Fact-checked by Grok 2 weeks ago

PANS-OPS

PANS-OPS, formally known as Procedures for Air Navigation Services – Aircraft Operations, is a foundational document issued by the (ICAO) that outlines standardized criteria and procedures for the design, construction, and execution of instrument flight operations in . Published as ICAO 8168, it consists of three volumes: Volume I on flight procedures for operational use, Volume II on the construction of visual and instrument flight procedures for specialists, and Volume III on aircraft operating procedures for flight crews. The document ensures safe, efficient, and uniform global by providing detailed guidance beyond ICAO's core (SARPs), assuming normal operations while requiring operators to handle contingencies. PANS-OPS covers essential flight phases, including departures, en-route , arrivals, approaches (such as , non-precision, and approach procedures with vertical guidance or APV), and holding patterns. It incorporates performance-based (PBN) specifications, including RNAV and RNP variants, to support modern navigation systems while maintaining obstacle clearance minima, such as 300 meters for en-route segments and tailored protections for approach areas. are categorized by (A–E for fixed-wing based on threshold speeds up to over 250 km/h, and H for helicopters), influencing operational minima like decision altitudes/heights (DA/H) and minimum descent altitudes/heights (/H). Techniques like continuous descent (CDFA) are emphasized to enhance safety in non-precision approaches. As the international benchmark, PANS-OPS differs from regional standards like the U.S. Terminal Instrument Procedures (TERPS) in areas such as circling approaches and obstacle clearance, promoting worldwide harmonization for procedure designers, air traffic services, and pilots. First issued in the and regularly amended (with the sixth edition in and updates through ), it reflects advancements in technology and safety requirements.

Overview

Definition and Purpose

PANS-OPS, or Procedures for Air Navigation Services – Aircraft Operations (ICAO Doc 8168), is an essential ICAO publication that provides detailed procedures and recommended practices supplementing the (SARPs) for the , publication, and execution of instrument flight procedures, including departures, arrivals, and approaches. This document provides detailed operational guidance for flight crews, air traffic controllers, and procedure designers to ensure consistent application of procedures worldwide. It encompasses criteria for both conventional and performance-based (PBN) methods, focusing on parameters such as , clearance, and minimum safe altitudes. The core purpose of PANS-OPS is to standardize procedures for transitioning aircraft safely between en-route navigation and terminal area operations, particularly in low-visibility or where visual references are limited. By defining precise flight paths, altitudes, and speeds, it minimizes collision risks with terrain and obstacles while optimizing airspace usage and . This standardization supports the ICAO's broader objective of enhancing and interoperability across international borders. In , PANS-OPS plays a pivotal role in enabling seamless global operations by offering uniform criteria that procedure designers use to construct safe instrument procedures, pilots follow during flight execution, and air traffic services apply for control and separation. It was first published in as a dedicated , resulting from the division of earlier combined PANS materials into specialized volumes to address the growing complexity of instrument flight operations. This separation allowed for more focused updates and applicability, ensuring the document remains adaptable to technological advancements in and capabilities.

Scope and Applicability

PANS-OPS, as outlined in ICAO Doc 8168, establishes standardized criteria for the design of instrument flight procedures, encompassing both conventional navigation and area navigation (RNAV) methods. Its scope specifically addresses departures, including standard instrument departures (SIDs) and omnidirectional departures; arrivals, such as standard instrument arrival routes (STARs) and terminal arrival altitudes; and approaches, covering precision, non-precision, approach procedures with vertical guidance (APV), and visual approaches. These procedures ensure safe operations under instrument flight rules (IFR) from the end of the runway to the initial en-route phase for departures and from the end of the en-route phase to the runway threshold for arrivals and approaches. It focuses primarily on terminal area procedures but also includes guidance on en-route holding and related navigation. The document excludes aerodrome operating procedures to complement other ICAO standards. The applicability of PANS-OPS extends to all 193 ICAO Contracting States, where it serves as a recommended practice to promote uniformity in instrument procedure design for operations. While not mandatory like (SARPs) in ICAO Annexes, its adoption is essential for flights and strongly encouraged for domestic operations to ensure and safety. Procedure designers, service providers, and operators in member states must align with these criteria, with implementation responsibilities falling to individual states. The document assumes normal operating conditions, including all engines functioning, operational navigation aids, and compliance with published charts; operators are required to develop separate procedures for abnormal or situations, such as engine failure or equipment malfunctions. Aircraft performance categories A through E are defined based on the at (V_at) during a 1.3g , which determines procedure-specific minima, obstacle clearance requirements, and climb gradients. Category A applies to with V_at ≤ 91 knots (169 km/h); Category B to 91–120 knots (169–224 km/h); Category C to 121–140 knots (225–259 km/h); Category D to 141–165 knots (260–306 km/h); and Category E to those exceeding 165 knots (306 km/h). These categories account for variations in handling and speed, ensuring tailored protection from obstacles during critical phases. Additionally, Category H is designated for helicopters with a maximum speed of 90 knots (167 km/h) on . Globally, PANS-OPS has been adopted across ICAO's 193 member states, facilitating consistent procedure design worldwide and supporting the integration of advanced technologies. Periodic amendments to Doc 8168 incorporate developments in Global Navigation Satellite Systems (GNSS) and performance-based navigation (PBN), with updates ensuring alignment with evolving needs, such as enhanced RNAV and specifications outlined in ICAO Doc 9613. As of Amendment No. 10 (28 November 2024), it continues to evolve with developments in GNSS and PBN. This ongoing revision process maintains the document's relevance for safe and efficient terminal operations.

