Labor disputes and job impacts

Unions representing BC Rail employees strongly opposed the proposed 99-year lease to (CN) announced in 2003, viewing it as a that would lead to widespread job losses and facility closures. The of BC Rail Trade Unions leaked an internal in May 2003 estimating that up to 1,223 jobs—encompassing both management and union positions—could be eliminated if the takeover proceeded, representing approximately 70% of the workforce. Following the lease approval in late 2003, CN announced initial layoffs affecting around 430 workers, though union analyses contended the total impact exceeded this figure due to subsequent facility rationalizations across . By 2005, hundreds of unionized employees had been laid off as CN shuttered BC Rail yards and maintenance shops in locations such as Prince George, Fort St. John, and North Vancouver, prioritizing integration into its larger network. To address transition concerns, negotiated supplemental collective agreements with unions like the Teamsters Canada Rail Conference, incorporating provisions for former BC Rail locomotive engineers and conductors, including seniority protections and specific terms expiring in 2010. These pacts aimed to mitigate disputes during absorption but did not prevent overall employment reductions, as CN's operational efficiencies reduced the need for redundant roles in the provincially isolated line. No major strikes occurred directly tied to BC Rail operations, though the lease process fueled broader labor federations' criticisms of government handling.

Alleged service degradation and abandonment proposals

In the years following Canadian National Railway's (CN) 60-year lease of BC Rail's freight operations in July 2004, some industry observers and shippers alleged a decline in on the former BC Rail network, attributing it to CN's integration priorities and reduced operational focus on lines. For instance, shortly after the , CN implemented service reductions, limiting freight operations to one train per day on the Prince George, , and Squamish subdivisions, which critics claimed exacerbated reliability issues for local shippers dependent on the route. By 2017, northeast mining interests reported that CN's inadequate track maintenance on segments near had stalled coal shipment restarts, as the railway had not restored capacity despite economic recovery signals from the sector. These service concerns contributed to persistently low traffic volumes, prompting multiple abandonment proposals by . In 2019, filed notice to discontinue 193.5 miles of the Takla Subdivision, starting from mile 79.8 north of Fort St. James, citing uneconomic operations due to minimal freight demand. More recently, on July 9, 2025, announced its intent to end operations on approximately 214 miles of leased trackage from Squamish to (Exeter Creek), effective after regulatory review, arguing that annual carloads had fallen below thresholds justifying maintenance under the Canada Transportation Act. The proposal excludes the Squamish Terminals branch but would sever through-traffic northward, drawing objections from affected communities and shippers who contended that prior service inconsistencies under had eroded rail's competitiveness against trucking alternatives. Regulatory proceedings for such discontinuances require to demonstrate financial inviability, including evidence of low revenue relative to upkeep costs, with opportunities for stakeholders to intervene via the Canadian Transportation Agency. While maintained that the lines' remote geography and limited industrial base inherently limited viability, proponents of retention argued for provincial to preserve for potential or short-line freight revival, highlighting broader debates over the long-term impacts of the lease structure.

References

  1. [1]
    British Columbia Trains - Traingeek – Trains and Photography
    Natively, the Pacific Great Eastern Railway was chartered in 1912 and was taken over by the province in 1918. In time this became BC Rail, and it operated ...
  2. [2]
    British Columbia Railway (BCR) - Northern BC Archives
    It was a class II regional railway and the third-largest in Canada, operating 2,320 km of mainline track. Primarily a freight railway, BC Rail also offered ...
  3. [3]
    [PDF] BRITISH COLUMBIA RAILWAY COMPANY - BC Budget
    Feb 18, 2003 · BC Rail, Canada's third largest railway as measured by revenue and continuous track, operates exclusively within British Columbia and has inter ...
  4. [4]
    03-010: The British Columbia Railway - South Peace Historical Society
    On April 1, 1972 the government of British Columbia changed the railroad name to “British Columbia Railroad”. This railroad now is extended north to Fort Nelson ...
  5. [5]
    BC Rail by David Othen - Traingeek – Trains and Photography
    The RDC made its last run on 31 October 2002 and BC Rail was leased by CN for 999 years from the Government of British Columbia in 2004. Most of the BC Rail ...
  6. [6]
    CN acquiring BC Rail for $1 billion | CBC News
    Dec 4, 2003 · Canadian National Railway will pay the British Columbia government $1 billion in cash to acquire publicly-owned BC Rail Ltd., the company said.
  7. [7]
    BC Rail Mainline to Branchline - OKthePK
    For all intense purposes it was called a sale but in actuality it was a 999 year lease to Canadian National Railway Company (CN) starting in 2004. The ...