Historical Development

Origins in ICAO Standards

The origins of PANS-OPS trace back to the post-World War II era, when the rapid expansion of international civil aviation necessitated global standardization of instrument flight procedures to ensure safety amid increasing air traffic, particularly with the advent of in the . Established under the in 1944, the (ICAO) began developing uniform standards to harmonize disparate national practices, addressing the challenges of varying obstacle clearance requirements and approach minima that had previously led to inconsistencies in procedure design and operations. The foundational procedures for arrival and approach were first developed by ICAO's Operations Division in 1949 and subsequently approved by the ICAO Council in 1951 for inclusion in the initial Procedures for Air Navigation Services (PANS), marking the beginning of what would become PANS-OPS. During the and , these early PANS documents integrated aircraft operations and procedural elements, evolving in parallel with ICAO Annex 6 (Operation of Aircraft), which provided broader operational standards but referenced supplementary procedures for navigation services. This period saw ongoing refinements to accommodate growing jet traffic and the need for reliable instrument approaches, consolidating scattered guidelines into a more cohesive framework. A key milestone occurred in 1979, when the original PANS was divided into separate documents to better organize content, leading to the establishment of PANS-OPS as ICAO Doc 8168 with its first edition in 1982. This initial edition separated flight procedures for operational use (Volume I) from construction criteria for procedure design (Volume II), addressing early challenges by providing uniform international standards for obstacle clearance and minima that superseded varying national approaches, including adaptations from established systems like the U.S. TERPS for global applicability. Prior to this division, all PANS-OPS material had been contained in a single document, but the extensive amendments to obstacle clearance and approach procedures necessitated the split to enhance clarity and implementation.

Key Amendments and Revisions

The process for PANS-OPS (ICAO Doc 8168) is managed by the ICAO Air Navigation Commission, which reviews and proposes updates every three to five years based on operational safety data, technological advancements, and feedback from specialized panels such as the Obstacle Clearance Panel and the Flight Procedure Panel. These are approved by the ICAO Council and announced through supplements to the ICAO Products and Services Catalogue, allowing states a period for implementation while permitting adaptations to local conditions. Key amendments have progressively refined PANS-OPS to address evolving needs. The 1983 ( 2 to Volume I) introduced changes to holding criteria, VOR/DME holding patterns, noise abatement procedures, and initial helicopter-specific operations, enhancing procedural standardization and environmental considerations. In 1993 ( 7), definitions for decision altitude/height (DA/H) and (RNAV) were added, alongside updates to departure and approach procedures, marking early integration of satellite-based navigation technologies. The 2001 amendment (Amendment 11) incorporated (RNP) procedures, barometric (baro-VNAV), and further integrations. 4 in 2010 advanced performance-based (PBN) with criteria for ground-based augmentation systems (GBAS), RNAV holding patterns, and satellite-based augmentation systems (SBAS) for approach with vertical guidance (APV) and baro-VNAV, improving in low-visibility operations. The 2018 amendment (Amendment 8, establishing the sixth edition of Volume I) involved significant restructuring by separating Volume III for aircraft operating procedures from Volume I, reducing the latter from three parts to two and focusing it on flight procedures; it also refined point-in-space (PinS) criteria and PBN approach specifications to support modern airspace management. The 2022 amendment (Amendment 10) further updated GBAS procedures and advanced RNP specifications, including title changes from RNAV to RNP for certain PBN approaches, aligning with global implementation of enhanced navigation accuracy and reducing (CFIT) risks through lessons from accident analyses. Subsequent updates include Amendment 11 (28 November 2024), which refined PBN specifications and obstacle clearance criteria, and Amendment 12 (applicable 28 November 2024), addressing further enhancements to approach procedures. These amendments collectively incorporate safety lessons from incidents like CFIT and integrate new technologies such as GNSS and PBN, with the current sixth edition (2018), as amended through Amendment 12 (applicable 28 November 2024), reflecting ongoing updates since the establishment of the multi-volume format in 1979.

Document Structure

Volumes and Divisions

The Procedures for Air Navigation Services – Aircraft Operations (PANS-OPS), designated as ICAO Doc 8168, is organized into three distinct volumes, with Volume I (6th Edition, 2018, Amendment 11, 2024), Volume II (7th Edition, 2020), and Volume III (1st Edition, 2018, Amendment 1, 2021), separating content for clarity and targeted application across stakeholders. Volume I, titled Flight Procedures, provides operational guidance for pilots and flight operations personnel on executing flight procedures, including criteria for minima, contingencies, and specifications. It is structured into Part I (General), covering definitions, abbreviations, and units, and Part II (Flight Procedure Requirements), which details sections on departures, en-route segments, arrivals, approaches (encompassing initial, intermediate, final, and phases), holding, and helicopter-specific procedures. Within Part II, conventional procedures are addressed alongside performance-based (PBN) elements, such as RNAV and RNP specifications, emphasizing pilot responsibilities like cold temperature corrections and obstacle clearance assumptions of 300 m (1,000 ft). Volume II, titled Construction of Visual and Instrument Flight Procedures, supplies criteria for procedure designers and airspace planners, focusing on the geometric and obstacle clearance requirements for building safe procedures. Divided into four parts, it includes Part I (General) on principles, fixes, and ; Part II (Conventional Procedures) detailing and non-precision approaches using aids like ILS, VOR, and NDB; (RNAV Procedures and Satellite-Based Procedures) covering GNSS, SBAS, and GBAS systems with PBN specifications; and Part IV (Helicopters) for specialized designs. A key feature is the detailed for procedure segments, such as the initial approach (up to 19 km wide, tapering to the fix), intermediate approach (minimum 75 m obstacle clearance), and (optimum 5.2% gradient, maximum 5° offset), ensuring uniform obstacle assessment areas and turn protections based on categories. Volume III, titled Aircraft Operating Procedures and introduced as a first edition in 2018 by extracting content from prior volumes, addresses broader operational protocols for flight crews and operators, including abatement and communication s. Its structure features sections on settings, simultaneous operations, SSR use, operational flight information (e.g., stabilized approaches and read-back requirements), standard operating procedures with checklists, airborne like ADS-B, and abatement procedures emphasizing continuous operations, preferential s, and departure climb profiles to minimize community while prioritizing safety. Across the volumes, appendices and attachments provide supplementary materials, such as conversion tables for to , examples of chart depictions, obstacle clearance calculations, and lists of abbreviations, acronyms, and measurement units to support consistent implementation. These volumes continue to be updated through periodic amendments, with the latest including Amendment 11 to Volume I (28 November 2024) and corrigenda to Volume II, ensuring alignment with evolving technologies and safety requirements as of November 2025.

Core Criteria for Procedures

The core criteria for procedures in PANS-OPS, as outlined in ICAO Doc 8168, establish the foundational standards for designing and executing flight procedures, ensuring and consistency across global . These criteria assume normal operations with all engines functioning, certified equipment, and operational navigation aids, while emphasizing that operators must develop separate contingency plans for abnormal or emergency situations. Procedures are constructed under standard atmospheric conditions, such as (ISA) +15°C at 2,000 ft , with pilots required to apply corrections for actual environmental variations. Key criteria focus on navigation accuracy, altitude constraints, and procedural geometry to maintain safe separation from obstacles and terrain. Navigation accuracy varies by system; for conventional aids like VOR/DME, it relies on signal protection areas and pilot corrections, whereas GNSS-based performance-based navigation (PBN) specifications, such as RNAV 1 or RNP 1, incorporate total system error limits including along-track and cross-track tolerances. Altitude constraints include minimum obstacle clearance (MOC) requirements, such as 300 m en route or 75 m during turning departures, with obstacle clearance altitude/height (OCA/H) and decision altitude/height (DA/H) defined to protect against terrain. Turn radii are calculated based on aircraft speed and a standard bank angle of 25° or a 3° per second rate, whichever results in the smaller radius, ensuring predictable path containment. Performance factors account for environmental influences to prevent deviations from intended flight paths. Wind effects are addressed through pilot-applied corrections for maintenance, with procedures designed assuming a standard 30 omnidirectional wind for turns and ICAO standard winds en route. corrections, particularly for cold temperatures, are mandatory to adjust altimetry readings and minimum altitudes, avoiding reduced obstacle clearance due to altimeter errors in non-standard conditions. These factors integrate with obstacle clearance principles to ensure procedures remain viable across varying operational environments. Procedures are designed for the worst-case performance within specified categories, with minima then adjusted for the specific category of the operating to optimize safety and efficiency. categories are defined by at threshold: Category A (<91 or 169 /h), B (91–120 or 169–223 /h), C (121–140 or 224–260 /h), D (141–165 or 261–306 /h), and H for helicopters (typically up to 160 or 296 /h). The primary units of measurement follow ICAO Annex 5, prioritizing the (e.g., kilometers per hour for speeds, meters for altitudes), though feet and knots are permitted where regionally accepted. All directional references use magnetic north as the frame, unless otherwise specified, to align with standard aeronautical charting.

Procedure Types

Departure Procedures

Standard Instrument Departures (SIDs) in PANS-OPS are designed to provide a safe transition from the runway to the en-route structure, ensuring obstacle clearance and efficient traffic flow while accommodating various aircraft performance capabilities. These procedures, detailed in ICAO Doc 8168 Volume I, Section II-2, assume normal operations and are based on the departure end of the runway (DER) as the reference point for climb and clearance calculations. Departure procedures are categorized into omnidirectional, straight departure, and turning departure types, with distinctions between RNAV () and conventional procedures. Omnidirectional departures provide no specific guidance and assume a straight climb until 120 m (394 ft) above the DER for aeroplanes or 90 m (295 ft) for helicopters before any turn begins, ensuring all-around obstacle clearance. Straight departures maintain an initial within 15° of the runway centerline with no turns permitted until reaching 400 ft above the DER, suitable for simple terrain without significant obstacles. Turning departures involve a turn greater than 15° from the runway , commencing at 120 m (394 ft) above the DER for aeroplanes (or 90 m for helicopters), typically initiated 600 m from the start to allow stabilization. RNAV departures utilize performance-based (PBN) specifications such as RNAV 1 or RNP 1, enabling precise waypoint-based routing with fixed areas, whereas conventional departures rely on ground-based aids like VOR or NDB with diverging protections based on splay angles. Key design elements include a minimum climb of 3.3% for aeroplanes (or 5% for helicopters) from the DER, which may be increased to account for obstacles or specific categories, and integration of noise abatement departure procedures (NADP 1 or NADP 2) to minimize community noise exposure by adjusting climb profiles—NADP 1 emphasizes a low-power climb initially followed by , while NADP 2 prioritizes early power reduction after takeoff. These gradients are calculated assuming all-engines-operating performance, with contingency provisions for one-engine-inoperative scenarios where a 2.5% may apply if terrain demands it. The procedure is divided into three primary segments: the takeoff segment from the DER to 35 above the elevation, where obstacle clearance begins; the initial climb segment up to 400 (or the en-route transition altitude if lower), focusing on straight or early turning paths with minimum obstacle clearance () increasing at 0.8% of the horizontal distance from the DER; and the en-route transition segment, which connects to the airway structure with a standard of 300 (984 ) and no further turns unless specified. assessment in the takeoff and initial segments ensures no fixed obstacles penetrate the protected surface starting at 35 above the , with additional 75 applied during turns to account for bank initiation. Operational constraints emphasize safety margins, including bank angle limits of 15° to 25° during turns to prevent excessive lateral , and speed restrictions tailored to categories—for example, maximum speeds for turning departures range from 165 km/h for Category H helicopters to 225 km/h for Category A aeroplanes, as outlined in design tables to maintain protection area integrity. These limits ensure compatibility with accuracy and clearance volumes, with pilots required to adhere to published speeds or those derived from performance data.
Aircraft CategoryMaximum Speed for Turning Departures (km/h)
A225
B240
C250
D265
E290
H ()165
This table illustrates representative speed constraints from PANS-OPS design criteria, ensuring procedural flyability across categories.