  8. [8]
    How BC Rail Was Made to Disappear - The Tyee
    Dec 27, 2011 · Premier Gordon Campbell's government broke an election promise and sold BC Rail to one of his political party's biggest backers -- CN Rail -- in ...<|separator|>
  9. [9]
    About Us - British Columbia Railway Company
    BCRC does not operate its own trains, but functions similar to an airport authority, maintaining the shared infrastructure and controlling the multi-user ...
  10. [10]
    End of the [Rail]Road: CN Plans to Discontinue Former BC Rail Line
    Oct 7, 2025 · CN intends to discontinue operating the former BC Rail track segment between Squamish, BC and 100 Mile House, BC.
  11. [11]
    [PDF] the pacific great eastern railway and british columbia
    The Pacific Great Eastern Railway was created in 1912, intended to run from Vancouver to Prince George, but failed due to mismanagement and economic conditions.
  12. [12]
    [PDF] PACIFIC GREAT EASTERN RAILWAY
    In 1912 the Pacific Great Eastern Railway Company was incorporated under Provincial charter and bond guarantee to construct and operate a railway from Prince ...
  13. [13]
    Pacific Great Eastern Railway: Map, History, Roster
    Aug 23, 2024 · The Pacific Great Eastern, which became the British Columbia Railway after 1972, was the third largest system in Canada.Missing: 1912-1948 | Show results with:1912-1948<|separator|>
  14. [14]
    Pacific Great Eastern/British Columbia Railway/B.C. Rail
    Like many early railways, financial difficulties loomed early and the B.C. government acquired all stock in 1918. The original plan to build to Prince George ...
  15. [15]
    Pacific Great Eastern Railway - Prince George - The Exploration Place
    Nov 21, 2021 · The railway started its planning and construction in 1912. By 1918 the railway had made its way to Quesnel. 2 World Wars and The Great ...Missing: 1912-1948 | Show results with:1912-1948
  16. [16]
    The Beginnings of the Pacific Great Eastern Railway
    Nov 19, 2019 · The first company that was meant to build a railway from coastal BC to the BC Interior was incorporated in 1891, but not much came of it. Once ...Missing: 1912-1948 | Show results with:1912-1948
  17. [17]
    Contemporary Railways | The Canadian Encyclopedia
    Feb 7, 2006 · During the 1950s and 1960s a number of major resource railways were completed. The Pacific Great Eastern (later the BRITISH COLUMBIA RAILWAY) ...
  18. [18]
    Significant Dates in Canadian railway history.
    Van Horne succeeded in laying 480 miles of track across the Prairies in the summer of 1882. ... 1956, June 11 - The Pacific Great Eastern Railway opens between ...
  19. [19]
    A railway runs through it - Squamish Chief
    Mar 24, 2019 · From 1949 until 1971, the railway connected logging and mining operations to the B.C. Interior and to Squamish, where resources could be ...
  20. [20]
    [PDF] british columbia railway
    The operating profit of $4.46 million, while down from 1978, was achieved in the face of very real difficulties. The severe rail car shortage during the first ...Missing: challenges 1970s
  21. [21]
    [PDF] british columbia railway 1980 annual report
    In 1980, British Columbia Railway recorded an operating profit of $7.5 million, an increase from the $4.5 million re- ported in 1979.Missing: 1970s | Show results with:1970s
  22. [22]
    [PDF] Electrification of the Tumbler Ridge Branch Line in British Columbia ...
    However, the $500 million (1983 Canadian dollars) construction cost of the electrified Tumbler. Ridge Branch Line (TRBL) is just a part of a $2. 5 billion ...
  23. [23]
    Using Electricity to Haul Coal: The British Columbia Railway's ...
    May 25, 2023 · The closure also made redundant the 130-kilometre electrified railway line that had been built exclusively to help transport coal from ...
  24. [24]
    50 kV Electrification of the Tumbler Ridge Branch Line Conceptual ...
    Economic studies comparing diesel with electric traction resulted in the decision to electrify this new branch line at a voltage of 50 kV from catenary to rails ...
  25. [25]
    [PDF] Canada's Railway Safety Regulatory Regime
    4 On October 30, 1987, 16 rail cars of a BC Rail train derailed and an estimated 200 tons of sulphur were dumped into the Cheakamus. River. Deadly sulphur- ...
  26. [26]
    Liberals, Stop Lying about BC Rail | The Tyee
    Mar 29, 2010 · Indeed, the railway had a $71.9 million operating profit in 1999, and its long-term debt actually fell that year by $4 million. Finally, Bond's ...