Arrival and Approach Procedures

Arrival procedures in PANS-OPS are designed to transition aircraft from en-route navigation to the initial approach phase, ensuring orderly descent and alignment with the . Standard Terminal Arrival Routes () serve as the primary structure for these procedures, linking the en-route environment to the Initial Approach Fix (IAF) while accommodating speed reductions and configuration changes. incorporate performance-based navigation (PBN) specifications such as RNAV 1 or RNP 1 to enable efficient routing, with minimum obstacle clearance () of 150 m (492 ) in the primary area tapering to zero at the edges of the secondary area. Instrument approach procedures are categorized into , non-precision, and approaches with vertical guidance (APV), each tailored to the available navigation aids and required accuracy. approaches, such as those using (ILS) or (MLS), provide both lateral and vertical guidance in three dimensions, achieving decision altitude/height (DA/H) as low as 75 m for Category I operations. Non-precision approaches, exemplified by VOR-based procedures, rely on lateral guidance only in two dimensions, descending to minimum descent altitude/height (/H). APV procedures, often utilizing satellite-based augmentation systems (SBAS), offer three-dimensional guidance similar to but with PBN . Each instrument approach consists of distinct segments to ensure safe progression: the initial segment from the IAF to the intermediate fix (IF) allows descent with 300 m (1,000 ft) ; the intermediate segment from the IF to the final approach fix (FAF) aligns the aircraft with a 150 m (492 ft) ; the final segment from the FAF to the missed approach point (MAPt) features a nominal 5.2% ; and the missed approach segment from the MAPt requires a minimum climb gradient of 2.5% with initial continuing from the final segment. For non-precision approaches, the final segment maintains 75 m to 90 m (246 ft to 295 ft) depending on FAF presence, ensuring at least 300 ft clearance over obstacles when accounting for operational margins. Minima for approaches are calculated based on aircraft category (A to E for fixed-wing, H for helicopters) and visibility requirements, such as (RVR) or distance to , with /H for and APV or /H for non- to avoid and obstacles. Circling approaches enable visual maneuvering to the after reaching /H when the landing is not aligned with the , requiring of the and obstacle clearance within the visual maneuvering area (e.g., 90 m for Category A). PBN-specific procedures like Authorization Required (RNP AR) approaches support curved paths and steeper descents with tighter tolerances, such as 556 m total tolerable error at the FAF, necessitating specialized and operational approval.

Obstacle Clearance

Clearance Principles

In PANS-OPS, obstacle clearance principles establish protected areas around nominal flight tracks to safeguard from and fixed obstacles during instrument procedures, ensuring a minimum level of by accounting for navigational inaccuracies, performance variations, and operational contingencies. These principles apply uniformly across procedure design, with clearance assessed relative to the lowest point on the intended flight path. The core framework divides clearance into primary and secondary areas. The primary area, symmetrically centered on the flight track, provides full obstacle protection with a constant minimum clearance () applied vertically and horizontally; it typically spans widths such as 300 m (984 ft) for arrival segments or 150 m (492 ft) on each side (total 300 m / 984 ft) for departure segments before turns. The secondary area extends outward from the primary boundary, offering reduced protection that tapers linearly from full at the inner edge to zero at the outer limit, such as an additional 25% of the total width on each side for departures or up to 4.6 (2.5 ) for certain approach segments. Vertical surfaces are defined by sloping planes (e.g., departure or approach obstacle identification surfaces) that rise at specified gradients from the threshold or fix, while horizontal surfaces limit lateral extent through straight edges or splaying arcs (e.g., 15° divergence). Minimum clearance values are standardized to reflect phase-specific risks: for departures, the is 48 m (157 ft) in the primary area, or the greater of 90 m (295 ft) or 0.8% of the distance from the departure end of the (DER) before turns exceeding 15°; for approaches, it is 300 m (984 ft) for en-route and initial segments, 150 m (492 ft) for intermediate segments tapering in secondary areas to zero, and 75 m (246 ft) for the final segment with a defined fix (FAF). These values ensure vertical separation from obstacles like buildings, towers, and natural , which are evaluated for penetration of the defined surfaces. In challenging environments, such as mountainous , the may be increased by up to 100% to address higher densities. Contingency provisions address potential downgrades in procedure performance, such as navigation system failures or non-standard altimeter settings, requiring operators to verify capability and designers to adjust parameters like climb gradients (e.g., reducing to 3.3% beyond critical obstacles) or incorporate additional margins. The Obstacle Clearance Altitude/Height (OCA/H) is calculated as the height of the highest obstacle in the applicable sector plus the required MOC, referenced to for OCA or the runway threshold for OCH, and includes category-specific adjustments for types. Obstacle identification surfaces (OIS) use specified gradients such as 2.5% for missed approach segments, applied over relevant distances beyond fix tolerance areas, ensuring comprehensive evaluation without excessive conservatism in design. As of Amendment 10 (28 2024), updates may refine criteria for in complex terrain.