  27. [27]
    Railway History | Canadian Toy Train Association
    Jan 19, 2016 · The BC Rail (originally PGE) operated from 1912-2004, and the CP Rail began in 1870, with the first transcontinental train in 1886.
  28. [28]
    [PDF] British Columbia Railway Company Annual Report 2002
    During 2002, the Company began a significant restructuring of its business in which it plans to dispose of or discontinue its deep-sea terminals, stevedoring ...Missing: 1990-2003 | Show results with:1990-2003<|separator|>
  29. [29]
    A NEW PARTNERSHIP TO REVITALIZE BC RAIL - News
    May 15, 2003 · The time frame for the process is as follows: May 2003. · Process initiated to solicit expressions of interest from qualified candidate bidders.
  30. [30]
    BC Rail Investment Partnership - BC Budget
    The railway right-of-way and infrastructure will be leased on a long-term basis to CN. The term of the lease is 60 years with an initial renewal of term of 30 ...Missing: details | Show results with:details
  31. [31]
    BC Rail knew of early bid leak, trial told | CBC News
    Sep 14, 2010 · CN Rail was the eventual winning bidder in November 2003, paying $1 billion for the main rail line over bids by CP Rail and Denver-based ...Missing: negotiation | Show results with:negotiation
  32. [32]
    Canadian National Railway Company - SEC.gov
    In November 2003, CN announced an agreement to pay the British Columbia government $1 billion in cash for all of the issued and outstanding shares of BC Rail ...Missing: details | Show results with:details
  33. [33]
    Billion-dollar B.C. Rail deal could last 990 years, transport minister ...
    Apr 20, 2004 · He confirmed the deal's contract language, which includes 60-year renewal options, could see CN operate BC Rail for 990 years, until 2994.
  34. [34]
    BC Rail investigation cleared politicians | CBC News
    Feb 16, 2011 · That strategy failed, however, and the provincially owned railway went to CN in 2003 for $1 billion. The documentation shows Basi and Virk ...
  35. [35]
    British Columbia Legislature raids - Wikipedia
    ... process for the sale of BC Rail. On December 28, 2003, a series of search warrants was executed at various locations throughout the Lower Mainland and in ...Missing: privatization | Show results with:privatization
  36. [36]
    BC Rail: the scent of a coverup - Yukon News
    Oct 22, 2010 · The trial of Basi and Virk, commonly known as the BC Rail trial, was about fraud, influence peddling, and money laundering, connected to the privatization of ...<|separator|>
  37. [37]
    CN enters agreement with competition bureau on BC Rail Partnership
    Jul 6, 2004 · 25, 2003, that CN would acquire all shares outstanding of BC Rail, and the right to operate over BC Rail's roadbed under a long-term lease.
  38. [38]
    [PDF] This is excellence. - AnnualReports.com
    Jul 15, 2018 · BC Rail as of July 14, 2004, the date of acquisition. The Company's cost to acquire BC Rail of $991 million includes purchase price adjustments.
  39. [39]
    British Columbia Railway Company
    The freight railway operations of the historic BC Rail line (from North Vancouver to Fort Nelson) were divested to CN in 2004, but the British Columbia ...Missing: history | Show results with:history
  40. [40]
    [PDF] Canadian Rail - Exporail
    Jul 15, 2004 · Some wags said that the initials 'PGE' stood for 'Prince George Eventually'. The. PGE did in fact reach Prince George in 1952 and finally.<|separator|>
  41. [41]
    CN slates C$780M in rail improvements in British Columbia, Manitoba
    May 23, 2025 · CN yesterday announced it will spend C$615 million on rail infrastructure projects in British Columbia and C$165 million in Manitoba.
  42. [42]
    CN Considers Abandoning BC Rail Main
    Jul 23, 2025 · The line is still owned by BC Rail and is leased to CN. The lease of BC Rail to CN caused a major political scandal known as “RailGate,” when ...
  43. [43]
    Canadian National Railway Plans Major Route Discontinuance
    Jul 23, 2025 · Canadian National Railway is reviewing plans to discontinue key BC Rail routes, citing high maintenance costs and operational challenges in ...Missing: 2024 | Show results with:2024<|separator|>
  44. [44]
    [PDF] 2025-07-11 EN CN Three Year Network Plan.xlsx
    Jul 11, 2025 · CN Three-Year Rail Network Plan. Canadian Network. Revised July 11, 2025. Milepost. British Columbia. Albreda. 0.00. 132.30. 132.30. Retain.
  45. [45]
    End of the [Rail]Road: CN Plans to Discontinue Former BC Rail Line
    Oct 7, 2025 · End of the [Rail]Road: CN Plans to Discontinue Former BC Rail Line ... In July 2025, CN released an updated three-year rail network plan ...Missing: 2024 | Show results with:2024
  46. [46]
    [PDF] 2025-08-25 EN CN Three Year Network Plan Progress Report.xlsx
    Aug 25, 2025 · February 19, 2024. August 19, 2024. British Columbia. Grande Prairie ... Steps Under Section 142 (1) - Steps for Discontinuance. Line ...
  47. [47]
    MP wants passenger rail in B.C.'s Sea-to-Sky region as CN Rail ...
    Jul 23, 2025 · A major railway has announced plans to end part of its operations by discontinuing its route north from Squamish till 100 Mile House. As CBC's ...
  48. [48]
    CN to exit Sea to Sky railway corridor, reviving rail transit hopes to ...
    Jul 19, 2025 · CN Rail plans to end its lease on the Sea to Sky corridor railway through Whistler by 2026, potentially allowing new passenger rail ...
  49. [49]
    British Columbia Railway Act - BC Laws
    Definitions. 1 In this Act: "BC Rail Partnership" means that general partnership, known as BC Rail Partnership, among 2 or more of the company, BC Rail Ltd.
  50. [50]
    [PDF] british columbia railway company - Gov.bc.ca
    British Columbia Railway Company (“BCRC” or “the Company”) is a commercial Crown corporation with 100% of its shares owned by the Province of British Columbia ( ...
  51. [51]
    [PDF] BC Railway Company 2023-2024 Executive Compensation Disclosure
    BCRC remains a self- supporting commercial Crown corporation and retains its legal and legislative authorities, assets and agreements.Missing: structure | Show results with:structure
  52. [52]
    [PDF] Consolidated Financial Statements - BRITISH COLUMBIA RAILWAY ...
    Mar 31, 2024 · The Company owns the former BC Rail right-of-way and railway track infrastructure and leases those assets to Canadian National Railway Company ( ...
  53. [53]
    [PDF] CROWN CORPORATION REPORTING ACT - BC Laws
    "corporation" means the British Columbia Ferry Corporation, the British Columbia. Hydro and Power Authority, the British Columbia Railway Company, the.
  54. [54]
    [PDF] 6391-BC Rail A/R
    BC Rail does not operate any of its own trains over the Port Subdivision, but maintains the track and manages all train operations over the subdivision and into ...
  55. [55]
    [PDF] British Columbia Railway Company - BC Budget
    With the disposition of its shares in BC Rail Ltd. and its partnership ... BCRC is a commercial Crown corporation with all of its business activities operating in.Missing: official | Show results with:official
  56. [56]
    [PDF] Crown Corporations Governance Study
    Crown Corporation Governance Structure in British Columbia. Page 23. may allocate decision-making among the board, Cabinet, Treasury. Board, the Minister ...
  57. [57]
    BC Rail executives earn $500K to manage railway with no trains ...
    Aug 30, 2024 · More than two decades after CN bought BC Rail for $1 billion, the Crown corporation's two executives are still taking home a healthy pay ...Missing: details | Show results with:details
  58. [58]
  59. [59]
    Executive Compensation Questions Lead to B.C. Rail | Vancouver Sun
    Jun 30, 2009 · ... Board of Directors voted to discontinue the following: – Discretionary Allowance – Lunch Club Membership Policy – Golf Membership Policy.Missing: oversight | Show results with:oversight
  60. [60]
    BC Rail board member earned thousands, Basi-Virk trial hears
    Sep 14, 2010 · A BC Rail board member continued to make tens of thousands of dollars every year in director fees, even after most of the railway was sold ...Missing: oversight | Show results with:oversight
  61. [61]
    [PDF] Ministerial Order 5/2004 - BC Laws
    BC Rail Partnership Revitalization Agreement: British Columbia Railway Company will lease, sublease, assign, license or sub-license, as the case may be, to ...Missing: CN details
  62. [62]
    History | About CN | cn.ca
    The British Columbia Railway is restructured. 1984. Under the new organization, BC Rail Ltd. is formed. The rail operations become known as BC Rail. More ...
  63. [63]
    CN: BC Rail now a done deal - Progressive Railroading
    It's official. Yesterday, Canadian National Railway Co. completed its BC Rail Ltd. transaction with the province of British Columbia.
  64. [64]
    BC Rail hooked up to CN engine ‣ WorldCargo News
    Jul 1, 2004 · CN was selected as the operator over several other Canadian and US railways last November after offering C$1 bill for a 60-year lease, ...
  65. [65]
    [PDF] british columbia railway company - BC Budget
    Aug 13, 2009 · BCRC will continue to retain ownership of all former BC Rail railway lands and track infrastructure, as well as the Port Subdivision railway, ...