Integration with Procedures

Obstacle clearance in PANS-OPS is applied through tailored surfaces and minima specific to each segment of an instrument procedure to ensure safe navigation while accounting for aircraft performance and procedural constraints. For departure procedures, clearance surfaces originate at the departure end of the runway (DER) with a standard all-engines net climb gradient of 3.3% to provide vertical separation from obstacles, increasing laterally in turning segments to accommodate bank angles up to 15-25 degrees depending on aircraft category. In approach procedures, the final segment typically employs a nominal glide path angle of 3° for non-precision approaches, with obstacle clearance surfaces extending 5.2% above the glide path in the primary area to maintain 75 meters (246 feet) minimum obstacle clearance (MOC) for most categories, tapering in secondary areas to zero. These segment-specific applications ensure that the required MOC—ranging from 30 meters in initial missed approach phases to 300 meters in en-route segments—is achieved without compromising procedural efficiency. Adjustments to obstacle clearance are made for performance-based navigation (PBN) specifications, where tighter track tolerances, such as RNAV 1 or RNP 1, allow for narrower protection areas (e.g., half-width of 2.5 nautical miles for RNP 1), reducing the overall airspace volume while maintaining equivalent safety through system error budgeting. For visual segments, such as those in circling approaches, clearance is provided via aircraft category-specific minima; for example, Category A require 90 meters (295 feet) within the visual , with visibility minima adjusted accordingly to ensure pilots can maintain terrain separation visually. These adaptations prioritize precision in PBN environments and compliance in terminal phases, ensuring compatibility with diverse capabilities. Illustrative examples highlight practical integration: in missed approach segments, procedures require a minimum climb to 50 meters (164 feet) over obstacles in the final phase before turns exceeding 15 degrees, with a 2.5% climb unless demands higher. Holding patterns incorporate a 300-meter (984 feet) above obstacles within the primary holding area, extending to 5 nautical miles with reduced clearance in buffer zones to account for wind-induced drift and turn radii up to 140 knots for Category A/B . These examples demonstrate how clearance ensures uninterrupted flight path continuity during critical maneuvers. When primary clearance areas are insufficient due to terrain or , secondary areas are utilized, providing full at the inner edge but linearly reducing it to zero toward the outer edge, necessitating higher published minima to compensate for the diminished protection. This approach maintains procedural usability while upholding safety margins. If new are identified post-design, such as temporary constructions penetrating clearance surfaces, procedures must be amended through revised obstacle assessments under ICAO guidelines, potentially increasing climb gradients, minima, or rerouting segments to restore compliance, with operators responsible for interim contingency planning.

Other PANS Documents

The Procedures for Air Navigation Services (PANS) form a family of ICAO documents that provide supplementary guidance and detailed procedures to support the (SARPs) outlined in the Annexes to the Convention on International Civil Aviation. These documents are approved by the ICAO Council and recommended for adoption by member States to promote uniformity in practices, though they carry no mandatory status equivalent to the Annexes. Among the key PANS documents, PANS-ATM (Doc 4444) addresses procedures, including rules for separation of , communication protocols, and coordination between air traffic services units. PANS-OPS (Doc 8168) cross-references PANS-ATM extensively, particularly for sequencing and vectoring during departure, arrival, and approach phases, ensuring that flight procedures align with broader requirements. This interdependency is essential, as PANS-OPS procedures must comply with PANS-ATM separation standards to maintain safety margins during operations. PANS-TRG (Doc 9868) focuses on training methodologies for aeronautical personnel, emphasizing competency-based approaches using instructional and systematic techniques. It supports the of SARPs related to personnel licensing and training in Annex 1 by providing standardized procedures for developing and delivering training programs. Like other PANS documents, PANS-TRG evolves through periodic amendments to incorporate advancements in training technologies and operational needs. Overall, the PANS series complements core air traffic services provisions in Annex 11 (Air Traffic Services), fostering integrated operations across flight phases. PANS-OPS procedures integrate stabilized approach criteria from Annex 6—ensuring minimum performance and clearance during —to support safe transitions to , drawing on related guidance within the broader PANS framework.