  66. [66]
    CN finalizes B.C. rail deal
    Jul 9, 2004 · CN finalizes B.C. rail deal. July 9, 2004 | Canada, Headlines. (The ... CN Rail and the B.C. government announced a partnership last year ...
  67. [67]
  68. [68]
    CN seeks to end lease on ex-BC Rail route north of Vancouver - Trains
    Canadian National Railway has announced its intention to abandon operations on 214 miles of former BC Rail ...
  69. [69]
    [PDF] Quick Railfan Guide to BC Rail's Squamish Subdivision
    Sep 22, 2003 · The Squamish Subdivision includes stops like North Vancouver Yard, Ambleside, Westbay, Porteau, and Squamish Yard. D'Arcy is served on special ...
  70. [70]
    BC Rail: Wilderness railfanning | Trains Magazine
    Nov 3, 2020 · In 1952, British Columbia pinned its future on a frontier railway. But the traffic didn't follow, leaving the province to look for ways of ...
  71. [71]
    THE BC RAIL INVESTMENT PARTNERSHIP - News
    The BC Rail Investment Partnership will provide $1 billion in new investment to B.C. and help create jobs and new opportunities for railway ...Missing: privatization timeline
  72. [72]
    BC Rail was leased, not sold to CN - Trainorders.com
    Apr 5, 2020 · The initial lease is for 60 years (to 2064), with a renewal option for another 30 years. For that 90-year period, CN paid $150 million (it paid ...CN REACHES AGREEMENT TO CLOSE BC RAIL TRANSACTIONWilliams Lake to Squamish suspended, not abandonedMore results from www.trainorders.com
  73. [73]
    Movement urges provincial government to take ownership of soon-to ...
    Aug 5, 2025 · VANCOUVER – On July 9th, Canadian National announced its intention to abandon its operations on its leased rail corridor between Squamish and ...
  74. [74]
    [PDF] connecting - CN Rail
    Feb 23, 2007 · July 2004. CN closes BC Rail transaction. Timeline since privatization. November 1995. Privatization of CN. February 1998. Illinois Central ...
  75. [75]
    CN to Invest $615 Million in British Columbia to Build Capacity and ...
    May 22, 2025 · In 2024, CN invested approximately $554 million CAD in British Columbia for track maintenance and key infrastructure initiatives. Highlights ...
  76. [76]
    Canada and B.C. Invest in Infrastructure Upgrades to Support ...
    Jul 15, 2024 · These upgrades are crucial to allow increased industrial traffic linked to mining activity and will generate well-defined, long-term benefits ...
  77. [77]
    BC Rail - Canada-Rail
    By 1977, cracks were beginning to show in the railway's industrial strategy. An inquiry was called after construction was halted on the Dease Lake line. The ...
  78. [78]
    Rail News - CN, CPR partner to speed up Vancouver port traffic. For ...
    CPR and CN also plan to improve interchanges for north shore freight traffic involving BC Rail Ltd., which CN is integrating into its system per an ...
  79. [79]
    Railroad reporting marks 101 - Trains Magazine
    Feb 7, 2024 · Railroad reporting marks: The letters indicate the owner of the car, while the number places it in the owner's fleet.
  80. [80]
    Union costs among top issues in 2004 BC Rail sale
    Apr 11, 2019 · CN Rail in 2004 inked a deal with Victoria to lease BC Rail's operations for 999 years. The year before, though, cabinet was hearing reports ...Missing: details | Show results with:details
  81. [81]
    CN buys BC Rail for $1-billion - The Globe and Mail
    Nov 25, 2003 · CN says it plans to cut 31 per cent of BC Rail's jobs or 430 positions, down from a work force about 1,380. ... The plan will add 600 new rail ...Missing: takeover savings labor
  82. [82]
    CN adds to acquisition roster by bagging BC Rail bid (11/26/2003)
    Nov 26, 2023 · The integration of CN's and BC Rail's operations will be conducted during the next three years to ensure a smooth transition for shippers and ...
  83. [83]
    CN buys BC Rail for $1 billion - Truck News
    Aug 1, 2014 · Among other plans for B.C. Rail, CN promises to: Assemble forest products trains in Prince George for scheduled express trips to the continental ...Missing: benefits | Show results with:benefits
  84. [84]
    Canadian competition bureau blesses CN's BC Rail deal
    The Class I recently reached a consent agreement with Canada's Competition Bureau, which requires CN to share merger efficiencies with BC Rail shippers, ...<|separator|>
  85. [85]
    B.C. probe urged after two CN trains derail in one day
    Dec 7, 2005 · So far this year, CN has experienced 11 main track derailments on the former BC Rail lines, which is nearly double the five-year average of six ...<|control11|><|separator|>
  86. [86]
    Inadequate brakes caused fatal CN derailment: report | CBC News
    May 28, 2009 · When CN took over the line after buying BC Rail from the provincial government in 2004, it did not use the dynamic brakes. The TSB also ...