Comparisons with Regional Criteria

PANS-OPS, as an ICAO standard, promotes international uniformity in instrument flight procedure design, whereas regional criteria like the U.S. Federal Aviation Administration's (FAA) Terminal Instrument Procedures (TERPS) outlined in FAA Order 8260.3G provide more U.S.-centric adaptations, including detailed specifications for Global Navigation Satellite System (GNSS) procedures and steeper climb gradients of 200 feet per (ft/NM), equivalent to approximately 3.3%, compared to the standard 2.5% procedure design gradient in PANS-OPS for missed approaches. These differences arise because TERPS assumes all-engines-operating conditions for standard procedures, allowing for higher performance expectations, while PANS-OPS emphasizes conservative assumptions to ensure global applicability. In contrast, the (EASA) and EUROCAE standards align closely with PANS-OPS, incorporating ICAO Doc 8168 criteria into documents like AMC 20-28 for clearance and vertical guidance approaches, but supplement them with EU-specific noise abatement rules under (EU) No 965/2012, such as mandatory noise preferential runway selection and operational restrictions to minimize environmental impact around aerodromes. For instance, EASA requires operators to adhere to published noise abatement procedures that may deviate from PANS-OPS flexibility to prioritize quieter flight paths, reflecting regional priorities for urban noise reduction. Key differences include TERPS' U.S.-focused minima, such as higher visibility requirements for Category D circling approaches (1.7 or 3.2 under TERPS versus 2.5 or about 4.6 under PANS-OPS), which can result in more restrictive operations for international flights entering U.S. . PANS-OPS prioritizes broader clearance surfaces, like larger circling radii based on a 20° bank angle (e.g., 5.3 for Category E), to accommodate diverse global terrains, whereas TERPS uses variable bank angles and smaller protected areas (e.g., 1.3 for Category A at low altitudes) for efficiency in domestic procedures. Harmonization efforts mitigate these variances, particularly through RTCA DO-236 standards for Performance-Based Navigation (PBN), which both PANS-OPS and TERPS reference to ensure interoperability in RNAV and RNP procedures; for example, FAA 20-138 integrates DO-236C requirements to align with ICAO PBN specifications. Many countries pursue dual compliance, as seen in where 700-053 mandates procedures designed to either TERPS or PANS-OPS criteria to facilitate cross-border operations. Challenges persist in bilateral agreements, where procedure mismatches—such as differing circling protections—can complicate approvals for foreign operators; for instance, in U.S.-Mexico agreements, hybrid designs blending PANS-OPS straight-in approaches with TERPS circling minima require additional FAA reviews to resolve safety discrepancies. In 2025, the FAA updated guidance (AC 120-105B) to transfer review of non-U.S. procedures to operators, facilitating PANS-OPS compliance while addressing TERPS differences. These issues underscore ongoing efforts by ICAO and regional authorities to converge criteria without compromising safety.

Implementation

Design Process Overview

The design of instrument flight procedures compliant with PANS-OPS, as outlined in ICAO Doc 8168, follows a structured to ensure safety, efficiency, and adherence to international standards. This process integrates , geometric construction, and to mitigate risks from and obstacles, primarily managed by qualified procedure designers within air navigation service providers (ANSPs). The process begins with , encompassing detailed surveys of , obstacles, aids, and features to establish a reliable baseline for construction. This step involves gathering aeronautical information from sources such as surveys and obstacle databases, ensuring all meets PANS-OPS accuracy requirements to support subsequent analyses. Following data collection, a assesses whether the proposed procedure can be safely implemented given the local environment, constraints, and operational needs. Designers evaluate potential alignments, , and preliminary obstacle clearance margins, often consulting stakeholders like airlines and regulators to confirm viability before proceeding. Geometry design then constructs the procedure's path, defining waypoints, turns, and segments using PANS-OPS criteria for conventional, RNAV, or RNP specifications. This phase employs manual calculations for basic elements alongside software simulations to trajectories and protection areas, ensuring the geometry aligns with system capabilities. Clearance verification confirms obstacle clearance throughout the procedure by applying PANS-OPS surfaces and margins, incorporating measures such as error budgets. For RNAV procedures, lateral error budgets typically allocate 0.3 for total system error (including , flight technical, and path definition components) to maintain safe separation from obstacles with high probability. A flight check, or validation flight, follows to empirically test the using equipped with appropriate systems, verifying flyability, signal coverage, and actual clearance. This step, conducted by ANSP or authorized teams, identifies any discrepancies and may require iterations to the design. Validation is ultimately approved by national aviation authorities, with ICAO providing oversight for in some cases. The process concludes with charting, where the validated procedure is depicted in aeronautical charts per ICAO Annex 4 standards, including minimum altitudes, speeds, and notes for pilots. The entire , from initiation to , typically spans 6 to 18 months depending on and regulatory reviews, demanding qualified personnel who have completed ICAO-approved PANS-OPS programs. Tools throughout combines manual methods for conceptual work with validated software for precise simulations and error modeling.

Compliant Software Tools

Compliant software tools for PANS-OPS design automate the calculation of flight path geometries, clearance evaluations, and procedure simulations to ensure adherence to ICAO criteria outlined in Doc 8168. These tools replace labor-intensive manual processes, enabling designers to model complex instrument flight such as departures, arrivals, and approaches while verifying compliance with assessment surfaces () and other safety margins. By integrating computational algorithms, they facilitate iterative design adjustments and generate outputs for validation and charting. The development of PANS-OPS compliant software traces back to the transition from manual drafting techniques used in the to automated systems in the late , driven by the need for precision in procedure construction amid growing air traffic demands. The ICAO's own Obstacle Assessment System (), a key reference , has evolved through multiple versions, with Version 4.5.2 released in September 2024 and Version 4.6 in July 2025, incorporating modifications for Category H helicopter operations such as adjusted excess clearance parameters. This official software, hosted by the Electronic Navigation Research Institute (ENRI), supports the evaluation of penetration into procedure-specific surfaces as defined in Doc 8168. Commercial tools emerged alongside, providing broader workflow integration for aeronautical authorities and designers. Current compliant tools include ICAO's for specialized obstacle assessments and commercial options like PANADES, an integrated package for full procedure design compliant with PANS-OPS criteria, and PDToolKit, which offers functions for building, modifying, and checking instrument procedures per ICAO Doc 9906 workflows. Other examples encompass FPAssistant, a .NET-based SDK for calculations aligned to PANS-OPS and supporting procedure prototyping, and , an automated tool for airspace planners that eliminates manual methods in instrument procedure creation. All such software must undergo validation to confirm accurate implementation of Doc 8168 criteria, as detailed in ICAO Doc 9906 Volume III, ensuring reliability in geometry, altitude, and clearance computations. Recent advancements in these tools emphasize integration with Geographic Information Systems (GIS) for real-time obstacle data incorporation, such as combining with FPAssistant to automate surface modeling and mountainous area assessments under PANS-OPS rules. Additionally, applications are emerging to optimize procedure designs; for instance, models automate the search for feasible flight paths while respecting Doc 8168 constraints, and algorithms like bee optimization enable efficient exploration of solution spaces for complex geometries. These enhancements improve design efficiency and safety, particularly for performance-based navigation procedures.