  87. [87]
    The Pacific Great Eastern Railway - Visit Lillooet
    Jul 11, 2025 · Construction of the historic Pacific Great Eastern Railway was an epic undertaking vital to the development of 20th Century British Columbia.Missing: milestones 1912-1948
  88. [88]
    BC Rail British Columbia Railway - Old Time Trains
    British Columbia Railway Pacific Great Eastern modernized its passenger service in 1956 with a fleet of three RDC-1's (80 seats) having two small compartments.
  89. [89]
    A Tear in My Eye: BC Rail Budd Cars - Railfan & Railroad Magazine
    Aug 24, 2020 · In the mid-1950s, predecessor Pacific Great Eastern acquired RDCs and put them in operation, hauling passengers through some of the finest ...
  90. [90]
    BC Rail Cariboo Prospector - Sister Betty
    By late 2002, BC Rail discontinued almost all of its passenger operations. The streamlined cars of the Whistler Northwind and the luxury Starlight Dinner Train ...
  91. [91]
    Exhibits - Railway Museum of British Columbia
    In 1974, the Province of British Columbia bought the locomotive for an excursion train. 'The Royal Hudson' ran on BC Rail track from North Vancouver to Squamish ...
  92. [92]
    advrails bc2 - Air Highways Magazine
    BC Rail Introduced a dinner train. • Added a train from Whistler, mainly for motor coach tour passengers. • Experienced no growth on its long-standing services.
  93. [93]
    On this day -- End of an Era - Trainorders.com
    Nov 1, 2024 · On this day, October 31, 2002, regular passenger service on BC Rail came to an end. Also in that time era, the Starlight Dinner train, Whistler Northwind ...Missing: decline | Show results with:decline
  94. [94]
    Whistler Northwind Retrospective - OKthePK
    The Whistler Northwind was a luxury rail-cruise train-set that operated between North Vancouver and Prince George, BC, from 2001 to 2002.
  95. [95]
    Adventure Rails- Whistler Northwind: Aviation & Travel Media.
    BC Rail has announced the 2002 schedule for its premier rail service, the Whistler Northwind, a luxurious rail cruise. The 2002 schedule runs from May 19 to ...
  96. [96]
    ARCHIVES: In 2002, BC Rail passenger service came to an end
    Sep 18, 2024 · According to then BC Rail Director of Communications Alan Dever, he stated that the market was affected by the economic climate, particularly ...
  97. [97]
  98. [98]
    BC Rail passenger service to end, despite objections
    Sep 6, 2002 · The service carried 81,000 one-way passengers in 2001, but still lost $4.8 million, said Dever. “We're losing millions of dollars a year on a ...Missing: losses | Show results with:losses
  99. [99]
    BC Rail Discontinues Passenger Trains - EriksRailNews.com
    In addition to discontinuing the Cariboo Prospector at the end of October, 2002 ... BC Rail Passenger Services Division. Back to Erik's Rail News front page.
  100. [100]
  101. [101]
    A railway runs through it - Pique Newsmagazine
    Mar 24, 2019 · The Pacific Great Eastern Railway line between Squamish and North Vancouver opened on Aug. 27, 1956. In 1972, the railway's name was changed to ...
  102. [102]
    Why Are We Selling Our Railway? | The Tyee
    Nov 14, 2003 · BC Rail eliminated its passenger service in the fall of 2002, isolating small, remote communities and leaving towns as big as Lillooet with ...
  103. [103]
    With Greyhound about to quit B.C., Lillooet calls for return of ...
    or any dedicated transit service, for that matter — since BC Rail shuttered the Cariboo Prospector in ...
  104. [104]
    PGE Locomotives (Part 2) - The Diesel Shop
    Mar 28, 2022 · During 1987, BC Rail entered the second-hand locomotive market and purchased eight SD40-2 cast-offs from the defunct Oneida & Western. The #9954 ...Missing: 1972-1989 | Show results with:1972-1989
  105. [105]
    Canadian National Railway Company
    In July 2004 CN finalized its purchase of BC Rail Ltd. from the government of British Columbia for CAD 1 billion. The deal gave CN ownership of the BC Rail ...