References

  1. [1]
    Procedures for Air Navigation Services (PANS) - Aircraft Operations
    In stockProcedures for Air Navigation Services (PANS) - Aircraft Operations - Volume I Flight Procedures (Doc 8168). 6th Edition, 2018. USD 387.00. Language.
  2. [2]
    [PDF] Aircraft Operations
    PANS-OPS, Volume III, applicable in 2018, was created from Part III of Volume I with the intention to separate the provisions related to aircraft operating ...
  3. [3]
    [PDF] Aircraft Operations
    ICAO Doc 8168, Volume III, is about Aircraft Operating Procedures, first edition, 2018, approved on 28 August 2018, applicable on 8 November 2018.
  4. [4]
    difference between ICAO PANS-OPS and US TERPS - SKYbrary
    ICAO Procedures, described in ICAO Doc 8168 Procedures for Air Navigation Services (PANS-OPS). PANS-OPS procedures are the international standard and are used ...
  5. [5]
    Procedures for Air Navigation Services (PANS) - Aircraft Operations
    In stockNov 28, 2024 · This volume is intended for the guidance of procedures specialists and describes the essential areas and obstacle clearance requirements.
  6. [6]
    [PDF] A42-WP/66 - ICAO
    Jul 24, 2025 · (Doc 9426). 1.5. The first edition of PANS-OPS, Doc 8168 was approved on 26th June 1961 for applicability on 1st October 1961. Doc 8168 has ...Missing: publication | Show results with:publication
  7. [7]
    Member States - ICAO
    There are 193 member states in ICAO, including Afghanistan, Albania, Algeria, and Andorra.
  8. [8]
    1944: The Chicago Conference - The Postal History of ICAO
    The Chicago Conference aimed to establish provisional air routes and services, and create a new aviation convention and organization, resulting in the Chicago ...
  9. [9]
    [PDF] ICAO Amendment process
    Jun 11, 2025 · ANC examines and establishes the final text to recommend to the Council for adoption (Annex) or approval (PANS). ❑ Council adopts (Annex) or.Missing: OPS cycle
  10. [10]
    [PDF] ICAO/IFPP Committee Report Meeting 06-02
    being Preparation of GBAS FAS Data Block Amendment for PANS OPS Volume II; introduce ... ICAO will change the PBN procedure title from RNAV to RNP by 2022.
  11. [11]
    Flight Procedures (Doc 8168) (Amendment no.10 dated 3/11/22 ...
    Procedures for Air Navigation Services (PANS) - Aircraft Operations - Volume I - Flight Procedures (Doc 8168) (Amendment no.10 dated 3/11/22). 6th Edition, 2018.
  12. [12]
    Procedures for Air Navigation Services (PANS) - Aircraft Operations
    $$866.00 In stockProcedures for Air Navigation Services (PANS) - Aircraft Operations - Volume II Construction of Visual & Instrument Flight Procedures (Doc 8168).<|control11|><|separator|>
  13. [13]
    Procedures for Air Navigation Services (PANS) - Aircraft Operations
    In stockProcedures for Air Navigation Services (PANS) - Aircraft Operations - Volume III - Aircraft Operating Procedures (Doc 8168-3). 1st Edition, 2018. USD 152.00.
  14. [14]
    [PDF] Aircraft Operations
    Nov 8, 2018 · This document, Doc 8168, Volume I, is the sixth edition of flight procedures for aircraft operations, published by ICAO.
  15. [15]
    [PDF] doc-8168-aircraft-operations.pdf - sky library
    This edition incorporates all amendments approved by the Council prior to 3 October 2006 and supersedes, on 23 November 2006, all previous editions of Doc 8168 ...
  16. [16]
    [PDF] Aircraft Operations
    Nov 4, 2021 · For more information on CDFAs, refer to PANS-OPS, (Doc 8168) Volume I, Part II, Section 5. Approach procedure with vertical guidance (APV) ...<|control11|><|separator|>
  17. [17]
    None
    Below is a merged summary of the Obstacle Clearance Principles in PANS-OPS (Doc 8168, Volume II) based on all provided segments. To retain all information in a dense and organized manner, I will use a combination of narrative text and tables in CSV format where appropriate. The response consolidates details across all segments, ensuring no information is lost, while maintaining clarity and structure.
  18. [18]
    [PDF] AC 120-105B - Advisory Circular
    Jun 4, 2025 · It is the responsibility of the operator to provide contingency procedures for abnormal and emergency operations. (ICAO Doc 8168, Aircraft ...<|control11|><|separator|>
  19. [19]
    How ICAO Develops Standards
    The development of SARPs and PANS follows a structured, transparent and multi-staged process – often known as the ICAO “amendment process” or “standards-making ...Missing: documents | Show results with:documents
  20. [20]
    Procedures For Air Navigation Services - Training - (Doc 9868)
    供應中These PANS contain material that provides for the uniform implementation of competency-based training and assessments for the multi-crew pilot licence (MPL) ...
  21. [21]
    [PDF] U.S. Standard for Terminal Instrument Procedures (TERPS)
    Feb 16, 2018 · International Civil Aviation Organization (ICAO) ... the pilot is conducting instrument operations utilizing IFPs based on the TERPS standard to.Missing: PANS- | Show results with:PANS-
  22. [22]
    None
    ### Summary of TERPS vs. PANS-OPS Differences in Instrument Procedure Design