  106. [106]
    CN to acquire BC Rail - FreightWaves
    Nov 26, 2003 · Canadian National Railway Co. said Tuesday it will pay the British Columbia government $1 billion in cash to acquire the outstanding shares of BC Rail Ltd.
  107. [107]
    BCOL 6001(GF6C) - Locomotives - Railroad Picture Archives
    When the 15-year coal deal with the Japanese Steel Mills ended so did the work for these electrics. The electrics were retired in 2000. ... Description: BCOL 6001 ...
  108. [108]
    BC Rail - The Diesel Shop
    682, 684, 686, 687 & 888 - wrecked & retired. C630M (MLW), 701 & 702, M6029-01 & 02, 7/69, #701 retired prior to CN takeover, ...
  109. [109]
    BCOL - Canadian National Railways Locomotive Roster
    BCOL 4654, C44-9W ; BCOL 6001, GMD, blt 1983, ret 2000 - Donated to Prince George Rlwy Museum, GF6C ; BCOL 6002, GMD, blt 1983, ret 2000, scrapped 2004, GF6C ...
  110. [110]
  111. [111]
  112. [112]
  113. [113]
    The "C630M" and "M630": Specs, Roster, History
    Aug 13, 2024 · The C630M and M630 were powerful, reliable locomotives with 3,000 horsepower, six powered axles, and a 16-cylinder engine, based on the C630 ...
  114. [114]
    GE Dash 8-40CM | Entertainment Trains Wiki - Fandom
    The GE Dash 8-40CM is a 6-axle diesel locomotive built by GE for Canadian railways from 1990-1994, with a 4,000-horsepower engine and a max speed of 70 mph.
  115. [115]
    BC Rail | Entertainment Trains Wiki - Fandom
    The Company was founded in the early 1910's and began operate between North Vancouver, Fort Nelson and Dease Lake. Like many Railroads The Company started out ...
  116. [116]
    GE "C44-9W" Locomotives: Data, Specs, Roster - American-Rails.com
    Jan 2, 2025 · The C44-9W solidified General Electric as the top locomotive builder. When production had ended the model had sold some 2,387 examples ...Missing: 9M | Show results with:9M
  117. [117]
    New and Old: BC Rail 4650 to 4654 – Traingeek
    Feb 6, 2024 · The province continues to own the land under the rails and CN has a 60-year renewable lease. I believe CN owns the locomotives but they ...Missing: fate | Show results with:fate
  118. [118]
    BC Rail EMD GF6C | The chipped blade - WordPress.com
    Oct 11, 2011 · The GF6C is, of course, an electric locomotive and therefore does not have a fuel tank slung between the bogies. Instead, it has a collection of ...
  119. [119]
    How Libs Made BC Rail's True Value a Fake Train Wreck | The Tyee
    May 24, 2010 · Shirley Bond declared that $857 million was the amount British Columbians “have paid to write down the debts of BC Rail over the past 15 years. ...
  120. [120]
    BC Rail Privatization should go forward - Fraser Institute
    Jan 20, 2004 · According to the Canadian Taxpayers Federation, BC rail is $600 million in the hole this year, with a $107 million deficit left over from last ...Missing: 1990s | Show results with:1990s
  121. [121]
    Royal Commission's "sell BC Rail" proposal still on the money
    May 4, 2003 · With $700 million of debt on its books, BC Rail moved only 15 percent of the value of the province's forest industry products. By 1977, the ...
  122. [122]
    Letter to Premier Gordon Campbell - Canadian Taxpayers Federation
    BC Rail has over a $600 million debt on its books; posted a $107 million deficit last year; and is short on resources for upgrades as it lacks economies of ...
  123. [123]
    CN wins BC Rail in $1-billion cash deal - The Globe and Mail
    Nov 26, 2003 · The government's proceeds from the $1-billion sale will go toward paying off BC Rail's $500-million debt. ... government's motives in selecting CN ...
  124. [124]
    [PDF] Consolidated Financial Statements BRITISH COLUMBIA RAILWAY ...
    We have audited the consolidated balance sheet of British Columbia Railway Company as at. December 31, 2004 and the consolidated statement of income and ...Missing: 1990-2004 | Show results with:1990-2004
  125. [125]
    [PDF] SUBSIDIES IN CANADIAN PASSENGER TRANSPORTATION
    Such is the case for BC Rail's passenger services which are subsidized by the province. Negotiated contracts can involve careful service definition and ...
  126. [126]
    CN's track record - CCPA - Canadian Centre for Policy Alternatives
    Mar 3, 2004 · BC Rail is estimated to be worth close to $2 billion, according to the government's own internal documents. CN paid $1 billion for a ninety-nine ...
  127. [127]
    [PDF] restated transaction agreement - Gov.bc.ca
    Nov 25, 2003 · D. The Purchaser wishes to purchase from the Vendors and the Vendors wish to sell to the Purchaser all of the Vendors' share interests in ...Missing: details | Show results with:details
  128. [128]
    Aides leaked BC Rail sale secrets | Vancouver Sun
    Dec 23, 2004 · The government announced on Nov. 25, 2003, that CN Rail was the successful bidder, paying $1 billion in cash and considerations for a 90-year ...<|separator|>
  129. [129]
    BC Rail corruption trial ends with guilty pleas | CBC News
    Dave Basi and Bob Virk — pleaded guilty Monday just as their trial was about to resume ...Missing: outcome | Show results with:outcome
  130. [130]
    Railgate, A to Z | The Tyee
    Dec 29, 2008 · Five years after the legislature raid, a who's who guide to BC's biggest political scandal.
  131. [131]
    BC Rail trial ends after deal reached - The Globe and Mail
    Oct 18, 2010 · Justice Anne MacKenzie accepted that submission, and also sentenced Dave Basi and Mr. Virk to 150 hours each of community service.Missing: scandal outcome
  132. [132]
    BC Rail defendants' $6M tab footed by taxpayers | CBC News
    Oct 19, 2010 · The minister said it's "not a stretch" to conclude Basi and Virk knew their costs would be covered before they changed their pleas to guilty.Missing: scandal outcome
  133. [133]
    Gabriel Yiu: B.C. Rail sale case is B.C.'s biggest political scandal
    Jul 25, 2009 · On November 13, Liberal backbencher MLA Paul Nettleton publicly accused the B.C. Liberal party of having a secret agenda to privatize B.C. Rail.
  134. [134]
    MLA calls for public inquiry into BC Rail scandal - Revelstoke Review
    Mar 16, 2011 · But seven years of investigation into the deception and corruption surrounding this process has proven that promise was also broken. Top level ...Missing: details timeline
  135. [135]
    Massive layoffs loom at B.C. Rail: unions | CBC News
    May 26, 2003 · Unions at B.C. Rail are warning that 1,223 management and union jobs could be lost if the Crown corporation is taken over by CN Rail.
  136. [136]
    BC Rail could face massive layoffs: report - The Globe and Mail
    May 26, 2003 · The Council of Trade Unions on BC Rail leaked an internal government document Monday that suggests 70 per cent of BC Rail employees will lose ...Missing: reaction | Show results with:reaction
  137. [137]
    B.C. Federation of Labour Release: CN sale a 99-year betrayal to ...
    Nov 27, 2003 · The Premier announced $750 million was paid by CN Rail for access to the BC Rail line, access to the BC Rail Pension Plan surplus, and the ...
  138. [138]
    BC Rail Goes Straight Downhill — What privatization really means ...
    Dec 1, 2005 · Several other bidders complained about the process before it was announced that CN's $1 Billion bid had won them the 999 year lease. Of course, ...
  139. [139]
    [PDF] REPRESENTATIVE OF CANADIAN NATIONAL RAILWAY ...
    Mar 5, 2010 · The B.C. Rail Agreement covering Locomotive Engineers formerly employed with B.C.. Rail. These agreements were due to expire on December 31 ...
  140. [140]
    [PDF] MEMORANDUM OF SETTLEMENT Dated October 1, 2010 Between ...
    Collective agreements 4.2, 4.3, 4.16 and the agreement covering employees on the former. BC Rail territory represented by the Teamsters Canada Rail Conference/ ...
  141. [141]
    CN cuts Prince George-N.Vancouver freight service
    Oct 8, 2004 · CN is cutting freight service on former BC Rail Prince George, Lillooet, and Squamish Subdivisions to one train daily.
  142. [142]
    Northeast B.C. mining restarts stall because CN Rail hasn't ... - CBC
    Feb 6, 2017 · Northeast B.C. mining restarts stall because CN Rail hasn't maintained tracks for shipping coal. Coal mines are restarting in Tumbler Ridge ...Missing: complaints | Show results with:complaints<|separator|>
  143. [143]
  144. [144]
    What could CN discontinuing its Sea to Sky Corridor line mean?
    Jul 17, 2025 · According to CN, the rail line to Squamish Terminals is not included in the discontinuance, meaning it will be business as usual and no ...
  145. [145]
    CN move opens 'once-in-a-generation opportunity' for passenger ...
    Jul 21, 2025 · CN Rail has announced it will discontinue operations on the rail line it controls between Squamish and 100 Mile House.Missing: degradation | Show results with:degradation