  23. [23]
    [PDF] AC 120-91 Overview (10MAR22) - Federal Aviation Administration
    Mar 10, 2022 · The takeoff flightpath must meet the specified obstacle clearance requirements in the event of an engine failure. Airport Obstacle Analysis.
  24. [24]
    [PDF] Annex II - AMC 20-28 - EASA
    Sep 24, 2012 · Detailed guidance on obstacle clearance is provided in PANS-OPS (ICAO Doc 8168,. Volume II). Note: Missed approach procedure may be supported by ...
  25. [25]
    Easy Access Rules for Air Operations (Regulation (EU) No 965/2012)
    They contain the applicable rules for Air OPS displayed in a consolidated, easy-to-read format with advanced navigation features through links and bookmarks.Missing: EUROCAE | Show results with:EUROCAE
  26. [26]
    Easy Access Rules for Air Operations - Revision 21, September 2023
    Sep 29, 2023 · ED Decision 2022/014/R. ALTIMETER SETTING PROCEDURES. The following paragraphs of ICAO Doc 8168 (PANS-OPS), Volume III provide recommended ...
  27. [27]
    Circling: Why Is It So Dangerous? - OpsGroup
    May 1, 2023 · Under PANS-OPS the circling area for an approach would extend to 4.2nm, while under TERPS (with an MDA of less than 1000') the same area would ...
  28. [28]
    [PDF] AC 20-138 - Chg 2 - Federal Aviation Administration
    Apr 7, 2016 · RTCA/DO-236C, Chg 1, Minimum Aviation System Performance Standards: Required Navigation Performance for Area Navigation, dated June 19, 2013 ...
  29. [29]
    Advisory Circular (AC) No. 700-053 - Transports Canada
    Aug 15, 2023 · Procedure design should comply with the applicable instrument flight procedure standard (FAA TERPS or ICAO PANS-OPS).
  30. [30]
    FAA To End Review of Foreign Instrument Procedures, Shifting Task ...
    Jul 8, 2025 · For example, Mexico generally follows PANS-OPS but uses TERPS circling standards due to a specific national exception. Operators can typically ...Missing: challenges bilateral agreements
  31. [31]
    None
    ### Summary of the 16 Steps of the IFP Design Process
  32. [32]
    Airspace and Procedure Design | SKYbrary Aviation Safety
    Airspace and procedure design should follow the principles laid down in ICAO Doc 8168 (PANS-OPS) and Doc 4444 (PANS-ATM). PANS-OPS provides criteria for the ...
  33. [33]
    PansOps Procedure Design Initial Course - ICAO
    Turn Calculations, Calculations of Rate of turn and radius of turn. Turn Protection, Protection areas of the turn based on wind effect and bounding circles.Missing: TRN | Show results with:TRN
  34. [34]
    Instrument Flight Procedures - Irish Aviation Authority
    The flight procedure development process involves input from a variety of personnel. Surveyors, AIS personnel, ground validation personnel, flight validation ...
  35. [35]
    [PDF] Instrument Flight Procedures (IFP) Process
    Development & QC. Flight Inspection. Publication. ≈ 45 days. ≈ 45 days. ≈2-4 months. ≈ 2-4 months *. ≈ 2 months. 50 days. ≈ 2 months. Timelines. * Stages after ...Missing: time | Show results with:time
  36. [36]
    ABOUT PANS-OPS OAS SOFTWARE DEVELOPMENT
    Thanks for the Feedback This project is building of a new version of PANS-OPS software. The testing of this software has been completed.Missing: compliant tools
  37. [37]
    PANADES - Flight Procedure Design software package
    PANADES is an integrated software package for Flight Procedure Design compliant to ICAO PANS OPS Criteria.Missing: commercial | Show results with:commercial
  38. [38]
    PDToolKit
    Provides a simple-to-use 'toolkit' of functions, allowing a procedure designer to quickly and flexibly build, modify, or check an instrument flight procedure.Missing: compliant | Show results with:compliant
  39. [39]
    Home - FPAssistant - Your .NET Aviation SDK
    The FPAssistant SDK empowers software developers with seamless set of API's aligned to FAA, ICAO, and EUROCONTROL standards, enabling rapid creation of ...
  40. [40]
    Instrument Procedure Design Software, Final Approach
    Final Approach is a fully integrated, automated tool for designing instrument procedures, eliminating manual methods, and is used by airspace planners.
  41. [41]
    9906 - Vol III - Flight Procedure Design Software Validation (1) 2010
    minimum OCH value due to high final slope according to the criteria expressed in Doc 8168, Volume II, Part I, Section 4, Chapter 5. The value of the proper ...
  42. [42]
    PANS OPS Basic ILS Using FPAssistant and QGIS for MHTG
    Aug 31, 2021 · Basic ILS surfaces are one of the evaluation possibilities under ICAO PANS OPS Doc 8168 Software used: FPAssistant ...Missing: advancements AI<|separator|>
  43. [43]
    PANS OPS Mountainous Area calculation for Instrument Flight ...
    Jun 24, 2021 · Tutorial on extracting the mountainous areas using QGIS + GRASS + r.neighbors using PANS OPS criteria in DOC 8168 VOL II
  44. [44]
    Intelligent Flight Procedure Design: A Reinforcement Learning ...
    Designers typically employ tools such as computer-aided design (CAD) in conjunction with established standards, such as ICAO Doc 8168 (PANS-OPS), and leverage ...
  45. [45]